CN113744390A - Park-oriented visual intelligent management and control platform - Google Patents

Park-oriented visual intelligent management and control platform Download PDF

Info

Publication number
CN113744390A
CN113744390A CN202110980372.5A CN202110980372A CN113744390A CN 113744390 A CN113744390 A CN 113744390A CN 202110980372 A CN202110980372 A CN 202110980372A CN 113744390 A CN113744390 A CN 113744390A
Authority
CN
China
Prior art keywords
scene
management
scenes
platform
park
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110980372.5A
Other languages
Chinese (zh)
Inventor
卓杰
卞光腾
葛磊
吴茂传
燕宪振
丁维齐
王跃
孙庆鑫
冯晓亮
朱纯
胡作伟
李刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jierui Information Technology Co Ltd
Original Assignee
Jiangsu Jierui Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jierui Information Technology Co Ltd filed Critical Jiangsu Jierui Information Technology Co Ltd
Priority to CN202110980372.5A priority Critical patent/CN113744390A/en
Publication of CN113744390A publication Critical patent/CN113744390A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2468Fuzzy queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T13/00Animation
    • G06T13/203D [Three Dimensional] animation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L69/00Network arrangements, protocols or services independent of the application payload and not provided for in the other groups of this subclass
    • H04L69/08Protocols for interworking; Protocol conversion

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • Computer Hardware Design (AREA)
  • Mathematical Physics (AREA)
  • Fuzzy Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Remote Sensing (AREA)
  • Architecture (AREA)
  • Computer Security & Cryptography (AREA)
  • Pure & Applied Mathematics (AREA)
  • Signal Processing (AREA)
  • Computer Graphics (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Analysis (AREA)
  • Evolutionary Computation (AREA)
  • Computational Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Probability & Statistics with Applications (AREA)
  • Computational Linguistics (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The invention discloses a park-oriented visual intelligent management and control platform, which is based on advanced technologies such as three-dimensional model building and management, JARIJS-based digital twin drive, OPC UA standard-based communication protocol conversion, global event and plan management and the like, integrates massive multi-source heterogeneous data covering the whole park uniformly, fully utilizes physical models, sensor updating and operation history, completes virtual-real mapping in a virtual space by combining park physical scene three-dimensional modeling and digital twin drive, realizes that the platform performs uniform management on park people, events and things, and assists park managers to perform comprehensive perception and comprehensive judgment on park operation situations in a 'what you see is what you get' mode, and realizes management refinement, decision-making scientification and service high efficiency.

Description

Park-oriented visual intelligent management and control platform
Technical Field
The invention relates to an intelligent management and control platform, in particular to a park-oriented visual intelligent management and control platform.
Background
At present, a method for a park platform to be used in a three-dimensional visual direction is customized development, the three-dimensional driving development is high in threshold, the requirement on three-dimensional knowledge of developers is high, and the reuse rate of a model is low; meanwhile, the conventional method is customized development and consumes time and labor for multi-standard communication protocols.
Disclosure of Invention
The invention aims to solve the technical problem of providing a visual intelligent management and control platform which is reasonable in design and is oriented to a park, aiming at the defects of the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme:
a visual intelligent management and control platform for a park is characterized in that the platform is supported by the Internet of things, big data and digital twins, a three-dimensional model is adopted for building and managing, JARIJS-based digital twins driving, OPC UA-standard-based communication protocol conversion and global event and plan management are adopted, digital twins visual analysis is carried out on key indexes in the fields of security, energy efficiency, equipment and environmental space of the park, and a manager is assisted to comprehensively control the operation situation of the park in a 'what you see is what you get' mode.
The technical problem to be solved by the invention can also be realized by the following technical scheme that the specific flow of the three-dimensional model building and management is that,
firstly, realizing digital modeling of attributes, methods and behavior characteristics of physical entities and processes in a digital space, wherein the model construction is multidimensional in geometry-physics-behavior-rule, and describes geometric characteristics, physical characteristics, behavior coupling relation and evolution rules of physical objects;
secondly, after the model scene is built successfully, the platform performs centralized management on the model scene, performs various module division on the model scene according to different garden management requirements, and each module supports three-dimensional model import in an OBJ format, an STL format and a GLTF format and also supports three-dimensional GIS, BIM, point cloud, oblique photography and two-dimensional GIS three-dimensional model embedding;
thirdly, the model scene is divided into,
and the scene catalog is used for carrying out classification management on the scenes according to industry classification. Platform maintainers can create a scene classification directory, modify a directory, delete a directory. A reminder function is required for deletion of a directory that has already been used. The default is that a scene catalogue of the individual is provided, and scenes uploaded by the individual are screened out.
And (3) scene browsing, wherein a user of the login platform can browse all scenes on the platform through a scene directory and switch different scenes to browse through a shortcut key and a mouse.
And uploading the scenes, wherein the system user can upload the own designed scenes to a platform for sharing and share the scenes to other project groups for application, so that the maximized utilization of the scenes is realized, the user uploads the scenes by selecting different classifications, the classifications which cannot be determined can be selected by default to be unclassified, and finally, the unclassified scenes are classified by system maintenance personnel.
Scene downloading, wherein the scene downloading supports scene sharing and application, and a user can select a scene to be downloaded and package and download the scene to the local. Each download or view of a scene records the number of times the scene has been viewed and downloaded.
And scene searching, wherein the scene searching module supports a user to quickly search a scene which the user wants to search in a fuzzy query mode, and search results can be further screened by classification.
And scene maintenance, wherein the scene maintenance mainly comprises the maintenance of reclassification management, uploading, downloading and deleting functions of the scene.
The technical problem to be solved by the present invention can also be solved by the following technical solution, where the communication protocol conversion based on the OPC UA standard includes an OPC UA server and a subsystem workstation server, the subsystem workstation server is connected to the OPC UA server sequentially through an IP physical network and an OPC UA client application layer, the OPC UA server provides a customized interface and an automatic interface to convert the communication protocol and the communication interface, and the conversion of the communication protocol is mainly to complete output according to the frame format of the source protocol and the frame format of the target protocol.
The technical problem to be solved by the present invention can also be achieved by following technical solutions, the process of the global event and plan management is,
aiming at emergencies or other emergencies occurring in the park management process, the platform provides a global event and plan management mechanism, before the system is started, emergency processing strategies summarized according to historical experience and fixed parameters of equipment are stored in a server, and after the system is started, the system can carry out single or periodic scheduling control on the equipment, automatically adjust the flow of part of the equipment and balance the load of the equipment according to preset settings; according to a scheduling strategy and an energy-saving strategy among mutual backup devices preset by a system and an optimal starting/stopping time control strategy of the devices, starting, increasing or closing part of the devices in the system in advance;
according to the preset event logic, when an event occurs, the relevant linkage control is automatically generated, and for high-level events, the relevant linkage is directly triggered through alarming, so that the response speed of the event is improved; the logic function of the system is the logic function built in the system, the development work at the program level is not needed, the logic is organized and modified on line according to the actual condition of the field system and the requirement of the user on the system, and the system service executes the modified logic.
The technical problem to be solved by the invention can be also realized by the following technical scheme that the JARIJS-based digital twin drive adopts a WebGL-based 3D drawing protocol to combine JavaScript and OpenGL ES 2.0 together, the WebGL provides hardware 3D accelerated rendering for HTML5 Canvas by adding one JavaScript binding of OpenGL ES 2.0, a 3D scene and a model are displayed in a browser by means of a system display card, complex navigation and data visualization are created, a JARIJS-based digital twin drive engine is integrated, and scene management, time processing, a scene control panel, a logic control panel and a data configuration management interface are supported and realized.
Compared with the prior art, the invention has the following beneficial effects:
firstly, after a three-dimensional model building and management technology, a communication protocol conversion technology based on OPC UA standard, a global event and plan management technology are applied to a remote visual intelligent management and control platform, the information transmission of data among independent subsystems of a park is opened, the operation data acquisition, analysis and integrated management based on digital twin visualization are realized, a traditional data interface is combined with a 3D virtual environment, the accurate mapping of real equipment information, geographic position information and the like of the park in a simulation model is realized, a visualized virtual scene is combined with real data, the operation and management of an environment monitoring system, a security system, an energy management and control system and the like are realized in a 'what you see is what you get' mode, the intuitive visibility of equipment and facility data in the park is enhanced, and the utilization rate of the environment monitoring system, the security system, the energy management and control system and the like is improved;
secondly, the digital twin driving technology based on JARIJS is used, the problems of large investment of three-dimensional developers, low development efficiency, complex system deployment and the like in the traditional park three-dimensional scene driving development project are solved, and a solid foundation is laid for high organization and bottom coding of the park digital twin scene.
Drawings
FIG. 1 is a model building flow chart of the three-dimensional model building and management of the present invention;
FIG. 2 is a functional block diagram of a communication protocol conversion based on the OPC UA standard;
FIG. 3 is a schematic diagram of global event and protocol management;
fig. 4 is a schematic diagram of a digital twin drive based on JARIJS.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Referring to fig. 1-4, a visual intelligent management and control platform for a park, which is supported by technologies such as internet of things, big data and digital twins, mainly breaks through key technologies such as three-dimensional model building and management, JARIJS-based digital twins driving, OPC UA-based communication protocol conversion, global event and plan management, performs digital twins visual analysis on key indexes in the fields such as security, energy efficiency, equipment and environmental space of the park, and assists a manager in comprehensively controlling the operation situation of the park in a 'what you see is what you get' manner, thereby effectively improving the operation efficiency and operation level of the park.
Referring to fig. 2, the three-dimensional model building and management of the invention is a digital representation of real world entities and systems, and is a basis for realizing model driving. The scene modeling is the digital modeling of the properties such as the attributes, the methods, the behaviors and the like of physical entities and processes in a digital space, the model construction is multidimensional in geometry-physics-behavior-rule, the geometric characteristics, the physical characteristics, the behavior coupling relation, the evolution rule and the like of a physical object are described, and the specific flow is as follows:
after the model scene is built successfully, the platform performs centralized management on the model scene, the model scene is divided into a plurality of modules according to different park management requirements, each module supports three-dimensional model import in formats such as OBJ, STL and GLTF, and supports three-dimensional model embedding such as three-dimensional GIS, BIM, point cloud, oblique photography and two-dimensional GIS.
Scene directory
And carrying out classification management of scenes according to industry classification. Platform maintainers can create a scene classification directory, modify a directory, delete a directory. A reminder function is required for deletion of a directory that has already been used. The default is that a scene catalogue of the individual is provided, and scenes uploaded by the individual are screened out.
Scene browsing
A user of the login platform can browse all scenes on the platform through the scene directory and switch different scenes to browse through a shortcut key and a mouse.
Scene upload
The system user can upload own designed scenes to a platform for sharing, share the scenes to other project groups for application, the maximized utilization of the scenes is achieved, the user uploads the scenes by selecting different classifications, the classification which cannot be determined can be selected as default and unclassified, and finally system maintenance personnel classify the unclassified scenes uniformly.
Scene download
The scene downloading supports scene sharing and application, and a user can select a scene to be downloaded and package and download the scene to the local. Each download or view of a scene records the number of times the scene has been viewed and downloaded.
Scene search
The scene searching module supports a user to quickly search a scene which the user wants to search in a fuzzy query mode, and the search result can be further screened by classification.
Scene maintenance
The scene maintenance mainly comprises the function maintenance of the scene such as reclassification management, uploading, downloading and deleting of the scene.
Referring to fig. 3, the visualized intelligent control platform for the park based on OPC UA standard of the present invention relates to a plurality of subsystems for a park, such as one-face communication, energy management, device control, and environment detection, and the subsystems are associated with different technical fields externally and internally.
Opc (ole for Process control), which is understood to be an object linking and embedding technique for Process control, is an industry standard established on the basis of cooperation with advanced hardware, software and automation systems companies in the world. The OPC specification specifies a standard in an industrial control system, which specifies an interface function of a communication system, so that a client can access field devices in a more uniform manner than before, and thus, the centralized and standardized management of the devices is facilitated. OPC UA (Unified Architecture) is a new OPC standard which is promoted on the basis of OPC successful application, an OPC UA interface protocol comprises the previous A & E, DA and OPC XML DA or HDA, all previous objects can be accessed by using only one address space, and the OPC UA interface protocol is not limited by a platform, provides a uniform interface for process control, avoids the process of respectively developing a driver for each device, simplifies steps in process control, and meets the requirement of standardization.
As shown in fig. 2, the platform provides a custom interface and an automatic interface to convert communication protocols and interfaces for different objects. The conversion of the communication protocol is mainly completed according to the frame format in the source protocol and the target protocol and the format of the target protocol. The output signal format generally has a fixed mode, and can meet the requirements by adjusting according to the requirements of customers and address information.
According to the management of the global event and the plan, aiming at the emergency or other emergency situations occurring in the management process of the park, the platform provides a management mechanism of the global event and the plan, before the system is started, emergency processing strategies summarized according to historical experience and fixed parameters of equipment are stored in a server, and after the system is started, the system can carry out single or periodic scheduling control on the equipment, automatically adjust the flow of certain equipment (such as an air conditioner, a fresh air machine, illumination and the like) and balance the load of the equipment according to the preset setting; some devices in the system are started, increased or closed in advance according to a scheduling strategy and an energy-saving strategy among the mutual backup devices preset by the system and an optimal starting/stopping time control strategy of the devices. According to the preset event logic, when an event occurs, the relevant linkage control can be automatically generated, and for high-level events, such as fire and other events, the relevant linkage can be directly triggered by alarming, so that the response speed of the event is improved; the logic function of the system is the logic function built in the system, the development work at the program level is not needed, the logic can be organized and modified on line according to the actual condition of the field system and the requirement of the user on the system, and the system service executes the modified logic.
The visual intelligent management and control platform dynamically represents the coordination and cooperative processing of the cross-subsystem among the building devices triggered by the building events by using a system linkage view, so that various events in the buildings are managed more effectively and globally, the labor is saved, the capability of the buildings for quickly responding to real events is improved, and building managers make decisions quickly to reduce harm and loss caused by certain accidents.
Referring to fig. 4, the JARIJS-based digital twin driver disclosed by the invention adopts a 3D drawing protocol based on WebGL (Web Graphics Library), combines JavaScript and OpenGL ES 2.0 together, and by adding one JavaScript binding of OpenGL ES 2.0, WebGL can provide hardware 3D accelerated rendering for HTML5 Canvas, based on which Web developers can display 3D scenes and models more smoothly in a browser by means of a system display card, and can also create complex navigation and data visualization.
However, WebGL has too high requirements for the three-dimensional directions of developers during the use process, and has low code development efficiency due to being more biased to the bottom layer. Based on the method, the intelligent control platform of the internet of things manufactures a self-configuration visual development module JARIJS based on WebGL, realizes a core engine of a visual editor through packaging common functional components in WebGL, integrates a digital twin driving engine based on JARIJS, and supports and realizes a series of integration bodies including scene management, time processing, a scene control panel, a logic control panel, a data configuration management interface and the like.
The JARIJS-based digital twin driver can realize rapid development of three-dimensional drive in a visual intelligent management and control platform, model building of application scenes and configuration of control relation, logic relation and data display relation among different models and components are realized, so that a driver developer does not pay attention to the logic of a bottom layer in the development process, the three-dimensional space knowledge storage requirement of the platform on the developer is reduced, and the development efficiency is improved.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (5)

1. The utility model provides a visual intelligent management and control platform towards garden, its characterized in that, this platform uses thing networking, big data, digital twin as the support, adopts three-dimensional model to build and manage, digital twin drive based on JARIJS, communication protocol conversion based on OPC UA standard, global event and plan management, carries out the visual analysis of digital twin to the key index in the security protection, efficiency, equipment, the environmental space field in the garden, and the mode that helps the administrator to control the operation situation in garden comprehensively in what you see is what you get.
2. The campus-oriented visual intelligent management and control platform according to claim 1, wherein the specific process of building and managing the three-dimensional model is as follows,
firstly, realizing digital modeling of attributes, methods and behavior characteristics of physical entities and processes in a digital space, wherein the model construction is multidimensional in geometry-physics-behavior-rule, and describes geometric characteristics, physical characteristics, behavior coupling relation and evolution rules of physical objects;
secondly, after the model scene is built successfully, the platform performs centralized management on the model scene, performs various module division on the model scene according to different garden management requirements, and each module supports three-dimensional model import in an OBJ format, an STL format and a GLTF format and also supports three-dimensional GIS, BIM, point cloud, oblique photography and two-dimensional GIS three-dimensional model embedding;
thirdly, the model scene is divided into,
the system comprises a scene catalog, a platform maintainer, a scene classification catalog, a modification catalog and a deletion catalog, wherein the scene catalog is used for carrying out classification management of scenes according to industry classification, the platform maintainer establishes the scene classification catalog, modifies the catalog and deletes the catalog, a reminding function is set when the used catalog is deleted, the personal scene catalog is defaulted, and the scenes uploaded by the individuals are screened out;
browsing scenes, logging in a platform user, browsing all scenes on the platform through a scene directory, and switching different scene browsing through a shortcut key and a mouse;
uploading scenes, uploading the designed scenes to a platform by a system user for sharing, sharing the scenes to other project groups for application, realizing the maximum utilization of the scenes, selecting different classifications for uploading the uploaded scenes by the user, selecting the unclassified scenes by default for the uncertain classification, and finally classifying the unclassified scenes by system maintenance personnel;
scene downloading, wherein the scene downloading supports scene sharing and application, a user selects a scene to be downloaded, packages and downloads the scene to the local, and the times of browsing and downloading the scene are recorded during each downloading or browsing of the scene;
scene searching, wherein the scene searching module supports a user to quickly search a scene which the user wants to search in a fuzzy query mode, and further screens search results by classification;
and scene maintenance, wherein the scene maintenance comprises the maintenance of reclassification management, uploading, downloading and deleting functions of the scene.
3. The intelligent campus-oriented visual management and control platform according to claim 1, wherein the communication protocol conversion based on OPC UA standard includes an OPC UA server and a subsystem workstation server, the subsystem workstation server is connected to the OPC UA server through an IP physical network and an OPC UA client application layer in sequence, the OPC UA server provides a customized interface and an automatic interface to convert the communication protocol and the communication interface, and the conversion of the communication protocol is mainly to complete output according to the frame format of the source protocol and the frame format of the target protocol.
4. The intelligent campus-oriented visual management and control platform according to claim 1, wherein the global event and plan management process is,
aiming at emergencies or other emergencies occurring in the park management process, the platform provides a global event and plan management mechanism, before the system is started, emergency processing strategies summarized according to historical experience and fixed parameters of equipment are stored in a server, and after the system is started, the system can carry out single or periodic scheduling control on the equipment, automatically adjust the flow of part of the equipment and balance the load of the equipment according to preset settings; according to a scheduling strategy and an energy-saving strategy among mutual backup devices preset by a system and an optimal starting/stopping time control strategy of the devices, starting, increasing or closing part of the devices in the system in advance;
according to the preset event logic, when an event occurs, the relevant linkage control is automatically generated, and for high-level events, the relevant linkage is directly triggered through alarming, so that the response speed of the event is improved; the logic function of the system is the logic function built in the system, the development work at the program level is not needed, the logic is organized and modified on line according to the actual condition of the field system and the requirement of the user on the system, and the system service executes the modified logic.
5. The campus-oriented visual intelligent management and control platform according to claim 1, wherein the JARIJS-based digital twin driver adopts a WebGL-based 3D drawing protocol to combine JavaScript and OpenGL ES 2.0 together, and by adding a JavaScript binding of OpenGL ES 2.0, WebGL provides hardware 3D accelerated rendering for HTML5 Canvas, and displays 3D scenes and models in a browser by means of a system display card, creates complex navigation and data visualization, integrates a JARIJS-based digital twin driver engine, and supports scene management, time processing, scene control panels, logic control panels and data configuration management interfaces.
CN202110980372.5A 2021-08-25 2021-08-25 Park-oriented visual intelligent management and control platform Pending CN113744390A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110980372.5A CN113744390A (en) 2021-08-25 2021-08-25 Park-oriented visual intelligent management and control platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110980372.5A CN113744390A (en) 2021-08-25 2021-08-25 Park-oriented visual intelligent management and control platform

Publications (1)

Publication Number Publication Date
CN113744390A true CN113744390A (en) 2021-12-03

Family

ID=78732742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110980372.5A Pending CN113744390A (en) 2021-08-25 2021-08-25 Park-oriented visual intelligent management and control platform

Country Status (1)

Country Link
CN (1) CN113744390A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114301953A (en) * 2021-12-13 2022-04-08 北京首奥置业有限公司 Internet of things equipment linkage control method and device, storage medium and electronic device
CN114758758A (en) * 2022-03-11 2022-07-15 武汉平纹信息技术有限公司 Processing method, system, medium, equipment and terminal for medical resource management optimization
CN115439618A (en) * 2022-04-28 2022-12-06 朱俊丰 Intelligent park information model system
CN115858689A (en) * 2022-10-30 2023-03-28 重庆旱獭信息技术有限公司 Internet of things relation mapping configuration method and system and computer storage medium
CN116303856A (en) * 2023-03-07 2023-06-23 北京龙软科技股份有限公司 Industrial geographic information system
CN117057126A (en) * 2023-08-11 2023-11-14 上海电气集团智慧能源科技有限公司 Energy-saving management and control system and energy-saving management and control method for park
CN117459556A (en) * 2023-11-16 2024-01-26 北京城建集团有限责任公司 Competitive sports wisdom stadium operation service system
CN117521969A (en) * 2023-11-21 2024-02-06 上海张江智荟科技有限公司 Intelligent park operation index calculation system based on digital twinning

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111815787A (en) * 2020-07-13 2020-10-23 北京优锘科技有限公司 Three-dimensional digital plan making system and method for petrochemical enterprises
CN113011837A (en) * 2021-03-03 2021-06-22 江苏杰瑞信息科技有限公司 Digital twin management and control platform based on micro-service
CN113110283A (en) * 2021-04-29 2021-07-13 武汉纺织大学 MPS system intelligent control method and system based on digital twin
CN113239543A (en) * 2021-05-12 2021-08-10 鸣启数字科技(山东)有限公司 Digital factory simulation system based on virtual reality technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111815787A (en) * 2020-07-13 2020-10-23 北京优锘科技有限公司 Three-dimensional digital plan making system and method for petrochemical enterprises
CN113011837A (en) * 2021-03-03 2021-06-22 江苏杰瑞信息科技有限公司 Digital twin management and control platform based on micro-service
CN113110283A (en) * 2021-04-29 2021-07-13 武汉纺织大学 MPS system intelligent control method and system based on digital twin
CN113239543A (en) * 2021-05-12 2021-08-10 鸣启数字科技(山东)有限公司 Digital factory simulation system based on virtual reality technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王翠萍: "《移动Web开发从入门到精通》", 31 August 2016, pages: 296 *
邓庆绪等: "《物联网中间件技术与应用》", 28 February 2021, pages: 106 - 109 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114301953A (en) * 2021-12-13 2022-04-08 北京首奥置业有限公司 Internet of things equipment linkage control method and device, storage medium and electronic device
CN114758758A (en) * 2022-03-11 2022-07-15 武汉平纹信息技术有限公司 Processing method, system, medium, equipment and terminal for medical resource management optimization
CN115439618A (en) * 2022-04-28 2022-12-06 朱俊丰 Intelligent park information model system
CN115858689A (en) * 2022-10-30 2023-03-28 重庆旱獭信息技术有限公司 Internet of things relation mapping configuration method and system and computer storage medium
CN116303856A (en) * 2023-03-07 2023-06-23 北京龙软科技股份有限公司 Industrial geographic information system
CN116303856B (en) * 2023-03-07 2024-01-09 北京龙软科技股份有限公司 Industrial geographic information system
CN117057126A (en) * 2023-08-11 2023-11-14 上海电气集团智慧能源科技有限公司 Energy-saving management and control system and energy-saving management and control method for park
CN117459556A (en) * 2023-11-16 2024-01-26 北京城建集团有限责任公司 Competitive sports wisdom stadium operation service system
CN117459556B (en) * 2023-11-16 2024-05-24 北京城建集团有限责任公司 Competitive sports wisdom stadium operation service system
CN117521969A (en) * 2023-11-21 2024-02-06 上海张江智荟科技有限公司 Intelligent park operation index calculation system based on digital twinning
CN117521969B (en) * 2023-11-21 2024-05-24 上海张江智荟科技有限公司 Intelligent park operation index calculation system based on digital twinning

Similar Documents

Publication Publication Date Title
CN113744390A (en) Park-oriented visual intelligent management and control platform
CN110549336B (en) Transformer substation patrols and examines robot centralized control main website system
CN105988367B (en) The modeling of industrial automation environment in cloud
CN103217935B (en) For accessing and transmit data, integrated and extendible framework
CN105843182B (en) A kind of power scheduling accident prediction system and method based on OMS
CN105407159B (en) Logistics transportation position service system
CN113011837A (en) Digital twin management and control platform based on micro-service
CN107622355A (en) Project cluster work progress digital management system and method
CN109976296A (en) A kind of manufacture process visualization system and construction method based on virtual-sensor
CN107483253A (en) A kind of data center machine room operation management system based on three-dimensional VR
CN105589349A (en) Crawler for discovering control system data in an industrial automation environment
CN106020138A (en) Layered map presentation for industrial data
CN111104622A (en) WEBGL-based three-dimensional GIS intelligent monitoring method and device
CN115758522A (en) Digital twin city management system and method
CN115375172A (en) BIM-based intelligent operation and maintenance method and system
CN115423278A (en) MIXBASE general digital twin visual monitoring platform
CN112346347A (en) Intelligent building integrated management system and information processing method thereof
CN111737789A (en) Building data visualization management system based on 3D digital scene
CN111209323A (en) Spatial geographic information big data processing system
CN116643542A (en) Oil field station digital twin process configuration method, system and device based on low-code development platform
CN115562217A (en) Digital twin monitoring system, method and device
CN114299743A (en) Three-dimensional operation monitoring system for urban rail transit
CN112184881B (en) Multi-level overall process monitoring method for power equipment
CN117744914A (en) BIM-based construction digital management method, platform and computer equipment
CN117290431A (en) System and method for fusing and visualizing multidimensional data of intelligent park

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination