CN113421062A - Auxiliary reminding system for power dispatching planning process time - Google Patents
Auxiliary reminding system for power dispatching planning process time Download PDFInfo
- Publication number
- CN113421062A CN113421062A CN202110713435.0A CN202110713435A CN113421062A CN 113421062 A CN113421062 A CN 113421062A CN 202110713435 A CN202110713435 A CN 202110713435A CN 113421062 A CN113421062 A CN 113421062A
- Authority
- CN
- China
- Prior art keywords
- plan
- processor
- reminding
- time
- power dispatching
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000013439 planning Methods 0.000 title claims description 10
- 238000000034 method Methods 0.000 title abstract description 8
- 230000008569 process Effects 0.000 title abstract description 5
- 238000012423 maintenance Methods 0.000 claims abstract description 36
- 230000003993 interaction Effects 0.000 claims description 9
- 238000012544 monitoring process Methods 0.000 claims description 3
- 238000012384 transportation and delivery Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 5
- 210000001520 comb Anatomy 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention provides an auxiliary reminding method and system for power dispatching plan process time. The method comprises the following steps: the system comprises a client side, a server and a service center, wherein the client side comprises a processor, a display, a reminding module and an information input unit, the information input unit is used for transmitting a power failure maintenance plan input by a user to the processor, the processor is used for managing each plan, identifying working days, holidays and rest days, and sending reminding instructions according to set time nodes; the display is used for displaying the maintenance plans processed by the processor according to the priority of the time sequence of each plan; the reminding module is used for popping up a window and displaying reminding content according to the reminding instruction sent by the processor.
Description
Technical Field
The invention belongs to the technical field of power grid dispatching, and particularly relates to an auxiliary reminding system for power dispatching planning process time.
Background
The statements in this section merely provide background information related to the present disclosure and may not necessarily constitute prior art.
The power grid dispatching is a center for normal operation of a modern power system, is a foundation for guaranteeing safe and stable operation of a power grid, and with requirements of safe production situations of the power grid and continuous upgrading of the scale of the power grid, a person on duty of a dispatching system needs to pay attention to and strictly control time nodes applied for each maintenance work while finishing power grid power failure maintenance planning work. The overhaul application needs to be reported in advance by three working days, the common application needs to be repeated in advance by one working day, the new equipment needs to be repeated in advance by two working days when being started, the work order is required to be within one hour of the approved overhaul time, the equipment is sent to a point and is required to be before the approved completion time, the requirements of the time nodes are strict, the management and control are difficult, the safe production operation of a power grid is influenced, the equipment is directly related to the examination indexes of units, extra work burden and thought pressure are increased for dispatching operation personnel, the work efficiency of a team is low, and the accuracy is difficult to guarantee.
Disclosure of Invention
In order to solve the technical problems in the background art, the invention provides an auxiliary reminding system for the power dispatching plan flow time, which helps operating personnel to complete related work according to the requirement of a time node through auxiliary reminding, ensures safe power failure overhaul and completion power transmission, and ensures that an index completion value is in a leading position.
In order to achieve the purpose, the invention adopts the following technical scheme:
the invention provides an auxiliary reminding system for power dispatching planning process time.
An electric power dispatching planning flow time auxiliary reminding system comprises: the system comprises a client side, a server and a service center, wherein the client side comprises a processor, a display, a reminding module and an information input unit, the information input unit is used for transmitting a power failure maintenance plan input by a user to the processor, the processor is used for managing each plan, identifying working days, holidays and rest days, and sending reminding instructions according to set time nodes; the display is used for displaying the maintenance plans processed by the processor according to the priority of the time sequence of each plan; the reminding module is used for popping up a window and displaying reminding content according to the reminding instruction sent by the processor.
Further, the information entry unit is used for the user to enter the maintenance plan that has a power failure, and the maintenance plan that has a power failure includes: the date of the submission of the service application, the date of the submission of the general application, the date of the approval of the new equipment, the time of the work order, the time of the approval of the service, the time of the equipment delivery point, and the time of the approval completion.
Further, the processor for managing each plan includes: and judging the association relationship between each plan and other plans.
Further, the determining the association relationship between each plan and other plans includes: the relation between the work order making time and the approved overhaul time, and the relation between the equipment sending time and the approved completion time.
Further, the reminding module sends a short message reminding.
Furthermore, the client comprises a data interaction module for transmitting the data processed by the processor.
Further, the processor transmits the processed data to the cloud processor through the data interaction module, and the cloud processor is used for monitoring the progress of the same maintenance plan in different regions.
Further, the cloud processor is connected with a display unit, and the display unit is used for receiving data transmitted by the cloud processor and displaying the progress of different regions and the same maintenance plan.
Further, the information entry unit is used for storing the power failure maintenance plan input by the user to the first database.
Further, the processor transmits the processed data to a second database through the data interaction module.
Compared with the prior art, the invention has the beneficial effects that:
the invention combs and arranges monthly power failure maintenance, displays power failure information to dispatching operation personnel by taking a calendar as a support, is visual and clear, is convenient to inquire, greatly lightens the work load of the operation personnel and improves the work efficiency.
The system can automatically check each power failure maintenance plan, performs popup reminding according to the time node requirement, ensures the accuracy of various benchmarking indexes, especially in the spring and autumn period, has tight time and heavy tasks, can reduce the work tasks of workers, improves the work quality, and enables the scheduling operator to have more energy to concentrate on the operation management of the power grid.
Advantages of additional aspects of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate exemplary embodiments of the invention and together with the description serve to explain the invention and not to limit the invention.
Fig. 1 is a structural diagram of an auxiliary reminding system for power dispatching planning flow time according to the present invention.
Detailed Description
The invention is further described with reference to the following figures and examples.
It is to be understood that the following detailed description is exemplary and is intended to provide further explanation of the invention as claimed. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of exemplary embodiments according to the invention. As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, and it should be understood that when the terms "comprises" and/or "comprising" are used in this specification, they specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof, unless the context clearly indicates otherwise.
It is noted that the flowchart and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of methods and systems according to various embodiments of the present disclosure. It should be noted that each block in the flowchart or block diagrams may represent a module, a segment, or a portion of code, which may comprise one or more executable instructions for implementing the logical function specified in the respective embodiment. It should also be noted that, in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the flowchart illustrations and/or block diagrams, and combinations of blocks in the flowchart illustrations and/or block diagrams, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
Example one
As shown in fig. 1, the present embodiment provides an auxiliary reminding system for power scheduling planning flow time.
An electric power dispatching planning flow time auxiliary reminding system comprises: the system comprises a client side, a server and a service center, wherein the client side comprises a processor, a display, a reminding module and an information input unit, the information input unit is used for transmitting a power failure maintenance plan input by a user to the processor, the processor is used for managing each plan, identifying working days, holidays and rest days, and sending reminding instructions according to set time nodes; the display is used for displaying the maintenance plans processed by the processor according to the priority of the time sequence of each plan; the reminding module is used for popping up a window and displaying reminding content according to the reminding instruction sent by the processor.
As one or more embodiments, the information entry unit is configured to enter, by a user, a blackout maintenance plan, where the blackout maintenance plan includes: the date of the submission of the service application, the date of the submission of the general application, the date of the approval of the new equipment, the time of the work order, the time of the approval of the service, the time of the equipment delivery point, and the time of the approval completion.
As one or more embodiments, the processor configured to manage each plan includes: judging the incidence relation between each plan and other plans; wherein, judging the incidence relation between each plan and other plans comprises: the relation between the work order making time and the approved overhaul time, and the relation between the equipment sending time and the approved completion time.
As one or more embodiments, the reminding module comprises sending a short message reminder.
In one or more embodiments, the client includes a data interaction module configured to transmit data processed by the processor. The processor transmits the processed data to the cloud processor through the data interaction module, and the cloud processor is used for monitoring the progress of the same maintenance plan in different regions. The cloud processor is connected with the display unit, and the display unit is used for receiving data transmitted by the cloud processor and displaying the progress of different regions and the same maintenance plan.
As one or more embodiments, the information entry unit is configured to store the blackout maintenance plan input by the user in the first database; and the processor transmits the processed data to a second database through the data interaction module.
The embodiment provides an electric power dispatching plan flow time auxiliary reminding system, according to the monthly power failure maintenance plan, with the calendar as the support, give the dispatcher with the audio-visual demonstration of daily power failure plan, and carry out the popup in advance according to maintenance operating time node requirement, alleviate operating pressure for the dispatch operation personnel, guarantee work efficiency. The specific functions are as follows:
1) and displaying the plan. In the system is typeeed with the maintenance plan that cuts a power failure with suitable format in advance, the system can arrange according to the time to the staff is shown to the format of calendar, makes the staff look over the plan that cuts a power failure, and it is more convenient to arrange daily work.
2) And identifying the working day. The system combs the power failure maintenance plan, and automatically identifies holidays and holidays so as to remind dispatching operation personnel to report maintenance applications in advance, common maintenance applications need to be reported in advance by one working day, and new equipment needs to be started by two working days in advance.
3) And displaying the start and completion time. The system displays the power failure plan by taking a calendar as a support, and when a mouse points to a certain plan, the specific completion starting time can be displayed to an operation dispatcher in a suspension window mode.
4) And reminding by using a time node. The system contrasts with a power failure plan, carries out popup reminding of maintenance ticket reporting (common maintenance application needs to be reported in advance by one working day, and new equipment needs to be started by two working days), carries out start preparation work reminding one hour before start according to specific start completion time, carries out reminding two hours before completion, and dispatches operating personnel to inform the maintenance personnel to handle completion or delay application as soon as possible.
5) And event recall. The dispatching operation personnel can inquire historical maintenance work records and inquire and check completed maintenance work so as to reasonably arrange a power failure maintenance plan.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (10)
1. The utility model provides a power dispatching planning flow time assists warning system which characterized in that includes: the system comprises a client side, a server and a service center, wherein the client side comprises a processor, a display, a reminding module and an information input unit, the information input unit is used for transmitting a power failure maintenance plan input by a user to the processor, the processor is used for managing each plan, identifying working days, holidays and rest days, and sending reminding instructions according to set time nodes; the display is used for displaying the maintenance plans processed by the processor according to the priority of the time sequence of each plan; the reminding module is used for popping up a window and displaying reminding content according to the reminding instruction sent by the processor.
2. The electric power dispatching plan flow time auxiliary reminding system of claim 1, wherein the information entry unit is used for a user to enter a power outage overhaul plan, and the power outage overhaul plan comprises: the date of the submission of the service application, the date of the submission of the general application, the date of the approval of the new equipment, the time of the work order, the time of the approval of the service, the time of the equipment delivery point, and the time of the approval completion.
3. The power dispatching plan flow time auxiliary reminding system of claim 1, wherein the processor for managing each plan comprises: and judging the association relationship between each plan and other plans.
4. The electric power dispatching plan flow time auxiliary reminding system as claimed in claim 3, wherein the judging of the association relationship between each plan and other plans comprises: the relation between the work order making time and the approved overhaul time, and the relation between the equipment sending time and the approved completion time.
5. The power dispatching plan flow time auxiliary reminding system of claim 1, wherein the reminding module comprises sending a short message reminder.
6. The electric power dispatching plan flow time auxiliary reminding system as claimed in claim 1, wherein the client comprises a data interaction module for transmitting data processed by the processor.
7. The electric power dispatching plan flow time auxiliary reminding system of claim 1, wherein the processor transmits the processed data to a cloud processor through a data interaction module, and the cloud processor is used for monitoring the progress of the same maintenance plan in different regions.
8. The electric power scheduling plan flow time auxiliary reminding system as claimed in claim 7, wherein the cloud processor is connected with a display unit, and the display unit is used for receiving data transmitted by the cloud processor and displaying the progress of different regions and the same maintenance plan.
9. The electric power dispatching plan flow time auxiliary reminding system as claimed in claim 1, wherein the information entry unit is used for storing the power outage overhaul plan input by the user to the first database.
10. The electric power dispatching plan flow time auxiliary reminding system as claimed in claim 1, wherein the processor transmits the processed data to the second database through the data interaction module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110713435.0A CN113421062B (en) | 2021-06-25 | 2021-06-25 | Auxiliary reminding system for power dispatching planning flow time |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110713435.0A CN113421062B (en) | 2021-06-25 | 2021-06-25 | Auxiliary reminding system for power dispatching planning flow time |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113421062A true CN113421062A (en) | 2021-09-21 |
CN113421062B CN113421062B (en) | 2023-05-23 |
Family
ID=77716817
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110713435.0A Active CN113421062B (en) | 2021-06-25 | 2021-06-25 | Auxiliary reminding system for power dispatching planning flow time |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113421062B (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6047260A (en) * | 1997-06-05 | 2000-04-04 | Attention Control Systems, Inc. | Intelligent planning and calendaring system with cueing feature and floating tasks |
US20070150326A1 (en) * | 2003-10-21 | 2007-06-28 | Canon Kabushiki Kaisha | Information apparatus |
CN101795443A (en) * | 2009-12-22 | 2010-08-04 | 中兴通讯股份有限公司 | Service reminder method, service reminder system and communication system |
JP2014026403A (en) * | 2012-07-26 | 2014-02-06 | Chugoku Electric Power Co Inc:The | Repair plan support system for power station/substation equipment, and repair plan support system for power station/substation equipment |
CN107994539A (en) * | 2017-12-06 | 2018-05-04 | 国网山东省电力公司滨州市滨城区供电公司 | A kind of distribution line failure detecting system based on Cloud Server |
CN109146294A (en) * | 2018-08-28 | 2019-01-04 | 武汉易普优科技有限公司 | A kind of automatic arrangement program method for transporting inspection plan for grid equipment |
CN111798088A (en) * | 2020-05-20 | 2020-10-20 | 广东电网有限责任公司广州供电局 | Power grid dispatching method and system |
CN112183896A (en) * | 2020-10-31 | 2021-01-05 | 国网河南省电力公司漯河供电公司 | Intelligent identification and auxiliary compilation method for regional power grid maintenance plan |
CN112184483A (en) * | 2020-09-29 | 2021-01-05 | 国网北京市电力公司 | Scheduling work display system based on OMS and computer equipment |
CN112330076A (en) * | 2020-12-10 | 2021-02-05 | 国网河南省电力公司漯河供电公司 | Auxiliary compilation system for regional power grid maintenance plan |
-
2021
- 2021-06-25 CN CN202110713435.0A patent/CN113421062B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6047260A (en) * | 1997-06-05 | 2000-04-04 | Attention Control Systems, Inc. | Intelligent planning and calendaring system with cueing feature and floating tasks |
US20070150326A1 (en) * | 2003-10-21 | 2007-06-28 | Canon Kabushiki Kaisha | Information apparatus |
CN101795443A (en) * | 2009-12-22 | 2010-08-04 | 中兴通讯股份有限公司 | Service reminder method, service reminder system and communication system |
JP2014026403A (en) * | 2012-07-26 | 2014-02-06 | Chugoku Electric Power Co Inc:The | Repair plan support system for power station/substation equipment, and repair plan support system for power station/substation equipment |
CN107994539A (en) * | 2017-12-06 | 2018-05-04 | 国网山东省电力公司滨州市滨城区供电公司 | A kind of distribution line failure detecting system based on Cloud Server |
CN109146294A (en) * | 2018-08-28 | 2019-01-04 | 武汉易普优科技有限公司 | A kind of automatic arrangement program method for transporting inspection plan for grid equipment |
CN111798088A (en) * | 2020-05-20 | 2020-10-20 | 广东电网有限责任公司广州供电局 | Power grid dispatching method and system |
CN112184483A (en) * | 2020-09-29 | 2021-01-05 | 国网北京市电力公司 | Scheduling work display system based on OMS and computer equipment |
CN112183896A (en) * | 2020-10-31 | 2021-01-05 | 国网河南省电力公司漯河供电公司 | Intelligent identification and auxiliary compilation method for regional power grid maintenance plan |
CN112330076A (en) * | 2020-12-10 | 2021-02-05 | 国网河南省电力公司漯河供电公司 | Auxiliary compilation system for regional power grid maintenance plan |
Also Published As
Publication number | Publication date |
---|---|
CN113421062B (en) | 2023-05-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210192426A1 (en) | Roster scheduling and task dispatching system for gate staff | |
US10282683B2 (en) | Technician control system | |
CN108416526B (en) | Online time-related risk monitoring system and method for nuclear power station production plan | |
US20100198647A1 (en) | Technical hotline resource management method and system | |
WO2006007191A2 (en) | Capacity planning method and system with approved accuracy and confidence indication | |
CN111815122A (en) | Intelligent scheduling decision method and decision system for vehicles in port operation field | |
CN113034051A (en) | Intelligent factory dynamic plan scheduling system | |
CN104616098A (en) | Task management method and system | |
CN110570057A (en) | petrochemical enterprise emergency resource management and scheduling system and method | |
CN115879728A (en) | Based on capital construction overall process platform system | |
CN113506618A (en) | Ambulance information management system | |
CN114171021A (en) | Distribution network virtual scheduling system and method based on artificial intelligence | |
CN110889516A (en) | Low-voltage service quick response visualization platform | |
CN113421062A (en) | Auxiliary reminding system for power dispatching planning process time | |
CN112581073B (en) | Method and system for managing collection operation maintenance labor intensity of robbery dispatch order | |
CN115600904A (en) | Emergency command system and emergency command method | |
CN117592676A (en) | Work-to-machine management system, method, equipment and storage medium | |
CN110278578B (en) | Management system for battery power and signal strength of public network interphone | |
CN105761015A (en) | Intelligent anti-error method and system suitable for operation order | |
CN112884447A (en) | Civil aviation airport data cooperation method and system | |
KR20140031427A (en) | Realtime crane work performance processing system and method | |
CN111242421A (en) | Method and system for carrying project management by IM group | |
CN111898984A (en) | Merchant background project management system | |
CN112634038A (en) | Transaction state control method and device for bank transaction platform | |
CN111008787A (en) | Planned power failure active monitoring and scheduling method based on metering terminal alarm technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |