CN111814232A - Device management method and related device - Google Patents

Device management method and related device Download PDF

Info

Publication number
CN111814232A
CN111814232A CN202010608862.8A CN202010608862A CN111814232A CN 111814232 A CN111814232 A CN 111814232A CN 202010608862 A CN202010608862 A CN 202010608862A CN 111814232 A CN111814232 A CN 111814232A
Authority
CN
China
Prior art keywords
target
information
operation information
building
target equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010608862.8A
Other languages
Chinese (zh)
Inventor
蒋薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wanyi Technology Co Ltd
Original Assignee
Wanyi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wanyi Technology Co Ltd filed Critical Wanyi Technology Co Ltd
Priority to CN202010608862.8A priority Critical patent/CN111814232A/en
Publication of CN111814232A publication Critical patent/CN111814232A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/904Browsing; Visualisation therefor

Abstract

The application discloses a device management method and related devices, which are applied to electronic devices, wherein the method comprises the following steps: acquiring component information of a target building; building Information Model (BIM) of the target building is built based on the component information, and a first association relation is built, wherein the first association relation is an association relation between a first identifier and a first position, the first identifier is an identifier of target equipment in the target building, and the first position is a position of a target equipment model of the target equipment in the BIM; and managing the target equipment based on the first incidence relation. By adopting the embodiment of the application, the problem of untimely equipment management can be favorably solved.

Description

Device management method and related device
Technical Field
The present application relates to the field of electronic technologies, and in particular, to an apparatus management method and a related apparatus.
Background
Along with the continuous promotion of people to intelligent house building's security, convenience and travelling comfort requirement, quantity, the kind of the equipment that intelligent house building used increase rapidly, lead to proposing higher requirement to the equipment management level. The traditional equipment management method mainly adopts manual equipment management, so that equipment cannot be processed in time when the equipment fails or needs to be adjusted.
Disclosure of Invention
The embodiment of the application provides a device management method and related devices.
In a first aspect, an embodiment of the present application provides an apparatus management method, which is applied to an electronic apparatus, and the method includes:
acquiring component information of a target building;
building Information Model (BIM) of the target building is built based on the component information, and a first association relation is built, wherein the first association relation is an association relation between a first identifier and a first position, the first identifier is an identifier of target equipment in the target building, and the first position is a position of a target equipment model of the target equipment in the BIM;
and managing the target equipment based on the first incidence relation.
In a second aspect, an embodiment of the present application provides an apparatus for device management, where the apparatus includes:
an acquisition unit configured to acquire component information of a target building;
the building information model BIM is used for building a Building Information Model (BIM) of the target building based on the component information, and a first association relation is built, wherein the first association relation is an association relation between a first identifier and a first position, the first identifier is an identifier of target equipment in the target building, and the first position is a position of a target equipment model of the target equipment in the BIM;
and the management unit is used for managing the target equipment based on the first incidence relation.
In a third aspect, an embodiment of the present application provides an electronic device, including a processor, a memory, a communication interface, and one or more programs, where the one or more programs are stored in the memory and configured to be executed by the processor, and the program includes instructions for executing steps in the method according to the first aspect of the embodiment of the present application.
In a fourth aspect, the present application provides a computer-readable storage medium, where the computer-readable storage medium stores a computer program for electronic data exchange, where the computer program makes a computer perform some or all of the steps described in the method according to the first aspect of the present application.
In a fifth aspect, the present application provides a computer program product, where the computer program product includes a non-transitory computer-readable storage medium storing a computer program, where the computer program is operable to cause a computer to perform some or all of the steps described in the method according to the first aspect of the present application. The computer program product may be a software installation package.
It can be seen that, in the embodiment of the present application, the electronic device first obtains the component information of the target building, then establishes the building information model BIM of the target building based on the component information, establishes the first association relationship, where the first association relationship is an association relationship between the first identifier and the first location, and finally manages the target device based on the first association relationship. Because the electronic equipment establishes the BIM model of the target building, the target equipment can be managed at any time through the incidence relation between the target equipment and the target equipment model, and the problem of untimely equipment management is avoided.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present application, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic structural diagram of an electronic device according to an embodiment of the present disclosure;
fig. 2 is a schematic flowchart of a device management method according to an embodiment of the present application;
fig. 3 is a schematic structural diagram of another electronic device provided in the embodiment of the present application;
fig. 4 is a schematic structural diagram of an apparatus management device according to an embodiment of the present application.
Detailed Description
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The following are detailed below.
The terms "first," "second," "third," and "fourth," etc. in the description and claims of this application and in the accompanying drawings are used for distinguishing between different objects and not for describing a particular order. Furthermore, the terms "include" and "have," as well as any variations thereof, are intended to cover non-exclusive inclusions. For example, a process, method, system, article, or apparatus that comprises a list of steps or elements is not limited to only those steps or elements listed, but may alternatively include other steps or elements not listed, or inherent to such process, method, article, or apparatus.
Reference herein to "an embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the application. The appearances of the phrase in various places in the specification are not necessarily all referring to the same embodiment, nor are separate or alternative embodiments mutually exclusive of other embodiments. It is explicitly and implicitly understood by one skilled in the art that the embodiments described herein can be combined with other embodiments.
Hereinafter, some terms in the present application are explained to facilitate understanding by those skilled in the art.
Electronic devices may include computing devices or other processing devices connected to wireless modems, as well as various forms of User Equipment (UE), Mobile Stations (MS), terminal Equipment (terminal), and so forth.
As shown in fig. 1, fig. 1 is a schematic structural diagram of an electronic device provided in an embodiment of the present application. The electronic device includes a processor, Memory, signal processor, transceiver, display screen, speaker, communication interface, Random Access Memory (RAM), camera, sensor, and the like. The storage, the signal processor, the display screen, the loudspeaker, the audio output module, the RAM, the camera, the sensor and the communication interface are connected with the processor, and the transceiver is connected with the signal processor.
The Display screen may be a Liquid Crystal Display (LCD), an Organic or inorganic Light-Emitting Diode (OLED), an active matrix Organic Light-Emitting Diode (AMOLED), or the like.
The camera may be a common camera, an infrared camera, or an intelligent camera, and is not limited herein. The camera may be a front camera or a rear camera, and is not limited herein.
Wherein the sensor comprises at least one of: light-sensitive sensors, gyroscopes, infrared proximity sensors, fingerprint sensors, pressure sensors, etc. Among them, the light sensor, also called an ambient light sensor, is used to detect the ambient light brightness. The light sensor may include a light sensitive element and an analog to digital converter. The photosensitive element is used for converting collected optical signals into electric signals, and the analog-to-digital converter is used for converting the electric signals into digital signals. Optionally, the light sensor may further include a signal amplifier, and the signal amplifier may amplify the electrical signal converted by the photosensitive element and output the amplified electrical signal to the analog-to-digital converter. The photosensitive element may include at least one of a photodiode, a phototransistor, a photoresistor, and a silicon photocell.
The processor is a control center of the electronic equipment, various interfaces and lines are used for connecting all parts of the whole electronic equipment, and various functions and processing data of the electronic equipment are executed by operating or executing software programs and/or modules stored in the memory and calling data stored in the memory, so that the electronic equipment is monitored integrally.
The processor may integrate an application processor and a modem processor, wherein the application processor mainly handles operating systems, user interfaces, application programs, and the like, and the modem processor mainly handles wireless communications. It will be appreciated that the modem processor described above may not be integrated into the processor.
The memory is used for storing software programs and/or modules, and the processor executes various functional applications and data processing of the electronic equipment by operating the software programs and/or modules stored in the memory. The memory mainly comprises a program storage area and a data storage area, wherein the program storage area can store an operating system, a software program required by at least one function and the like; the storage data area may store data created according to use of the electronic device, and the like. Further, the memory may include high speed random access memory, and may also include non-volatile memory, such as at least one magnetic disk storage device, flash memory device, or other volatile solid state storage device.
The following describes embodiments of the present application in detail.
As shown in fig. 2, an apparatus management method provided in the embodiment of the present application is applied to the electronic apparatus, and specifically includes the following steps:
step 201: and acquiring component information of the target building.
The component information may be drawing information, picture information, video information, or the like.
The target building may be a house, an office building, or other building.
The component information comprises information of equipment in the target building, and component information of the target building is constructed.
Step 202: building information model BIM of the target building is built based on the component information, and a first association relation is built, wherein the first association relation is an association relation between a first mark and a first position, the first mark is a mark of target equipment in the target building, and the first position is a position of a target equipment model of the target equipment in the BIM.
The first identifier may be a number of the target device, a location of the target device, or another unique identifier.
The target device may be an air conditioner, a television, a humidifier, a sweeping robot, or the like.
Step 203: and managing the target equipment based on the first incidence relation.
It can be seen that, in the embodiment of the present application, the electronic device first establishes a building information model BIM of the target building, and establishes a first association relationship, where the first association relationship is an association relationship between the first identifier and the first location, and then manages the target device based on the first association relationship. Because the electronic equipment establishes the BIM model of the target building, the target equipment can be managed at any time through the incidence relation between the target equipment and the target equipment model, and the problem of untimely equipment management is avoided.
In an implementation manner of the present application, the managing the target device based on the first association includes:
receiving a device management request for the target device;
acquiring operation information of the target equipment based on the equipment management request;
and managing the target equipment based on the first incidence relation and the operation information.
The device management request may be a request for adjusting the operation information of the device, or may be a request for checking the operation state of the device, or may be a request for adjusting the operation state of the device.
The device management request may be represented by identification information, where different identification information represents different requests, and the identification information may be a letter or a number.
For example, if the identification information is 1, it indicates that the operation information of the device is adjusted, if the identification information is 2, it represents that the operation state of the device is checked, and if the identification information is 3, it represents that the operation state of the device is adjusted.
The device management requests are different, and the corresponding operation information may be different.
It can be seen that, in the embodiment of the present application, the operation information is first obtained through the device management request, and then the target device is managed through the operation information.
In an implementation manner of the present application, the device management request carries first indication information, where the first indication information is used to indicate to obtain first operation information of the target device;
the managing the target device based on the first association relationship includes:
determining whether the working state of the target equipment is normal or not based on the configuration information of the target equipment and the first operation information stored in the memory corresponding to the BIM model;
under the condition that the working state of the target equipment is normal, associating the first running information to the target equipment model based on the first association relation;
and when the working state of the target equipment is abnormal, associating the working state of the target equipment to the BIM based on the first association relation, and sending first indication information to the target equipment, wherein the first indication information is used for indicating the target equipment to enter a shutdown state.
The target devices are different, the corresponding first operation information may be different, and the configuration information may be different.
Wherein the configuration information comprises first operation information.
The mapping relationship between the target device and the configuration information is shown in table 1, and the configuration information includes, but is not limited to, the following.
TABLE 1
Target device Configuration information
Television receiver Response time, brightness, contrast resolution
Air conditioner Noise value, circulating air quantity, heating quantity and refrigerating quantity
Humidifier Humidification rate, water storage capacity, noise value
...... ......
For example, if the target device is a television, the first configuration information of the television may include response time, brightness, contrast resolution, maximum volume, and the like. Assuming that the response time included in the first configuration information is 16ms to 20ms, if the response time included in the first operation information is 3s, it is determined that the operating state of the television is abnormal, and if the response time included in the first operation information is 14ms, it is determined that the operating state of the television is normal.
The associating of the operating state of the target device to the BIM model may be updating a color of an area where the target device model is located in the BIM.
It can be seen that, in the embodiment of the application, the working state of the target device is determined through the first configuration information and the first operation information, which is beneficial to improving the accuracy of determining the working state.
In an implementation manner of the present application, the device management request carries second indication information, where the second indication information is used to indicate to obtain second operation information of the target device and environment information of an environment where the target device is located;
the managing the target device based on the first association relationship includes:
determining third operation information based on the setting information of the target device and the environment information stored in a memory corresponding to the BIM model;
updating the second operation information to third operation information under the condition that the second operation information is different from the third operation information;
and associating the third operation information to the target equipment model based on the first association relation, and sending the third operation information to the target equipment based on the first association relation.
The target devices are different, and the corresponding environment information may be the same or different.
The mapping relationship between the target device and the environment information is shown in table 2.
TABLE 2
Target device Environmental information
Air conditioner Temperature of
Humidifier Humidity
Television receiver Number of people watching
...... ......
Wherein, different target devices and different environmental information acquisition methods are adopted.
For example, if the target device is an air conditioner, the temperature sensor is used to detect the temperature of the environment where the air conditioner is located; if the target equipment is a humidifier, detecting the temperature of the environment where the air conditioner is located by adopting a humidity sensor; and if the target equipment is a television, photographing the environment where the television is located, and determining the number of people watching by carrying out face recognition on the photograph.
Wherein, when the target device is an air conditioner, determining third operation information based on the setting information of the target device and the environment information stored in the memory corresponding to the BIM model includes: and determining the third operation information based on the mapping relation between the setting information and the environment information. The mapping relationship among the setting information, the environment information, and the third operation information is shown in table 3.
TABLE 3
Setting information Environmental information Third operation information
(15℃~20℃,26℃) 18℃ 26℃
(20℃~30℃,25℃) 26℃ 25℃
(30℃~40℃,23℃) 38℃ 23℃
...... ......
And sending the third running information to the target equipment, wherein the third running information is used for adjusting the running information by the target equipment.
It can be seen that, in the embodiment of the application, the third operation information is determined by the setting information and the environment information, and then the second operation information is adjusted based on the third operation information, which is beneficial to improving the comfort level of the environment where the target device is located.
In one implementation of the present application, the target device is fixed in the target building; after the third operation information is sent to the target device based on the first association relationship, the method further includes:
determining a first time length of the target device operating based on the third operation information based on a first time and the third operation information, wherein the first time is a time for sending the third operation information;
and sending reminding information at a second moment, wherein the reminding information is used for reminding updating of the running information of the target equipment, the second moment is later than the first moment, and the time difference between the first moment and the second moment is the first duration.
The first time period may be preset or determined according to the third operation information.
For example, if the target device is an air conditioner, the third operation information is a set temperature of the air conditioner. Assuming a set temperature of 19 c, the first time period is 10 minutes, and assuming a set temperature of 25c, the first time period is 30 minutes.
The target devices are different, and the corresponding first time lengths may be the same or different.
It can be seen that, in the embodiment of the application, the reminding message is sent after the first duration, and the reminding message is used for reminding the updating of the operation information of the target device, so that the comfort level of the environment where the target device is located is improved.
In one implementation of the present application, the target device is unsecured in the target building; after the sending the second operation information to the target device based on the first association relationship, the method further includes:
determining a second location of the target device model in the BIM over a first time period;
determining a first route between the first location to the second location based on the first location, the second location, and the BIM;
converting the position in the first route into the position of the target equipment in the target building to obtain a second route;
and sending the second route to the target device, wherein the second route is used for the target device to move based on the second route.
Wherein the first time period is different, and the corresponding second position is different.
The second position corresponding to the first period may be preset.
The first time interval can be 08:30am to 9:30am, 11:30am to 13:30pm, 20:30pm to 21:10pm and other time intervals.
Optionally, the determining a first route between the first location to the second location based on the first location, the second location, and the BIM includes:
determining a route to be selected between the first location and the second location based on the BIM;
determining the path length of the route to be selected and the number of curves of the route to be selected;
determining the first route among the routes to be selected based on a first formula, the path length, and the number of curves.
Wherein the first formula is L ═ e × R + d × W, the R is the path length, the W is the number of curves, the e and the d are constants, the e and the d are followed by 1, and the L is the weight.
For example, assuming that there are 2 routes to be selected (L1 and L2), the path length of L1 is 20cm, the number of bends is 3, the path length of L2 is 25cm, the number of bends is 4, e is 0.4, and d is 0.6, then the weight corresponding to L1 is 0.4+ 20+3 + 0.6-9.8, the weight corresponding to L2 is 25 + 0.4+ 0.6-12.4, and since the weight of L1 is less than the weight of L2, then L1 is determined to be the first route.
Wherein the converting the location in the first route to the location of the target device in the target building to obtain a second route comprises:
determining a location of the target device in the target building based on a second formula, a preset ratio, and a location in the first route.
The second formula is Y ═ α × X, where Y is the position of the target device in the target building, α is a preset proportion, and X is the position in the first route.
It can be seen that, in the embodiment of the present application, the second route is sent to the target device, so that the target device moves based on the second route, and since the target device can move according to the second route, convenience of the target building is improved.
Referring to fig. 3, in accordance with the embodiment shown in fig. 2, fig. 3 is a schematic structural diagram of an electronic device provided in an embodiment of the present application, and as shown in the figure, the electronic device includes a processor, a memory, a communication interface, and one or more programs, where the one or more programs are stored in the memory and configured to be executed by the processor, and the programs include instructions for performing the following steps:
acquiring component information of a target building;
building Information Model (BIM) of the target building is built based on the component information, and a first association relation is built, wherein the first association relation is an association relation between a first identifier and a first position, the first identifier is an identifier of target equipment in the target building, and the first position is a position of a target equipment model of the target equipment in the BIM;
and managing the target equipment based on the first incidence relation.
In an implementation manner of the present application, in terms of managing the target device based on the first association relationship, the program includes instructions for performing the following steps:
receiving a device management request for the target device;
acquiring operation information of the target equipment based on the equipment management request;
and managing the target equipment based on the first incidence relation and the operation information.
In an implementation manner of the present application, the device management request carries first indication information, where the first indication information is used to indicate to acquire first operation information of the target device, and in terms of managing the target device based on the first association relationship and the operation information, the program includes instructions for performing the following steps:
determining whether the working state of the target equipment is normal or not based on the configuration information of the target equipment and the first operation information stored in the memory corresponding to the BIM model;
under the condition that the working state of the target equipment is normal, associating the first running information to the target equipment model based on the first association relation;
and when the working state of the target equipment is abnormal, associating the working state of the target equipment to the BIM based on the first association relation, and sending first indication information to the target equipment, wherein the first indication information is used for indicating the target equipment to enter a shutdown state.
In an implementation manner of the present application, the device management request carries second indication information, where the second indication information is used to indicate to obtain second operation information of the target device and environment information of an environment where the target device is located; in the aspect of managing the target device based on the first association relationship and the operation information, the program includes instructions for performing the following steps:
updating the second operation information to third operation information based on the setting information of the target device, the second operation information and the environment information stored in the memory corresponding to the BIM model;
and associating the third operation information to the target equipment model based on the first association relation, and sending the third operation information to the target equipment based on the first association relation.
In one implementation of the present application, the target device is fixed in the target building; after sending the third operation information to the target device based on the first association, the program includes instructions for performing the following steps:
determining a first time length of the target device operating based on the third operation information based on a first time and the third operation information, wherein the first time is a time for sending the third operation information;
and sending reminding information at a second moment, wherein the reminding information is used for reminding updating of the running information of the target equipment, the second moment is later than the first moment, and the time difference between the first moment and the second moment is the first duration.
In one implementation of the present application, the target device is unsecured in the target building; after sending the third operation information to the target device based on the first association, the program includes instructions for performing the following steps:
determining a second location of the target device model in the BIM over a first time period;
determining a first route between the first location to the second location based on the first location, the second location, and the BIM;
converting the position in the first route into the position of the target equipment in the target building to obtain a second route;
and sending the second route to the target device, wherein the second route is used for the target device to move based on the second route.
It should be noted that, for the implementation process of the embodiment of the present application, reference may be made to the implementation process described in the foregoing method embodiment, and a description thereof is omitted here.
Referring to fig. 4, fig. 4 is a device management apparatus for an electronic device according to an embodiment of the present disclosure, the apparatus including:
an acquisition unit 401 for acquiring member information of a target building;
an establishing unit 402, configured to establish a building information model BIM of the target building based on the component information, and establish a first association relationship, where the first association relationship is an association relationship between a first identifier and a first location, the first identifier is an identifier of a target device in the target building, and the first location is a location of a target device model of the target device in the BIM;
a management unit 403, configured to manage the target device based on the first association relationship.
In an implementation manner of the present application, in terms of managing the target device based on the first association relationship, the management unit 403 is configured to execute the following steps:
receiving a device management request for the target device;
acquiring operation information of the target equipment based on the equipment management request;
and managing the target equipment based on the first incidence relation and the operation information.
In an implementation manner of the present application, the device management request carries first indication information, where the first indication information is used to indicate to acquire first operation information of the target device, and in terms of managing the target device based on the first association relationship and the operation information, the management unit 403 is configured to execute instructions of the following steps:
determining whether the working state of the target equipment is normal or not based on the configuration information of the target equipment and the first operation information stored in the memory corresponding to the BIM model;
under the condition that the working state of the target equipment is normal, associating the first running information to the target equipment model based on the first association relation;
and when the working state of the target equipment is abnormal, associating the working state of the target equipment to the BIM based on the first association relation, and sending first indication information to the target equipment, wherein the first indication information is used for indicating the target equipment to enter a shutdown state.
In an implementation manner of the present application, the device management request carries second indication information, where the second indication information is used to indicate to obtain second operation information of the target device and environment information of an environment where the target device is located; in terms of the management of the target device based on the first association relationship and the operation information, the management unit 403 is configured to execute the following steps:
updating the second operation information to third operation information based on the setting information of the target device, the second operation information and the environment information stored in the memory corresponding to the BIM model;
and associating the third operation information to the target equipment model based on the first association relation, and sending the third operation information to the target equipment based on the first association relation.
In one implementation of the present application, the target device is fixed in the target building; after sending the third operation information to the target device based on the first association relationship, the management unit 403 is further configured to execute the following steps:
determining a first time length of the target device operating based on the third operation information based on a first time and the third operation information, wherein the first time is a time for sending the third operation information;
and sending reminding information at a second moment, wherein the reminding information is used for reminding updating of the running information of the target equipment, the second moment is later than the first moment, and the time difference between the first moment and the second moment is the first duration.
In one implementation of the present application, the target device is unsecured in the target building; after sending the third operation information to the target device based on the first association relationship, the management unit 403 is further configured to execute the following steps:
determining a second location of the target device model in the BIM over a first time period;
determining a first route between the first location to the second location based on the first location, the second location, and the BIM;
converting the position in the first route into the position of the target equipment in the target building to obtain a second route;
and sending the second route to the target device, wherein the second route is used for the target device to move based on the second route.
The present application also provides a computer-readable storage medium, where the computer-readable storage medium stores a computer program for electronic data exchange, where the computer program makes a computer perform some or all of the steps described in the electronic device in the above method embodiments.
Embodiments of the present application also provide a computer program product, where the computer program product includes a non-transitory computer-readable storage medium storing a computer program, and the computer program is operable to cause a computer to perform some or all of the steps described in the electronic device in the above method. The computer program product may be a software installation package.
The steps of a method or algorithm described in the embodiments of the present application may be implemented in hardware, or may be implemented by a processor executing software instructions. The software instructions may be comprised of corresponding software modules that may be stored in Random Access Memory (RAM), flash Memory, Read Only Memory (ROM), Erasable Programmable ROM (EPROM), Electrically Erasable Programmable ROM (EEPROM), registers, a hard disk, a removable disk, a compact disc Read only Memory (CD-ROM), or any other form of storage medium known in the art. An exemplary storage medium is coupled to the processor such the processor can read information from, and write information to, the storage medium. Of course, the storage medium may also be integral to the processor. The processor and the storage medium may reside in an ASIC. Additionally, the ASIC may reside in an access network device, a target network device, or a core network device. Of course, the processor and the storage medium may reside as discrete components in an access network device, a target network device, or a core network device.
Those skilled in the art will appreciate that in one or more of the examples described above, the functionality described in the embodiments of the present application may be implemented, in whole or in part, by software, hardware, firmware, or any combination thereof. When implemented in software, may be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When loaded and executed on a computer, cause the processes or functions described in accordance with the embodiments of the application to occur, in whole or in part. The computer may be a general purpose computer, a special purpose computer, a network of computers, or other programmable device. The computer instructions may be stored on a computer readable storage medium or transmitted from one computer readable storage medium to another, for example, from one website, computer, server, or data center to another website, computer, server, or data center via wire (e.g., coaxial cable, fiber optic, Digital Subscriber Line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device, such as a server, a data center, etc., that incorporates one or more of the available media. The usable medium may be a magnetic medium (e.g., a floppy Disk, a hard Disk, a magnetic tape), an optical medium (e.g., a Digital Video Disk (DVD)), or a semiconductor medium (e.g., a Solid State Disk (SSD)), among others.
The above-mentioned embodiments are intended to illustrate the objects, technical solutions and advantages of the embodiments of the present application in further detail, and it should be understood that the above-mentioned embodiments are only specific embodiments of the present application, and are not intended to limit the scope of the embodiments of the present application, and any modifications, equivalent substitutions, improvements and the like made on the basis of the technical solutions of the embodiments of the present application should be included in the scope of the embodiments of the present application.

Claims (9)

1. A device management method applied to an electronic device, the method comprising:
acquiring component information of a target building;
building Information Model (BIM) of the target building is built based on the component information, and a first association relation is built, wherein the first association relation is an association relation between a first identifier and a first position, the first identifier is an identifier of target equipment in the target building, and the first position is a position of a target equipment model of the target equipment in the BIM;
and managing the target equipment based on the first incidence relation.
2. The method of claim 1, wherein managing the target device based on the first association comprises:
receiving a device management request for the target device;
acquiring operation information of the target equipment based on the equipment management request;
and managing the target equipment based on the first incidence relation and the operation information.
3. The method according to claim 2, wherein the device management request carries first indication information, and the first indication information is used for indicating to obtain first operation information of the target device;
the managing the target device based on the first association relationship and the operation information includes:
determining whether the working state of the target equipment is normal or not based on the configuration information of the target equipment and the first operation information stored in the memory corresponding to the BIM model;
under the condition that the working state of the target equipment is normal, associating the first running information to the target equipment model based on the first association relation;
and when the working state of the target equipment is abnormal, associating the working state of the target equipment to the BIM based on the first association relation, and sending first indication information to the target equipment, wherein the first indication information is used for indicating the target equipment to enter a shutdown state.
4. The method according to claim 2, wherein the device management request carries second indication information, and the second indication information is used for indicating that second operation information of the target device and environment information of an environment where the target device is located are obtained;
the managing the target device based on the first association relationship and the operation information includes:
updating the second operation information to third operation information based on the setting information of the target device, the second operation information and the environment information stored in the memory corresponding to the BIM model;
and associating the third operation information to the target equipment model based on the first association relation, and sending the third operation information to the target equipment based on the first association relation.
5. The method of claim 4, wherein the target device is fixed in the target building; after the third operation information is sent to the target device based on the first association relationship, the method further includes:
determining a first time length of the target device operating based on the third operation information based on a first time and the third operation information, wherein the first time is a time for sending the third operation information;
and sending reminding information at a second moment, wherein the reminding information is used for reminding updating of the running information of the target equipment, the second moment is later than the first moment, and the time difference between the first moment and the second moment is the first duration.
6. The method of claim 4, wherein the target device is unsecured in the target building; after the sending the second operation information to the target device based on the first association relationship, the method further includes:
determining a second location of the target device model in the BIM over a first time period;
determining a first route between the first location to the second location based on the first location, the second location, and the BIM;
converting the position in the first route into the position of the target equipment in the target building to obtain a second route;
and sending the second route to the target device, wherein the second route is used for the target device to move based on the second route.
7. A device management apparatus, applied to an electronic device, the method includes:
an acquisition unit configured to acquire component information of a target building;
the building information model BIM is used for building a Building Information Model (BIM) of the target building based on the component information, and a first association relation is built, wherein the first association relation is an association relation between a first identifier and a first position, the first identifier is an identifier of target equipment in the target building, and the first position is a position of a target equipment model of the target equipment in the BIM;
and the management unit is used for managing the target equipment based on the first incidence relation.
8. An electronic device, comprising a processor, memory, a communication interface, and one or more programs stored in the memory and configured to be executed by the processor, the programs comprising instructions for performing the steps in the method of any of claims 1-6.
9. A computer-readable storage medium, characterized in that the computer-readable storage medium stores a computer program, wherein the computer program is processed to perform the method according to any of the claims 1-6.
CN202010608862.8A 2020-06-29 2020-06-29 Device management method and related device Pending CN111814232A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010608862.8A CN111814232A (en) 2020-06-29 2020-06-29 Device management method and related device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010608862.8A CN111814232A (en) 2020-06-29 2020-06-29 Device management method and related device

Publications (1)

Publication Number Publication Date
CN111814232A true CN111814232A (en) 2020-10-23

Family

ID=72856562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010608862.8A Pending CN111814232A (en) 2020-06-29 2020-06-29 Device management method and related device

Country Status (1)

Country Link
CN (1) CN111814232A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106709983A (en) * 2016-11-18 2017-05-24 航天图景(北京)科技有限公司 Three-dimensional model acquisition and application system and method
CN107229231A (en) * 2017-06-07 2017-10-03 青岛海信移动通信技术股份有限公司 Home equipment management method and device
CN107491070A (en) * 2017-08-31 2017-12-19 成都通甲优博科技有限责任公司 A kind of method for planning path for mobile robot and device
CN107525243A (en) * 2017-08-10 2017-12-29 珠海格力电器股份有限公司 The control system and method for air-conditioner temperature
CN107613248A (en) * 2017-09-07 2018-01-19 湖南茂劲信息科技有限公司 Monitoring unmanned system and method based on BIM
CN109117531A (en) * 2018-07-27 2019-01-01 武汉虹信技术服务有限责任公司 A kind of Architectural Equipment O&M method for inspecting and system based on BIM model
CN110188454A (en) * 2019-05-27 2019-08-30 北京建筑大学 Architectural Equipment and Building Information Model matching process and device
CN110378063A (en) * 2019-07-26 2019-10-25 腾讯科技(深圳)有限公司 Deployed with devices method, apparatus and electronic equipment based on wisdom space
CN110907449A (en) * 2018-09-17 2020-03-24 通用电气公司 Automatic damage rating system
CN111143923A (en) * 2019-12-17 2020-05-12 万翼科技有限公司 Model processing method and related device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106709983A (en) * 2016-11-18 2017-05-24 航天图景(北京)科技有限公司 Three-dimensional model acquisition and application system and method
CN107229231A (en) * 2017-06-07 2017-10-03 青岛海信移动通信技术股份有限公司 Home equipment management method and device
CN107525243A (en) * 2017-08-10 2017-12-29 珠海格力电器股份有限公司 The control system and method for air-conditioner temperature
CN107491070A (en) * 2017-08-31 2017-12-19 成都通甲优博科技有限责任公司 A kind of method for planning path for mobile robot and device
CN107613248A (en) * 2017-09-07 2018-01-19 湖南茂劲信息科技有限公司 Monitoring unmanned system and method based on BIM
CN109117531A (en) * 2018-07-27 2019-01-01 武汉虹信技术服务有限责任公司 A kind of Architectural Equipment O&M method for inspecting and system based on BIM model
CN110907449A (en) * 2018-09-17 2020-03-24 通用电气公司 Automatic damage rating system
CN110188454A (en) * 2019-05-27 2019-08-30 北京建筑大学 Architectural Equipment and Building Information Model matching process and device
CN110378063A (en) * 2019-07-26 2019-10-25 腾讯科技(深圳)有限公司 Deployed with devices method, apparatus and electronic equipment based on wisdom space
CN111143923A (en) * 2019-12-17 2020-05-12 万翼科技有限公司 Model processing method and related device

Similar Documents

Publication Publication Date Title
CN111783392B (en) Drawing examination result display method and related equipment
KR20170090951A (en) Electronic device and controlling method thereof
CN109068116B (en) Image processing method and device based on supplementary lighting, mobile terminal and storage medium
CN109168108B (en) Amplitude adjusting method and device for electroacoustic device and mobile terminal
CN112491998A (en) Message pushing method and related equipment
CN110536016B (en) Network sharing method and related equipment
CN110572208B (en) Network switching method and related equipment
WO2017191908A1 (en) Method for calculating location information and electronic device therefor
CN113033584B (en) Data processing method and related equipment
CN112149851A (en) Parking space reservation method and related equipment
JP7472281B2 (en) Electronic device and focusing method
CN111240218B (en) Equipment control method and related equipment
CN111814232A (en) Device management method and related device
CN110798505B (en) Management method and related device of plug-in Internet of things equipment
CN110035379B (en) Positioning method and terminal equipment
US20220151018A1 (en) Wifi network disconnecting method and related device
CN113126857B (en) Data processing method and related equipment
CN111768015B (en) Online reservation method and related equipment
CN110795267B (en) Hierarchical automatic recovery method and related equipment
CN112612517B (en) Data acquisition method and related equipment
CN110830495A (en) Network access management method and related equipment
CN111859502A (en) Method and related equipment for positioning drawing review result
CN110825396B (en) Exception handling method and related equipment
CN110210896B (en) Method and mobile terminal for drawing reward in application program
CN111832104B (en) Method for establishing three-dimensional equipment model and related equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201023

RJ01 Rejection of invention patent application after publication