CN109146294A - A kind of automatic arrangement program method for transporting inspection plan for grid equipment - Google Patents
A kind of automatic arrangement program method for transporting inspection plan for grid equipment Download PDFInfo
- Publication number
- CN109146294A CN109146294A CN201810987017.9A CN201810987017A CN109146294A CN 109146294 A CN109146294 A CN 109146294A CN 201810987017 A CN201810987017 A CN 201810987017A CN 109146294 A CN109146294 A CN 109146294A
- Authority
- CN
- China
- Prior art keywords
- staff
- automatic arrangement
- arrangement program
- module
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 34
- 238000004458 analytical method Methods 0.000 claims abstract description 12
- 239000003990 capacitor Substances 0.000 claims abstract description 10
- 238000012797 qualification Methods 0.000 claims abstract description 5
- 230000000875 corresponding effect Effects 0.000 claims abstract 6
- 230000000052 comparative effect Effects 0.000 claims description 14
- 238000007405 data analysis Methods 0.000 claims description 7
- 238000012502 risk assessment Methods 0.000 claims description 6
- 238000013075 data extraction Methods 0.000 claims description 4
- 239000000284 extract Substances 0.000 claims description 4
- 230000005540 biological transmission Effects 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 4
- 230000009466 transformation Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063112—Skill-based matching of a person or a group to a task
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to automatic arrangement program method and technology fields, especially a kind of automatic arrangement program method that inspection plan is transported for grid equipment, the following steps are included: first, count generator, transformer, motor, breaker, disconnecting switch, protection screen, switchgear, the quantity and distributing position of capacitor, then the corresponding operation operation item for listing each equipment and projects corresponding activity duration, then corresponding to list the time required for each equipment inspection is debugged and check the item that debugging needs to pay attention to, list the quantity of staff and the effective operation time distribution graph of staff, also need to list the analysis of operation qualification and the comparison table of each staff simultaneously, each operating personnel's isolated operation operates the time required for each equipment.It is easy to operate in the present invention, it is easy to use, inspection plan can be transported to grid equipment and carries out automatic arrangement program, improved scheduling efficiency, avoided the occurrence of mistake.
Description
Technical field
The present invention relates to automatic arrangement program method and technology field more particularly to it is a kind of for grid equipment transport inspection plan it is automatic
Scheduling method.
Background technique
Power network includes power transformation, transmission and disttrbution, will use a large amount of grid equipment in this, such as: generator, transformation
Device, motor, breaker, disconnecting switch, protection screen, switchgear, capacitor.These equipment during operation, need work people
Member regularly carries out fortune inspection operation, and then ensures the normal operation of equipment, to ensure power supply.But traditional power grid is set
The scheduling method of received shipment inspection plan is all mostly artificial scheduling, and operating efficiency is low, and inflexible, it is also possible to go wrong
Phenomenon.For this purpose, a kind of it is proposed that automatic arrangement program method for transporting inspection plan for grid equipment.
Summary of the invention
The purpose of the present invention is to solve disadvantages existing in the prior art, and the one kind proposed is transported for grid equipment
Examine the automatic arrangement program method of plan.
To achieve the goals above, present invention employs following technical solutions:
Design a kind of automatic arrangement program method for grid equipment fortune inspection plan, comprising the following steps:
S1: firstly, statistics generator, transformer, motor, breaker, disconnecting switch, protection screen, switchgear, capacitor
Quantity and distributing position, the then corresponding operation operation item for listing each equipment and when the corresponding operation of projects
Between, it is then corresponding to list the time required for each equipment inspection is debugged and check the item that debugging needs to pay attention to;
S2: the quantity of staff and the effective operation time distribution graph of staff are listed, while also needing to arrange
The analysis of operation qualification and comparison table, each operating personnel's isolated operation of each staff operates needed for each equipment out
The time wanted assesses each staff to the grasp situation of the points for attention in S1;
S3: the learning state situation analysis table of the staff during being also in practice and the guidance of trainee are listed
The schedule of employee;
S4: the data input of facility information and staff in S1, S2 and S3 into automatic arrangement program module, automatically
Data analysis module in arranging module analyzes and counts information above, and makes risk assessment, then calculates correlation
Index;
S5: data extraction module automatically extracts preset reference index, then the index of correlation of calculating and in advance
The reference index of setting is compared, is analyzed, and is calculated deviation index, standard deviation, variance and average value departure degree and supplied
With reference at the same time, also starting chart generating module is to generate Comparative result chart.
Preferably, it also needs to count in S1 to list generator, transformer, motor, breaker, disconnecting switch, protection
The fortune inspection priority level of screen, switchgear, capacitor, fortune inspection priority level in company with the facility information and work in S1, S2 and S3
The information for making personnel is entered into together in automatic arrangement program module.
Preferably, the relevant information for the staff that needs are asked for leave or are had a holiday is input in time in automatic arrangement program module,
Then automatic arrangement program module reads the relevant information for the staff that asks for leave or have a holiday, and is timely fed back in Master Control Center.
Preferably, module of arranging an order according to class and grade receives the information of Master Control Center, and starts analysis module automatically, is then jumped in the form of pop-up
Prompting message out is simultaneously emitted by prompting sound, reminds sound go 10-15s, when issuing prompting sound, if having on duty
Personnel's pressing receives information button, can stop issuing immediately and remind sound.
Preferably, it is again started up data analysis module to analyze and count worker information of asking for leave or have a holiday, and does
Then risk assessment out calculates index of correlation, then restart the step in S5.
Preferably, the Comparative result chart generated in S5 is using cylindricality comparison chart or broken line comparison chart or bar shaped pair
Compare chart.
Preferably, scheduling list is automatically generated according to Comparative result chart, is then shown on touching display screen, opened simultaneously
Dynamic SMS transmission module is sent to the scheduling list of generation on the mobile phone of staff.
A kind of automatic arrangement program method for transporting inspection plan for grid equipment proposed by the present invention, beneficial effect are: the use
In grid equipment fortune inspection plan automatic arrangement program method by being analyzed and processed to the information of typing, and calculate correlation and refer to
Mark, then compares processing, while generating Comparative result chart, in addition also takes into account the feelings for the staff that asks for leave or have a holiday
Condition finally generates scheduling list according to Comparative result chart, and list is sent on the mobile phone terminal of staff, operation letter
It is single, it is easy to use, inspection plan can be transported to grid equipment and carries out automatic arrangement program, improved scheduling efficiency, avoided the occurrence of mistake.
Specific embodiment
It is next combined with specific embodiments below that the present invention will be further described.
Embodiment 1
The invention proposes a kind of automatic arrangement program methods that inspection plan is transported for grid equipment, include the following steps:
S1: firstly, statistics generator, transformer, motor, breaker, disconnecting switch, protection screen, switchgear, capacitor
Quantity and distributing position, the then corresponding operation operation item for listing each equipment and when the corresponding operation of projects
Between, it is then corresponding to list the time required for each equipment inspection is debugged and check the item that debugging needs to pay attention to;
It also needs to count in S1 to list generator, transformer, motor, breaker, disconnecting switch, protection screen, switch
The fortune inspection priority level of cabinet, capacitor, the facility information and staff transported in inspection priority level companion S1, S2 and S3
Information is entered into together in automatic arrangement program module;
S2: the quantity of staff and the effective operation time distribution graph of staff are listed, while also needing to arrange
The analysis of operation qualification and comparison table, each operating personnel's isolated operation of each staff operates needed for each equipment out
The time wanted assesses each staff to the grasp situation of the points for attention in S1;
S3: the learning state situation analysis table of the staff during being also in practice and the guidance of trainee are listed
The schedule of employee;
S4: the data input of facility information and staff in S1, S2 and S3 into automatic arrangement program module, automatically
Data analysis module in arranging module analyzes and counts information above, and makes risk assessment, then calculates correlation
Index;
S5: data extraction module automatically extracts preset reference index, then the index of correlation of calculating and in advance
The reference index of setting is compared, is analyzed, and is calculated deviation index, standard deviation, variance and average value departure degree and supplied
With reference at the same time, also starting chart generating module to generate Comparative result chart, adopt by the Comparative result chart generated in S5
Chart or broken line comparison chart are compared with cylindricality or bar shaped compares chart.
The relevant information for the staff that needs are asked for leave or are had a holiday is input in time in automatic arrangement program module, then automatically
Arranging module reads the relevant information for the staff that asks for leave or have a holiday, and is timely fed back in Master Control Center;Needs are asked for leave or
The staff that has a holiday is in view of that can avoid the occurrence of mistake with more flexible automatic arrangement program within the scope of scheduling.
Module of arranging an order according to class and grade receives the information of Master Control Center, and starts analysis module automatically, and prompting is then jumped out in the form of pop-up
Information is simultaneously emitted by prompting sound, reminds sound go 10s, when issuing prompting sound, receives if there is operator on duty to press
To information button, it can stop issuing immediately and remind sound.
It is again started up data analysis module to analyze and count worker information of asking for leave or have a holiday, and makes risk and comment
Estimate, then calculate index of correlation, then restarts the step in S5;
Scheduling list is automatically generated according to Comparative result chart, is then shown on touching display screen, while starting short message
Sending module is sent to the scheduling list of generation on the mobile phone of staff;By the way that scheduling list is sent to staff's hand
On machine, it can be convenient staff and understand field data of scheduling information, accurately to respond the information in scheduling list.
Embodiment 2
The invention proposes a kind of automatic arrangement program methods that inspection plan is transported for grid equipment, include the following steps:
S1: firstly, statistics generator, transformer, motor, breaker, disconnecting switch, protection screen, switchgear, capacitor
Quantity and distributing position, the then corresponding operation operation item for listing each equipment and when the corresponding operation of projects
Between, it is then corresponding to list the time required for each equipment inspection is debugged and check the item that debugging needs to pay attention to;
It also needs to count in S1 to list generator, transformer, motor, breaker, disconnecting switch, protection screen, switch
The fortune inspection priority level of cabinet, capacitor, the facility information and staff transported in inspection priority level companion S1, S2 and S3
Information is entered into together in automatic arrangement program module;
S2: the quantity of staff and the effective operation time distribution graph of staff are listed, while also needing to arrange
The analysis of operation qualification and comparison table, each operating personnel's isolated operation of each staff operates needed for each equipment out
The time wanted assesses each staff to the grasp situation of the points for attention in S1;
S3: the learning state situation analysis table of the staff during being also in practice and the guidance of trainee are listed
The schedule of employee;
S4: the data input of facility information and staff in S1, S2 and S3 into automatic arrangement program module, automatically
Data analysis module in arranging module analyzes and counts information above, and makes risk assessment, then calculates correlation
Index;
S5: data extraction module automatically extracts preset reference index, then the index of correlation of calculating and in advance
The reference index of setting is compared, is analyzed, and is calculated deviation index, standard deviation, variance and average value departure degree and supplied
With reference at the same time, also starting chart generating module to generate Comparative result chart, adopt by the Comparative result chart generated in S5
Chart or broken line comparison chart are compared with cylindricality or bar shaped compares chart.
The relevant information for the staff that needs are asked for leave or are had a holiday is input in time in automatic arrangement program module, then automatically
Arranging module reads the relevant information for the staff that asks for leave or have a holiday, and is timely fed back in Master Control Center;Needs are asked for leave or
The staff that has a holiday is in view of that can avoid the occurrence of mistake with more flexible automatic arrangement program within the scope of scheduling.
Module of arranging an order according to class and grade receives the information of Master Control Center, and starts analysis module automatically, and prompting is then jumped out in the form of pop-up
Information is simultaneously emitted by prompting sound, reminds sound go 15s, when issuing prompting sound, receives if there is operator on duty to press
To information button, it can stop issuing immediately and remind sound.
It is again started up data analysis module to analyze and count worker information of asking for leave or have a holiday, and makes risk and comment
Estimate, then calculate index of correlation, then restarts the step in S5;
Scheduling list is automatically generated according to Comparative result chart, is then shown on touching display screen, while starting short message
Sending module is sent to the scheduling list of generation on the mobile phone of staff;By the way that scheduling list is sent to staff's hand
On machine, it can be convenient staff and understand field data of scheduling information, accurately to respond the information in scheduling list.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (7)
1. a kind of automatic arrangement program method for transporting inspection plan for grid equipment, which comprises the following steps:
S1: firstly, the number of statistics generator, transformer, motor, breaker, disconnecting switch, protection screen, switchgear, capacitor
Amount and distributing position, the then corresponding operation operation item for listing each equipment and projects corresponding activity duration,
Then corresponding to list the time required for each equipment inspection is debugged and check the item that debugging needs to pay attention to;
S2: listing the quantity of staff and the effective operation time distribution graph of staff, while also needing to list each
The operation qualification of a staff is analyzed and comparison table, each operating personnel's isolated operation operate required for each equipment
Time assesses each staff to the grasp situation of the points for attention in S1;
S3: that lists the learning state situation analysis table and trainee for being also in the staff during practising instructs employee
Schedule;
S4: the data input of facility information and staff in S1, S2 and S3 into automatic arrangement program module, automatic arrangement program
Data analysis module in module analyzes and counts information above, and makes risk assessment, then calculates index of correlation;
S5: data extraction module automatically extracts preset reference index, then the index of correlation of calculating and presetting
Reference index compare, analyze, and calculate deviation index, standard deviation, variance and average value departure degree for reference,
At the same time, also starting chart generating module is to generate Comparative result chart.
2. a kind of automatic arrangement program method for transporting inspection plan for grid equipment according to claim 1, which is characterized in that
It also needs to count in S1 to list generator, transformer, motor, breaker, disconnecting switch, protection screen, switchgear, capacitor
Fortune inspection priority level together records fortune inspection priority level in company with the information of facility information and staff in S1, S2 and S3
Enter into automatic arrangement program module.
3. a kind of automatic arrangement program method for transporting inspection plan for grid equipment according to claim 1, which is characterized in that
The relevant information for the staff for needing to ask for leave or have a holiday is input in time in automatic arrangement program module, and then automatic arrangement program module is read
The relevant information for the staff that asks for leave or have a holiday is taken, and is timely fed back in Master Control Center.
4. a kind of automatic arrangement program method for transporting inspection plan for grid equipment according to claim 3, which is characterized in that row
Class's module receives the information of Master Control Center, and starts analysis module automatically, and prompting message is then jumped out in the form of pop-up, is sent out simultaneously
Remind sound out, remind sound go 10-15s, issue remind sound when, if having operator on duty's pressing receive information by
Button can stop issuing immediately and remind sound.
5. a kind of automatic arrangement program method for transporting inspection plan for grid equipment according to claim 1, which is characterized in that again
Secondary log-on data analysis module analyzes and counts worker information of asking for leave or have a holiday, and makes risk assessment, then counts
Index of correlation is calculated, the step in S5 is then restarted.
6. a kind of automatic arrangement program method for transporting inspection plan for grid equipment according to claim 1, which is characterized in that
The Comparative result chart generated in S5 compares chart using cylindricality comparison chart or broken line comparison chart or bar shaped.
7. a kind of automatic arrangement program method for transporting inspection plan for grid equipment according to claim 1, which is characterized in that root
Scheduling list is automatically generated according to Comparative result chart, is then shown on touching display screen, while starting SMS transmission module handle
The scheduling list of generation is sent on the mobile phone of staff.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810987017.9A CN109146294B (en) | 2018-08-28 | 2018-08-28 | Automatic scheduling method for operation and inspection plan of power grid equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810987017.9A CN109146294B (en) | 2018-08-28 | 2018-08-28 | Automatic scheduling method for operation and inspection plan of power grid equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109146294A true CN109146294A (en) | 2019-01-04 |
CN109146294B CN109146294B (en) | 2022-04-08 |
Family
ID=64828482
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810987017.9A Active CN109146294B (en) | 2018-08-28 | 2018-08-28 | Automatic scheduling method for operation and inspection plan of power grid equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109146294B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111369145A (en) * | 2020-03-04 | 2020-07-03 | 海南金盘智能科技股份有限公司 | Method and system for generating transformer scheduling scheme |
CN113421062A (en) * | 2021-06-25 | 2021-09-21 | 国网山东省电力公司汶上县供电公司 | Auxiliary reminding system for power dispatching planning process time |
CN117114362A (en) * | 2023-10-18 | 2023-11-24 | 江苏秉信科技有限公司 | Power grid operation plan scheduling method, system, terminal equipment and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105741036A (en) * | 2016-01-29 | 2016-07-06 | 苏州浙远自动化工程技术有限公司 | Production scheduling system and method of smart factory of traditional Chinese medicines |
CN107844892A (en) * | 2017-09-29 | 2018-03-27 | 深圳供电局有限公司 | A kind of equipment O&M plan Dynamic Scheduling system and optimization method |
CN108256778A (en) * | 2018-01-31 | 2018-07-06 | 北京仿真中心 | A kind of high-level plan and scheduling method based on machine learning and parallel simulation |
-
2018
- 2018-08-28 CN CN201810987017.9A patent/CN109146294B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105741036A (en) * | 2016-01-29 | 2016-07-06 | 苏州浙远自动化工程技术有限公司 | Production scheduling system and method of smart factory of traditional Chinese medicines |
CN107844892A (en) * | 2017-09-29 | 2018-03-27 | 深圳供电局有限公司 | A kind of equipment O&M plan Dynamic Scheduling system and optimization method |
CN108256778A (en) * | 2018-01-31 | 2018-07-06 | 北京仿真中心 | A kind of high-level plan and scheduling method based on machine learning and parallel simulation |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111369145A (en) * | 2020-03-04 | 2020-07-03 | 海南金盘智能科技股份有限公司 | Method and system for generating transformer scheduling scheme |
CN113421062A (en) * | 2021-06-25 | 2021-09-21 | 国网山东省电力公司汶上县供电公司 | Auxiliary reminding system for power dispatching planning process time |
CN117114362A (en) * | 2023-10-18 | 2023-11-24 | 江苏秉信科技有限公司 | Power grid operation plan scheduling method, system, terminal equipment and storage medium |
CN117114362B (en) * | 2023-10-18 | 2024-02-06 | 江苏秉信科技有限公司 | Power grid operation plan scheduling method, system, terminal equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN109146294B (en) | 2022-04-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109146294A (en) | A kind of automatic arrangement program method for transporting inspection plan for grid equipment | |
CN103389705B (en) | Operation supervise and control system and operation supervise and control method | |
CN110956357A (en) | Intelligent regulation and control networked interaction system applied to power company | |
CN110829595B (en) | Intelligent power station relay protection equipment overhaul safety isolation measure execution method and system | |
CN107657361A (en) | Materials intelligent management and Intelligent Production System | |
CN110456750B (en) | Information acquisition equipment, forging die production information acquisition system and working method thereof | |
CN109782724B (en) | Control method for preventing misoperation-locking and terminal equipment | |
CN104036348A (en) | Electronic mobile operation order system | |
CN105335828A (en) | Operation method of production management | |
CN109472550A (en) | The anti-human-equation error method, apparatus in million kilowatt nuclear power station and terminal device | |
CN108446197A (en) | A kind of control protection board automatic checkout system and method | |
CN109873867B (en) | Express cabinet information transmission method, device and system, express cabinet and storage medium | |
CN103984795A (en) | IEC (international electro-technical commission) 61850-based on-line partial discharge monitoring equipment communication simulation method | |
CN110490523A (en) | Generation method, device and the electronic equipment of stock inventory | |
CN104933921A (en) | Answering system, and client and client system used for answering | |
CN105279588A (en) | Power grid dispatching operation associated monitoring system | |
JP2015102921A (en) | Work result management system, work result management method, and work result management program | |
CN106059090A (en) | Prompt system based on scheduling automation system and work method thereof | |
CN105354769A (en) | Data processing method and device used for power distribution network equipment | |
CN112382901B (en) | Device quick grounding method, quick grounding control device and quick grounding device | |
CN115685816A (en) | Energy data subscription and control system based on websocket | |
CN202383740U (en) | Handheld wireless terminal-based judge scoring system | |
CN113708501A (en) | Method and system for improving scheduling operation ticket standard rate | |
CN104777808A (en) | Recording method for operating condition debugging of power station as well as record reading methods | |
JP2011038995A (en) | Electric power monitoring system and system controller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230926 Address after: Room B703, 7th Floor, V+Partner Building Tower, No. 371 Friendship Avenue, Wuchang District, Wuhan City, Hubei Province, 430000 Patentee after: Wuhan Huachuang Power Intelligent Technology Co.,Ltd. Address before: 430000 No. 999, Gaoxin Avenue, Wuhan, Hubei Patentee before: WUHAN EPUOPT TECHNOLOGY Co.,Ltd. |