CN106451271A - Cable aisle bridge structure and installment method thereof - Google Patents

Cable aisle bridge structure and installment method thereof Download PDF

Info

Publication number
CN106451271A
CN106451271A CN201611231425.9A CN201611231425A CN106451271A CN 106451271 A CN106451271 A CN 106451271A CN 201611231425 A CN201611231425 A CN 201611231425A CN 106451271 A CN106451271 A CN 106451271A
Authority
CN
China
Prior art keywords
cable
steel pipe
protection steel
cable protection
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611231425.9A
Other languages
Chinese (zh)
Other versions
CN106451271B (en
Inventor
于会
陈有双
陈志�
陈福亮
汤春生
汤琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qianxi Power Supply Co of State Grid Jibei Electric Power Co Ltd
Original Assignee
Qianxi Power Supply Co of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qianxi Power Supply Co of State Grid Jibei Electric Power Co Ltd filed Critical Qianxi Power Supply Co of State Grid Jibei Electric Power Co Ltd
Priority to CN201611231425.9A priority Critical patent/CN106451271B/en
Publication of CN106451271A publication Critical patent/CN106451271A/en
Application granted granted Critical
Publication of CN106451271B publication Critical patent/CN106451271B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0462Tubings, i.e. having a closed section
    • H02G3/0481Tubings, i.e. having a closed section with a circular cross-section
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • H02G1/08Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
    • H02G1/085Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling using portable tools
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/06Installations of electric cables or lines in or on the ground or water in underground tubes or conduits; Tubes or conduits therefor

Abstract

The invention relates to a cable aisle bridge structure and an installment method thereof and belongs to the technical field of electric equipment. The technology scheme comprises the steps that make cables (1) lay in cable trenches under the ground (30). The cables cross a foundation (2) and a cable protection steel pipe on one side of the road successively. Make the cables lie on a cable supporting arm (14) of a curved bridge frame (12) and then make the cables stretch skyward. The end of the cables(1) which stretch skyward cross an elbow protection pipe(24) and the second pipe successively and then make the cables extend downward. The end of the cables (1) stretch extend downward cross the cable protection steel pipe and the foundation (2) on another side of the road successively again and then stretch into cable trenches under the ground (30). The positives effects of the cable aisle bridge structure and the installment method thereof are that the problem about when the cables pass through the road an operation side of pipe-jacking construction does not exist, or the place which is not appropriate to make the pipe-jacking construction due to the geological problems under the ground or the place where the road is not allowed to excavate can be resolved, the road surface is no need to be destroyed, the traffic is not affected and it is convenient to make construction. The cable aisle bridge structure and installment method thereof has the advantages of being convenient to construct, saving work and labor, short construction period and low cost.

Description

A kind of cable passageway portal structure and its installation method
Technical field
The present invention relates to a kind of cable passageway portal structure and its installation method, belong to electrical equipment technical field.
Background technology
The method that cable passageway typically adopts excavation or push pipe in the past, the excavation construction cycle is long, affects traffic, expense of taking a lot of work Power;Push pipe needs operation side big, the geological conditions below road is required harsh, needs to avoid underground electric, sewage, heat The pipelines such as power, water supply, combustion gas.Other drift sand, mudstone mixing soil property are not suitable for push pipe, and also some soil properties are basic only pushes up Go.This kind of method being accomplished by inquiring into new cable passageway structure and cable passageway.
Content of the invention
It is an object of the invention to provide a kind of cable passageway portal structure and its installation method, cable needs crossing highway When, pour into a mould two concrete pedestals in both sides of highway, concrete pedestal installs two high bridge frame support structures, bridge by foundation bolt Arc crane span structure attachment structure is installed on frame support structure, cable passes through column, cable cat ladder and crane span structure and easily solves a passageway difficult problem, This cable testing bridge passageway structures and methods are both without destruction road surface, and do not affect traffic, easy construction, save labor, are suitable for Do not allow the place excavated in do not had geology top under the jacking construction scope of operation or highway not pipe, highway, solve background technology and deposit The problems referred to above.
The technical scheme is that:
A kind of cable passageway portal structure, comprises crane span structure supporting construction and crane span structure attachment structure, and described crane span structure supporting construction is two Individual, it is symmetricly set on the both sides of highway, crane span structure attachment structure is arcuate structure, is arranged on the top of crane span structure supporting construction, two ends It is fixed on the upper end of two crane span structure supporting constructions;
Described crane span structure supporting construction comprises basis, foundation bolt, lower margin stirrup, base anchor, column, cable cat ladder, connecting plate, electricity Cable protection steel pipe and help pipe anchor ear, the cast of described basis on the ground, is provided with foundation bolt in basis, lower margin stirrup is tied up and set lower margin On bolt;Column is four, and two are one group, and every group is arranged in parallel, and the bottom of four columns is all welded on base anchor, On the basis of base anchor is fixed on, the upper end of column is provided with connecting plate;Cable cat ladder is several, is vertically fixed on two neighboring vertical Between post;Cable protection steel pipe is arranged between four columns, and on the basis of bottom is fixed on, cable protection steel pipe comprises cable to be protected Shield steel pipe one and cable protection steel pipe two, cable protection steel pipe one and cable protection steel pipe two are semicircle steel pipe, and cable is protected All it is welded with fixing bolt, cable protection steel pipe one and cable protection steel pipe two pass through outside shield steel pipe one and cable protection steel pipe two Fixing bolt is arranged on cable cat ladder;Cable protection steel pipe one and cable protection steel pipe two are fastened and fixed by connecting bolt; Pipe anchor ear is helped to be arranged on the outside of cable protection steel pipe, by cable protection steel pipe strap on cable bearer;
Described crane span structure attachment structure comprises arc bridge stand beam, diagonal brace two, cable support load, elbow protection pipe, protection pipe two and card pipe Anchor ear, described arc bridge stand beam is four, and four arc bridge stand beams constitute the bent frame of cavity, and the bottom of arc bridge stand beam leads to Cross connecting plate to be connected with the top of column, two neighboring arc bridge stand beam is provided with several diagonal braces two and cable support load, protection Pipe two is located in the cavity of bent frame, and protection pipe two is fastened in cable support load by card pipe anchor ear;Elbow protection pipe is two Individual, it is symmetricly set on the inside of crane span structure supporting construction and crane span structure attachment structure junction, elbow protection pipe one end and cable protection Fastener for connection, the other end is connected with protection pipe two.
The upper end of described cable protection steel pipe one and cable protection steel pipe two is equipped with steel pipe tube head plastic cement one, cable protection The lower end of steel pipe one and cable protection steel pipe two is equipped with steel pipe tube head plastic cement two.
Also comprise crossbeam and crossbeam diagonal brace, crossbeam is arranged between two crane span structure supporting constructions, by connecting plate be located at The column of basis inner side is connected, and crossbeam is provided with several crossbeam diagonal braces.
Described base anchor is fixed on the upper of basis by anchor nut.
The left and right sides of described cable protection steel pipe one is equipped with connecting screw hole one, the left and right sides of cable protection steel pipe two It is equipped with connecting screw hole two, cable protection steel pipe one and cable protection steel pipe two pass through connecting screw hole one by connecting bolt and connect Connect screw two to be fastened and fixed.
Described connecting plate passes through connecting bolt one and arc bridge stand beam connects, and is connected with column by connecting bolt two.
A kind of installation method of cable passageway portal structure, using above-mentioned cable passageway portal structure, its installation steps is such as Under:
The first step, in both sides of highway pre-embedded anchoring bolts, foundation bolt is tied with lower margin stirrup, cast around foundation bolt Basis;
Second step, takes four root posts, two one group, every group be arranged in parallel, and four root post bottoms are all welded on base anchor, and four are stood Burn-on four connecting plates respectively in the top of post, several cable cat ladders of burn-oning between two neighboring column, and after welding, column passes through On the basis of base anchor is fixed on highway side;
3rd step, then take four root posts, two one group, every group be arranged in parallel, and four root post bottoms are all welded on base anchor, four Burn-on four connecting plates respectively in the top of column, several cable cat ladders of burn-oning between two neighboring column, by column after welding On the basis of highway opposite side is fixed on by base anchor;
4th step, several crossbeam diagonal braces is welded on crossbeam, the crossbeam then crossbeam being welded with several crossbeam diagonal braces hangs It is contained on the column inside basis;
5th step, diagonal brace two and cable support load is respectively welded on two neighboring arc bridge stand beam, then will be welded with diagonal brace two It is lifted on the column of both sides of highway with the arc bridge stand beam of cable support load, arc bridge stand beam bottom is passed through connecting plate and stood The top of post connects;
6th step, fixing bolt is welded on cable protection steel pipe one and the outside of cable protection steel pipe two, cable protection steel pipe One and cable protection steel pipe two upper end bonding steel pipe tube head plastic cement one, under cable protection steel pipe one and cable protection steel pipe two Then cable protection steel pipe one and cable protection steel pipe dual-purpose fixing bolt are arranged on cable by end bonding steel pipe tube head plastic cement two On cat ladder;
7th step, by cable laying in the cable duct below ground, cable passes through basis and the cable protection steel of highway side Guan Yi, after being applied in the cable support load of arc bridge stand beam, continues up and stretches out, cable protection steel pipe two is buckled in cable protection On steel pipe one, by connecting bolt clamping, then with helping pipe anchor ear to be fixed on cable protection steel pipe two and cable protection steel pipe one On cable cat ladder;
8th step, cable external part upwards extends downwardly from after sequentially passing through elbow protection pipe and protection pipe two, then is embraced with card pipe Protection pipe two is stuck in cable support load hoop, and the downward external part of cable sequentially passes through the cable protection steel of highway opposite side again After pipe one and basis, it extend in the cable duct below ground, cable protection steel pipe two is buckled on cable protection steel pipe one, lead to Cross connecting bolt clamping, finally with helping pipe anchor ear that cable protection steel pipe two and cable protection steel pipe one are fixed on cable cat ladder On, that is, complete to install.
The positive effect of the present invention:Solution cable is crossed does not have geology under the jacking construction scope of operation or highway to be not suitable for during highway Push pipe, highway do not allow the difficult problem that the place excavated runs into, and both without destruction road surface, and do not affect traffic, have easy construction, Save labor, short construction period, the low advantage of expense.
Brief description
Fig. 1 is present configuration schematic diagram;
In figure:Cable 1, basis 2, foundation bolt 3, lower margin stirrup 4, base anchor 5, anchor nut 6, column 7, cable cat ladder 8, company Fishplate bar 9, crossbeam 10, crossbeam diagonal brace 11, arc bridge stand beam 12, diagonal brace 2 13, cable support load 14, cable protection steel pipe 1, electricity Cable protection steel pipe 2 16, fixing bolt 17, connecting bolt 18, connecting screw hole 1, connecting screw hole 2 20, help pipe anchor ear 21, steel Pipe tube head plastic cement 1, steel pipe tube head plastic cement 2 23, elbow protection pipe 24, protection pipe 2 25, card pipe anchor ear 26, connecting bolt one 27th, connecting bolt 2 28, highway 29, ground 30.
Specific embodiment
The present invention is described further with reference to the accompanying drawings and examples:
A kind of cable passageway portal structure, comprises crane span structure supporting construction and crane span structure attachment structure, and described crane span structure supporting construction is two Individual, it is symmetricly set on the both sides of highway 29, crane span structure attachment structure is arcuate structure, is arranged on the top of crane span structure supporting construction, two End is fixed on the upper end of two crane span structure supporting constructions;
Described crane span structure supporting construction comprises basis 2, foundation bolt 3, lower margin stirrup 4, base anchor 5, column 7, cable cat ladder 8, connects Fishplate bar 9, cable protection steel pipe and help pipe anchor ear 21, described basic 2 are cast on ground 30, are provided with foundation bolt 3 in basis 2, Lower margin stirrup 4 is tied up and is set on foundation bolt 3;Column 7 is four, and two are one group, and every group arranged in parallel, four columns 7 Bottom is all welded on base anchor 5, and base anchor 5 is fixed on basis 2, and the upper end of column 7 is provided with connecting plate 9;Cable cat ladder is Several, be vertically fixed between two neighboring column;Cable protection steel pipe is arranged between four columns 7, and bottom is fixed on On basis 2, cable protection steel pipe comprises cable protection steel pipe 1 and cable protection steel pipe 2 16, cable protection steel pipe 1 He Cable protection steel pipe 2 16 is semicircle steel pipe, is all welded with fixing spiral shell outside cable protection steel pipe one and cable protection steel pipe two Bolt 17, cable protection steel pipe one and cable protection steel pipe two are arranged on cable cat ladder 8 by fixing bolt 17;Cable protection steel Pipe one and cable protection steel pipe two are fastened and fixed by connecting bolt 18;Pipe anchor ear 21 is helped to be arranged on the outer of cable protection steel pipe Side, by cable protection steel pipe strap on cable bearer;
Described crane span structure attachment structure comprises arc bridge stand beam 12, diagonal brace 2 13, cable support load 14, elbow protection pipe 24, protection pipe 2 25 and card pipe anchor ear 26, described arc bridge stand beam 12 is four, and four arc bridge stand beams 12 constitute the bent frame of cavitys, arc The bottom of shape bridge stand beam 12 is connected with the top of column 7 by connecting plate 9, and two neighboring arc bridge stand beam 12 is provided with several Diagonal brace 2 13 and cable support load 14, protection pipe 2 25 is located in the cavity of bent frame, and protection pipe 2 25 passes through card pipe anchor ear 26 It is fastened in cable support load 14;Elbow protection pipe 24 is two, is symmetricly set on crane span structure supporting construction with crane span structure attachment structure even Connect the inside at place, elbow protection pipe 24 one end and cable protection fastener for connection, the other end is connected with protection pipe 2 25.
The upper end of described cable protection steel pipe 1 and cable protection steel pipe 2 16 is equipped with steel pipe tube head plastic cement one, cable The lower end of protection steel pipe one and cable protection steel pipe two is equipped with steel pipe tube head plastic cement two(12).
Also comprise crossbeam 10 and crossbeam diagonal brace 11, crossbeam 10 is arranged between two crane span structure supporting constructions, by connecting plate 9 It is connected with the column 7 positioned at basis 2 inner side, crossbeam 10 is provided with several crossbeam diagonal braces 11.
Described base anchor 5 is fixed on the upper of basis 2 by anchor nut 6.
The left and right sides of described cable protection steel pipe one is equipped with connecting screw hole 1, the left and right two of cable protection steel pipe two Side is equipped with connecting screw hole 2 20, and cable protection steel pipe one and cable protection steel pipe two pass through connecting screw hole by connecting bolt 18 One and connecting screw hole two be fastened and fixed.
Described connecting plate 9 passes through connecting bolt 1 and arc bridge stand beam 12 connects, by connecting bolt 2 28 and column Connect.
A kind of installation method of cable passageway portal structure, using above-mentioned cable passageway portal structure it is characterised in that such as Lower installation steps:
The first step, in highway 27 both sides pre-embedded anchoring bolts 3, foundation bolt is tied with lower margin stirrup 4, in the week of foundation bolt 3 Enclose cast basis 2;
Second step, takes four root posts 7, two one group, every group be arranged in parallel, and four root post 7 bottom is all welded on base anchor 5, and four Burn-on four connecting plates 9 respectively in the top of root post 7, several cable cat ladders 8 of burn-oning between two neighboring column 7, after welding, Column 7 is fixed on the basis 2 of highway side by base anchor 5;
3rd step, then take four root posts 7, two one group, every group be arranged in parallel, and four root post 7 bottom is all welded on base anchor 5, Burn-on four connecting plates 9 respectively in the top of four root posts 7, several cable cat ladders 8 of burn-oning between two neighboring column 7 weld Afterwards column 7 is fixed on the basis 2 of highway opposite side by base anchor 5;
4th step, several crossbeam diagonal braces 11 is welded on crossbeam 10, then crossbeam is welded with several crossbeam diagonal braces 11 Crossbeam 10 is lifted on the column 7 of basis 2 inner side;
5th step, several diagonal braces 2 13 and cable support load 14 is respectively welded on two neighboring arc bridge stand beam 12, then The arc bridge stand beam 12 being welded with diagonal brace 2 13 and cable support load 14 is lifted on the column 7 of both sides of highway, arc crane span structure Beam 12 bottom is connected with the top of column 7 by connecting plate 9;
6th step, fixing bolt 17 is welded on cable protection steel pipe 1 and the outside of cable protection steel pipe 2 16, and cable is protected Upper end bonding steel pipe tube head plastic cement 1, cable protection steel pipe 1 and the cable of shield steel pipe 1 and cable protection steel pipe 2 16 The lower end bonding steel pipe tube head plastic cement 2 23 of protection steel pipe 2 16, then by cable protection steel pipe 1 and cable protection steel pipe two 16 are arranged on cable cat ladder 8 with fixing bolt 17;
7th step, cable 1 is laid in the cable duct below ground 30, and cable 1 passes through the basis 2 of highway side and cable to protect Shield steel pipe 1, after being applied in the cable support load 14 of arc bridge stand beam 12, continues up and stretches out, by cable protection steel pipe 2 16 It is buckled on cable protection steel pipe 1, by connecting bolt 18 clamping, then with helping pipe anchor ear 21 by cable protection steel pipe 2 16 He Cable protection steel pipe 1 is fixed on cable cat ladder 8;
8th step, cable 1 external part upwards extends downwardly from after sequentially passing through elbow protection pipe 24 and protection pipe two, then is managed with card Protection pipe two is stuck in cable support load 14 anchor ear 26, and the downward external part of cable 1 sequentially passes through the electricity of highway opposite side again It extend in the cable duct below ground 30 after cable protection steel pipe 1 and basis 2, cable protection steel pipe 2 16 is buckled in cable On protection steel pipe 1, by connecting bolt 18 clamping, finally with helping pipe anchor ear 21 to protect cable protection steel pipe 2 16 and cable Shield steel pipe 1 is fixed on cable cat ladder 8, that is, complete to install.
Described basic 2 is long 80cm, wide 40cm, the concrete foundation of high 120cm, is cast in the both sides of highway 29 respectively, Pre-buried two foundation bolts 3 in each basis;Described foundation bolt is diameter 18mm round steel, a diameter of 6mm of lower margin stirrup; Described column 7 is diameter 10cm steel pipe, highly for 6 meters;Described base anchor is long 60cm, wide 30cm, the iron plate of thick 5mm, according to Foundation bolt size perforate perforating, is welded on column bottom;Described connecting plate is the square iron plate of long 15cm, according to design chi Very little be welded with connecting bolt 18, connecting plate 9 be four pieces, be welded in four column tops respectively;Described cable protection steel pipe is diameter The steel pipe of 200mm, is slit into two halves, wherein half is cable protection steel pipe 1 on the middle separated time of cable protection steel pipe, Second half is cable protection steel pipe 2 16;Burn-on fixing bolt 17 in the Guan Pi center upper and lower ends of cable protection steel pipe one, left Right two ends are welded with connecting screw hole 1;Burn-on fixing bolt 17 in the Guan Pi center upper and lower ends of cable protection steel pipe 24, left and right Two ends are welded with the connecting screw hole two 20 corresponding with connecting screw hole 1;Connecting bolt 18 passes through connecting screw hole 1 and connects spiral shell Cable protection steel pipe 1 and cable protection steel pipe 24 are tightened together by hole 2 20.Described steel pipe tube head plastic cement 1 and steel pipe Tube head plastic cement 2 12 is a kind of plastic being stained with sum in cable protection steel pipe 1 and cable protection steel pipe 24 tube head, plays guarantor Shield cable 1 is not acted on by tube head card wound.

Claims (7)

1. a kind of cable passageway portal structure it is characterised in that:Comprise crane span structure supporting construction and crane span structure attachment structure, described crane span structure Supporting construction is two, is symmetricly set on highway(29)Both sides, crane span structure attachment structure be arcuate structure, be arranged on crane span structure support The top of structure, two ends are fixed on the upper end of two crane span structure supporting constructions;
Described crane span structure supporting construction comprises basis(2), foundation bolt(3), lower margin stirrup(4), base anchor(5), column(7), electricity Cable cat ladder(8), connecting plate(9), cable protection steel pipe and help pipe anchor ear(21), described basis(2)It is cast in ground(30)On, base Plinth(2)Inside it is provided with foundation bolt(3), lower margin stirrup(4)Tie up and set foundation bolt(3)On;Column(7)For four, two are one group, Every group arranged in parallel, four columns(7)Bottom be all welded on base anchor(5)On, base anchor(5)It is fixed on basis(2) On, column(7)Upper end be provided with connecting plate(9);Cable cat ladder is several, is vertically fixed between two neighboring column;Electricity Cable protection steel pipe is arranged on four columns(7)Between, bottom is fixed on basis(2)On, cable protection steel pipe comprises cable protection Steel pipe one(15)With cable protection steel pipe two(16), cable protection steel pipe one(15)With cable protection steel pipe two(16)It is semicircle All it is welded with fixing bolt outside shape steel pipe, cable protection steel pipe one and cable protection steel pipe two(17), cable protection steel pipe one He Cable protection steel pipe two passes through fixing bolt(17)It is arranged on cable cat ladder(8)On;Cable protection steel pipe one and cable protection steel Pipe two passes through connecting bolt(18)It is fastened and fixed;Help pipe anchor ear(21)It is arranged on the outside of cable protection steel pipe, by cable protection Steel pipe strap is on cable bearer;
Described crane span structure attachment structure comprises arc bridge stand beam(12), diagonal brace two(13), cable support load(14), elbow protection pipe (24), protection pipe two(25)With card pipe anchor ear(26), described arc bridge stand beam(12)For four, four arc bridge stand beams(12)Structure Become the bent frame of cavity, arc bridge stand beam(12)Bottom pass through connecting plate(9)With column(7)Top connect, adjacent two Individual arc bridge stand beam(12)It is provided with several diagonal braces two(13)With cable support load(14), protection pipe two(25)It is located at bent frame Cavity in, protection pipe two(25)By card pipe anchor ear(26)It is fastened on cable support load(14)On;Elbow protection pipe(24)For two Individual, it is symmetricly set on the inside of crane span structure supporting construction and crane span structure attachment structure junction, elbow protection pipe(24)One end and cable Protection fastener for connection, the other end and protection pipe two(25)Connect.
2. a kind of cable passageway portal structure according to claim 1 it is characterised in that:Described cable protection steel pipe one (15)With cable protection steel pipe two(16)Upper end be equipped with steel pipe tube head plastic cement one(22), cable protection steel pipe one and cable are protected The lower end of shield steel pipe two is equipped with steel pipe tube head plastic cement two(23).
3. a kind of cable passageway portal structure according to claim 2 it is characterised in that:Also comprise crossbeam(10)And crossbeam Diagonal brace(11), crossbeam(10)It is arranged between two crane span structure supporting constructions, by connecting plate(9)With positioned at basis(2)Inner side Column(7)It is connected, crossbeam(10)It is provided with several crossbeam diagonal braces(11).
4. a kind of cable passageway portal structure according to claim 1 and 2 it is characterised in that:Described base anchor(5)Pass through Anchor nut(6)It is fixed on basis(2)Upper.
5. a kind of cable passageway portal structure according to claim 1 and 2 it is characterised in that:Described cable protection steel pipe One left and right sides is equipped with connecting screw hole one(19), the left and right sides of cable protection steel pipe two is equipped with connecting screw hole two (20), cable protection steel pipe one and cable protection steel pipe two pass through connecting bolt(18)Through connecting screw hole one and connecting screw hole two It is fastened and fixed.
6. a kind of cable passageway portal structure according to claim 1 and 2 it is characterised in that:Described connecting plate(9)Pass through Connecting bolt one(27)With arc bridge stand beam(12)Connect, by connecting bolt two(28)It is connected with column.
7. the installation method of a kind of cable passageway portal structure, using the cable passageway portal structure described in claim 3, it is special Levy and be following installation steps:
The first step, in highway(27)Both sides pre-embedded anchoring bolts(3), foundation bolt is tied with lower margin stirrup(4), in foundation bolt (3)Surrounding cast basis(2);
Second step, takes four root posts(7), two one group, every group be arranged in parallel, four root posts(7)Bottom is all welded in base anchor(5) On, four root posts(7)Top burn-on respectively four connecting plates(9), two neighboring column(7)Between several cables of burn-oning climb Ladder(8), after welding, column(7)By base anchor(5)It is fixed on the basis of highway side(2)On;
3rd step, then take four root posts(7), two one group, every group be arranged in parallel, four root posts(7)Bottom is all welded in base anchor (5)On, four root posts(7)Top burn-on respectively four connecting plates(9), two neighboring column(7)Between burn-on several electricity Cable cat ladder(8), by column after welding(7)By base anchor(5)It is fixed on the basis of highway opposite side(2)On;
4th step, by several crossbeam diagonal braces(11)It is welded on crossbeam(10)On, then crossbeam is welded with several crossbeam diagonal braces (11)Crossbeam(10)It is lifted on positioned at basis(2)The column of inner side(7)On;
5th step, by diagonal brace two(13)With cable support load(14)It is respectively welded at two neighboring arc bridge stand beam(12)On, then Diagonal brace two will be welded with(13)With cable support load(14)Arc bridge stand beam(12)It is lifted on the column positioned at both sides of highway(7)On, Arc bridge stand beam(12)Connecting plate is passed through in bottom(9)With column(7)Top connect;
6th step, by fixing bolt(17)It is welded on cable protection steel pipe one(15)With cable protection steel pipe two(16)Outside, Cable protection steel pipe one(15)With cable protection steel pipe two(16)Upper end bonding steel pipe tube head plastic cement one(22), cable protection steel Guan Yi(15)With cable protection steel pipe two(16)Lower end bonding steel pipe tube head plastic cement two(23), then by cable protection steel pipe one (15)With cable protection steel pipe two(16)Use fixing bolt(17)It is arranged on cable cat ladder(8)On;
7th step, by cable(1)Be laid in ground(30)In following cable duct, cable(1)Basis through highway side(2) With cable protection steel pipe one(15), it is applied to arc bridge stand beam(12)Cable support load(14)After upper, continue up and stretch out, by electricity Cable protection steel pipe two(16)It is buckled in cable protection steel pipe one(15)On, by connecting bolt(18)Clamping, then with helping pipe anchor ear (21)By cable protection steel pipe two(16)With cable protection steel pipe one(15)It is fixed on cable cat ladder(8)On;
8th step, cable(1)External part upwards sequentially passes through elbow protection pipe(24)Extend downwardly from after protection pipe two, then use Card pipe anchor ear(26)Protection pipe two is stuck in cable support load(14)On, cable(1)Downward external part sequentially passes through highway again The cable protection steel pipe one of opposite side(15)And basis(2)After extend into ground(30)In following cable duct, by cable protection Steel pipe two(16)It is buckled in cable protection steel pipe one(15)On, by connecting bolt(18)Clamping, finally with helping pipe anchor ear(21)Will Cable protection steel pipe two(16)With cable protection steel pipe one(15)It is fixed on cable cat ladder(8)On, that is, complete to install.
CN201611231425.9A 2016-12-28 2016-12-28 A kind of cable passageway portal structure and its installation method Active CN106451271B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611231425.9A CN106451271B (en) 2016-12-28 2016-12-28 A kind of cable passageway portal structure and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611231425.9A CN106451271B (en) 2016-12-28 2016-12-28 A kind of cable passageway portal structure and its installation method

Publications (2)

Publication Number Publication Date
CN106451271A true CN106451271A (en) 2017-02-22
CN106451271B CN106451271B (en) 2017-12-01

Family

ID=58215479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611231425.9A Active CN106451271B (en) 2016-12-28 2016-12-28 A kind of cable passageway portal structure and its installation method

Country Status (1)

Country Link
CN (1) CN106451271B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795749A (en) * 2017-12-13 2018-03-13 北京住总集团有限责任公司 A kind of precast spliced pipe fitting jacking system and its construction method
CN108756420A (en) * 2018-06-14 2018-11-06 国网安徽省电力有限公司经济技术研究院 A kind of cable termination with cross over crane span structure integral type tower
CN109149488A (en) * 2018-09-14 2019-01-04 中铁第四勘察设计院集团有限公司 A kind of administrative region of a city railway arrangement structure for pipelines and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040253057A1 (en) * 2001-11-22 2004-12-16 Fumiaki Tsuchiya Method of constructing information correspondence pipe, constructed structure, and construction member
CN204030412U (en) * 2014-05-09 2014-12-17 国网上海市电力公司 There is engineering stringing crossing frame system in a kind of 500 kv substation 220 kilovolts
CN205016930U (en) * 2015-10-22 2016-02-03 国网山东省电力公司枣庄供电公司 Frame is strideed across to inflatable 10kV wire
CN105490233A (en) * 2015-11-26 2016-04-13 国网河南偃师市供电公司 Highway crossing device for wire
CN205646634U (en) * 2016-05-26 2016-10-12 国网山东省电力公司阳谷县供电公司 Device is strideed across with highway to electric wire netting construction
CN206283215U (en) * 2016-12-28 2017-06-27 国网冀北电力有限公司迁西县供电分公司 A kind of cable passageway portal structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040253057A1 (en) * 2001-11-22 2004-12-16 Fumiaki Tsuchiya Method of constructing information correspondence pipe, constructed structure, and construction member
CN204030412U (en) * 2014-05-09 2014-12-17 国网上海市电力公司 There is engineering stringing crossing frame system in a kind of 500 kv substation 220 kilovolts
CN205016930U (en) * 2015-10-22 2016-02-03 国网山东省电力公司枣庄供电公司 Frame is strideed across to inflatable 10kV wire
CN105490233A (en) * 2015-11-26 2016-04-13 国网河南偃师市供电公司 Highway crossing device for wire
CN205646634U (en) * 2016-05-26 2016-10-12 国网山东省电力公司阳谷县供电公司 Device is strideed across with highway to electric wire netting construction
CN206283215U (en) * 2016-12-28 2017-06-27 国网冀北电力有限公司迁西县供电分公司 A kind of cable passageway portal structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795749A (en) * 2017-12-13 2018-03-13 北京住总集团有限责任公司 A kind of precast spliced pipe fitting jacking system and its construction method
CN108756420A (en) * 2018-06-14 2018-11-06 国网安徽省电力有限公司经济技术研究院 A kind of cable termination with cross over crane span structure integral type tower
CN109149488A (en) * 2018-09-14 2019-01-04 中铁第四勘察设计院集团有限公司 A kind of administrative region of a city railway arrangement structure for pipelines and method

Also Published As

Publication number Publication date
CN106451271B (en) 2017-12-01

Similar Documents

Publication Publication Date Title
CN207847228U (en) A kind of overturning-preventing concrete wire pole
CN106451271B (en) A kind of cable passageway portal structure and its installation method
CN104563578A (en) Combined framework pillar for 500kV transformer substation and mounting method of combined framework pillar
CN207143708U (en) A kind of across foundation ditch synthesis steel trestle of lift-on/lift-off type
CN206283215U (en) A kind of cable passageway portal structure
CN204386242U (en) For the combined type truss column of 500kV transformer station
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN215443391U (en) Transmission line and 5G communication sharing steel pipe pole
CN111795212B (en) Suspension method and suspension structure for pipeline crossing foundation pit
CN103982076A (en) Single cycle 110 kV/35 stay wire type aluminum alloy urgent repair tower
CN204402097U (en) For the integrated form framework of the outlet of 500kV transformer station, inlet wire, transition
CN104563554B (en) For the combined type lattice girder of 500kV transformer stations integrated form framework
CN113073683A (en) Temporary suspension device for existing pipeline and construction method
CN203420281U (en) Novel pre-stressed single tubular pile high-rise tower foundation structure
CN107401184A (en) A kind of construction method of composite material I well
CN104533115A (en) Integrated framework for wire outlet, wire inlet and transition of 500 kV transformer substation
CN214958438U (en) Novel temporary integrated machine electric pipeline finished product support system
CN204386223U (en) For the combined type lattice girder of 500kV transformer station integrated form framework
CN205775846U (en) A kind of automatic water drain type moves protective platform
CN210669448U (en) Basic support structure suitable for cable crossing
CN215714615U (en) Prefabricated bridge guardrail
CN112942629B (en) Collision test wall and prefabricated installation method thereof
CN210050389U (en) A mounting structure that is used for interim pipeline of foundation ditch hole limit to lay
CN219427085U (en) Bearing platform pre-buried frock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant