CN104777808A - Recording method for operating condition debugging of power station as well as record reading methods - Google Patents

Recording method for operating condition debugging of power station as well as record reading methods Download PDF

Info

Publication number
CN104777808A
CN104777808A CN201510141836.8A CN201510141836A CN104777808A CN 104777808 A CN104777808 A CN 104777808A CN 201510141836 A CN201510141836 A CN 201510141836A CN 104777808 A CN104777808 A CN 104777808A
Authority
CN
China
Prior art keywords
state
simulated operation
information
power station
identity information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510141836.8A
Other languages
Chinese (zh)
Other versions
CN104777808B (en
Inventor
孙超
张伟
宋磊
孙敏
尚伟伟
崔琦
王峤峙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE GRID SHANDONG PROVINCE LAOLING POWER SUPPLY Co
State Grid Corp of China SGCC
Original Assignee
STATE GRID SHANDONG PROVINCE LAOLING POWER SUPPLY Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE GRID SHANDONG PROVINCE LAOLING POWER SUPPLY Co, State Grid Corp of China SGCC filed Critical STATE GRID SHANDONG PROVINCE LAOLING POWER SUPPLY Co
Priority to CN201510141836.8A priority Critical patent/CN104777808B/en
Publication of CN104777808A publication Critical patent/CN104777808A/en
Application granted granted Critical
Publication of CN104777808B publication Critical patent/CN104777808B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Debugging And Monitoring (AREA)
  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)

Abstract

The invention provides a recording method for operating condition debugging of a power station as well as record reading methods. The recording method mainly comprises the following steps: identity information of an operator is read and stored, then scanning is performed for the first time to acquire the condition of operating equipment before operation, then simulation operation is performed on the operating equipment, a key chain is inserted for execution start, then the operating equipment is scanned for the second time, and accordingly, the condition of the operating equipment after simulation operation is stored, so that the condition can be compared with the previous condition, and an operation record text is generated finally for follow-up lookup. Besides, the invention further provides multiple methods for reading the operation record text. Therefore, the operator later can understand related operation record before debugging of the operating equipment, and the later maintenance working efficiency can be improved greatly.

Description

The record of a kind of power station running status debugging and read method
Technical field
The present invention relates to supervisory control of substation technical field, particularly relate to record and the read method of the running status debugging of a kind of power station.
Background technology
In transformer station's main control room, the running status of station district all devices is passed through collection in worksite device transmission to main control room, operating personnel need to adjust the operating mode of each equipment in time according to machine operation, to reach safe, reliable, efficient power transmission and transformation requirement.This just requires that the operation conditions of each equipment can reflect by imitation screen system in main panel timely and accurately intuitively, to be shown to operating personnel's reference in time.
In the dispatching and monitoring work of the transformer station of reality, come according to on-the-spot machine operation, at the optimum configurations of the enterprising line correlation of simulated operation screen often by experienced staff.In addition, each simulated operation correspond to a simulated operation hole, this simulated operation hole for allowing operator insert key chain so that the relevant setting it carried out on simulated operation screen is started.From the management work of reality, in the apparatus control system of transformer station, not only have an operator, and the pulpit of connection operational outfit is more than one, particularly some large-scale transformer stations will be more complicated.But in existing management system, record is not carried out to the operating process of operator, and be only the control of authority realizing for operational outfit by key chain, that is to say that the people only holding associated key button could regulate and control equipment.If when carrying out maintenance of equipment or prophylactic repair to the later stage, often to carry out the fault that comprehensive inspection just can find equipment, if and will to the operation note of retrieving for examination in the past, then not relevant record data can provide reference, make the time of the maintenance of equipment or maintenance longer like this.More inconvenient is, when different operating person is on duty, if it is not operated by it that the equipment of last time is arranged, so its cannot find at all relevant operation note come current device carry out reference judge, but need to inquire last operator by liaison mode, and last operator often can not very clearly recall relevant setting.
In order to the problems referred to above that substation exists, associative operation is recorded by the mode arranging minute book in operation room, but due to an often more than operation room in a transformer station, the operation note between different operating room or also there is mobility and closure between operator.
In a word, effective record cannot be realized for the process of operational outfit debugging in existing transformer station, thus cause the problem that equipment debugging efficiency is not high and operational outfit operational reliability is low.
Summary of the invention
The shortcoming of prior art in view of the above, the object of the present invention is to provide record and the read method of the running status debugging of a kind of power station, effective record cannot be realized for solving in existing transformer station for the process of operational outfit debugging, thus cause the problem that equipment debugging efficiency is not high and operational outfit operational reliability is low.
For achieving the above object and other relevant objects, the present invention puies forward following technical scheme:
Scheme one
A kind of recording method realizing power station running status debugging based on simulated operation screen, at least comprise: the identity information of read operation person also carries out identity information identification checking, time as very first time information when reading described identity information is stored simultaneously, and preserve described identity information when described identity information is proved to be successful, and by described authentication information and described very first time information association; The state of switching node on the multiple operational outfit of single pass, and on each operational outfit scanning obtained, the current state of switching node is stored as the first state; Synchronously be detected on the simulated operation instruction of the upper input of described simulated operation screen and the positional information of operation key chain, described positional information associated with described simulated operation instruction as simulated operation nodal information, and is stored; The state of switching node on the multiple operational outfit of rescan, and the state of switching node is stored as the second state on each operational outfit scanning obtained, be described second state by described first state updating stored simultaneously, and described for renewal the first state successful time stored as the second temporal information; Described identity information is associated with the first state and second state of described very first time information, the second temporal information, simulated operation nodal information and switching node, and generates corresponding operation note text, and preserved.
As the above-mentioned preferred version realizing the recording method of power station running status debugging based on simulated operation screen, the state of each described switching node only includes described first state and the second state, and once/rescan can the quantity of maximum identification operational outfit switching node state be 256.
As the above-mentioned preferred version realizing the recording method of power station running status debugging based on simulated operation screen, when generation described operation note text when being preserved, the second state of described very first time information, the second temporal information, simulated operation nodal information and the switching node preserved before synchronization removal.
As the above-mentioned preferred version realizing the recording method of power station running status debugging based on simulated operation screen, described simulated operation instruction is power station running status tuning parameter.
Scheme two
Realize a read method for power station running status debugging recording based on simulated operation screen, described read method comprises: in the upper input inquiry operational order of described simulated operation screen; Read be associated with described query manipulation instruction and the operation note text generated according to the recording method in described claim 1, and by described operation note text output extremely described simulated operation with on shown.
As the above-mentioned preferred version realizing the read method of power station running status debugging recording based on simulated operation screen, described query manipulation instruction is specially one or more the combination in the first state and the second state comprising very first time information, the second temporal information, simulated operation nodal information and switching node.
Scheme three
Realize a read method for power station running status debugging recording based on simulated operation screen, described read method comprises: in the upper input inquiry request instruction of described simulated operation screen; Obtain and identify identity information, if identify successfully, then read be associated with described identity information and the operation note text generated according to the recording method in described claim 1, and by described operation note text output extremely described simulated operation with on shown; If recognition failures, then refuse inquiry request.
As mentioned above, the present invention has following beneficial effect: the present invention is by by operation identity information and the various setting carried out operational outfit by this identity information and arrange relevant parameter state etc. to associative operation and all recorded and preserve, and operating an operation note text later generating correspondence, and this recording text can be inquired about in ground, thus facilitate operator operational outfit is debugged, greatly can also improve the efficiency of later stage maintenance or maintenance work.
Accompanying drawing explanation
Fig. 1 is shown as the principle schematic for the operating system of commissioning test equipment in a kind of power station.
Fig. 2 is a kind of recording method realization flow figure realizing power station running status debugging based on simulated operation screen in the present invention.
Fig. 3 is a kind of read method process flow diagram realizing power station running status debugging recording based on simulated operation screen in the present invention.
Fig. 4 is the another kind of read method process flow diagram realizing power station running status debugging recording based on simulated operation screen in the present invention.
Drawing reference numeral explanation
1 simulated operation screen
2 simulated operation holes
3 control modules
4 operational outfits
5 storage modules
6 data interaction module
7 clock modules
8 battery modules
S110-S150 method step
S210-S240 method step
S310-S330 method step
Embodiment
Below by way of specific instantiation, embodiments of the present invention are described, those skilled in the art the content disclosed by this instructions can understand other advantages of the present invention and effect easily.The present invention can also be implemented or be applied by embodiments different in addition, and the every details in this instructions also can based on different viewpoints and application, carries out various modification or change not deviating under spirit of the present invention.It should be noted that, when not conflicting, the feature in following examples and embodiment can combine mutually.
It should be noted that, the diagram provided in following examples only illustrates basic conception of the present invention in a schematic way, then only the assembly relevant with the present invention is shown in graphic but not component count, shape and size when implementing according to reality is drawn, it is actual when implementing, and the kenel of each assembly, quantity and ratio can be a kind of change arbitrarily, and its assembly layout kenel also may be more complicated.
Embodiment one
As Fig. 1, show a kind of operating system for commissioning test equipment 4, as shown in the figure, described operating system comprises: simulated operation screen 1, be arranged at the simulated operation hole 2 on described simulated operation screen 1, control simulation, storage module 5, data interaction simulated block and clock are simulated and battery module 8, wherein, described simulated operation hole 2 is connected to operational outfit 4, described control module 3 is connected to described simulated operation screen 1, storage module 5, clock module 7 and battery module 8, and described data interaction module 6 is connected between described storage module 5 and simulated operation hole 2.By aforesaid operations system, operational outfit 4 and operating equipment can be separated by and leave, and by carrying out arranging the simulation of operational outfit 4 on simulated operation screen 1, arranging by key chain being inserted in simulated operation the simulation be enabled on simulated operation screen 1 afterwards.
Further, for the ease of being well understood in the past for the operation note of operational outfit, invention provides a kind of recording method realizing power station running status debugging based on simulated operation screen, please refer to Fig. 2, described recording method comprises the following steps:
Step S110, the identity information of read operation person also carries out identity information identification checking, time as very first time information when reading described identity information is stored simultaneously, and preserve described identity information when described identity information is proved to be successful, and by described authentication information and described very first time information association;
Step S120, the state of switching node on the multiple operational outfit of single pass, and on each operational outfit scanning obtained, the current state of switching node is stored as the first state;
Step S130, is synchronously detected on the simulated operation instruction of the upper input of described simulated operation screen and the positional information of operation key chain, described positional information is associated with described simulated operation instruction as simulated operation nodal information, and stored;
Step S140, the state of switching node on the multiple operational outfit of rescan, and the state of switching node is stored as the second state on each operational outfit scanning obtained, be described second state by described first state updating stored simultaneously, and described for renewal the first state successful time stored as the second temporal information;
Step S150, is associated with the first state and second state of described very first time information, the second temporal information, simulated operation nodal information and switching node by described identity information, and generates corresponding operation note text, and is preserved.
Particularly, in described step S110, described identity information can be that the job number, ID (identity number) card etc. of operator can identify the numbering of this identity information of operation or store the medium of identity information, and Migrant women can be avoided like this to carry out illegitimate analog operation to controlling equipment.By preserving the information of the identity information person that just can know associative operation, and recording the time successfully that identifies, just can know the initial time starting to carry out associative operation, being conducive to the statistics of the data message in later stage.
Particularly, in the step s 120, owing to needing to carry out debugging operations to current operational outfit, so need to be preserved debug the operational outfit state successfully, thus formed contrast with the state after debugging, thus the change for relevant device can be understood.The mode of carrying out surface sweeping is here the I/O port by scanning connecting valve node, each I/O port has two states, thus utilize the parallel method arranged, (in other words the state of each described switching node only includes described first state and the second state to the IO state surface sweeping net of configuration 8 × 8, and once/rescan can the quantity of maximum identification operational outfit switching node state be 256.), as long as be 8 I/O ports read in arbitrary group in scanning, the efficiency of scanning can be improved like this, avoid operator's waiting as long for before simulated operation screen.
Particularly, in step s 130, which, operator can shield the simulation setting of enterprising line correlation at operation simulation, if start relevant setting when just inserting corresponding button after setting on simulated operation hole.In this this setting up procedure, the simulated operation instruction of operator can be recorded by the mode with time shaft, also can record when inserting key chain and starting the position that key chain inserts simulation handle hole simultaneously, and the two is associated, be stored simultaneously and call for the later stage.
Particularly, in step S140, due to the setting of being correlated with to operational outfit, so its state also will change, and now, need to carry out rescan to it, come to make contrast with preoperative operational outfit state with this.
Particularly, in step S150, in order to can better the operation process recording of operator be got off, in this step, the relevant information of all storages in operating process is associated with the identity information be identified, thus according to the Table Model preset, described information is imported in Table Model, thus obtains this operation note text.And the text is just used to supply the later stage to inquire about, this associative operation of this operation just clearly can be known by text information, very clear.
Further, when generation described operation note text when being preserved, the second state of described very first time information, the second temporal information, simulated operation nodal information and the switching node preserved before synchronization removal.The storage of mass data can be avoided like this, to reduce the pressure for storage facilities.
Embodiment two
Further, on the basis of above-described embodiment one, additionally provide a kind of read method realizing power station running status debugging recording based on simulated operation screen in the present embodiment, as shown in Figure 3, described read method comprises:
Step S210, starts;
Step S220, in the upper input inquiry operational order of described simulated operation screen;
Step S230, read be associated with described query manipulation instruction and the operation note text generated according to the recording method in above-described embodiment one, and by described operation note text output extremely described simulated operation with on shown;
Step S240, terminates.
By above-mentioned read method, can at simulated operation screen end by input identity information, a kind of information in first state of very first time information, the second temporal information, simulated operation nodal information and switching node and the second state is inquired about, also in more than can being, the combination of information be inquired about, thus can know relevant operation text message very easily.
Embodiment three
Further, additionally provide another realizes power station running status debugging recording read method based on simulated operation screen in the present embodiment, as Fig. 4, described read method comprises:
Step S310, starts;
Step S320, in the upper input inquiry request instruction of described simulated operation screen;
Step S330, obtains identity information, and identifies described identity information:
Step S330-A, if identify successfully, then read be associated with described identity information and the operation note text generated according to the recording method in described embodiment one, and by described operation note text output extremely described simulated operation with on shown.
Step S330-B, if recognition failures, then refuses inquiry request.
By the present embodiment three, described identity information is the IC-card or the radio-frequency card that store identity information, in time needing the operation note of inquiry, only need described IC-card or radio-frequency card to be placed on the simulated operation being provided with cog region to shield, described identity information is allowed to be read atomically and to identify, the tedious steps manually inputting various number information can be avoided, thus the reading of convenient described operation note text and inquiry.
In sum, the present invention is by by operation identity information and the various setting carried out operational outfit by this identity information and arrange relevant parameter state etc. to associative operation and all recorded and preserve, and operating an operation note text later generating correspondence, and this recording text can be inquired about in ground, thus facilitate operator operational outfit is debugged, greatly can also improve the efficiency of later stage maintenance or maintenance work.So the present invention effectively overcomes various shortcoming of the prior art and tool high industrial utilization.
Above-described embodiment is illustrative principle of the present invention and effect thereof only, but not for limiting the present invention.Any person skilled in the art scholar all without prejudice under spirit of the present invention and category, can modify above-described embodiment or changes.Therefore, such as have in art usually know the knowledgeable do not depart from complete under disclosed spirit and technological thought all equivalence modify or change, must be contained by claim of the present invention.

Claims (8)

1. realize a recording method for power station running status debugging based on simulated operation screen, it is characterized in that, comprising:
The identity information of read operation person also carries out identity information identification checking, time as very first time information when reading described identity information is stored simultaneously, and preserve described identity information when described identity information is proved to be successful, and by described authentication information and described very first time information association;
The state of switching node on the multiple operational outfit of single pass, and on each operational outfit scanning obtained, the current state of switching node is stored as the first state;
Synchronously be detected on the simulated operation instruction of the upper input of described simulated operation screen and the positional information of operation key chain, described positional information associated with described simulated operation instruction as simulated operation nodal information, and is stored;
The state of switching node on the multiple operational outfit of rescan, and the state of switching node is stored as the second state on each operational outfit scanning obtained, be described second state by described first state updating stored simultaneously, and described for renewal the first state successful time stored as the second temporal information;
Described identity information is associated with the first state and second state of described very first time information, the second temporal information, simulated operation nodal information and switching node, and generates corresponding operation note text, and preserved.
2. the recording method realizing power station running status debugging based on simulated operation screen according to claim 1, it is characterized in that, the state of each described switching node only includes described first state and the second state, and once/rescan can the quantity of maximum identification operational outfit switching node state be 256.
3. the recording method realizing power station running status debugging based on simulated operation screen according to claim 1, it is characterized in that, when generation described operation note text when being preserved, the second state of described very first time information, the second temporal information, simulated operation nodal information and the switching node preserved before synchronization removal.
4. the recording method realizing power station running status debugging based on simulated operation screen according to claim 1, it is characterized in that, described simulated operation instruction is power station running status tuning parameter.
5. realize a read method for power station running status debugging recording based on simulated operation screen, it is characterized in that, described read method comprises:
In the upper input inquiry operational order of described simulated operation screen;
Read be associated with described query manipulation instruction and the operation note text generated according to the recording method in described claim 1, and by described operation note text output extremely described simulated operation with on shown.
6. the read method realizing power station running status debugging recording based on simulated operation screen according to claim 5, it is characterized in that, described query manipulation instruction is specially one or more the combination in the first state and the second state comprising very first time information, the second temporal information, simulated operation nodal information and switching node.
7. realize a read method for power station running status debugging recording based on simulated operation screen, it is characterized in that, described read method comprises:
In the upper input inquiry request instruction of described simulated operation screen;
Obtain and identify identity information, if identify successfully, then read be associated with described identity information and the operation note text generated according to the recording method in described claim 1, and by described operation note text output extremely described simulated operation with on shown; If recognition failures, then refuse inquiry request.
8. the read method realizing power station running status debugging recording based on simulated operation screen according to claim 7, it is characterized in that, the method obtaining described identity information is: the IC-card or radio-frequency card that store identity information are positioned in the card-reading zone on simulated operation screen, to complete the automatic reading of described identity information.
CN201510141836.8A 2015-03-27 2015-03-27 A kind of record and read method of power station running status debugging Expired - Fee Related CN104777808B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510141836.8A CN104777808B (en) 2015-03-27 2015-03-27 A kind of record and read method of power station running status debugging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510141836.8A CN104777808B (en) 2015-03-27 2015-03-27 A kind of record and read method of power station running status debugging

Publications (2)

Publication Number Publication Date
CN104777808A true CN104777808A (en) 2015-07-15
CN104777808B CN104777808B (en) 2017-07-14

Family

ID=53619338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510141836.8A Expired - Fee Related CN104777808B (en) 2015-03-27 2015-03-27 A kind of record and read method of power station running status debugging

Country Status (1)

Country Link
CN (1) CN104777808B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107886305A (en) * 2017-11-24 2018-04-06 上海华力微电子有限公司 A kind of method of one-touch activation Data Collection project
CN108490894A (en) * 2018-02-27 2018-09-04 浙江浙能兰溪发电有限责任公司 The monitoring method of power plant valve and the monitoring device of power plant valve

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102340180A (en) * 2011-09-23 2012-02-01 河南省电力公司南阳供电公司 Remote forced monitoring system for transformer station switching operation
WO2012114113A2 (en) * 2011-02-23 2012-08-30 Responsiveload Limited Virtual power station
CN103177399A (en) * 2013-03-13 2013-06-26 国家电网公司 Transformer substation standard operation firming method
CN103199455A (en) * 2013-03-13 2013-07-10 国家电网公司 Solidification power transformation specification operation system
CN104065169A (en) * 2014-07-04 2014-09-24 国家电网公司 Distributed universal virtual plug-in system of intelligent substation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012114113A2 (en) * 2011-02-23 2012-08-30 Responsiveload Limited Virtual power station
CN102340180A (en) * 2011-09-23 2012-02-01 河南省电力公司南阳供电公司 Remote forced monitoring system for transformer station switching operation
CN103177399A (en) * 2013-03-13 2013-06-26 国家电网公司 Transformer substation standard operation firming method
CN103199455A (en) * 2013-03-13 2013-07-10 国家电网公司 Solidification power transformation specification operation system
CN104065169A (en) * 2014-07-04 2014-09-24 国家电网公司 Distributed universal virtual plug-in system of intelligent substation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107886305A (en) * 2017-11-24 2018-04-06 上海华力微电子有限公司 A kind of method of one-touch activation Data Collection project
CN108490894A (en) * 2018-02-27 2018-09-04 浙江浙能兰溪发电有限责任公司 The monitoring method of power plant valve and the monitoring device of power plant valve
CN108490894B (en) * 2018-02-27 2020-12-01 浙江浙能兰溪发电有限责任公司 Monitoring method and monitoring device for power plant valve

Also Published As

Publication number Publication date
CN104777808B (en) 2017-07-14

Similar Documents

Publication Publication Date Title
CN105005658B (en) Transformer station's integrated system apparatus logic emulation mode
CN103389705B (en) Operation supervise and control system and operation supervise and control method
CN100583920C (en) Method and apparatus for generating testing script, testing method, apparatus and system
CN110942403B (en) Table area topology model standing book acquisition system and method for mobile equipment
CN103593809A (en) Intelligent operation-ticket semanteme verification method of automatic power dispatching system
CN109800156A (en) A kind of subway signal system automation test method based on profile command
CN105530541A (en) Set top box hardware test method and device
CN110456750B (en) Information acquisition equipment, forging die production information acquisition system and working method thereof
CN104808516A (en) Electrical equipment operation control method and device
CN103559098B (en) Smart card test number control, Apparatus and system
CN110989547A (en) Detection method and system for intelligent substation one-key sequence control system
CN110854725B (en) Service linkage system and method between multiple power substations
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN104777808A (en) Recording method for operating condition debugging of power station as well as record reading methods
CN103441895B (en) A kind of automatization cipher machine test system and its method of work
CN110733037B (en) Signal processing method and device, storage medium and processor
JP3842154B2 (en) Power system monitoring and control device
CN106777220A (en) A kind of processing method of the continuous unusual fluctuation of power distribution network artwork
CN115146942B (en) Electronic operation ticket system and operation method for hydropower plant
CN104486117B (en) A kind of the configuration order exchange method and system of more board core switch
CN101895439A (en) Multi-network element polling device and method
CN105243096B (en) A kind of XML file treating method and apparatus
CN105630634A (en) Application system disaster recovery backup switching method and device
CN105117305A (en) Data management apparatus for intelligent device of intelligent substation
CN110971000A (en) Automatic constant value setting system for feeder and setting method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170714

Termination date: 20190327

CF01 Termination of patent right due to non-payment of annual fee