CN109117531A - A kind of Architectural Equipment O&M method for inspecting and system based on BIM model - Google Patents

A kind of Architectural Equipment O&M method for inspecting and system based on BIM model Download PDF

Info

Publication number
CN109117531A
CN109117531A CN201810844708.3A CN201810844708A CN109117531A CN 109117531 A CN109117531 A CN 109117531A CN 201810844708 A CN201810844708 A CN 201810844708A CN 109117531 A CN109117531 A CN 109117531A
Authority
CN
China
Prior art keywords
architectural equipment
model
bim model
bim
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810844708.3A
Other languages
Chinese (zh)
Inventor
李超
蔡剑峰
宋胜利
孙含福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Hong Xin Technological Service Co Ltd
Original Assignee
Wuhan Hong Xin Technological Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Hong Xin Technological Service Co Ltd filed Critical Wuhan Hong Xin Technological Service Co Ltd
Priority to CN201810844708.3A priority Critical patent/CN109117531A/en
Publication of CN109117531A publication Critical patent/CN109117531A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Geometry (AREA)
  • Business, Economics & Management (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Health & Medical Sciences (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Computational Mathematics (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of Architectural Equipment O&M method for inspecting based on BIM model builds the BIM model system of building outdoor scene, and the Architectural Equipment for building outdoor scene is corresponding with the Architectural Equipment model of BIM model to associate;The operating parameter for obtaining Architectural Equipment, the operating parameter of Architectural Equipment is associated on Architectural Equipment model;According to the position of inspection in BIM model, Architectural Equipment model running parameter a certain range of in model is shown on BIM model, realizes and O&M inspection is carried out to Architectural Equipment using BIM model.The invention also discloses a kind of Architectural Equipment O&M cruising inspection system based on BIM model.Technical solution of the present invention, inspection for current Architectural Equipment relies on subjective observation, and inefficiency, the problem of being easy to missing inspection or inspection not in time, a kind of new Architectural Equipment O&M method for inspecting is constructed on the basis of BIM model, administrative staff can be checked and be managed comprehensively to equipment to be inspected in whole building according to predetermined patrol plan.

Description

A kind of Architectural Equipment O&M method for inspecting and system based on BIM model
Technical field
The invention belongs to architecture intellectualized management fields, and in particular to a kind of Architectural Equipment O&M based on VR and BIM model Method for inspecting.
Background technique
The full name in English of architecture information model (BIM) is Building Information Modeling, is one complete Standby information model, can by engineering project in Life cycle the engineering information of each different phase, process and resource set In Cheng Yi model, easily used by each participant of engineering.By true possessed by 3-dimensional digital technical modelling building Real information provides mutually coordinated, internally consistent information model for engineering design and construction, and the model is made to reach design and construction Integration, each profession cooperates, to reduce engineering production cost, ensures that engineering presses matter completion on time.
Virtual reality technology (VR, Virtual Reality) is an important directions of emulation technology, be emulation technology with The set of the multiple technologies such as computer graphics human-machine interface technology multimedia technology sensing technology network technology, is one rich The interleaving techniques front subject and research field of challenge.Virtual reality technology (VR) mainly includes simulated environment, perception, nature Technical ability and sensing equipment etc..Simulated environment be generated by computer, dynamic 3 D stereo photorealism in real time.
Architectural Equipment inspection is the efficiency of the quality and raising inspection work by ensuring inspection work to improve equipment A kind of horizontal mode of maintenance, the purpose is to grasp the variation of equipment operation condition and ambient enviroment, discovery facility defect and Jeopardize safe hidden danger, adopt an effective measure in time, guarantees that the safety of equipment and system are stablized.During inspection, in time It was found that security risk and adopt an effective measure be it is critically important, especially in some large-scale, crowded construction areas.But It is at present by equipment routing inspection to solve following three main bugbears that current Architectural Equipment inspection faces: 1. inspections are not in place, Missing inspection or unpunctual;2. making a report on inspection result low efficiency by hand, being easy leakage item or error;3. administrative staff are difficult to timely, quasi- Really, comprehensively understand line conditions, it is difficult to formulate optimal maintenance and repair scheme.
In practice, the intelligent building 3D visualization technique based on BIM also obtains unprecedented development, with the hair of software technology Open up it is more and more high-end, user the use of software perception is required it is higher and higher, especially to using building intellectualization management as target IBMS platform for, the 3D presentation technology that the information such as building construction structure, map are presented in such a way that 3D is visual is in the industry One of inexorable trend and intelligent building field core technology of cutting edge technology development.VR technology has become the hair of emphasis at present Trend is opened up, wisdom garden, intelligent building merge VR technology, more get information about the basic condition of garden, building, in addition entirely certainly The advanced application function such as roaming, the taking turn of dynamicization can reach wisdom garden and efficient, automatic, the energy-efficient O&M pipe of intelligent building The purpose of reason, and comprehensive garden, building automatic roaming;Automatic video frequency in garden and groups of building is realized in conjunction with video monitoring system It makes an inspection tour, realizes the AR presentation technology that real video scene is combined with dummy model.It is further promoted safe, comfortable, convenient, high The humane life of effect, working environment.
Summary of the invention
Aiming at the above defects or improvement requirements of the prior art, the present invention provides a kind of building based on VR and BIM model Equipment O&M method for inspecting is built, at least can partially be solved the above problems.The method of technical solution of the present invention, for current building The inspection of equipment relies on the subjective observation of staff, and inefficiency, it is easy to missing inspection or inspection not in time, to cause The case where security risk, allows administrative staff according to predetermined patrol plan, to whole by the way of BIM models coupling VR Equipment to be inspected is checked comprehensively in a building, while can also carry out comprehensive management to the equipment in building.
To achieve the above object, according to one aspect of the present invention, a kind of Architectural Equipment fortune based on BIM model is provided Tie up method for inspecting, which is characterized in that including
S1 builds the BIM model system of building outdoor scene, and will build the Architectural Equipment of the Architectural Equipment and BIM model of outdoor scene Model correspondence associates;
The operating parameter that S2 obtains Architectural Equipment will be built according to the corresponding relationship of Architectural Equipment and Architectural Equipment model The operating parameter of equipment is associated on Architectural Equipment model;
S3 exists Architectural Equipment model running parameter a certain range of in model according to the position of inspection in BIM model It is shown on BIM model, realizes and O&M inspection is carried out to Architectural Equipment using BIM model.
Preferably as one of technical solution of the present invention, step S1 includes,
S11 builds the BIM model system of building outdoor scene, is set using building of the identical device id to corresponding building outdoor scene Standby and BIM model Architectural Equipment model is numbered;
S12 sets up incidence relation between the Architectural Equipment and Architectural Equipment model of device id having the same, will build The operating status for building equipment is associated on Architectural Equipment model;
The BIM model partition is multiple subsystems, the son by classification of the S13 according to Architectural Equipment, bonding apparatus ID It include at least one Architectural Equipment model in system.
Preferably as one of technical solution of the present invention, step S2 includes,
S21 obtains the operating parameter of Architectural Equipment according to the operating status of Architectural Equipment;
S22 binds the device id of Architectural Equipment, operating parameter, so that can check the Architectural Equipment by device id Operating parameter;;
Operating parameter in Architectural Equipment is associated with by S23 according to the corresponding relationship of Architectural Equipment and Architectural Equipment model On Architectural Equipment model.
Preferably as one of technical solution of the present invention, step S3 includes,
S31 establishes BIM model coordinate systems, determines coordinate of the current inspection position in BIM model;
S32 determines the effective distance that Architectural Equipment operating parameter is shown in BIM model, obtains the effective of current position coordinates The device id of Architectural Equipment model in distance;
S33 obtains the operating parameter of corresponding Architectural Equipment according to device id, and the operating parameter is shown in BIM model Out.
One as technical solution of the present invention is preferred, includes in step S3,
S31 ' arbitrarily selects one or more Architectural Equipments at least one subsystem to patrol as the O&M of Architectural Equipment Examine target;
S32 ' determines what current inspection position Architectural Equipment parameter in the coordinate and BIM model in BIM model was shown Effective range;
S33 ' determines the Architectural Equipment in its effective range in selected subsystem according to the coordinate of current inspection position Operating parameter, and shown in BIM model.
According to one aspect of the present invention, a kind of Architectural Equipment O&M cruising inspection system based on BIM model is provided, it is special Sign is, including,
BIM model buildings module, for building the BIM model system of building outdoor scene, and the Architectural Equipment that outdoor scene will be built It is corresponding with the Architectural Equipment model of BIM model to associate;
Device parameter information module, for obtaining the operating parameter of Architectural Equipment, according to Architectural Equipment and Architectural Equipment mould The operating parameter of Architectural Equipment is associated on Architectural Equipment model by the corresponding relationship of type;
O&M polling module, for the position according to inspection in BIM model, by Architectural Equipment a certain range of in model Model running parameter is shown on BIM model, is realized and is carried out O&M inspection to Architectural Equipment using BIM model.
Preferably as one of technical solution of the present invention, BIM model buildings module includes,
Device model module, for building the BIM model system of building outdoor scene, using identical device id to building accordingly The Architectural Equipment model of the Architectural Equipment and BIM model of building outdoor scene is numbered;
Relating module, for setting up association between the Architectural Equipment of device id having the same and Architectural Equipment model The operating status of Architectural Equipment is associated on Architectural Equipment model by relationship;
Subsystem module, for the classification according to Architectural Equipment, the BIM model partition is multiple by bonding apparatus ID Subsystem includes at least one Architectural Equipment model in the subsystem.
Preferably as one of technical solution of the present invention, device parameter information module includes,
Parameter acquisition module obtains the operating parameter of Architectural Equipment for the operating status according to Architectural Equipment;
Parameter binding module, for binding the device id of Architectural Equipment, operating parameter, so that can be looked by device id See the operating parameter of the Architectural Equipment;
Parameter association module will be in Architectural Equipment for the corresponding relationship according to Architectural Equipment and Architectural Equipment model Operating parameter is associated on Architectural Equipment model.
Preferably as one of technical solution of the present invention, O&M polling module includes,
Position coordinates module determines coordinate of the current inspection position in BIM model for establishing BIM model coordinate systems;
Model capture module obtains current for determining Architectural Equipment operating parameter is shown in BIM model effective distance The device id of Architectural Equipment model in the effective distance of position coordinates;
Device parameter module, for obtaining the operating parameter of corresponding Architectural Equipment according to device id, by the operating parameter It is shown in BIM model.
Preferably as one of technical solution of the present invention, O&M polling module includes,
Object module, for any one or more Architectural Equipments selected at least one subsystem as Architectural Equipment O&M inspection target;
Locating module, for determining current inspection position Architectural Equipment in the coordinate and BIM model in BIM model The effective range that parameter is shown;
Display module determines in its effective range in selected subsystem for the coordinate according to current inspection position Architectural Equipment operating parameter, and shown in BIM model.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, have below beneficial to effect Fruit:
1) method of technical solution of the present invention, using BIM model, by unique device id by Architectural Equipment itself with Architectural Equipment model interaction in BIM model gets up, and then the operating parameter of actual Architectural Equipment is passed through Unique Device ID Correspondence is associated in BIM model, is realized and is carried out real-time inspection using operating status of the BIM model to Architectural Equipment, improves The routing inspection efficiency and safety of Architectural Equipment, while being greatly reduced missing inspection and false retrieval problem odds.
2) method of technical solution of the present invention, using Unique Device ID to corresponding Architectural Equipment and Architectural Equipment model into Row number to realize the corresponding association of the two, while being numbered Architectural Equipment and buildings model using device id, has Help that Architectural Equipment is classified and managed by BIM model, is needing to the same category of device (building in a such as subsystem Equipment or associated some Architectural Equipments) carry out inspection when, targetedly it can be selected.
3) method of technical solution of the present invention can be closed the operating parameter of Architectural Equipment in real time by Unique Device ID It is linked in BIM model, on the one hand realizes and Architectural Equipment is monitored and managed in real time by BIM model, on the other hand, Also improve the efficiency of Architectural Equipment O&M inspection.In addition, in the process for carrying out O&M inspection to Architectural Equipment using BIM model In, it can also be adjusted at any time according to the actual situation, substantially increase the convenience of O&M inspection.
Detailed description of the invention
Fig. 1 is the flow chart of the Architectural Equipment O&M method for inspecting in technical solution of the present invention embodiment based on BIM model;
Fig. 2 is that BIM model builds flow chart in technical solution of the present invention embodiment;
Fig. 3 is that BIM model and the operating parameter of Architectural Equipment are associated with flow chart in technical solution of the present invention embodiment;
Fig. 4 is the flow chart for carrying out the inspection of Architectural Equipment O&M in technical solution of the present invention embodiment using BIM model;
Fig. 5 is carried out using BIM model to Architectural Equipment subsystem or Architectural Equipment in technical solution of the present invention embodiment The flow chart of Architectural Equipment O&M inspection;
Fig. 6 is the Architectural Equipment O&M inspection structure chart in technical solution of the present invention embodiment based on BIM model;
Fig. 7 be in technical solution of the present invention embodiment using BIM model to video monitoring system carry out inspection during State diagram;
Fig. 8 be in technical solution of the present invention embodiment using BIM model to fire-fighting system carry out inspection during during The state diagram of volume.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below Not constituting a conflict with each other can be combined with each other.The present invention is described in more detail With reference to embodiment.
Provided in the embodiment of technical solution of the present invention a kind of Architectural Equipment O&M method for inspecting based on BIM model and System, this method and system can also be combined with VR technology etc., realized and realized in buildings model using VR technology and build garden Virtually stroll.Just so-called What You See Is What You Get, can in conjunction with VR technology using BIM model in huge garden and groups of building Further intuitively to realize garden, building building O&M, realize that garden, building building equipment O&M automatic detecting have become Intelligent building green, a kind of trend of efficient O&M.Operation maintenance personnel, more can be intuitive, efficient in the case where staying indoors Solve garden, build building real-time status, and using VR technology can office it is on the spot in person accomplish patrol garden, understanding garden The timely state and security alarm information of all weak current equipments in area, save a large amount of human costs and garden patrol time, realize Efficiently, economic O&M mode.By the architecture information attribute characteristic powerful using BIM, the powerful the intuitional and experiential thinking of VR is being added, And the powerful building intelligent O&M control system of IBMS platform is integrated, the orderly fortune in our garden, building building is ensured jointly Row provides comfortable work, living environment for us.
Technical solution of the present invention is further detailed combined with specific embodiments below.One is provided in the present embodiment Architectural Equipment O&M method for inspecting and system of the kind based on BIM model, wherein as shown in Figure 1, the process includes following portion Point:
Firstly, it is necessary to build the BIM model of building outdoor scene according to the building outdoor scene of practical construction area (such as rainbow letter garden) System.Internal structure arrangement including arrangement pattern and every solitary building between campus building.The internal junction of building Structure arrangement includes the layer structure of building, Architectural Equipment arrangement etc., and Architectural Equipment has weak current equipment system and multiple equipment System etc..The device systems of building include at least video monitoring system, fire-fighting system, perimeter system, access control system, air-conditioning system Multiple subsystems such as system, lighting system, as shown in Figure 6.Further, right as shown in Fig. 2, during building BIM model Each device model is numbered, and assigns its unique device id, meanwhile, building of the Architectural Equipment model in practical real account Corresponding Architectural Equipment also uses same device id in outdoor scene, to realize actual Architectural Equipment and building in BIM model Device model correspondence is built to associate.Meanwhile in the present embodiment, preferably according to the device id of Architectural Equipment equipment, will entirely it set Standby system is divided into multiple subsystems, i.e., multiple subsystems including weak current equipment system.
Secondly, obtaining the operating parameter of equipment.It for example, include multiple cameras, distribution in video monitoring system In multiple positions of construction area, each camera is responsible for obtaining image, the sound picture of different zones.Obtaining video monitoring In system when the operating parameter of any camera, need to obtain the model of this camera, position, the region for being responsible for shooting and The image etc. in the region taken.According to the demand of Architectural Equipment equipment Yun inspection, it can pointedly be obtained and be set with specific aim Standby operating parameter is not limited in the type for being enumerated above out.It include that the equipment exists in the operating parameter of Architectural Equipment Whole parameter informations of display can be digitized in operational process.According to the corresponding pass between Architectural Equipment and Architectural Equipment model The operating parameter of Architectural Equipment correspondence can be associated on Architectural Equipment model by system.So that staff in BIM model just It can check the operating parameter of Architectural Equipment.
Finally, carrying out O&M inspection to Architectural Equipment using BIM model realization.Specifically, BIM model buildings are completed Afterwards, by switching visual angle, it can be realized and entire garden is observed in BIM model.If establishing BIM model coordinate systems, So observation position be also in BIM model with position coordinates, likewise, each device model be also have it is respective only One coordinate.For the observation inspection distinguished more effective for each Architectural Equipment, using BIM model display when It waits, displaing coordinate shows that operating parameter, that is, the building are set on the observation a certain range of Architectural Equipment model in position The actual operation parameters of the standby corresponding Architectural Equipment of model.
Further, in the present embodiment, in order to the Architectural Equipment of what comes into a driver's and the Architectural Equipment model of BIM model will be built Correspondence associates, by the way of carrying out unique number to Architectural Equipment and its corresponding Architectural Equipment model.Namely It says, for the Architectural Equipment model in actual Architectural Equipment and its corresponding BIM model, using identical device id to it It is numbered, and this device id is uniquely, not repeat with other equipment ID, build so that the device id is uniquely directed toward this Build equipment and its corresponding Architectural Equipment model.As shown in figure 3, in the present embodiment, by the corresponding equipment of building Architectural Equipment ID and operating parameter are bound, and can find corresponding Architectural Equipment operating parameter using the device id.In this case, exist In BIM model, arbitrarily selected Architectural Equipment model can obtain the device id of the device model, and then the available building is set The operating parameter of the standby corresponding Architectural Equipment of model.It is important to note that by device id and Architectural Equipment operating parameter After being bound, the operating parameter of Architectural Equipment still can carry out dynamic update according to the actual motion state of Architectural Equipment, from And realizing the equipment operating parameter obtained according to device id is all the real time execution parameter of the Architectural Equipment.
As shown in figure 4, during carrying out the inspection of Architectural Equipment O&M using BIM model, it is necessary first to determine current Position of the inspection position in BIM model.Then the Architectural Equipment model within the scope of effective distance operating parameter shown The Architectural Equipment operating parameter being associated with is shown.The effective distance that operating parameter is shown can be set according to demand. According to the O&M inspection demand of Architectural Equipment, it is also an option that any one or more subsystems, during inspection, just for Property shows the operating parameter of the Architectural Equipment in the subsystem chosen, as shown in Figure 5.
In other words, it using the building building and equipment O&M method for inspecting and system of the present embodiment, may be implemented in BIM Automatic roaming, the inspection of building equipment are carried out in model, and can be intuitive by roaming, the whole process of inspection by VR glasses Presentation it is before eyes.Including the method that device model in BIM and weak current equipment subsystem integrate, inspection route is selected in BIM model It selects, the method for inspection device selection, gets through data link, realize in BIM model Dynamic Display device attribute, video resource Method.
Wherein, the method that weak current equipment model and equipment subsystem integrate in BIM, equipment subsystem include including video System, fire-fighting subsystem, circumference subsystem, gate inhibition's subsystem, air conditioning subsystem, illumination subsystems and other subsystems;Pass through Device model component in BIM is associated by customized unique mark with equipment, and its business operation is function integrated flat Platform realizes the purpose that building equipment is managed in BIM model.
Automatic roaming inspection, including customized inspection route in a model are realized in a model, and can be in route week Equipment in the coverage area of side is checked, the detail parameters and operating status of these equipment are understood.It can be with customized inspection Equipment specifies several equipment, checks according to specified sequence equipment in BIM model, also will appreciate that the detailed of equipment Parameter and operating status.
Wherein, during presentation device detail parameters and operating status, by getting through data link, in BIM model The business function for checking equipment can be operated, achievees the purpose that control equipment.For example, by by mono- camera shooting head model and one of BIM After a real camera is associated with by unique identification, in all detailed attributes for being directly viewable the camera in a model, and energy Open video resource, control holder operation etc..Accomplish also to add instant video information during camera device inspection It sets out and, the presentation that implementation model, real video resource combine.For better visual effect, VR glasses can also be utilized, Can sense of reality equipment routing inspection, automatic roaming in BIM model, the purpose of cognition on the spot in person in true garden inspection.
In the embodiment of technical solution of the present invention, including the groups such as equipment subsystem, data link, BIM model, business function At unit, wherein equipment subsystem includes subsystem of video, fire-fighting subsystem, circumference subsystem, gate inhibition's subsystem, air-conditioning subsystem System, illumination subsystems and other subsystems, BIM model are counted by IBMS (intelligent building management system) with equipment subsystem According to integrating, achieve the purpose that control equipment in BIM model.And the present embodiment provides according to the automatic roaming of BIM model, automatically patrol The business functions such as inspection, VR experience, customized inspection route, customized inspection device, equipment routing inspection.Utilize video monitoring of the present invention During system automatic detecting, it can show that garden video camera detailed attribution information, online information, warning message etc. are a variety of Data, and show real-time video resource.For example, during carrying out inspection to video monitoring system using BIM model, when Have a camera in the effective range of preceding inspection position, then in BIM model, can operating parameter to the camera into Row real-time display, the real-time pictures including shooting camera access in BIM model, the dummy model of current BIM model are drawn Face is switched to the picture of camera captured in real-time.Meanwhile in BIM model, adjustable visual angle can be executed or change shooting The operation such as direction, these operations also can be changed specific camera, that is, change its bat by the incidence relation of device id Take the photograph angle or direction etc..Thus, can be in time to subsystems according to the data information observed in real time in BIM model And the Architectural Equipment in subsystem is regulated and controled, as shown in Figure 7.Further, Architectural Equipment is being carried out using BIM model During inspection, in addition to according to preset inspection route carry out inspection, can also custom-configure inspection route or It is to be adjusted at any time according to inspection situation to inspection route and inspection device, including switch Architectural Equipment either subsystem. In another specific embodiment, as shown in figure 8, can show garden smoke sensing equipment during fire-fighting equipment automatic detecting A variety of data such as detailed attribution information, online information, warning message.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include Within protection scope of the present invention.

Claims (10)

1. a kind of Architectural Equipment O&M method for inspecting based on BIM model, which is characterized in that including
S1 builds the BIM model system of building outdoor scene, and will build the Architectural Equipment model of the Architectural Equipment and BIM model of outdoor scene Correspondence associates;
S2 obtains the operating parameter of Architectural Equipment, according to the corresponding relationship of Architectural Equipment and Architectural Equipment model, by Architectural Equipment Operating parameter be associated on Architectural Equipment model;
S3 is according to the position of inspection in BIM model, by Architectural Equipment model running parameter a certain range of in model in BIM mould It is shown in type, realizes and O&M inspection is carried out to Architectural Equipment using BIM model.
2. a kind of Architectural Equipment O&M method for inspecting based on BIM model according to claim 2, wherein the step S1 includes,
S11 builds the BIM model system of building outdoor scene, using identical device id to the Architectural Equipment of corresponding building outdoor scene and The Architectural Equipment model of BIM model is numbered;
S12 sets up incidence relation between the Architectural Equipment and Architectural Equipment model of device id having the same, and building is set Standby operating status is associated on Architectural Equipment model;
The BIM model partition is multiple subsystems, the subsystem by classification of the S13 according to Architectural Equipment, bonding apparatus ID In include at least one Architectural Equipment model.
3. a kind of Architectural Equipment O&M method for inspecting based on BIM model according to claim 1 or 2, wherein the step Rapid S2 includes,
S21 obtains the operating parameter of Architectural Equipment according to the operating status of Architectural Equipment;
S22 binds the device id of Architectural Equipment, operating parameter, so that can check the operation of the Architectural Equipment by device id Parameter;
Operating parameter in Architectural Equipment is associated with building according to the corresponding relationship of Architectural Equipment and Architectural Equipment model by S23 On device model.
4. described in any item a kind of Architectural Equipment O&M method for inspecting based on BIM model according to claim 1~3, wherein The step S3 includes,
S31 establishes BIM model coordinate systems, determines coordinate of the current inspection position in BIM model;
S32 determines the effective distance that Architectural Equipment operating parameter is shown in BIM model, obtains the effective distance of current position coordinates The device id of interior Architectural Equipment model;
S33 obtains the operating parameter of corresponding Architectural Equipment according to device id, and the operating parameter is shown in BIM model Come.
5. a kind of described in any item Architectural Equipment O&M method for inspecting based on BIM model of claim 2~4, wherein described Include in step S3,
S31 ' arbitrarily selects O&M inspection mesh of the one or more Architectural Equipments at least one subsystem as Architectural Equipment Mark;
It is effective that S32 ' determines that current inspection position Architectural Equipment parameter in the coordinate and BIM model in BIM model is shown Range;
S33 ' determines the fortune of the Architectural Equipment in its effective range in selected subsystem according to the coordinate of current inspection position Row parameter, and shown in BIM model.
6. a kind of Architectural Equipment O&M cruising inspection system based on BIM model, which is characterized in that including,
BIM model buildings module, for building the BIM model system of building outdoor scene, and the Architectural Equipment and BIM that outdoor scene will be built The Architectural Equipment model correspondence of model associates;
Device parameter information module, for obtaining the operating parameter of Architectural Equipment, according to Architectural Equipment and Architectural Equipment model The operating parameter of Architectural Equipment is associated on Architectural Equipment model by corresponding relationship;
O&M polling module, for the position according to inspection in BIM model, by Architectural Equipment model a certain range of in model Operating parameter is shown on BIM model, is realized and is carried out O&M inspection to Architectural Equipment using BIM model.
7. a kind of Architectural Equipment O&M cruising inspection system based on BIM model according to claim 6, wherein the BIM mould Type builds module,
Device model module, it is real to corresponding building using identical device id for building the BIM model system of building outdoor scene The Architectural Equipment of scape and the Architectural Equipment model of BIM model are numbered;
Relating module is closed for setting up association between the Architectural Equipment of device id having the same and Architectural Equipment model System, the operating status of Architectural Equipment is associated on Architectural Equipment model;
Subsystem module, for the classification according to Architectural Equipment, the BIM model partition is multiple subsystems by bonding apparatus ID It unites, includes at least one Architectural Equipment model in the subsystem.
8. a kind of Architectural Equipment O&M cruising inspection system based on BIM model according to claim 6 or 7, wherein described to set Include for parameter information module,
Parameter acquisition module obtains the operating parameter of Architectural Equipment for the operating status according to Architectural Equipment;
Parameter binding module, for binding the device id of Architectural Equipment, operating parameter, so that can check this by device id The operating parameter of Architectural Equipment;
Parameter association module, for the corresponding relationship according to Architectural Equipment and Architectural Equipment model, by the operation in Architectural Equipment On parameter association to Architectural Equipment model.
9. according to a kind of described in any item Architectural Equipment O&M cruising inspection systems based on BIM model of claim 6~8, wherein The O&M polling module includes,
Position coordinates module determines coordinate of the current inspection position in BIM model for establishing BIM model coordinate systems;
Model capture module obtains current location for determining Architectural Equipment operating parameter is shown in BIM model effective distance The device id of Architectural Equipment model in the effective distance of coordinate;
Device parameter module, for obtaining the operating parameter of corresponding Architectural Equipment according to device id, by the operating parameter in BIM It is shown in model.
10. described according to a kind of described in any item Architectural Equipment O&M method for inspecting based on BIM model of claim 7~9 O&M polling module includes,
Object module, for any fortune of one or more Architectural Equipments as Architectural Equipment selected at least one subsystem Tie up inspection target;
Locating module, for determining current inspection position Architectural Equipment parameter in the coordinate and BIM model in BIM model The effective range of display;
Display module determines building in selected subsystem in its effective range for the coordinate according to current inspection position The operating parameter of equipment is built, and is shown in BIM model.
CN201810844708.3A 2018-07-27 2018-07-27 A kind of Architectural Equipment O&M method for inspecting and system based on BIM model Pending CN109117531A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810844708.3A CN109117531A (en) 2018-07-27 2018-07-27 A kind of Architectural Equipment O&M method for inspecting and system based on BIM model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810844708.3A CN109117531A (en) 2018-07-27 2018-07-27 A kind of Architectural Equipment O&M method for inspecting and system based on BIM model

Publications (1)

Publication Number Publication Date
CN109117531A true CN109117531A (en) 2019-01-01

Family

ID=64863433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810844708.3A Pending CN109117531A (en) 2018-07-27 2018-07-27 A kind of Architectural Equipment O&M method for inspecting and system based on BIM model

Country Status (1)

Country Link
CN (1) CN109117531A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110361987A (en) * 2019-08-08 2019-10-22 上海博坤信息技术有限公司 A kind of electromechanical equipment operating status analog simulation method based on Building Information Model
CN110398940A (en) * 2019-06-27 2019-11-01 上海宝钢工业技术服务有限公司 Production operation place inspection risk control system
CN110992510A (en) * 2019-12-19 2020-04-10 杭州四方博瑞科技股份有限公司 Security scene VR-based automatic night patrol inspection method and system
CN111179461A (en) * 2019-12-30 2020-05-19 万翼科技有限公司 BIM (building information modeling) -based routing inspection record generation method and equipment and storage medium
CN111310947A (en) * 2020-02-28 2020-06-19 广州正为明昱信息科技有限公司 Building facility operation and maintenance method, equipment, storage medium and system based on 5G
CN111814232A (en) * 2020-06-29 2020-10-23 万翼科技有限公司 Device management method and related device
CN111913619A (en) * 2020-07-08 2020-11-10 广州番禺职业技术学院 Fire-fighting data reading and interaction method based on BIM lightweight
CN111950068A (en) * 2020-08-31 2020-11-17 江苏工程职业技术学院 Method and device for maintaining building equipment based on Bim
CN112150114A (en) * 2020-09-29 2020-12-29 中冶华天工程技术有限公司 Intelligent endowment system based on BIM technology and construction method
CN112164141A (en) * 2020-09-29 2021-01-01 华南理工大学 BIM technology-based machine room management method, device, equipment and storage medium
CN112214820A (en) * 2020-10-12 2021-01-12 中国电建集团华东勘测设计研究院有限公司 BIM-based engineering inspection method and device, storage medium and equipment
CN112487311A (en) * 2020-11-27 2021-03-12 深圳万物安全科技有限公司 Method and system for positioning physical equipment based on 3D modeling
CN112669485A (en) * 2020-12-18 2021-04-16 国网四川省电力公司电力科学研究院 Real scene immersion type patrol system for electric power operation site based on Internet of things
CN113010936A (en) * 2021-02-23 2021-06-22 上海巡智科技有限公司 Auxiliary construction method, device and readable storage medium
CN113219874A (en) * 2021-05-13 2021-08-06 中消云(北京)物联网科技研究院有限公司 Data processing method and device for detection equipment
CN115860443A (en) * 2023-03-02 2023-03-28 青岛研博数据信息技术有限公司 Building intelligent management method and system based on BIM technology
CN116972855A (en) * 2023-09-22 2023-10-31 北京洛斯达科技发展有限公司 BIM-based coal preparation plant equipment three-dimensional roaming inspection method and system
CN117808324A (en) * 2024-02-27 2024-04-02 西安麦莎科技有限公司 Building progress assessment method for unmanned aerial vehicle vision coordination

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104765329A (en) * 2014-03-11 2015-07-08 北京博锐尚格节能技术股份有限公司 3D energy consumption display method, 3D energy consumption display device and 3D energy consumption display system
CN105224179A (en) * 2015-09-30 2016-01-06 北京恒华伟业科技股份有限公司 Method for information display and device
CN105955463A (en) * 2016-04-26 2016-09-21 王立峰 BIM (Building Information Modeling)-based VR (Virtual Reality) virtual feeling system
CN106843630A (en) * 2015-12-07 2017-06-13 广联达软件股份有限公司 The display methods of BUILDINGS MODELS and the display system of BUILDINGS MODELS
CN107102604A (en) * 2017-06-27 2017-08-29 中铁四局集团有限公司 A kind of apparatus monitoring method, apparatus and system
CN107169208A (en) * 2017-05-19 2017-09-15 河北省电力勘测设计研究院 Transformer station's O&M inspection method based on BIM three-dimensional information technologies
CN107358401A (en) * 2017-06-09 2017-11-17 上海嘉实(集团)有限公司 Intelligent management system/method, readable storage medium storing program for executing and the terminal of construction project
CN107729065A (en) * 2017-11-02 2018-02-23 港珠澳大桥管理局 The method and system of a kind of 3 D monitoring

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104765329A (en) * 2014-03-11 2015-07-08 北京博锐尚格节能技术股份有限公司 3D energy consumption display method, 3D energy consumption display device and 3D energy consumption display system
CN105224179A (en) * 2015-09-30 2016-01-06 北京恒华伟业科技股份有限公司 Method for information display and device
CN106843630A (en) * 2015-12-07 2017-06-13 广联达软件股份有限公司 The display methods of BUILDINGS MODELS and the display system of BUILDINGS MODELS
CN105955463A (en) * 2016-04-26 2016-09-21 王立峰 BIM (Building Information Modeling)-based VR (Virtual Reality) virtual feeling system
CN107169208A (en) * 2017-05-19 2017-09-15 河北省电力勘测设计研究院 Transformer station's O&M inspection method based on BIM three-dimensional information technologies
CN107358401A (en) * 2017-06-09 2017-11-17 上海嘉实(集团)有限公司 Intelligent management system/method, readable storage medium storing program for executing and the terminal of construction project
CN107102604A (en) * 2017-06-27 2017-08-29 中铁四局集团有限公司 A kind of apparatus monitoring method, apparatus and system
CN107729065A (en) * 2017-11-02 2018-02-23 港珠澳大桥管理局 The method and system of a kind of 3 D monitoring

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110398940A (en) * 2019-06-27 2019-11-01 上海宝钢工业技术服务有限公司 Production operation place inspection risk control system
CN110361987A (en) * 2019-08-08 2019-10-22 上海博坤信息技术有限公司 A kind of electromechanical equipment operating status analog simulation method based on Building Information Model
CN110992510A (en) * 2019-12-19 2020-04-10 杭州四方博瑞科技股份有限公司 Security scene VR-based automatic night patrol inspection method and system
CN111179461A (en) * 2019-12-30 2020-05-19 万翼科技有限公司 BIM (building information modeling) -based routing inspection record generation method and equipment and storage medium
CN111310947A (en) * 2020-02-28 2020-06-19 广州正为明昱信息科技有限公司 Building facility operation and maintenance method, equipment, storage medium and system based on 5G
CN111814232A (en) * 2020-06-29 2020-10-23 万翼科技有限公司 Device management method and related device
CN111913619B (en) * 2020-07-08 2022-06-14 广州番禺职业技术学院 Fire-fighting data reading and interaction method based on BIM lightweight
CN111913619A (en) * 2020-07-08 2020-11-10 广州番禺职业技术学院 Fire-fighting data reading and interaction method based on BIM lightweight
CN111950068A (en) * 2020-08-31 2020-11-17 江苏工程职业技术学院 Method and device for maintaining building equipment based on Bim
CN112150114A (en) * 2020-09-29 2020-12-29 中冶华天工程技术有限公司 Intelligent endowment system based on BIM technology and construction method
CN112164141A (en) * 2020-09-29 2021-01-01 华南理工大学 BIM technology-based machine room management method, device, equipment and storage medium
CN112214820A (en) * 2020-10-12 2021-01-12 中国电建集团华东勘测设计研究院有限公司 BIM-based engineering inspection method and device, storage medium and equipment
CN112487311A (en) * 2020-11-27 2021-03-12 深圳万物安全科技有限公司 Method and system for positioning physical equipment based on 3D modeling
CN112669485A (en) * 2020-12-18 2021-04-16 国网四川省电力公司电力科学研究院 Real scene immersion type patrol system for electric power operation site based on Internet of things
CN112669485B (en) * 2020-12-18 2021-08-03 国网四川省电力公司电力科学研究院 Real scene immersion type patrol system for electric power operation site based on Internet of things
CN113010936A (en) * 2021-02-23 2021-06-22 上海巡智科技有限公司 Auxiliary construction method, device and readable storage medium
CN113010936B (en) * 2021-02-23 2023-07-21 上海巡智科技有限公司 Auxiliary construction method, equipment and readable storage medium
CN113219874A (en) * 2021-05-13 2021-08-06 中消云(北京)物联网科技研究院有限公司 Data processing method and device for detection equipment
CN115860443A (en) * 2023-03-02 2023-03-28 青岛研博数据信息技术有限公司 Building intelligent management method and system based on BIM technology
CN116972855A (en) * 2023-09-22 2023-10-31 北京洛斯达科技发展有限公司 BIM-based coal preparation plant equipment three-dimensional roaming inspection method and system
CN116972855B (en) * 2023-09-22 2023-12-26 北京洛斯达科技发展有限公司 BIM-based coal preparation plant equipment three-dimensional roaming inspection method and system
CN117808324A (en) * 2024-02-27 2024-04-02 西安麦莎科技有限公司 Building progress assessment method for unmanned aerial vehicle vision coordination
CN117808324B (en) * 2024-02-27 2024-06-04 西安麦莎科技有限公司 Building progress assessment method for unmanned aerial vehicle vision coordination

Similar Documents

Publication Publication Date Title
CN109117531A (en) A kind of Architectural Equipment O&M method for inspecting and system based on BIM model
CN112311097B (en) Online intelligent patrol centralized monitoring system and method for transformer substation
WO2022095616A1 (en) On-line intelligent inspection system and method for transformer substation
WO2021073046A1 (en) Parallel smart emergency collaboration method and system, and electronic device
CN102497568B (en) Interactive three-dimensional virtual scene and visualized information integrating system
CN110187665A (en) A kind of intelligent managing and control system of underground pipe gallery
CN111815751A (en) Intelligent fire-fighting Internet of things visual management system and method
CN111222190B (en) Ancient building management system
CN110175368A (en) A kind of rail traffic data display systems based on BIM+GIS
CN102930598A (en) System and method for positioning tunnel detection equipment and displaying status of tunnel detection equipment by using three-dimensional model
CN109344420A (en) A kind of building collaboration interlock method and system based on BIM model
CN110992510A (en) Security scene VR-based automatic night patrol inspection method and system
CN114330024A (en) Digital twin-based fire-fighting drilling method and system
CN112037337A (en) Market three-dimensional digital emergency plan drilling system and method
CN110874866A (en) Transformer substation three-dimensional monitoring method and system based on videos
CN209267713U (en) Cable tunnel monitoring system
CN112541704A (en) Intelligent building operation and maintenance management system based on BIM platform
CN106445777A (en) Machine room smart 3D inspection system
CN110070622A (en) A kind of library application system and application method based on AR technology
CN115423645A (en) Man-machine safety intelligent management system and method for hydraulic power plant
CN211015113U (en) Intelligent type pipe control system for underground comprehensive pipe gallery
CN114299743A (en) Three-dimensional operation monitoring system for urban rail transit
CN114092279A (en) Full-service ubiquitous visual intelligent power operation and maintenance system
CN207068056U (en) A kind of building fire Personnel Rescue System based on BIM
CN109359751A (en) Intelligent building operation management system and its management method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190101