CN109057409A - It is a kind of can integral hoisting mobile shelter - Google Patents
It is a kind of can integral hoisting mobile shelter Download PDFInfo
- Publication number
- CN109057409A CN109057409A CN201810972826.2A CN201810972826A CN109057409A CN 109057409 A CN109057409 A CN 109057409A CN 201810972826 A CN201810972826 A CN 201810972826A CN 109057409 A CN109057409 A CN 109057409A
- Authority
- CN
- China
- Prior art keywords
- bracket
- shelter
- roof system
- mobile shelter
- integral hoisting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Tents Or Canopies (AREA)
Abstract
The invention discloses it is a kind of can integral hoisting mobile shelter, be related to shipbuilding tooling field, including roof system, bracket, lifting lug and auxiliary draw ear;The roof system is located at the top of the mobile shelter, is horizontally arranged;The bracket is located at the two sides of the roof system, and the bracket is placed vertically, and the two sides of the bottom of roof system are fixedly connected at the top of the bracket;The lifting lug is fixedly connected on the top of the roof system, and the two sides of each bracket are fixedly installed the auxiliary and draw ear;The present invention can the mobile shelter of integral hoisting can be realized the integral shift between building berth and dock, mobile shelter is set to use in dock, it does not need temporarily to build shelter again, improve production efficiency, hull fabrication cycle is shortened, and is not necessarily to transversely strengthening when integral hoisting movement shelter, remains to be run on preset track after moving, the larger service efficiency for improving mobile shelter, moves that the period is short, input cost is few.
Description
Technical field
The present invention relates to shipbuilding tooling field, specially it is a kind of can integral hoisting mobile shelter.
Background technique
Certain important ships have stringent welding surroundings requirement in entire manufacturing process, and body section is made on building berth
Preferable similar indoor environment can be built when making with mobile shelter, but segmentation when general assembly, is not available but in dock
Shelter is moved to build preferable indoor environment.In order to build similar indoor welding procedure environment, applied in dock
When work is welded, generally built at temporary obscuration within certain a period of time in some construction point.But since segmentation final assembly lead time is longer,
Hull size is big, builds at temporary obscuration and removes and need to be repeated, has severely impacted production efficiency, and extend hull
Fabrication cycle.If mobile shelter can also use in dock, does not need temporarily to build shelter again, also improve production
Efficiency and shortening hull fabrication cycle.
Existing mobile shelter can only be moved on specific one group of track on building berth, not have the function that can be moved
Energy.Even if can move, that is also to spend a large amount of manpower and material resources from one using trolley in the case where terrace h eight is not much different
A building berth track integral shift is to another building berth track.But it encounters terrace and differs larger, the building berth track and ship of general shipyard
Depressed place orbit altitude often differs 10m~15m, this can not carry out integral shift shelter using trolley.If utilizing shipyard
The mobile shelter of interior crane integral hoisting routine, mobile shelter, which will appear biggish deformation, after lifting leads to shelter
It can not be run on preset track.In addition it is moved if lift again after laterally fixing to the column of conventional shelter, but
A whole ship or body section are often paved in dock, the shelter after laterally fixing can not be put into dock.Therefore often at present
The mobile shelter of rule can not often use in dock.
Summary of the invention
The purpose of the present invention is to provide it is a kind of can integral hoisting mobile shelter, to solve to mention in above-mentioned background technique
Out the problem of.
To achieve the above object, the invention provides the following technical scheme: it is a kind of can integral hoisting mobile shelter, including
Roof system, bracket, lifting lug and auxiliary draw ear;
The roof system is located at the top of the mobile shelter, is horizontally arranged;
The bracket is located at the two sides of the roof system, and the bracket is placed vertically, is fixedly connected at the top of the bracket
In the two sides of the bottom of roof system;
The lifting lug is fixedly connected on the top of the roof system, and the two sides of each bracket are fixedly installed described auxiliary
Help drawing ear.
Further, the lifting lug is located at the top two sides of the roof system, and every side is described at the top of the roof system
Lifting lug is arranged along straight uniform.
Further, the auxiliary that the auxiliary of the every side of the roof system draws ear equidistantly evenly distributed and adjacent is drawn
The distance between ear is 6~8m.
Further, the frame bottom is provided with away wheel.
Further, it is described walk wheel along the bracket sole length direction it is equidistantly evenly distributed.
Compared with prior art, the beneficial effects of the present invention are:
1. the present invention can the mobile shelter of integral hoisting can be realized the integral shift between building berth and dock, make to move
Shelter can use in dock, do not need temporarily to build shelter again, improve production efficiency, shorten hull production week
Phase;
2. the present invention can the mobile shelter of integral hoisting when making the mobile shelter of integral hoisting without transversely strengthening, and remove
Shelter is smaller without deformation or deformation after shifting, remains to be run on preset track, larger to improve mobile shelter
Service efficiency;
3. the present invention can the mobile shelter of integral hoisting move that the period is short, input cost is few.
Detailed description of the invention
Fig. 1 be the present invention can integral hoisting mobile shelter structural schematic diagram;
Fig. 2 is the enlarged drawing in Fig. 1 at A;
Fig. 3 is the enlarged drawing in Fig. 1 at B;
Fig. 4 be the present invention can integral hoisting mobile shelter Lift-on/Lift-off System schematic diagram;
Fig. 5 be the present invention can integral hoisting mobile shelter Lift-on/Lift-off System schematic diagram right view;
Fig. 6 is the enlarged drawing in Fig. 4 at C.
In appended drawing reference: 1, roof system;2, bracket;3, lifting lug;4, auxiliary draws ear;5, wheel is walked;6, gantry;7, it hangs
Row;8, capstan winch;9, building berth;10, dock;11, building berth track;12, dock track.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The invention proposes it is a kind of can integral hoisting mobile shelter, as shown in Figure 1, including roof system 1, bracket 2, lifting lug
3 and auxiliary draw ear 4.Roof system 1 is located at the top of mobile shelter, is horizontally arranged, and for stopping the wind and rain from top, builds class
Like indoor working environment.Bracket 2 is located at the down either side of roof system 1, and bracket 2 is placed vertically, and the top of bracket 2 is fixedly connected
In two side bottoms of roof system 1, bracket 2 plays the role of support to roof system 1.
As shown in Fig. 2, lifting lug 3 is fixedly connected at the top of the left and right ends of roof system 1, and the lifting lug 3 of every side is along level side
To equidistant evenly distributed.As shown in figure 3, the two sides of the bottom of each bracket 2, which are provided with, assists drawing ear 4, and the every side of bracket 2
Auxiliary draws length direction of the ear 4 along 2 bottom surface of bracket equidistantly evenly distributed, and it is 6~8m that adjacent auxiliary, which draws the distance between ear 4,.
The bottom that wheel 5 is located at the collateral frame 2 of mobile shelter two is walked, and walking for every side takes turns 5 along the length direction etc. of 2 bottom surface of bracket
Away from evenly distributed.
The movement shelter can be set on building berth 9 or in dock 10, and building berth track is offered on the ground of building berth 9
11, dock track 12 is offered on the ground of dock 10.The gauge of building berth track 11, the gauge of dock track 12 and the wheel for walking wheel
Away from equal, and the orientation for walking wheel 5 of the extending direction and the mobile every side of shelter of building berth track 11 and dock track 12
In parallel.It when mobile shelter is located on building berth 9, walks wheel 5 and is arranged in building berth track 11, allow mobile shelter along ship
The extending direction of platform track 11 is mobile;When mobile shelter is located in dock 10, walks wheel 5 and be arranged in dock track 12, make
Shelter must be moved can move along the extending direction of dock track 12.
As shown in Figures 4 and 5, will mobile shelter when being moved to dock 10 from building berth 9, using wirerope by Gantry
It is connected at the top of the suspension hook and hanging row 7 at 6 top of machine, and 7 bottom of hanging row is connected with lifting lug 3 using wirerope, passes through Gantry
Machine 6 integrally slings mobile shelter, makes to walk wheel 5 to leave building berth track 11;Then travelling gantry crane 6, by mobile wind and rain
Canopy is moved in dock 13 from building berth 9;When mobile shelter will fall rail, as shown in fig. 6, connecting capstan winch using wirerope
8 and auxiliary draw ear 4, the bottom of mobile shelter is pulled by capstan winch 8, adjusts the position of mobile shelter bottom, makes to walk wheel 5 smart
Standard is fallen into dock track 12, and that completes mobile shelter accurately falls rail.Mobile shelter is moved to building berth 9 from dock 10
When, similarly.
The present invention can the mobile shelter of integral hoisting can be realized the integral shift between building berth and dock, make mobile wind
Awning can use in dock, do not need temporarily to build shelter again, improve production efficiency, shorten hull production week
Phase, and without transversely strengthening when making the mobile shelter of integral hoisting, move it is interior after shelter it is smaller without deformation or deformation, remain to
It is run on preset track, the larger service efficiency for improving mobile shelter moves that the period is short, input cost is few.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (5)
1. one kind can integral hoisting mobile shelter, it is characterised in that: including roof system, bracket, lifting lug and auxiliary draw ear;
The roof system is located at the top of the mobile shelter, is horizontally arranged;
The bracket is located at the two sides of the roof system, and the bracket is placed vertically, is fixedly connected on room at the top of the bracket
The two sides of the bottom of lid;
The lifting lug is fixedly connected on the top of the roof system, and the two sides of each bracket are fixedly installed the auxiliary and draw
Ear.
2. one kind according to claim 1 can integral hoisting mobile shelter, it is characterised in that: the lifting lug distinguishes position
The lifting lug of every side is arranged along straight uniform at the top of the top two sides of the roof system, the roof system.
3. one kind according to claim 1 can integral hoisting mobile shelter, it is characterised in that: the every side of roof system
The auxiliary to draw the equidistantly evenly distributed and adjacent auxiliary of ear to draw the distance between ear be 6~8m.
4. one kind according to claim 1 can integral hoisting mobile shelter, it is characterised in that: the frame bottom is equal
It is provided with away wheel.
5. one kind according to claim 4 can integral hoisting mobile shelter, it is characterised in that: it is described walk wheel along described
The sole length direction of bracket is equidistantly evenly distributed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810972826.2A CN109057409A (en) | 2018-08-24 | 2018-08-24 | It is a kind of can integral hoisting mobile shelter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810972826.2A CN109057409A (en) | 2018-08-24 | 2018-08-24 | It is a kind of can integral hoisting mobile shelter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109057409A true CN109057409A (en) | 2018-12-21 |
Family
ID=64756026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810972826.2A Pending CN109057409A (en) | 2018-08-24 | 2018-08-24 | It is a kind of can integral hoisting mobile shelter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109057409A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112537409A (en) * | 2020-12-03 | 2021-03-23 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | Cabin top structure and construction site closing method facilitating construction in cabin |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2243604A1 (en) * | 1973-09-12 | 1975-04-04 | Collet Noel | Folding shelter for a hut, caravan etc. - has awning of an extensible frame consiting of hoops joined by side-struts |
CN102126667A (en) * | 2010-01-19 | 2011-07-20 | 中冶成工上海五冶建设有限公司 | Method for hoisting open type groove body with large volume and small rigidity |
CN204001872U (en) * | 2014-06-05 | 2014-12-10 | 深圳海龙建筑制品有限公司 | A kind of movable awning |
CN204867870U (en) * | 2015-08-26 | 2015-12-16 | 中船澄西船舶修造有限公司 | Hoist and mount formula wind and rain canopy |
CN207484687U (en) * | 2017-11-07 | 2018-06-12 | 中船黄埔文冲船舶有限公司 | A kind of removable shelter |
-
2018
- 2018-08-24 CN CN201810972826.2A patent/CN109057409A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2243604A1 (en) * | 1973-09-12 | 1975-04-04 | Collet Noel | Folding shelter for a hut, caravan etc. - has awning of an extensible frame consiting of hoops joined by side-struts |
CN102126667A (en) * | 2010-01-19 | 2011-07-20 | 中冶成工上海五冶建设有限公司 | Method for hoisting open type groove body with large volume and small rigidity |
CN204001872U (en) * | 2014-06-05 | 2014-12-10 | 深圳海龙建筑制品有限公司 | A kind of movable awning |
CN204867870U (en) * | 2015-08-26 | 2015-12-16 | 中船澄西船舶修造有限公司 | Hoist and mount formula wind and rain canopy |
CN207484687U (en) * | 2017-11-07 | 2018-06-12 | 中船黄埔文冲船舶有限公司 | A kind of removable shelter |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112537409A (en) * | 2020-12-03 | 2021-03-23 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | Cabin top structure and construction site closing method facilitating construction in cabin |
CN112537409B (en) * | 2020-12-03 | 2024-03-08 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | Cabin top structure and construction site sealing method facilitating construction in cabin of ship |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121257A (en) | Component Intelligent transport method and system for assembled architecture | |
CN101892736B (en) | High altitude moving hanging basket construction method | |
CN201825671U (en) | Hoisting trolley for track plate | |
CN206986744U (en) | Steel box-girder flange area slidably construction operation platform | |
CN109160421A (en) | A kind of integral hoisting system of mobile shelter | |
CN107288352B (en) | The transport of the closed shed dormer roof boarding of overlarge area and installation method | |
CN103899093A (en) | Step-by-step hoisting construction method of mega-frame steel truss beam | |
CN106544959B (en) | The construction method of king-tower lifting segment and bridge main tower saddle containing saddle | |
CN104060543A (en) | Installation device of prefabricated bridge deck | |
CN109057409A (en) | It is a kind of can integral hoisting mobile shelter | |
CN103086276B (en) | Construction method for hoisting bridge type crane in high-rise well tower type building | |
CN106193567A (en) | Variable-section integrated lifting operation platform adduction construction method for ultrahigh building | |
CN109505411A (en) | Tube truss structure roofing installation method | |
CN105752854A (en) | Special rope shake preventing gantry crane for port | |
CN206051300U (en) | A kind of gantry crane's supporting legs structure | |
CN202465099U (en) | Single-girder partial hanging gantry crane | |
CN109205468A (en) | A kind of integral hoisting method of mobile shelter | |
CN208749156U (en) | A kind of mobile shelter system that can be moved between dock building berth | |
KR20130015084A (en) | Construction appratus for composit truss free cantilever bridge and construction method of composit truss free cantilever bridge using the same | |
CN205688820U (en) | A kind of installation system of high-rise building large area cell cube curtain wall block | |
CN209143538U (en) | A kind of integral hoisting device for rapid | |
CN210260897U (en) | Hoisting device for prefabricated part | |
CN110862023A (en) | Construction method of mechanical hoisting device | |
CN106702911B (en) | A kind of secondary traversing construction method for hanging of cable-carried arch bridge rib-lifting section | |
CN104891371A (en) | Portable and movable building hoist device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181221 |