CN205839693U - A kind of man-made lake backing layer - Google Patents
A kind of man-made lake backing layer Download PDFInfo
- Publication number
- CN205839693U CN205839693U CN201620824376.9U CN201620824376U CN205839693U CN 205839693 U CN205839693 U CN 205839693U CN 201620824376 U CN201620824376 U CN 201620824376U CN 205839693 U CN205839693 U CN 205839693U
- Authority
- CN
- China
- Prior art keywords
- layer
- bed course
- man
- sand bed
- lake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Revetment (AREA)
Abstract
This utility model relates to man-made lake technical field of construction, particularly to a kind of man-made lake backing layer.This man-made lake backing layer includes concrete cushion, the first sand bed course is laid above concrete cushion, laying water-proof coiled material layer above the first sand bed course, the second sand bed course is laid above waterproof roll layer, alert layer is laid above the second sand bed course, above alert layer, lay sandy gravel stratum, above sandy gravel stratum, lay geotextiles, above geotextiles, lay plantation soil layer.This man-made lake backing layer is rational in infrastructure, design science, water not easy to leak in lake and loss, anti-seepage effect are excellent, it is ensured that the balance of ecosystem around lake water after man-made lake construction and lake, it is thus achieved that the most ecological more environmentally friendly places of cultural interest.
Description
(1) technical field
This utility model relates to man-made lake technical field of construction, particularly to a kind of man-made lake backing layer.
(2) background technology
Man-made lake usually people are planned, have a kind of lake that purpose excavates, and produce under non-natural environment, bag
Include landscape lake and large-scale reservoir.Different with natural lake, man-made lake embodies the wisdom of human use and nature remodeling.
In man-made lake work progress, for preventing the steady decay of ecosystem, protection and saving water resource, particularly exist
The area that the north water resource critical shortage, subsoil water constantly decline, man-made lake must take comprehensive water saving and make-up water measure, with
Prevent the excessive seepage of lake water, here it is annoying many environment specialists and the lakebed Anti-seeping technology engineering of building expert.
At present, great majority be use the method laying antiseepage film to do lakebed seepage control project, with hindering in natural stratum
The infitration process of lower water, but the impervious barrier simple in construction of existing man-made lake, the repulsive force between soil particle is big, hygroscopic, lake
Interior water easy to leak and loss, it is impossible to reaching intended antiseepage purpose, ecological, environmental protective effect is poor.
(3) summary of the invention
This utility model is in order to make up the deficiencies in the prior art, it is provided that the water in a kind of rational in infrastructure, design science, lake
Easy to leak and loss, the man-made lake backing layer of anti-seepage effect excellence, do not solve problems of the prior art.
This utility model is achieved by the following technical solution:
A kind of man-made lake backing layer, including concrete cushion, lays the first sand bed course above concrete cushion,
Laying water-proof coiled material layer above first sand bed course, lays the second sand bed course, at the second sand pad above waterproof roll layer
Lay alert layer above Ceng, above alert layer, lay sandy gravel stratum, above sandy gravel stratum, lay geotextiles, spread above geotextiles
If plantation soil layer.
Described concrete cushion is 75mm thickness C20 plain concrete cushion layer;Described first sand bed course is 270-330mm thickness
One sand bed course;Described waterproof roll layer is HDPE waterproof roll layer;Described second sand bed course is thick second sand of 170-230mm
Soil padding;Described alert layer is the polyethylene netted spacer bed of material;Described sandy gravel stratum is 270-330mm thickness sandy gravel stratum;Described soil
The specification of work cloth is 400g/m2;Described plantation soil layer is that 470-530mm thickness plants soil layer.
The relative compaction of described first sand bed course, the second sand bed course and sandy gravel stratum is 90%;Described polythene net
The shape spacer bed of material is orange polyethylene netted spacer material.
The beneficial effects of the utility model are: this man-made lake backing layer is designed by said structure, can keep the water in lake
Not by seepage and loss, anti-seepage effect is excellent;This man-made lake backing layer is applied in the Anti-seeping technology structure of man-made lake, it is ensured that
The balance of ecosystem around lake water after man-made lake construction and lake, it is thus achieved that the most ecological more environmentally friendly places of cultural interest.
(4) accompanying drawing explanation
Below in conjunction with the accompanying drawings this utility model is further described.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of alert layer in Fig. 1.
In figure, 1 concrete cushion, 2 first sand bed courses, 3 waterproof roll layers, 4 second sand bed courses, 5 alert layers, 6 sand
Gravel bed, 7 geotextiles, plant soil layer for 8 kinds.
(5) detailed description of the invention
For the technical characterstic of this programme can be clearly described, below by detailed description of the invention, and combine its accompanying drawing, to this reality
It is described in detail with novel.
Embodiment 1
As shown in accompanying drawing 1-2, this man-made lake backing layer includes concrete cushion 1, lays the above concrete cushion 1
One sand bed course 2, laying water-proof coiled material layer 3 above the first sand bed course 2, above waterproof roll layer 3, lay the second sand
Bed course 4, lays alert layer 5 above the second sand bed course 4, lays sandy gravel stratum 6, spread above sandy gravel stratum 6 above alert layer 5
If geotextiles 7, above geotextiles 7, lay plantation soil layer 8.
Described concrete cushion 1 is 75mm thickness C20 plain concrete cushion layer;Described first sand bed course 2 is 300mm thickness first
Sand bed course;Described waterproof roll layer 3 is HDPE waterproof roll layer;Described second sand bed course 4 is thick second sand pad of 200mm
Layer;Described alert layer 5 is the polyethylene netted spacer bed of material;Described sandy gravel stratum 6 is 300mm thickness sandy gravel stratum;Described geotextiles 7
Specification is 400g/m2;Described plantation soil layer 8 plants soil layer for 500mm thickness.
The relative compaction of described first sand bed course the 2, second sand bed course 4 and sandy gravel stratum 6 is 90%;Described polyethylene
The netted spacer bed of material is orange polyethylene netted spacer material.
The construction method of above-mentioned man-made lake backing layer, including following operating procedure:
(1) laying of concrete cushion
Foreign material in field are carried out clearly by fully erased all lake water in concrete cushion construction area by design requirement
Removing, particularly thoroughly to clean out the point foreign material such as stone, tree root, basal plane is not allow for localized indentation and shows especially as, the base cleared up
Face hammer ram or tamping plate ramming, be allowed to closely knit smooth, will clean out all foreign material, after place meets requirement, and laying mixed
Solidifying soil padding, course must not be in hydrops before compacting;
(2) laying of HDPE film waterproof roll liner layer
A, the top of step (1) concrete cushion lay relative compaction reach 90% medium sand and coarse sand as the first sand
Soil padding;First sand bed course should be laid with low ground pressure apparatus;
B, continue above complete the first sand bed course to lay HDPE waterproof roll laying;Laying HDPE waterproof roll
Front reply coiled material presentation quality carries out out bag and checks, records and repairs the mechanical damage having been found that and produce wound, hole, lose
Etc. defect.Then in plain concrete cushion layer thick for 75mm, carry out coiled material laying according to about code requirement, take appropriate measures
Prevent waterproof roll liner from being punctured by foreign material.
C, continuing above complete HDPE waterproof roll to lay the second sand bed course laying, the second sand bed course should be with low
Ground pressure apparatus is laid;Whole process of deployment palpus impurities removing, prevents HDPE waterproof roll to be punctured;
D, above the second sand bed course continue lay orange polyethylene netted spacer material alert layer;
E, continue to lay relative compaction above complete orange polyethylene netted spacer material alert layer and reach laying
The 30-40mm cobble gravel of 90%, whole process of deployment palpus impurities removing, prevent HDPE waterproof roll to be punctured;
(3) laying of geotextiles
Continue to lay on request 400g/m laying above complete gravel2Geotextiles;Geotextiles seam is with hot weld/molten
Connecting, weld seam lap width is not less than 10cm, and geotextiles is connected with peripheral structure thing should use expansion bolt and steel plate press strip anchor
Gu, coupling part will brushing emulsified asphalt (thick 2mm), in case there is seepage at this;Lay above complete geotextiles laying
Plantation soil layer, constructs complete.
The application in man-made lake is constructed of the above-mentioned man-made lake backing layer, can keep the water in lake not by seepage and loss, anti-
Ooze excellent effect, it is ensured that the balance of ecosystem around lake water after man-made lake construction and lake, it is thus achieved that the most ecological more environmentally friendly
The places of cultural interest.
Embodiment 2
As shown in accompanying drawing 1-2, such as the man-made lake backing layer of embodiment 1, except that, described first sand bed course is
The thick first sand bed course of 270mm;Described waterproof roll layer is HDPE waterproof roll layer;Described second sand bed course is that 170mm is thick
Second sand bed course;Described sandy gravel stratum is 270mm thickness sandy gravel stratum;Described plantation soil layer is that 470mm thickness plants soil layer.
The construction method of above-mentioned man-made lake backing layer and application are with embodiment 1.
Embodiment 3
As shown in accompanying drawing 1-2, such as the man-made lake backing layer of embodiment 1, except that, described first sand bed course is
The thick first sand bed course of 330mm;Described second sand bed course is the thick second sand bed course of 230mm;Described sandy gravel stratum is that 330mm is thick
Sandy gravel stratum;Described plantation soil layer is that 530mm thickness plants soil layer.
The construction method of above-mentioned man-made lake backing layer and application are with embodiment 1.
This utility model does not describes part in detail, is the known technology of those skilled in the art of the present technique.Finally illustrate, with
Upper embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although with reference to preferred embodiment to this utility model
It is described in detail, it will be understood by those within the art that, the technical solution of the utility model can have been repaiied
Changing or equivalent, without deviating from objective and the scope of technical solutions of the utility model, it all should be contained at this utility model
Right in the middle of.
Claims (3)
1. a man-made lake backing layer, including concrete cushion, is characterized in that: lay the first sand above concrete cushion
Bed course, laying water-proof coiled material layer above the first sand bed course, above waterproof roll layer, lay the second sand bed course, second
Lay alert layer above sand bed course, above alert layer, lay sandy gravel stratum, above sandy gravel stratum, lay geotextiles, in geotextiles
Plantation soil layer is laid in top.
A kind of man-made lake backing layer the most according to claim 1, is characterized in that: described concrete cushion is 75mm thickness C20
Plain concrete cushion layer;Described first sand bed course is the thick first sand bed course of 270-330mm;Described waterproof roll layer is that HDPE prevents
Water coiled material layer;Described second sand bed course is the thick second sand bed course of 170-230mm;Described alert layer is the netted isolation of polyethylene
Material bed;Described sandy gravel stratum is 270-330mm thickness sandy gravel stratum;The specification of described geotextiles is 400g/m2;Described plantation soil layer is
470-530mm thickness plantation soil layer.
A kind of man-made lake backing layer the most according to claim 2, is characterized in that: described first sand bed course, the second sand
The relative compaction of bed course and sandy gravel stratum is 90%;The described polyethylene netted spacer bed of material is the netted spacer of orange polyethylene
Material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620824376.9U CN205839693U (en) | 2016-08-01 | 2016-08-01 | A kind of man-made lake backing layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620824376.9U CN205839693U (en) | 2016-08-01 | 2016-08-01 | A kind of man-made lake backing layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205839693U true CN205839693U (en) | 2016-12-28 |
Family
ID=57617913
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620824376.9U Withdrawn - After Issue CN205839693U (en) | 2016-08-01 | 2016-08-01 | A kind of man-made lake backing layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205839693U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087854A (en) * | 2016-08-01 | 2016-11-09 | 中建八局第建设有限公司 | A kind of man-made lake backing layer and construction method thereof and application |
-
2016
- 2016-08-01 CN CN201620824376.9U patent/CN205839693U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087854A (en) * | 2016-08-01 | 2016-11-09 | 中建八局第建设有限公司 | A kind of man-made lake backing layer and construction method thereof and application |
CN106087854B (en) * | 2016-08-01 | 2019-02-26 | 中建八局第一建设有限公司 | A kind of man-made lake backing layer and its construction method and application |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100464034C (en) | Flexible reinforced retaining structure and construction method therefor | |
CN103410139B (en) | Foundation ditch narrow zone backfill densification process | |
CN103510441A (en) | Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof | |
CN101581085A (en) | Reservoir seepage-proofing geomembrane tiered structure and construction method thereof | |
CN105672365B (en) | GCL vertical impermeable walls and preparation method thereof | |
CN105155510B (en) | Method capable of carrying out microorganism solidifying and crusting on super soft foundation surface and matching device | |
CN106087854B (en) | A kind of man-made lake backing layer and its construction method and application | |
CN107119505A (en) | The general fast railway bed filling construction method of desert area | |
CN101311418A (en) | Exchange filling method for deep-foundation pit and large area equipment foundation | |
CN109024458A (en) | A kind of coal mine subsidence land landscape revetment and the construction method of water-bed antiseepage | |
CN105401530A (en) | Structural layer of bridge abutment back and construction process thereof | |
CN106283944A (en) | Method for reinforcing shallow soft foundation by pressing and filling rubbles and/or blocks | |
CN108486976A (en) | Mountain highway, which is filled out, digs intersection road structure and its construction method | |
CN109778625A (en) | A kind of express highway roadbed structure that dregs class building castoff fills | |
CN104278683B (en) | The method on top board greening heap slope, storehouse, a kind of ground | |
CN101831898B (en) | Horizontal shallow layer negative-pressure consolidation working cushion layer technique | |
CN107419628A (en) | A kind of construction method of the rapid build road on reclaimed ground | |
CN205839693U (en) | A kind of man-made lake backing layer | |
CN205399440U (en) | Inflation dirt road moat structure | |
CN202247789U (en) | Seepage-proofing structure for river bottom | |
CN202139571U (en) | Plant protective river foundation structure | |
CN102116007B (en) | Isolation waterproof filling method for treating surface layer of highway foundation | |
CN207512762U (en) | A kind of friction pile repairs structure with the breakage mountain body that TGXG is combined | |
CN204174496U (en) | A kind of novel town road structure | |
CN201411682Y (en) | Pre-pressing solidifying device of new blown-filled mucky soil soft ground straw mattress |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20161228 Effective date of abandoning: 20190226 |