CN109344420A - A kind of building collaboration interlock method and system based on BIM model - Google Patents
A kind of building collaboration interlock method and system based on BIM model Download PDFInfo
- Publication number
- CN109344420A CN109344420A CN201810884969.8A CN201810884969A CN109344420A CN 109344420 A CN109344420 A CN 109344420A CN 201810884969 A CN201810884969 A CN 201810884969A CN 109344420 A CN109344420 A CN 109344420A
- Authority
- CN
- China
- Prior art keywords
- linkage
- subsystem
- collaboration
- equipment
- parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000004458 analytical method Methods 0.000 claims abstract description 13
- 238000012545 processing Methods 0.000 claims description 55
- 230000008569 process Effects 0.000 claims description 21
- 238000012544 monitoring process Methods 0.000 claims description 11
- 230000009471 action Effects 0.000 claims description 3
- 241000208340 Araliaceae Species 0.000 claims description 2
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 claims description 2
- 235000003140 Panax quinquefolius Nutrition 0.000 claims description 2
- 235000008434 ginseng Nutrition 0.000 claims description 2
- 230000000875 corresponding effect Effects 0.000 description 32
- 230000008859 change Effects 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 241001465382 Physalis alkekengi Species 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000005286 illumination Methods 0.000 description 3
- 230000005764 inhibitory process Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000004378 air conditioning Methods 0.000 description 2
- 230000002547 anomalous effect Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000003138 coordinated effect Effects 0.000 description 2
- 238000012217 deletion Methods 0.000 description 2
- 230000037430 deletion Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 238000011282 treatment Methods 0.000 description 2
- 230000001960 triggered effect Effects 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012806 monitoring device Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
- 238000007794 visualization technique Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Abstract
The invention discloses a kind of, and the building based on BIM model cooperates with interlock method, the real time execution parameter including collecting device subsystem, and the operating status of equipment subsystem is reflected in real time on BIM model;The operating parameter of equipment subsystem is handled, the collaboration linkage scheme of equipment subsystem is configured according to the operating parameter;Analysis identification is carried out to the real time execution parameter of equipment subsystem, judges whether the trigger condition for meeting collaboration linkage scheme, if then triggering corresponding linkage prediction scheme and sending a warning;It cooperates with linkage scheme to save according to misoperation parameter configuration and starts collaboration linkage scheme.The method of technical solution of the present invention also discloses a kind of building collaborative linkage system based on BIM model, the case where for current collaboration linkage inefficiency, rehearsal is pre-configured with to collaboration linkage scheme using BIM model, the operating status of equipment subsystem is reflected in time on BIM model simultaneously, one is provided and accurately and effectively cooperates with linkage management scheme.
Description
Technical field
The invention belongs to intelligent building linkage fields, and in particular to a kind of building collaboration interlock method based on BIM model
And system.
Background technique
BIM is based on every relevant information data of construction-engineering project, it is established that three-dimensional buildings model is led to
Cross real information possessed by digital information analogue simulation building.It has information completeness, information relevance, information consistent
Property, visualization, harmony, simulation, optimization property and the features such as figure can be gone out.IBMS(Intelligent Building
Management System) intelligent building comprehensive management platform be one with computer, communication apparatus, measurement and control unit is basic
Tool realizes building automation management by internet, technology of Internet of things, and network operator is built in help or manager realizes building
(group) the energy control, promoted security protection ability, promoted estate management efficiency, be a collection data acquisition and storage, energy consumption analysis,
The functional applications such as energy control and management, intellectual analysis, collaboration linkage, wisdom property are flat in synthesis internet+management of one
Platform.
As user requires the use of software perception higher and higher, building knot is presented in such a way that 3D is visual
The information such as structure, map are one of the inexorable trend and intelligent building field core technology of cutting edge technology development in the industry.Currently,
Intelligent building 3D visualization technique based on BIM obtains unprecedented development, realizes and relies on using IBMS as platform, integrates BIM model
Operation management platform be the following intelligent building O&M developing direction.Based on BIM model, administrative staff can direct feel building
The working condition of each subsystem in object understands operating status when equipment linkage, improves operation management efficiency.IBMS and BIM can
Depending on the complementarity of change technology, more intuitive intelligent building operation management mode is realized, realize the city of energy conservation, green, environmental protection
Groups of building.
Building structure and its internal unit are shown by conventional model (such as two-dimensional model) in the prior art
When, however it remains emulator is not high, and the single problem of display state can not accurately show building structure and its internal unit
Mutually matched dynamic change situation at runtime.In this case, conventional model can not accurately real-time display building structure
And its mutually matched state of internal unit, corresponding measure is taken according to current state in time, even results in serious consequence.This
Outside, for administrative staff, the collaboration linkage information for updating each device systems in building structure of one side promptly and accurately,
Also it can reduce management cost, while saving human and material resources, improve the efficiency of management.On the other hand, BIM can also be utilized
Model drills equipment linkage prediction scheme, to efficiently and effectively filter out Best Management Plan.
Summary of the invention
Aiming at the above defects or improvement requirements of the prior art, the present invention provides a kind of, and the building based on BIM model is assisted
With interlock method and system.The method of technical solution of the present invention cooperates with linkage process inefficiency for current building, can not
The case where accurately reflecting building collaboration linkage process is realized and is drilled being pre-configured with for linkage scheme of collaboration by utilizing BIM model
Practice, while the operating status of equipment subsystem is reflected in time on BIM model, provides an accurately and effectively building collaboration
Linkage management scheme.
To achieve the above object, according to one aspect of the present invention, a kind of building collaboration connection based on BIM model is provided
Dynamic method, which is characterized in that include the following steps,
S1 is according to the corresponding relationship between equipment subsystem and BIM model, the real time execution parameter of collecting device subsystem,
And the operating status of equipment subsystem is reflected in real time on BIM model;
S2 handles the operating parameter of equipment subsystem, and the collaboration of equipment subsystem is configured according to the operating parameter
Linkage scheme, and be the corresponding trigger condition of each collaboration linkage arrangements and warning information;
S3 carries out analysis identification to the real time execution parameter of equipment subsystem, filters out the real time execution ginseng of equipment subsystem
Misoperation parameter in number, judges whether the misoperation parameter meets the trigger condition of collaboration linkage scheme, if then
It triggers corresponding linkage prediction scheme and sends a warning, otherwise enter step S4;
S4 cooperates with linkage scheme according to misoperation parameter configuration, sets collaboration linkage for current misoperation parameter
The trigger condition of scheme saves and starts collaboration linkage scheme.
One as technical solution of the present invention is preferred, includes in step S2,
Collaboration linkage demand of the S21 according to equipment subsystem in operation, determines equipment for carrying out collaboration linkage
System;
S22 is configured and is protected in the incidence relation in collaboration linkage process between equipment running status to equipment subsystem
It deposits;
S23 cooperates with the corresponding trigger condition of linkage scheme and/or warning information simultaneously according to collaboration linkage demand configuration is current
It saves.
Preferably as one of technical solution of the present invention, step S3 includes,
S31 is filtered out not in critical field according to the operating parameter critical field of equipment each in equipment subsystem
The real time execution parameter of equipment subsystem;
S32 identifies the equipment operating parameter not in critical field, will need at equipment subsystem collaboration linkage
The equipment operating parameter of reason is determined as misoperation parameter;
S33 judges whether the misoperation parameter meets the trigger condition of collaboration linkage scheme, if then directly triggering
Corresponding collaboration linkage scheme and/or warning information, otherwise enter step S4.
Preferably as one of technical solution of the present invention, step S4 includes,
S41 determines the equipment subsystem for carrying out collaboration linkage according to misoperation parameter;
S42 is configured and is protected in the incidence relation in collaboration linkage process between equipment running status to equipment subsystem
It deposits;
S43 cooperates with the corresponding trigger condition of linkage scheme and/or warning information simultaneously according to collaboration linkage demand configuration is current
It saves.
One as technical solution of the present invention is preferred, wherein further include,
The operating status of building collaboration linkage is reflected in BIM according to the real time execution parameter of equipment subsystem by S6 in real time
On model, to realize the real time monitoring of building collaboration linkage process.
To achieve the above object, according to one aspect of the present invention, a kind of building collaboration connection based on BIM model is provided
Dynamic system, which is characterized in that including
Subsystem module, for according to the corresponding relationship between equipment subsystem and BIM model, collecting device subsystem
Real time execution parameter, and the operating status of equipment subsystem is reflected in real time on BIM model;
Interlocking module is cooperateed with, is handled for the operating parameter to equipment subsystem, is configured according to the operating parameter
The collaboration linkage scheme of equipment subsystem, and be the corresponding trigger condition of each collaboration linkage arrangements and warning information;
Trigger module carries out analysis identification for the real time execution parameter to equipment subsystem, filters out equipment subsystem
Real time execution parameter in misoperation parameter, judge the misoperation parameter whether meet collaboration linkage scheme triggering
Otherwise condition enters configuration module if then triggering corresponding linkage prediction scheme and sending a warning;
Configuration module, for cooperateing with linkage scheme according to misoperation parameter configuration, by current misoperation parameter setting
For the trigger condition of collaboration linkage scheme, saves and start collaboration linkage scheme.
Preferably as one of technical solution of the present invention, wherein the collaboration interlocking module includes,
Requirement analysis module, for the collaboration linkage demand according to equipment subsystem in operation, determination is assisted
With the equipment subsystem of linkage;
Link arrangements module, for the pass to equipment subsystem in cooperateing with linkage process between equipment running status
Connection relationship is configured and is saved;
Trigger condition module, for according to the corresponding trigger condition of the current collaboration linkage scheme of collaboration linkage demand configuration
And/or it warning information and saves.
Preferably as one of technical solution of the present invention, trigger module includes,
Choice of parameters module filters out not for the operating parameter critical field according to equipment each in equipment subsystem
The real time execution parameter of equipment subsystem in critical field;
Identification module will need equipment subsystem for identifying to the equipment operating parameter not in critical field
The equipment operating parameter of collaboration linkage processing is determined as misoperation parameter;
Judgment module, for judging whether the misoperation parameter meets the trigger condition of collaboration linkage scheme, if
Corresponding collaboration linkage scheme and/or warning information are then directly triggered, S4 is otherwise entered step.
One as technical solution of the present invention is preferred, and system further includes display module, for according to equipment subsystem
The operating status of building collaboration linkage is reflected on BIM model by real time execution parameter in real time, to realize building collaboration linkage
The real time monitoring of process.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, have below beneficial to effect
Fruit:
1) method of technical solution of the present invention, using intelligent building management system, building is set by building BIM model
Standby actual operation parameters are got up with BIM model interaction, so that BIM model can show the operation of equipment subsystem in time
Parameter accurately simulates building structure and its internal unit mutually matched dynamic change situation at runtime, thus by equipment
The state of subsystem collaboration linkage is accurately shown on BIM model, to be adjusted in time to collaboration linkage scheme.
2) method of technical solution of the present invention, by collection, analysis, transmitting and the processing to each subsystem resource, and will
It accurately shows on BIM, thus when being configured to equipment subsystem collaboration linkage scheme, it can be real-time
It checks inter-subsystem intelligent linkage state, makes and optimal control and decision scheme are carried out to Architectural Equipments various in building, and
It provides Architectural Equipment relevant information for other systems, to reach efficient, economic, energy saving, coordinated operation state, provides quickly
Emergency response scheme purpose.
3) method of technical solution of the present invention drills equipment linkage prediction scheme using BIM model, on the one hand can be with needle
The default of collaboration linkage scheme is carried out to the event being likely to occur, and presupposed solution is shown on BIM model, with observation
Its effect;On the other hand, for the emergency event of not preset in advance, can also link prediction scheme according to the good collaboration of configured in advance
The prediction scheme for current emergency event is designed, to efficiently and effectively filter out Best Management Plan and to emergency event
It is handled.
Detailed description of the invention
Fig. 1 is the system construction drawing of the embodiment of technical solution of the present invention;
Fig. 2 is the method flow diagram of the embodiment of technical solution of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below
Not constituting a conflict with each other can be combined with each other.The present invention is described in more detail With reference to embodiment.
It is excellent in the present embodiment in order to preferably realize that the collaboration of each device systems of intelligent building links using BIM model
It is selected in when build BIM model, i.e., is respectively processed for each equipment subsystem, to adapt to subsystem under different conditions
Presentation result.For example, in order to which the open/close state of lamp is presented, needing to add for lamps and lanterns model to lighting apparatus subsystem
Light source, display light source when lamps and lanterns are opened, lamps and lanterns close light source when closing, and lamp becomes opening state by closed state, then in model
Lamp become have light source by gauge without light source.Specific Exhibition Design can according to need and be designed to different images, as fixture color changes
Or other forms.In another example sprinkling equipment needs to increase water spray movement in fire-fighting equipment subsystem;Access control equipment system
In, door needs to increase opening-closing door movement etc..Further, IBMS is associated with BIM model integrated, integrated IBMS equipment subsystem
System, including video monitoring subsystem, fire-fighting subsystem, circumference subsystem, gate inhibition's subsystem, air conditioning subsystem, illumination subsystems
Deng.When disposing device model in Unity3D, by the corresponding relationship typing of equipment subsystem and model into system, i.e., factory
Quotient's number is write on the attribute or script of model, and the corresponding relationship of device id and supplier number is established in IBMS subsystem, thus
It realizes that subscriber device is associated with model component, equipment is positioned in a model, alarm equipment location can also be understood in time
Domain.
That is, since the equipment entity in each subsystem establishes pass with the device model in BIM model
Connection relationship, is operated to map to and executes corresponding operating in equipment entity to the device model in BIM model.Such as in BIM
Lighting apparatus is closed in model, then the light source of the lighting apparatus model is closed in the display result of BIM model, while in the photograph
Physically, also correspondence is closed light source the corresponding lighting apparatus of bright device model.To realize the equipment mould in operation BIM model
Type can carry out the effect of alignment processing to equipment entity.On this basis, it is further provided in the present embodiment and utilizes BIM mould
Type realizes the collaboration linkage strategy of multiple submodels in intelligent building.
Specifically, as shown in Figure 1, the collaborative linkage system of the present embodiment includes subsystem module, Service Processing Module
With apply display module.Wherein, subsystem module is connected with Service Processing Module by interface adapter.Specifically, it connects
Mouth adapter can provide various functional interfaces and call for bussiness processing layer, and different subsystems connects configured with different calling
Mouthful, different sub-systems progress state is controlled with separation failure with realization, is diversified risks, convenient for management.As bussiness processing layer
Intermediary interface layer between subsystems server, the information exchange between bussiness processing layer and subsystems require
It is completed by interface adapter.
Further, subsystem module includes multiple subsystems, such as: subsystem of video, fire-fighting subsystem, circumference subsystem
System, gate inhibition's subsystem, air conditioning subsystem, illumination subsystems and other subsystems, each subsystem are individually responsible for groups of building (BIM
The corresponding groups of building of model) a part work, if subsystem of video is responsible for the video surveillance management of groups of building, wherein may wrap
Include multiple monitoring devices;The management of fire safety etc. of fire-fighting subsystem responsible groups of building.
Service Processing Module is responsible for the access of all subsystems, data exchange, data-storing and pipe in subsystem module
Real-time and historical data base is managed, realizes the tasks such as linkage task schedule, timetable task schedule.That is, the present embodiment
Service Processing Module includes at least subsystem AM access module, data exchange module, data memory module and data base administration mould
Block, in addition, wherein further including task scheduling modules.
It is using the major function of display module, by 3D engine, by the task status and task of subsystems
Content is shown on 3D platform, while showing the control content that Service Processing Module is issued to subsystem.User can benefit
Real time monitoring and history monitoring are carried out with operating status, the operating parameter etc. of equipment in application display module sub-system, or
Person is controlled by Service Processing Module sub-system.It is above-mentioned monitor and control process can application display module on can
It is shown depending on changing.In addition, the various warning informations generated in collaborative linkage system can also be received using display module, as fire-fighting is alert
It notifies breath, gate inhibition's warning information etc., it is shown on 3D platform, while being directed to different warning informations, according to business
The process instruction of processing module is handled and shows corresponding content.
Specifically, in the present embodiment, it includes two aspects that Service Processing Module, which carries out processing to warning information, and one is
The warning information being likely to occur is pre-configured with, different collaboration linkage plans is pre-configured with according to the classification of warning information
Slightly, the trigger condition of each collaboration linkage strategy is set as corresponding warning information.The other is receive warning information when
It waits, i.e., the warning information is judged, trigger corresponding collaboration linkage strategy after determining its classification, realize in whole building group
The collaboration of different sub-systems links.Specifically, in order to realize the above functions, in the embodiment of technical solution of the present invention, business
Processing module includes main control module, log management module, configuration management module, alert management module, event manager module, linkage
Management module, attribute management module, cache module and database interface module.
Wherein, main control module is responsible for information collection, storage, analysis and decision, the mainly operation information of collection subsystem
And be stored in database, comprehensive point is carried out using operating status of these information to multiple subsystems of whole building group
Analysis, the collaboration linkage strategy between multiple subsystems provide data analysis foundation.Log management module includes being for collecting
Data information including system running log, operation log and device log, is monitored, and remember with the operating status of sub-system
Operation instruction signal and device status monitoring that record Service Processing Module issues it etc..In configuration management module, user
It can be pre- to collaboration linkage according to the running state information (including current operating conditions and history run state) of subsystems
Case carries out flexible configuration, supports customized prediction scheme, i.e., voluntarily according to subsystem and its relevant attribute of corresponding device or event
The content of configuration linkage prediction scheme, and linkage prediction scheme is stored by database interface into database, after setting trigger condition,
It can be used as a collaboration linkage prediction scheme to be called.It, can be for possible in one side configuration management module in the present embodiment
The case where appearance, carries out the configuration of linkage prediction scheme in advance, on the other hand, in the emergency case for occurring not configuring in advance, also can
Enough linkage prediction scheme configuration processing is carried out in time for emergency case.That is, configuration management module is responsible for configuration collaboration linkage
The information such as essential information, trigger condition and the execution operation of prediction scheme, determine the subsystem of the corresponding linkage of each trigger condition,
And each subsystem executes movement, further, can with the list of linkage configuration strategies all in display system, with
And the additions and deletions that linkage configures are provided and change function (configuring to collaboration linkage prediction scheme).
Alert management module is then that the interface of warning information inquiry and processing is provided for application presentation layer, in the present embodiment
After generating warning information in subsystem or transaction processing system, transaction processing system is while handling it, application
Display module can be shown specific warning information on display platform (such as 3D platform) and real-time display business processing
The processing status (assigning including process instruction and subsystem execute corresponding processing result after process instruction) of module, this mistake
Journey passes through alert management module and realizes.Further, alert management module can also receive the warning information being currently received,
And it sends it to and is shown using display module.Specifically, then not aobvious when being not received by warning information
Show, for the warning information received, alert management module can provide " confirmation " in the operation interface of application display module
The instruction such as " recovery " relevant treatments, and the relevant operation of the command content execution process instruction according to user's selection, can also incite somebody to action
The warning information that processing is completed is stored to Historical Alerts information.
Event manager module is responsible for alarm, the anomalous event, such as fire-fighting that specific processing subsystem and its corresponding device generate
Triggering produces warning information in subsystem, then event manager module just needs to identify this warning information, by its turn
The identifiable form of other modules is turned to, and warning information is transmitted to the moulds such as linkage management, configuration management and master control rapidly
Block is further identified, is handled.Event manager module is to carry out information between Service Processing Module and application display module
Interactive important bridge, event manager module is interface of the Service Processing Module to application display module transmitting information, main to wrap
Include alarm push, attribute push, notice push, configuration change reports, subsystem key parameter reports, such as business at
The warning information (from subsystems or Service Processing Module itself) that reason module receives, in order to right on 3D platform
It is shown, is needed to first pass through event manager module and is entered using display module, then enters back into 3D display module and police
Report management module is shown and manages.
Linkage management module is responsible for receiving the attribute or event message sent by interface adapter, judges to receive
Whether there is trigger signal in information, if there is the linkage prediction scheme signal that is triggered then passes through interface adapter according under the linkage prediction scheme
It says the word to subsystem, subsystem is executed the operation in linkage prediction scheme by configuration sequence, and is sent operation executive condition to and answered
Use presentation layer.Attribute management module is responsible for the attribute informations such as parameter and the operation of management subsystem and its corresponding device, either
Its attribute information is managed, such as the operating status attribute of specific video equipment or fire-fighting in subsystem of video
The operating status of specific fire-fighting equipment in subsystem.It, can also according to device attribute (or device attribute variation) in the present embodiment
To understand the operating status of subsystems in time, when alarm module fails to issue warning information in time, son can also be passed through
The device attribute of system is reacted in time for emergency case.
It include subsystem 3D display module, subsystem 3D O&M module, business processing display module etc. using display module,
It is shown with carrying out the process of business processing in the equipment state and service display module in sub-system, subsystem.Its
In, subsystem 3D display module is responsible for the position of display subsystem equipment and essential information on 3D platform, provide 3D browsing with
User is facilitated to check.Subsystem 3D O&M module is responsible for realizing the control of sub-system equipment, such as illumination system on 3D platform
The ON/OFF lamp of system, the opening-closing door operation of access control system, i.e., pass to corresponding son for information is controlled by Service Processing Module
System and specific equipment are to realize the change of equipment state, while specific equipment time of day changes, by equipment state
Information reflects in real time on corresponding device model.That is, may be implemented by Service Processing Module to equipment subsystem
State is modified.When this modification includes analog machine subsystem operating status in BIM model, to setting in BIM model
Standby subsystem state is changed the preview to realize collaboration linkage scheme (i.e. using BIM model to true under collaboration linkage scheme
The equipment subsystem operating status of real state is simulated), or by BIM model under the equipment subsystem of time of day
Hair collaboration linkage instruction, executes collaboration linkage prediction scheme.
In other words, the Service Processing Module of the present embodiment can provide the basic letter of building collaboration linkage arrangements
Breath, trigger condition and execution operation content etc. are the maincenter cores of entire collaboration linkage configuration system, are responsible for reception and processing
Various information, including analysis identification is carried out to equipment subsystem data information, collaboration linkage prediction scheme is configured (including it is original
The operations such as configuration, modification configuration, deletion configuration), while can also issue all kinds of instructions.In addition, Service Processing Module also has
Various types of data information is summarized into the function of storing into database.Further, due to Service Processing Module and display module phase
Connection, data procedures of all generations in Service Processing Module, can pass to display module progress by data-interface
It visualizes.
As shown in Fig. 2, being flow chart of the invention, in a specific embodiment, when some system generates alarm, association
With linked system can automatic monitoring alarm region the case where, by customized linkage strategy, execute corresponding operation, user can be with
The process that direct feel operates in such a way that 3D is browsed.In the present embodiment, following steps are preferably included:
Step 1: configuration collaboration linkage prediction scheme essential information.Collaboration linkage prediction scheme essential information is established according to demand, such as name
Claim (can be customized with the progress of prediction scheme title, be named as A in the present embodiment in order to state), configures collaboration linkage prediction scheme
Target etc., be arranged the prediction scheme priority (priority of each system also has difference, such as 3 grades or 5 grades according to demand, this
In embodiment with no restriction to this).
Step 2: the trigger condition of setting collaboration linkage prediction scheme A selectes a specific equipment in subsystem, setting monitoring
Attribute trigger condition (such as triggering when the attribute data for monitoring certain equipment in subsystem reaches a certain threshold value), trigger condition can
Think one or more, can be between multiple trigger conditions " and " or "or" relationship.
Step 3: needing to cooperate with linkage under the prediction scheme according to trigger condition and the target of collaboration linkage prediction scheme, determination
Equipment, and equipment controlled attribute value is configured, while actuation time is set;With multiple subsystem coordinateds,
When with multiple action commands, it is also necessary to be configured to the execution time of different sub-systems movement.Such as, fire-fighting is being needed
When subsystem carries out collaboration linkage, attribute value (such as fire-fighting range), actuation time (the fire-fighting equipment fortune of fire-fighting equipment are determined
Turn duration etc.).Complete the configuration of collaboration linkage prediction scheme.
Step 4: the utilization of collaboration linkage prediction scheme.Interface adapter by received data conversion at attribute or event message simultaneously
Service Processing Module is sent it to, bussiness processing layer judges whether it meets trigger condition, to determine whether to execute collaboration connection
Dynamic prediction scheme.If it is determined that executing, bussiness processing layer then links prediction scheme according to corresponding collaboration will be under instruction by interface adapter
The subsystems for needing to cooperate with linkage are dealt into, execute the operation in linkage prediction scheme according to configuration sequence, and operation is executed into feelings
Condition is sent to using represent layer.
In conclusion the collaborative linkage system in the present embodiment, including at least the subsystem mould being made of multiple subsystems
Multiple subsystems are monitored the Service Processing Module of management by block, and the state and business processing situation of sub-system are opened up
That shows applies display module.Wherein subsystem module carries out information exchange by interface adapter and Service Processing Module, each
Subsystem is equipped with individual interface adapter, and an adapter damage or a subsystem break down wherein in this way
When, the operation of other subsystems is not influenced, reduces the failure rate of collaborative linkage system in the present embodiment.
Further, the parameter information of subsystem enters Service Processing Module by interface adapter.Service Processing Module
In be additionally provided with main control module, controlled for sub-system;Log management module, for the operation to collaborative linkage system
Log, operation log and device log etc. are saved;The flexible configuration of configuration management module collaborative support prediction scheme (is such as made by oneself
Adopted prediction scheme), according to subsystem and its relevant attribute of corresponding device or the content of event configuration linkage prediction scheme, and the prediction scheme that will link
Through database interface storage into database;Alert management to provide using represent layer, inquire and what is handled connects by warning information
Mouthful;Event manager module is responsible for alarm, the anomalous event that processing subsystem and its corresponding device generate;Linkage management module is responsible for
The attribute or event message that receiving interface adapter is sent, according to trigger condition by the behaviour in configuration sequence execution linkage prediction scheme
Make, and sends operation executive condition to using represent layer;Attribute management module is responsible for management subsystem and its corresponding device
The attribute informations such as parameter and operation.To sum up, the submodule in Service Processing Module is extracted respectively by interface adapter respectively
The information of a subsystem, and it is stored according to certain structure into database.Warning information (the alarm issued for subsystem
Information can be that subsystem actively issues or Service Processing Module is according to the attribute data change triggers detected), at business
Reason system carries out collaboration linkage processing, while alert management module and event manager module to it by event linkage management module
The information such as the state by the treatment process of Service Processing Module, state and subsystem are shown on 3D platform.
If each equipment subsystem is considered as bottom, due to the attribute status of subscriber device in the present embodiment
It is associated with the device model in BIM model, different subsystems can show the shape of equipment cooperateing in 3D model when linkage
State variation.The attribute change of bottom real-time report equipment, is sent to using display module, is reported using display module according to bottom
Attribute, relevant movement is executed to relevant device.Wherein, the processes such as collection, processing of facility information are all in business processing
It is completed in module.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to
The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include
Within protection scope of the present invention.
Claims (9)
1. a kind of building based on BIM model cooperates with interlock method, which is characterized in that include the following steps,
S1 is incited somebody to action according to the corresponding relationship between equipment subsystem and BIM model, the real time execution parameter of collecting device subsystem
The operating status of equipment subsystem is reflected in real time on BIM model;
S2 handles the operating parameter of equipment subsystem, is linked according to the collaboration that the operating parameter configures equipment subsystem
Scheme, and be the corresponding trigger condition of each collaboration linkage arrangements and warning information;
S3 carries out analysis identification to the real time execution parameter of equipment subsystem, filters out the misoperation ginseng in real time execution parameter
Number, judges whether the misoperation parameter meets the trigger condition of collaboration linkage scheme, if it is pre- then to trigger corresponding linkage
Case simultaneously sends a warning, and otherwise enters step S4;
S4 cooperates with linkage scheme according to misoperation parameter configuration, sets collaboration linkage scheme for current misoperation parameter
Trigger condition, save and start the collaboration linkage scheme.
2. a kind of building based on BIM model according to claim 1 cooperates with interlock method, wherein in the step S2
Including,
Collaboration linkage demand of the S21 according to equipment subsystem in operation, determines the equipment subsystem for carrying out collaboration linkage;
S22 is configured and is saved in the incidence relation in collaboration linkage process between equipment running status to equipment subsystem;
S23 is according to the corresponding trigger condition of the current collaboration linkage scheme of collaboration linkage demand configuration and/or warning information and saves.
3. a kind of building based on BIM model according to claim 1 or 2 cooperates with interlock method, wherein the step S3
Including,
S31 filters out the equipment not in critical field according to the operating parameter critical field of equipment each in equipment subsystem
The real time execution parameter of subsystem;
S32 identifies the equipment operating parameter not in critical field, will need equipment subsystem collaboration linkage processing
Equipment operating parameter is determined as misoperation parameter;
S33 judges whether the misoperation parameter meets the trigger condition of collaboration linkage scheme, if then directly triggering corresponds to
Collaboration linkage scheme and/or warning information, otherwise enter step S4.
4. a kind of described in any item buildings based on BIM model cooperate with interlock method according to claim 1~3, wherein described
Step S4 includes,
S41 determines the equipment subsystem for carrying out collaboration linkage according to misoperation parameter;
S42 is configured and is saved in the incidence relation in collaboration linkage process between equipment running status to equipment subsystem;
S43 is according to the corresponding trigger condition of the current collaboration linkage scheme of collaboration linkage demand configuration and/or warning information and saves.
5. a kind of building based on BIM model according to any one of claims 1 to 4 cooperates with interlock method, wherein also wrapping
It includes,
The operating status of building collaboration linkage is reflected in BIM model according to the real time execution parameter of equipment subsystem by S6 in real time
On, to realize the real time monitoring of building collaboration linkage process.
6. a kind of building collaborative linkage system based on BIM model, which is characterized in that including
Subsystem module, for according to the corresponding relationship between equipment subsystem and BIM model, collecting device subsystem it is real-time
Operating parameter, and the operating status of equipment subsystem is reflected in real time on BIM model;
Interlocking module is cooperateed with, is handled for the operating parameter to equipment subsystem, equipment is configured according to the operating parameter
The collaboration linkage scheme of subsystem, and be the corresponding trigger condition of each collaboration linkage arrangements and warning information;
Trigger module carries out analysis identification for the real time execution parameter to equipment subsystem, filters out the reality of equipment subsystem
When operating parameter in misoperation parameter, judge the misoperation parameter whether meet collaboration linkage scheme triggering item
Otherwise part enters configuration module if then triggering corresponding linkage prediction scheme and sending a warning;
Configuration module sets this for current misoperation parameter for cooperateing with linkage scheme according to misoperation parameter configuration
The trigger condition for cooperateing with linkage scheme saves and starts collaboration linkage scheme.
7. a kind of building collaborative linkage system based on BIM model according to claim 6, wherein the collaboration linkage
Module includes,
Requirement analysis module, for the collaboration linkage demand according to equipment subsystem in operation, determination needs to carry out collaboration connection
Dynamic equipment subsystem;
Link arrangements module, for closing to equipment subsystem in the association in collaboration linkage process between equipment running status
System is configured and is saved;
Trigger condition module, for according to the corresponding trigger condition of the current collaboration linkage scheme of collaboration linkage demand configuration and/or
Warning information simultaneously saves.
8. a kind of building collaborative linkage system based on BIM model according to claim 6 or 7, wherein the trigger mode
Block includes,
Choice of parameters module is filtered out and is not being marked for the operating parameter critical field according to equipment each in equipment subsystem
The real time execution parameter of equipment subsystem in quasi- range;
Identification module will need equipment subsystem to cooperate with for identifying to the equipment operating parameter not in critical field
The equipment operating parameter of linkage processing is determined as misoperation parameter;
Judgment module, for judging whether the misoperation parameter meets the trigger condition of collaboration linkage scheme, if then straight
It picks out and sends out collaboration linkage scheme and/or warning information corresponding, otherwise enter step S4.
9. according to a kind of described in any item building collaborative linkage systems based on BIM model of claim 6~8, wherein described
System further includes display module, for the real time execution parameter according to equipment subsystem, by the operating status of building collaboration linkage
It is reflected on BIM model in real time, to realize the real time monitoring of building collaboration linkage process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810884969.8A CN109344420A (en) | 2018-08-06 | 2018-08-06 | A kind of building collaboration interlock method and system based on BIM model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810884969.8A CN109344420A (en) | 2018-08-06 | 2018-08-06 | A kind of building collaboration interlock method and system based on BIM model |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109344420A true CN109344420A (en) | 2019-02-15 |
Family
ID=65296670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810884969.8A Pending CN109344420A (en) | 2018-08-06 | 2018-08-06 | A kind of building collaboration interlock method and system based on BIM model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109344420A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109920218A (en) * | 2019-03-29 | 2019-06-21 | 武汉虹信技术服务有限责任公司 | A kind of alarm trigger event intelligent recognition and interlock method based on key alarm column |
CN110415334A (en) * | 2019-06-26 | 2019-11-05 | 广东康云科技有限公司 | A kind of outdoor scene threedimensional model application system and method |
CN112087523A (en) * | 2020-09-18 | 2020-12-15 | 成都聚家科技有限公司 | Intelligent building management system and device based on cloud service and computer readable storage medium |
CN112180795A (en) * | 2020-09-30 | 2021-01-05 | 湖南建工集团有限公司 | Device and method for operation early warning and linkage control of building equipment |
CN112904815A (en) * | 2021-01-18 | 2021-06-04 | 汉维科技发展有限公司 | Building intelligent system integration method |
CN113852501A (en) * | 2021-09-17 | 2021-12-28 | 中邮科通信技术股份有限公司 | Intelligent linkage system and method for Internet of things equipment |
CN114301953A (en) * | 2021-12-13 | 2022-04-08 | 北京首奥置业有限公司 | Internet of things equipment linkage control method and device, storage medium and electronic device |
CN114419838A (en) * | 2021-12-30 | 2022-04-29 | 杭州晨鹰军泰科技有限公司 | Linkage alarm configuration method, device and equipment and readable storage medium |
CN117132005A (en) * | 2023-10-16 | 2023-11-28 | 浙江春风动力股份有限公司 | High-dispersion and high-flexibility low-cost manufacturing system for large-displacement motorcycle |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204390397U (en) * | 2015-02-10 | 2015-06-10 | 厦门合道工程设计集团有限公司 | Based on the automatic fire alarm infosystem of BIM |
CN105426972A (en) * | 2015-10-28 | 2016-03-23 | 上海同筑信息科技有限公司 | Engineering project intelligent operation management method and system based on BIM |
CN107272535A (en) * | 2017-07-11 | 2017-10-20 | 武汉虹信技术服务有限责任公司 | The linkage and interlock method of a kind of intelligent building management system |
CN107729065A (en) * | 2017-11-02 | 2018-02-23 | 港珠澳大桥管理局 | The method and system of a kind of 3 D monitoring |
CN108281176A (en) * | 2018-04-12 | 2018-07-13 | 上海科瑞漫拓信息技术有限公司 | Hospital architecture wisdom operation management system based on BIM and method |
-
2018
- 2018-08-06 CN CN201810884969.8A patent/CN109344420A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204390397U (en) * | 2015-02-10 | 2015-06-10 | 厦门合道工程设计集团有限公司 | Based on the automatic fire alarm infosystem of BIM |
CN105426972A (en) * | 2015-10-28 | 2016-03-23 | 上海同筑信息科技有限公司 | Engineering project intelligent operation management method and system based on BIM |
CN107272535A (en) * | 2017-07-11 | 2017-10-20 | 武汉虹信技术服务有限责任公司 | The linkage and interlock method of a kind of intelligent building management system |
CN107729065A (en) * | 2017-11-02 | 2018-02-23 | 港珠澳大桥管理局 | The method and system of a kind of 3 D monitoring |
CN108281176A (en) * | 2018-04-12 | 2018-07-13 | 上海科瑞漫拓信息技术有限公司 | Hospital architecture wisdom operation management system based on BIM and method |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109920218A (en) * | 2019-03-29 | 2019-06-21 | 武汉虹信技术服务有限责任公司 | A kind of alarm trigger event intelligent recognition and interlock method based on key alarm column |
CN110415334A (en) * | 2019-06-26 | 2019-11-05 | 广东康云科技有限公司 | A kind of outdoor scene threedimensional model application system and method |
CN110415334B (en) * | 2019-06-26 | 2023-03-10 | 广东康云科技有限公司 | Real-scene three-dimensional model application system and method |
CN112087523A (en) * | 2020-09-18 | 2020-12-15 | 成都聚家科技有限公司 | Intelligent building management system and device based on cloud service and computer readable storage medium |
CN112180795A (en) * | 2020-09-30 | 2021-01-05 | 湖南建工集团有限公司 | Device and method for operation early warning and linkage control of building equipment |
CN112904815A (en) * | 2021-01-18 | 2021-06-04 | 汉维科技发展有限公司 | Building intelligent system integration method |
CN113852501A (en) * | 2021-09-17 | 2021-12-28 | 中邮科通信技术股份有限公司 | Intelligent linkage system and method for Internet of things equipment |
CN114301953A (en) * | 2021-12-13 | 2022-04-08 | 北京首奥置业有限公司 | Internet of things equipment linkage control method and device, storage medium and electronic device |
CN114419838A (en) * | 2021-12-30 | 2022-04-29 | 杭州晨鹰军泰科技有限公司 | Linkage alarm configuration method, device and equipment and readable storage medium |
CN117132005A (en) * | 2023-10-16 | 2023-11-28 | 浙江春风动力股份有限公司 | High-dispersion and high-flexibility low-cost manufacturing system for large-displacement motorcycle |
CN117132005B (en) * | 2023-10-16 | 2024-02-27 | 浙江春风动力股份有限公司 | High-dispersion and high-flexibility low-cost manufacturing system for large-displacement motorcycle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109344420A (en) | A kind of building collaboration interlock method and system based on BIM model | |
CN101329564B (en) | Computer room management system | |
CN102804084B (en) | The method of integrated multiple management domain | |
CN110046718A (en) | A kind of intelligent operation platform based on BIM and RFID | |
CN105554059B (en) | Logistics transportation Intellisense and position service system based on Beidou navigation technology | |
CN107256007B (en) | The system and method for virtualization for industrial automation environment | |
CN110428135A (en) | A kind of pipe gallery equipment condition monitoring management system | |
CN105407159B (en) | Logistics transportation position service system | |
CN105589923A (en) | Dynamic search engine for an industrial environment | |
CN108830462A (en) | A kind of pipe gallery wisdom operation management platform and method | |
CN110158648A (en) | A kind of Urban Underground pipe gallery O&M monitoring management system | |
CN107193375A (en) | A kind of electric power safety production scene interaction systems based on virtual reality | |
CN105988367A (en) | Modeling of industrial automation environment the cloud | |
CN111104622A (en) | WEBGL-based three-dimensional GIS intelligent monitoring method and device | |
CN110288176A (en) | Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS | |
CN113744390A (en) | Park-oriented visual intelligent management and control platform | |
CN112346347A (en) | Intelligent building integrated management system and information processing method thereof | |
CN110188893A (en) | A kind of building operation management system | |
CN115375172A (en) | BIM-based intelligent operation and maintenance method and system | |
CN112381412A (en) | Digital twin satellite pulsating type general assembly distributed management and control system | |
CN110276516A (en) | Distribution monitoring analysis and repairing command methods based on power grid GIS | |
CN114254982A (en) | Smart factory cloud management system | |
US20070282781A1 (en) | Method To Retrieve Data For An Equipment, Plant Or A Process | |
CN114139950A (en) | Intelligent building integrated management platform based on BIM | |
CN115423645A (en) | Man-machine safety intelligent management system and method for hydraulic power plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190215 |