CN109137946A - 一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法 - Google Patents
一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法 Download PDFInfo
- Publication number
- CN109137946A CN109137946A CN201811268882.4A CN201811268882A CN109137946A CN 109137946 A CN109137946 A CN 109137946A CN 201811268882 A CN201811268882 A CN 201811268882A CN 109137946 A CN109137946 A CN 109137946A
- Authority
- CN
- China
- Prior art keywords
- double
- guide pile
- wall steel
- cofferdam
- steel boxed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
Abstract
本发明在此提供一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法;解决了在湍急岩质河床环境下,双壁钢围堰下放时受水流力作用难以精确定位,且下放后由于河床无覆盖层,双壁钢围堰难以稳固的问题。如图1‑图5所示,本发明专利首先利用冲击钻施工定位孔,然后按设计定位孔位置下放定位桩,为保证定位桩在定位孔内锚固牢靠,定位桩下放后在桩内灌注混凝土,钢围堰下放时通过定位桩对围堰的位移进行约束。双壁钢围堰下放至河床后,在双壁钢围堰夹壁内按设计高度浇注夹壁混凝土,使双壁钢围堰与定位桩粘结形成整体,从而达到稳固双壁钢围堰的目的。
Description
技术领域
本发明涉及一种围堰快速定位与稳固施工方法,具体讲是一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法。
背景技术
湍急岩质河床双壁钢围堰施工时,现通常采用如下措施进行操作;
一、双壁钢围堰下放时,由于水流力较大,双壁钢围堰在未稳固前极易被水流冲走,因此现通常在围堰四周设置拉索进行定位,此方式定位精度较低,且拉索数量较多,易对附近航道产生安全隐患。
二、双壁钢围堰下放后,由于河床无覆盖层,双壁钢围堰难以稳固,因此现通常在双壁钢围堰四周回填砂卵石,此方式将对双壁钢围堰根部产生较大土压力,给双壁钢围堰结构造成一定安全风险。
发明内容
因此,为了解决上述不足,本发明在此提供一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法;解决了在湍急岩质河床环境下,双壁钢围堰下放时受水流力作用难以精确定位,且下放后由于河床无覆盖层,双壁钢围堰难以稳固的问题。
本发明是这样实现的,构造一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法,其特征在于:
首先利用冲击钻施工定位孔,然后按设计定位孔位置下放定位桩,为保证定位桩在定位孔内锚固牢靠,定位桩下放后在桩内灌注混凝土,钢围堰下放时通过定位桩对围堰的位移进行约束;双壁钢围堰下放至河床后,在双壁钢围堰夹壁内按设计高度浇注夹壁混凝土,使双壁钢围堰与定位桩粘结形成整体,从而达到稳固双壁钢围堰的目的;
施工步骤如下:
1)、钻孔:利用冲击钻按定位桩桩位施工定位孔,为保证定位桩具有足够的埋置深度,定位孔孔深不得小于2m,孔径不得小于50cm;
2)、定位桩安装:钻孔完成后,利用吊车安装φ325×6mm定位桩,为保证定位桩在定位孔内锚固牢靠,确保定位桩桩底四周与河床岩石间充满混凝土,故定位桩下放至孔底20cm处时停止下放,然后向孔内浇注混凝土;
3)、双壁钢围堰下放:待定位桩内混凝土强度达到设计要求后即可下放双壁钢围堰;由于双壁钢围堰水平斜撑与定位桩距离较近,因此围堰下放时在水流力作用下不会产生较大位移;
4)、浇注夹壁混凝土:双壁钢围堰下放至河床后,按设计高度浇注夹壁混凝土,通过夹壁混凝土将双壁钢围堰与定位桩粘结形成整体,从而达到稳固双壁钢围堰的目的。
本发明具有如下优点:本发明在此提供一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法;解决了在湍急岩质河床环境下,双壁钢围堰下放时受水流力作用难以精确定位,且下放后由于河床无覆盖层,双壁钢围堰难以稳固的问题。如图1-图5所示,本发明专利首先利用冲击钻施工定位孔,然后按设计定位孔位置下放定位桩,为保证定位桩在定位孔内锚固牢靠,定位桩下放后在桩内灌注混凝土,钢围堰下放时通过定位桩对围堰的位移进行约束。双壁钢围堰下放至河床后,在双壁钢围堰夹壁内按设计高度浇注夹壁混凝土,使双壁钢围堰与定位桩粘结形成整体,从而达到稳固双壁钢围堰的目的。
本专利具体的优点体现为:
(1)定位精度高,定位设施不占用围堰附近水域,对周围船舶通行影响小;
(2)定位速度快,现场仅需控制定位桩的安装位置,围堰下放后无需二次定位;
(3)直接利用夹壁混凝土与定位桩粘结进行稳固,围堰稳固效果好,不会增加围堰荷载,结构安全可靠。
附图说明
图1是本发明立面布置图(顺桥向);
图2是本发明立面布置图(横桥向);
图3是本发明平面布置图;
图4是本发明定位桩桩底大样图;
图5是本发明定位桩处围堰夹壁大样图。
其中:φ325×6定位桩1,双壁钢围堰2,夹壁混凝土3,封底混凝土4,墩柱5,承台6,灌注桩基础7,∅600×10钢管内支撑8,水平斜撑9,定位孔10。
具体实施方式
下面将结合附图1-图5对本发明进行详细说明,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明在此提供一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法;解决了在湍急岩质河床环境下,双壁钢围堰下放时受水流力作用难以精确定位,且下放后由于河床无覆盖层,双壁钢围堰难以稳固的问题。
如图1-图5所示,本发明专利首先利用冲击钻施工定位孔,然后按设计定位孔位置下放定位桩,为保证定位桩在定位孔内锚固牢靠,定位桩下放后在桩内灌注混凝土,钢围堰下放时通过定位桩对围堰的位移进行约束。双壁钢围堰下放至河床后,在双壁钢围堰夹壁内按设计高度浇注夹壁混凝土,使双壁钢围堰与定位桩粘结形成整体,从而达到稳固双壁钢围堰的目的。
本发明具体施工步骤如下:
1)、钻孔:利用冲击钻按定位桩桩位施工定位孔,为保证定位桩具有足够的埋置深度,定位孔孔深不得小于2m,孔径不得小于50cm;
2)、定位桩安装:钻孔完成后,利用吊车安装φ325×6mm定位桩,为保证定位桩在定位孔内锚固牢靠,确保定位桩桩底四周与河床岩石间充满混凝土,故定位桩下放至孔底20cm处时停止下放,然后向孔内浇注混凝土;
3)、双壁钢围堰下放:待定位桩内混凝土强度达到设计要求后即可下放双壁钢围堰;由于双壁钢围堰水平斜撑与定位桩距离较近,因此围堰下放时在水流力作用下不会产生较大位移;
4)、浇注夹壁混凝土:双壁钢围堰下放至河床后,按设计高度浇注夹壁混凝土,通过夹壁混凝土将双壁钢围堰与定位桩粘结形成整体,从而达到稳固双壁钢围堰的目的。
本专利具有如下优点:
(1)定位精度高,定位设施不占用围堰附近水域,对周围船舶通行影响小;
(2)定位速度快,现场仅需控制定位桩的安装位置,围堰下放后无需二次定位;
(3)直接利用夹壁混凝土与定位桩粘结进行稳固,围堰稳固效果好,不会增加围堰荷载,结构安全可靠。
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。
Claims (1)
1.一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法,其特征在于:
首先利用冲击钻施工定位孔,然后按设计定位孔位置下放定位桩,为保证定位桩在定位孔内锚固牢靠,定位桩下放后在桩内灌注混凝土,钢围堰下放时通过定位桩对围堰的位移进行约束;双壁钢围堰下放至河床后,在双壁钢围堰夹壁内按设计高度浇注夹壁混凝土,使双壁钢围堰与定位桩粘结形成整体,从而达到稳固双壁钢围堰的目的;
施工步骤如下:
1)、钻孔:利用冲击钻按定位桩桩位施工定位孔(10),为保证定位桩具有足够的埋置深度,定位孔孔深不得小于2m,孔径不得小于50cm;
2)、定位桩安装:钻孔完成后,利用吊车安装φ325×6mm定位桩(1),为保证定位桩在定位孔内锚固牢靠,确保定位桩桩底四周与河床岩石间充满混凝土,故定位桩下放至孔底20cm处时停止下放,然后向孔内浇注混凝土;
3)、双壁钢围堰下放:待定位桩内混凝土强度达到设计要求后即可下放双壁钢围堰(2);由于双壁钢围堰水平斜撑与定位桩距离较近,因此围堰下放时在水流力作用下不会产生较大位移;
4)、浇注夹壁混凝土:双壁钢围堰(2)下放至河床后,按设计高度浇注夹壁混凝土(3),通过夹壁混凝土将双壁钢围堰与定位桩粘结形成整体,从而达到稳固双壁钢围堰的目的。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811268882.4A CN109137946B (zh) | 2018-10-29 | 2018-10-29 | 一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811268882.4A CN109137946B (zh) | 2018-10-29 | 2018-10-29 | 一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109137946A true CN109137946A (zh) | 2019-01-04 |
CN109137946B CN109137946B (zh) | 2021-01-26 |
Family
ID=64806697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811268882.4A Active CN109137946B (zh) | 2018-10-29 | 2018-10-29 | 一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109137946B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113216227A (zh) * | 2021-04-22 | 2021-08-06 | 浙大城市学院 | 复杂湍急水域钢围堰的施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1884719A (zh) * | 2006-06-08 | 2006-12-27 | 中铁大桥局股份有限公司 | 围堰内无封底混凝土、开口高低刃脚双壁钢围堰施工工艺 |
CN101358453A (zh) * | 2008-08-21 | 2009-02-04 | 中铁大桥局股份有限公司 | 复合型套箱围堰及其建造方法 |
JP2014015809A (ja) * | 2012-07-11 | 2014-01-30 | Okumura Corp | 鋼矢板の継手部止水工法及び流出防止金物 |
CN105604072A (zh) * | 2016-01-18 | 2016-05-25 | 中国铁建大桥工程局集团有限公司 | 一种钢护筒围堰及应用钢护筒围堰的钢护筒沉放就位方法 |
-
2018
- 2018-10-29 CN CN201811268882.4A patent/CN109137946B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1884719A (zh) * | 2006-06-08 | 2006-12-27 | 中铁大桥局股份有限公司 | 围堰内无封底混凝土、开口高低刃脚双壁钢围堰施工工艺 |
CN101358453A (zh) * | 2008-08-21 | 2009-02-04 | 中铁大桥局股份有限公司 | 复合型套箱围堰及其建造方法 |
JP2014015809A (ja) * | 2012-07-11 | 2014-01-30 | Okumura Corp | 鋼矢板の継手部止水工法及び流出防止金物 |
CN105604072A (zh) * | 2016-01-18 | 2016-05-25 | 中国铁建大桥工程局集团有限公司 | 一种钢护筒围堰及应用钢护筒围堰的钢护筒沉放就位方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113216227A (zh) * | 2021-04-22 | 2021-08-06 | 浙大城市学院 | 复杂湍急水域钢围堰的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109137946B (zh) | 2021-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103967031B (zh) | 一种加固地基的沉箱与桩组合基础及其施工方法 | |
CN102966108B (zh) | 紧临既有建筑物以地下结构为内支撑的深基坑施工方法 | |
CN102953341B (zh) | 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构 | |
CN102392458B (zh) | 一种水中裸岩基础施工用钢板桩围堰施工方法 | |
CN104018512B (zh) | 对环境微扰动的沉井下沉施工方法 | |
WO2015135471A1 (zh) | 水上平台结构水底固定用空心筒墩及其安装施工方法 | |
CN204199335U (zh) | 一种减小phc管桩施工挤土效应的泄压井 | |
CN102979069A (zh) | 一种在深水急流无覆盖层陡峭裸岩上的钻孔桩平台施工方法 | |
CN102953362B (zh) | 一种设置在深水急流无覆盖层陡峭裸岩上的钻孔桩平台 | |
CN102979039B (zh) | 一种在深水急流无覆盖层陡峭裸岩上的高位栈桥施工方法 | |
CN105239598A (zh) | 井式全自动立体车库的整体下沉施工方法 | |
CN101205721A (zh) | 深水低桩承台施工中用钢围堰结合高压旋喷桩围水的方法 | |
CN101906787B (zh) | 含砂礓石地层中大深度竖向测斜管施工置备的方法 | |
CN107012871B (zh) | 一种悬挂式围护深大长基坑装配式结构的逆作施工方法 | |
CN102966111A (zh) | 一种在深水急流无覆盖层陡峭裸岩上的钢管桩锚固施工方法 | |
CN106351241A (zh) | 紧临既有线大跨度连续梁深水基础施工方法 | |
CN104164881A (zh) | 一种桩墙叠合悬臂基坑支护施工方法及结构 | |
CN203049443U (zh) | 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构 | |
CN106758759B (zh) | 一种用于深水裸岩河床的栈桥桩基及其锚固方法 | |
CN204311435U (zh) | 一种旋挖咬合钢筋混凝土防渗墙 | |
CN106223355A (zh) | 一种深水高桩承台抱箍法有底钢套箱的装置及施工方法 | |
JP2020122288A (ja) | 洋上風力発電用基礎の下部構造および洋上風力発電用基礎の下部構造の施工方法 | |
CN109137946A (zh) | 一种湍急岩质河床双壁钢围堰快速定位与稳固施工方法 | |
CN106400807B (zh) | 海工驳船灌浆方法及其设备 | |
CN107178088A (zh) | 一种地下室防水基坑结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |