CN109056734A - Diaphram wall defect grouting mending construction method - Google Patents

Diaphram wall defect grouting mending construction method Download PDF

Info

Publication number
CN109056734A
CN109056734A CN201810979678.7A CN201810979678A CN109056734A CN 109056734 A CN109056734 A CN 109056734A CN 201810979678 A CN201810979678 A CN 201810979678A CN 109056734 A CN109056734 A CN 109056734A
Authority
CN
China
Prior art keywords
grouting
slip casting
pipe
hole
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810979678.7A
Other languages
Chinese (zh)
Inventor
吴洁妹
尹宇杰
赵永强
赵国伟
荀为卓
董恒晟
谭纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201810979678.7A priority Critical patent/CN109056734A/en
Publication of CN109056734A publication Critical patent/CN109056734A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Abstract

The present invention relates to a kind of diaphram wall defect grouting mending construction methods, it the steps include: 1) in defective locations two sides construction water-stop curtain, and clear up waste pulp and roach above slot section, 2) take core-drill(ing) machine pilot hole to designated depth in designated position, 3) the slurry pipe of appropriate size is installed in coring hole, two slurry pipes are buried in each coring hole, one is Grouting Pipe, another is discharge pipe, 4) it is washed with water using grouting pump, it is promoted up and down in cleaning, until overflowing clear water in hole, 5) using the past slurry ipe grout of grouting material, 6) slip casting is more than twice in each coring hole, first, the slip casting in a Grouting Pipe, it emerges in another discharge pipe and stops slip casting after slurries and close ball valve;Slip casting is until slurry overpressure reaches 1Mpa or more again later, and stopping slip casting simultaneously closes ball valve, and slip casting terminates.The present invention a variety of diaphram wall defects and leakage problem caused by can effectively solving because of cause specific.

Description

Diaphram wall defect grouting mending construction method
Technical field
The present invention relates to a kind of grouting mending methods in diaphram wall defective locations.
Background technique
Diaphram wall goes along with sb. to guard him form as current deep-foundation pit engineering is most common, is widely used at home at present, but Since diaphram wall, especially ultra-deep underground continuous wall difficulty of construction are high, it may be interfered and be made by extraneous factor in work progress At mass defect, such as concrete supply not in time, natural weather or other reasons cause construction to interrupt, field geology conditions it is complicated Deng.Since ground wall quality is concerning deep pit monitor, defect must be handled.The traditional benefit wall taken on the outside of wall, The measures cost such as piling is extremely high, and due to that concrete strength need be waited to rise, entire project progress is also seriously tied down. Therefore, it is necessary to invent a kind of diaphram wall defect grouting mending construction method, can effectively repair above-mentioned by research tackling key problem Defect, while repairing cost is substantially reduced, reduce duration loss.
Summary of the invention
The present invention is to solve already present ground wall mass defects, provide one kind and apply in diaphram wall defect grouting mending Work method.
To achieve the above object, the present invention is achieved by the following technical solutions:
1) a kind of diaphram wall defect grouting mending construction method the steps include: in defective locations two sides construction sealing Curtain, and clear up waste pulp and roach above slot section, 2) take core-drill(ing) machine pilot hole to designated depth in designated position, 3) coring The slurry pipe of appropriate size is installed in hole, two slurry pipes are buried in each coring hole, one is Grouting Pipe, and another is discharge pipe, 4) it is washed with water using grouting pump, is promoted up and down in cleaning, until overflowing clear water in hole, 5) use grouting material toward slurry pipe Interior grouting, 6) slip casting more than twice, firstly, the slip casting in a Grouting Pipe, is emerged in another discharge pipe in each coring hole Stop slip casting after slurries and closes the ball valve of Grouting Pipe and discharge pipe;Later again slip casting until Grouting Pipe and blowing overpressure Reach 1Mpa or more, stop slip casting and close ball valve, slip casting terminates.
In step 1), to prevent slurries in filling process excessive, first in ground wall defective locations two sides construction water-stop curtain, adopt It is reinforced with conventional rotary jet strengthening or MJS engineering method, to guarantee repair efficiency.
In step 2), first in ground wall defective locations pilot hole, aperture should meet the installation needs of subsequent slurry pipe, and ultimate depth is answered Depending on actual conditions after coring, until core sample meets the requirements.
The Grouting Pipe is equipped with mouth spray in designated depth, and the aperture stifled jail of geotextiles prevents roach, waste pulp from pouring in hole It is interior.
The grouting material is big flowing and the high feature of early strength with ungauged regions, and chloride and metal be not swollen Swollen dose of grouting material;The grouting material 3d compression strength reaches 25Mpa or more, and 7d compression strength is more than or equal under original place and connects Continuous wall concrete crushing strength.
The beneficial effects of the present invention are:
The present invention a variety of diaphram wall defects caused by can effectively solving because of cause specific, such as by wall covered with mud, mixed Local strength's defect and leakage problem caused by the reasons such as solidifying soil is layered, connector is dealt with improperly;Execute-in-place of the present invention is easy, Relevant device, material are readily transported and store, and can carry out rapidly operation under complicated, narrow site condition, have high Adaptability;Practice result proves working well using invention repairing diaphram wall, the intensity and sealing after repairing Design and site requirement can be fully met.
Detailed description of the invention
Fig. 1 is ground wall defect schematic diagram;
Fig. 2 is water-stop curtain schematic diagram;
Wherein: (a) being top view, (b) longitudinal sectional view;
Fig. 3 is grouting process schematic diagram;
Fig. 4 is pigging and grouting schematic diagram;
Wherein: (a) pigging (b) is in the milk.
Specific embodiment
The invention will be further described with embodiment with reference to the accompanying drawing.
Diaphram wall defect grouting mending construction method of the invention, construction procedure is:
1) in the two sides Di Qiang construction water-stop curtain, the waste pulp and roach above slot section are cleared up
To prevent slurries in filling process excessive, first in the ground two sides (see Fig. 1) wall defective locations A construction water-stop curtain, such as Fig. 2 (a), it is (b) shown, C can be reinforced using conventional rotary jet strengthening B or MJS engineering method, to guarantee repair efficiency.In order to protect Card ground wall repairing work can be accurately positioned defective locations, should also first clean out the waste pulp generated in the above process, roach.
2) take core-drill(ing) machine pilot hole to designated depth in designated position
Drawing hole site is tentatively drafted according to the construction note of defectively wall D, is generally arranged along the direction Di Qiang.Investment In designated position pilot hole, aperture should meet the peace of subsequent slurry pipe for core-drill(ing) machine or other equipment crept into concrete of having the ability Dress needs, and ultimate depth should be depending on actual conditions after coring, until core sample meets the requirements.
3) installation slurry pipe in coring hole
The slurry pipe of appropriate size is installed in coring hole, slurry pipe should be able to bear the pressure during slip casting, preferably use steel pipe; Two slurry pipes are buried in each coring hole, as shown in figure 3, one is Grouting Pipe 1, another is discharge pipe 2;Grouting Pipe 1 is referring to Depthkeeping degree is equipped with plural mouth spray, and the aperture stifled jail of geotextiles prevents roach, waste pulp from pouring in hole.
4) cleaning slurry pipe
Grouting Pipe 1 and discharge pipe 2 clean (see Fig. 4 (a)) using grouting pump water 5 after the installation is completed, in cleaning above and below It is promoted, until overflowing clear water 6 in hole 4.
5) grouting mending
As shown in Fig. 4 (b), be in the milk 7 in Grouting Pipe 1 using special grouting material, which has a ungauged regions, big flowing and The high feature of early strength, and not chloride and expansion of metal agent;Grouting material 3d compression strength can achieve 25Mpa with On, 7d compression strength should be greater than being equal to continuous wall concrete compression strength under original place.In each coring hole must slip casting more than twice, The slip casting in a wherein Grouting Pipe 1 first, another is used as discharge pipe 2, stops slip casting after slurries of emerging in discharge pipe 2 and closes Close ball valve 3;Until pressure reaches 1Mpa or more in Grouting Pipe 1 and discharge pipe 2, stopping slip casting simultaneously secures slip casting for slip casting again later The ball valve 3 of pipe 1 and discharge pipe 2, slip casting terminates;It is closely knit to guarantee that grouting material can fill ground wall defective locations A by the above method.

Claims (5)

1. a kind of diaphram wall defect grouting mending construction method, which is characterized in that the steps include: 1) in defective locations two sides Construct water-stop curtain, and clear up waste pulp and roach above slot section, 2) take core-drill(ing) machine pilot hole to specified depth in designated position Degree, 3) the slurry pipe of installation appropriate size in coring hole is buried two slurries in each coring hole and is managed, and one is Grouting Pipe, Ling Yigen For discharge pipe, 4) it is washed with water using grouting pump, it is promoted up and down in cleaning, until until overflowing clear water, 5) use filling. in the hole in Slurry is toward slurry ipe grout, 6) more than twice, firstly, the slip casting in a Grouting Pipe, another is put for slip casting in each coring hole Starch the ball valve for stopping slip casting after emerging slurries in pipe and closing Grouting Pipe and discharge pipe;Slip casting up to Grouting Pipe and is put again later Slurry overpressure reaches 1Mpa or more, stops slip casting and closes ball valve, slip casting terminates.
2. diaphram wall defect grouting mending construction method according to claim 1, it is characterised in that: in step 1), To prevent slurries in filling process excessive, first in ground wall defective locations two sides construction water-stop curtain, using conventional rotary jet strengthening Or MJS engineering method is reinforced, to guarantee repair efficiency.
3. diaphram wall defect grouting mending construction method according to claim 1, it is characterised in that: in step 2), First in ground wall defective locations pilot hole, aperture should meet the installation needs of subsequent slurry pipe, and ultimate depth should be according to feelings practical after coring Depending on condition, until core sample meets the requirements.
4. diaphram wall defect grouting mending construction method according to claim 1, it is characterised in that: the Grouting Pipe It is equipped with mouth spray in designated depth, the aperture stifled jail of geotextiles prevents roach, waste pulp from pouring in hole.
5. diaphram wall defect grouting mending construction method according to claim 1, it is characterised in that: the grouting material For with ungauged regions, greatly flowing and the high feature of early strength, and the not grouting material of chloride and expansion of metal agent;It is described Grouting material 3d compression strength reaches 25Mpa or more, and 7d compression strength is more than or equal to continuous wall concrete compression strength under original place.
CN201810979678.7A 2018-08-27 2018-08-27 Diaphram wall defect grouting mending construction method Pending CN109056734A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810979678.7A CN109056734A (en) 2018-08-27 2018-08-27 Diaphram wall defect grouting mending construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810979678.7A CN109056734A (en) 2018-08-27 2018-08-27 Diaphram wall defect grouting mending construction method

Publications (1)

Publication Number Publication Date
CN109056734A true CN109056734A (en) 2018-12-21

Family

ID=64756162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810979678.7A Pending CN109056734A (en) 2018-08-27 2018-08-27 Diaphram wall defect grouting mending construction method

Country Status (1)

Country Link
CN (1) CN109056734A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110863521A (en) * 2019-11-25 2020-03-06 湘乡市交通运输局 Method and device for treating defects of pile foundation by grouting
CN114164833A (en) * 2021-12-07 2022-03-11 中交第一航务工程局有限公司 Deep hole guiding and grouting process under complex geological conditions of water-rich sand layer
CN115341554A (en) * 2022-08-30 2022-11-15 中建八局第三建设有限公司 Construction method for plugging and reinforcing and protecting underground diaphragm wall with defects under water-rich silt stratum

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09144016A (en) * 1995-11-28 1997-06-03 Takenaka Komuten Co Ltd Execution method of concrete in underground water leakage section
CN101413266A (en) * 2008-11-28 2009-04-22 广东省长大公路工程有限公司 Processing method of interlayer defect injection concrete of drill filling pile
CN103541359A (en) * 2013-09-18 2014-01-29 浙江省岩土基础公司 Method for repairing and treating quality defect of cast-in-place pile
CN106836214A (en) * 2017-02-06 2017-06-13 姬凤玲 Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect treatment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09144016A (en) * 1995-11-28 1997-06-03 Takenaka Komuten Co Ltd Execution method of concrete in underground water leakage section
CN101413266A (en) * 2008-11-28 2009-04-22 广东省长大公路工程有限公司 Processing method of interlayer defect injection concrete of drill filling pile
CN103541359A (en) * 2013-09-18 2014-01-29 浙江省岩土基础公司 Method for repairing and treating quality defect of cast-in-place pile
CN106836214A (en) * 2017-02-06 2017-06-13 姬凤玲 Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect treatment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
何庆生: "某深基坑"两墙合一"地下连续墙大断面质量缺陷补强技术研究与应用", 《广东土木与建筑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110863521A (en) * 2019-11-25 2020-03-06 湘乡市交通运输局 Method and device for treating defects of pile foundation by grouting
CN114164833A (en) * 2021-12-07 2022-03-11 中交第一航务工程局有限公司 Deep hole guiding and grouting process under complex geological conditions of water-rich sand layer
CN115341554A (en) * 2022-08-30 2022-11-15 中建八局第三建设有限公司 Construction method for plugging and reinforcing and protecting underground diaphragm wall with defects under water-rich silt stratum

Similar Documents

Publication Publication Date Title
CN106321121A (en) Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN109056734A (en) Diaphram wall defect grouting mending construction method
CN107217691A (en) For city underground leak stopping and the method for strengthening construction
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN109973117B (en) Leaking stoppage and reinforcement method for structure crack
CN106836214A (en) Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect treatment
CN110617381A (en) Drainage pipeline cracking local plugging structure, plugging method and repairing method
CN207727600U (en) Plugging dewatering well device
CN107326868A (en) A kind of large reservoir concrete dam body fracture plugging method
CN103410119A (en) Method for water interception curtain grouting in leakage concrete
CN113090068B (en) Vacuum pouring process for rush-repairing deep-buried building top concrete structure under limited conditions
CN103061349A (en) Processing method for foundation pit piping
CN110685716A (en) Sleeve valve pipe grouting method after boulder blasting treatment
CN101672187A (en) Anti-seepage water treatment method
CN110409511B (en) Water stopping method for joint of secant pile and diaphragm wall
CN105780792B (en) A kind of foundation pit high water head Dewatering by pressure reduction well shut-in well method and structure of shunting in a well
CN104404960B (en) A kind of underground diaphragm wall seam grouting device and constructional method
CN207469277U (en) The quick slip casting plugging device of diaphram wall leakage point in a kind of foundation pit
CN108360573B (en) Device for preventing post-cast strip of basement floor from leaking and construction method thereof
CN206889866U (en) A kind of pipeline for avoiding seepage wears pool wall device
CN114197508B (en) Easy-to-seal water draining device, manufacturing method and using method thereof
CN207392205U (en) A kind of pile foundation post jacking device
CN107338816A (en) A kind of high artesian post-cast strip is depressured leak-blocking construction method
CN110777860A (en) Method for grouting and plugging back of side wall leakage water of subway station
CN112695701A (en) Method for treating upstream and downstream through cracks of concrete dam body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221

RJ01 Rejection of invention patent application after publication