CN106836214A - Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect treatment - Google Patents

Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect treatment Download PDF

Info

Publication number
CN106836214A
CN106836214A CN201710077368.1A CN201710077368A CN106836214A CN 106836214 A CN106836214 A CN 106836214A CN 201710077368 A CN201710077368 A CN 201710077368A CN 106836214 A CN106836214 A CN 106836214A
Authority
CN
China
Prior art keywords
pile
pressure
carry out
grouting
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710077368.1A
Other languages
Chinese (zh)
Other versions
CN106836214B (en
Inventor
姬凤玲
周爱忠
孟照辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen University
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710077368.1A priority Critical patent/CN106836214B/en
Publication of CN106836214A publication Critical patent/CN106836214A/en
Application granted granted Critical
Publication of CN106836214B publication Critical patent/CN106836214B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/64Repairing piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention provides the construction method that a kind of rotary digging bored concrete pile pile body collapse hole or pile bottom sediment mass defect are processed, comprise the steps:Carry out high-pressure water gas cutting, water and lift deslagging borehole cleaning;Carry out injected hole sealing and Grouting Pipe is installed;Carry out cement grout preparation;Carry out self-compaction normal pressure or low-pressure grouting;Carry out high-pressure slip-casting, mend slurry, final pressure;Carry out bar planting and reinforce pile body collapse hole rejected region;Carry out foundation pile reinspection.The construction method, consolidation process not only has been carried out to pile defect, while slurries can also be immersed in the gap between pile body and surrounding soil, or even the crack of pile body surrounding soil has been invaded, the intensity of the frictional resistance and pile peripheral earth between stake soil is improve, so as to improve the bearing capacity of foundation pile.The technological operation is fairly simple, and borehole cleaning is clean, speed is fast, low cost, and range of grouting is big, intensity is high, and defect processing effect is good.

Description

Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect treatment
Technical field
The invention belongs to the construction method that a kind of rotary digging bored concrete pile pile body collapse hole or pile bottom sediment mass defect are processed, specifically Say it is that finish rolling is implanted into by high-pressure water gas cutting-gas-lift slag discharging-hole flushing-self-compaction common pressure grouting-high-pressure slip-casting-injected hole in ground The construction method of high-strength screw-thread steel (need not be implanted into finish rolling high-strength screw-thread steel during treatment sediment) is to pile body collapse hole or pile bottom sediment Defect is reinforced, and is finally reached the purpose for the treatment of defect.
Background technology
Rotary digging bored concrete pile is more due to construction link, complex process, and currently without unified job specfication, pile quality is deposited In many uncertainties, various mass defects are easily produced, bearing capacity of pile can be caused substantially to reduce when serious, or even cause to break The such great quality accident of stake.
The content of the invention
The present invention is using two interconnected drillings for judging pile body collapse hole or pile bottom sediment mass defect, using height Pressure aqueous vapor cutting-gas-lift slag discharging-hole flushing-self-compaction common pressure grouting-high-pressure slip-casting-injected hole is implanted into the construction of high-strength screw-thread steel Method carries out consolidation process to defect.
The invention provides the construction method that a kind of rotary digging bored concrete pile pile body collapse hole or pile bottom sediment mass defect are processed, bag Include following step:
Carry out high-pressure water gas cutting, water and lift deslagging borehole cleaning;
Carry out injected hole sealing and Grouting Pipe is installed;
Carry out cement grout preparation;
Carry out self-compaction normal pressure or low-pressure grouting;
Carry out high-pressure slip-casting, mend slurry, final pressure;Carry out bar planting and reinforce pile body collapse hole rejected region;
Carry out foundation pile reinspection.
The present invention enters horizontal high voltage and cuts using high-pressure water gas to the soil block or sediment of pile body collapse hole or pile bottom sediment rejected region Cut, soil block or sediment are cut, is crushed, while the sand grains of fault location, sticking grain, powder are washed out into stake by the method for gaslift Outward, cement mortar and slip casting to defective locations are then prepared using high-mark cement, so as to displace clear water at defective locations or Air, fault location intensity is increased finally by high-pressure slip-casting and the method that is implanted into high-strength screw-thread steel, is finally reached treatment defect Purpose.
Beneficial effects of the present invention:The present invention is using high-pressure water gas to pile body collapse hole or the soil block of pile bottom sediment rejected region Or sediment enters horizontal high voltage cutting, scope big to the cutting strength of soil block at collapse hole or sediment is wide, broken thorough;By powerful Air-flow lifts sand grains, sticking grain, powder and the water body of row's fault location and is allowed to discharge outside stake, and borehole cleaning is clean, thorough;By using assembling Formula flexibility plastic water press seal head closure aperture, revolutionizes conventional cement and starches the slow speed sealed, Grouting Pipe and drainpipe not The shortcoming that can be reused, improves speed of application, has saved substantial amounts of joint filling material;By the construction of self-compaction common pressure grouting Technique makes the concentration of cement grout and the ratio of mud not change, so as to ensure that the intensity of cement grout;By high-pressure slip-casting Construction technology, consolidation process not only has been carried out to pile defect, while slurries can be also immersed between pile body and surrounding soil Gap, or even invade the build joints such as the crack of pile body surrounding soil, improve frictional resistance between stake soil and the soil body Intensity, so as to improve the bearing capacity of foundation pile;The foundation pile that there is collapse hole or sediment defect is carried out by construction method of the present invention Treatment, had both saved substantial amounts of piling or rework cost, and the substantial amounts of construction period has been saved again.In a word, construction method operation Fairly simple, borehole cleaning is clean, speed is fast, low cost, and range of grouting is big, intensity is high, and defect processing effect is good.
Brief description of the drawings
Accompanying drawing is the method operation diagram of this construction method.
Fig. 1 is pile body collapse hole defect reinforcing treatment schematic diagram (unit:mm).
Fig. 2 is pile bottom sediment defect reinforcing treatment schematic diagram (unit:mm).
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples.
In row are implemented, the present invention is using two interconnected brills for judging pile body collapse hole or pile bottom sediment defect Hole, high-strength spiral shell is implanted into using high-pressure water gas cutting-gas-lift slag discharging-hole flushing-self-compaction common pressure grouting-high-pressure slip-casting-injected hole The construction method of line steel carries out consolidation process to pile body collapse hole or pile bottom sediment defect.Specifically, it is using high-pressure water gas pair The soil block or sediment of pile body collapse hole or pile bottom sediment rejected region enter horizontal high voltage cutting, soil block or sediment are cut, is crushed, while The sand grains of fault location, sticking grain, powder are washed out outside stake by the method for gaslift, cement mortar is then prepared using high-mark cement And slip casting is to defective locations, so as to displace the clear water or air at defective locations, finally by high-pressure slip-casting and it is implanted into high-strength The method of screw-thread steel increases fault location intensity.
In operation, high-pressure gas injection pipe 1 is put into the fault location in one of drill core hole 6, and the aqueous vapor of injection can cut The soil block or sediment 10 of collapse hole fault location 9 are cut, and itself and water are washed out outside stake by drilling;Said process is repeated, is entered repeatedly Row cutting, the row of act, untill rejected region is substantially without dregs, extract high-pressure gas injection pipe 1;Assembled flexible is used at pile crown The first 3 closure aperture of plastic water press seal;Cement paste is injected into collapse hole 9 or heavy by the normal pressure of Grouting Pipe 11 in an end socket 3 The defect bottom of slag 10 carries out self-compaction slip casting;The valve 4 of the valve 4 and another Grouting Pipe 11 of closing drainpipe 2 enters horizontal high voltage Slip casting, successively as stated above, slip casing by pressure is carried out from another Grouting Pipe 11, then mends slurry, final pressure;In the collapse hole 9 of drilling 6 Fault location implantation reinforcing bar 7 (not needed during treatment pile bottom sediment defect) reinforces pile body collapse hole defect;Repetition measurement after 7 days.5 is mixed for pile body Solidifying soil, 8 is rotary digging bored concrete pile.
Concrete construction method is as follows:
The first step, advanced horizontal high voltage aqueous vapor cutting, water lift deslagging borehole cleaning
After judging to fill clear water in two drillings of pile body collapse hole defect or pile bottom sediment defect, high-pressure gas injection pipe is put Enter the fault location in one of drilling, and be connected with air compressor machine.Then air compressor machine is started, the aqueous vapor of injection can cut defective part The soil block or sediment of position, meanwhile, the air of injection can be sprayed from collapse hole or sediment fault location with high pressure and speed to aperture Penetrate, loose silt particle and water washed out outside stake by drilling, until in drilling injected water base by row's light untill.Then Clear water is re-injected, said process is repeated, cutting, the row of act is repeated, untill rejected region is substantially without dregs.
High-pressure gas injection pipe is put into the collapse hole fault location in another drilling, said process is repeated.
Scarfing cinder construction parameter:Air pressure:≥0.60-0.80MPa;
Tolerance:≥13m3/min;
Power:≥90kW
Second step, carries out injected hole sealing and Grouting Pipe is installed
Aperture is blocked using assembled flexible plastic water press seal head at pile crown.The expansion of water filling rear head can make end socket with Hole wall is in close contact and maintains water injection pressure stabilization in more than 1.5MPa.A Grouting Pipe and one are each equipped with each end socket Drainpipe, Grouting Pipe will be goed deep into collapse hole or sediment defective locations bottom, and drainpipe will go deep into 1.6-2.0m below pile crown.
3rd step, carries out cement grout preparation
Grouting serous fluid is the neat slurry prepared by P.0.42.5 Portland cement.
The ratio of mud is controlled:Ratio of mud span is 0.5~0.6.It is required that slurries stir, with stir with.Slurry is mixed to use Water must not will be sieved using sewage, slurries, prevent that debris are mixed into slurries.
4th step, carries out self-compaction normal pressure or low-pressure grouting
Cement paste is injected into collapse hole or sediment defect bottom by the Grouting Pipe normal pressure in an end socket, by 2 rows Grouting Pipe in water pipe and another end socket opens the valve of these three discharge pipes as discharge pipe.As cement grout is slow Injection, the cement grout of bottom slowly discharges outside stake the slowly upper act of the water on top, gas by discharge pipe.Discharge pipe discharge Clear water gradually becomes cement grout, if the cement-slurry concentration of the close injection of the cement mortar concentration of certain discharge pipe therein discharge When, close the discharge pipe;Appropriate grouting pressure value, the cement grout until other 2 discharge pipes are emerged respectively, and the concentration of increasing connects Respectively by its valve closing during the cement-slurry concentration of nearly injection.
5th step, carries out high-pressure slip-casting, mends slurry, final pressure
Continue to be slowly increased grouting pressure, maximum grouting pressure reaches 2.0~2.5MPa or so Shi Ping and starches, and maintenance 10~ 15min.Successively as stated above, slip casing by pressure is carried out from another Grouting Pipe.After slip casting terminates, the continuous bleed of cement mortar is consolidated Knot, slurries liquid level declines therewith, now in time to cement grout is supplemented in hole, untill liquid level no longer declines.
6th step, carries out bar planting (not needed during treatment pile bottom sediment defect) and reinforces pile body collapse hole rejected region
The finish rolling high-strength screw-thread steel (PSB1080) of a diameter of 40mm, a length of 6m is implanted into the pile body collapse hole defect of injected hole Place, each injected hole is implanted into 1~2.
7th step, carries out foundation pile reinspection
After 7 days, low strain dynamic pile integrity detection or drill core test are carried out to the stake, with verification process effect.
In row are implemented, when high-pressure water gas cutting, water act deslagging hole flushing is carried out, clear water must be filled in two drillings, High-pressure gas injection pipe is put into the fault location in one of drilling, and is connected with air compressor machine.
In row are implemented, when carrying out injected hole sealing and Grouting Pipe installation, assembled flexible plastic water is used at pile crown Press seal head closure slip casting aperture.The expansion of water filling rear head can be such that end socket is in close contact with hole wall.It is each equipped with each end socket One Grouting Pipe and a drainpipe.
In row are implemented, when cement grout preparation is carried out, grouting serous fluid is matched somebody with somebody by P.0.42.5 Portland cement The neat slurry of system.The ratio of mud is controlled 0.5~0.6 or so.
In row are implemented, when self-compaction normal pressure or low-pressure grouting draining is carried out, cement paste is passed through into an injected hole Grouting Pipe normal pressure be injected into defect bottom, when discharge cement mortar concentration close to injection cement grout when close discharge pipe;It is suitable Stop when grouting pressure value, the cement grout until other discharge pipes are emerged, and concentration is increased close to injection cement-slurry concentration Only slip casting.
In row are implemented, when carrying out high-pressure slip-casting, mending slurry, final pressure, high pressure slurries are disposably injected by a Grouting Pipe, And other 3 valves of pipe are closed, and grouting pressure is slowly increased, maximum grouting pressure is maintained at 2.0~2.5MPa or so, and ties up Hold 10~15min.
Implement row in, carry out bar planting reinforce pile body collapse hole rejected region when, each injected hole fault location be implanted into 1~ 2 a diameter of 40mm, the finish rolling high-strength screw-thread steels (PSB1080) of a length of 6m.
In row are implemented, foundation pile reinspection is carried out after 7 days, low strain dynamic pile integrity detection or core drilling method inspection are carried out to the stake Survey.
In real work operation, equipment will keep good state during whole cutting reinforcement, if in water under high pressure During mud churning is replaced and screen is starched, equipment goes wrong, then cause the reinforced work of whole stake to be fallen short of success for lack of final effort.Therefore mending All machineries are overhauled before strong Defect Piles, be maintained, it is ensured that its excellent state.

Claims (7)

1. the construction method that rotary digging bored concrete pile pile body collapse hole or pile bottom sediment mass defect are processed, it is characterised in that methods described Comprise the steps:
Carry out high-pressure water gas cutting, water and lift deslagging borehole cleaning;
Carry out injected hole sealing and Grouting Pipe is installed;
Carry out cement grout preparation;
Carry out self-compaction normal pressure or low-pressure grouting;
Carry out high-pressure slip-casting, mend slurry, final pressure;
Carry out bar planting and reinforce pile body collapse hole rejected region;
Carry out foundation pile reinspection.
2. construction method as claimed in claim 1, it is characterised in that when carrying out high-pressure water gas cutting, water and lifting deslagging hole flushing, Must will judge to fill clear water in two drillings of pile body collapse hole defect or pile bottom sediment defect, high-pressure gas injection pipe is put into wherein one Collapse hole or pile bottom sediment fault location in individual drilling, and be connected with air compressor machine.
3. construction method as claimed in claim 1, it is characterised in that when injected hole sealing is carried out and Grouting Pipe is installed, Using assembled flexible plastic water press seal head closure slip casting aperture at pile crown.
4. construction method as claimed in claim 1, it is characterised in that when carrying out cement grout and preparing, grouting serous fluid be by The neat slurry that P.O.42.5 Portland cements are prepared.
5. construction method as claimed in claim 1, it is characterised in that when self-compaction normal pressure or low-pressure grouting draining is carried out, Cement paste is injected into defect bottom by the Grouting Pipe normal pressure of an injected hole, when the close injection of the cement mortar concentration of discharge Discharge pipe is closed during cement grout.
6. construction method as claimed in claim 1, it is characterised in that when carrying out high-pressure slip-casting, mending slurry, final pressure, mud jacking high Liquid is disposably injected by a Grouting Pipe, and closes other 3 valves of pipe, is slowly increased grouting pressure, maximum grouting pressure 2.0~2.5MPa or so is maintained at, and maintains 10~15min.
7. construction method as claimed in claim 1, it is characterised in that each injected hole fault location implanted diameter is 40mm, length It is finish rolling high-strength screw-thread steel (PSB1080) 1-2 roots of 6m.
CN201710077368.1A 2017-02-06 2017-02-06 Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect processing Active CN106836214B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710077368.1A CN106836214B (en) 2017-02-06 2017-02-06 Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710077368.1A CN106836214B (en) 2017-02-06 2017-02-06 Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect processing

Publications (2)

Publication Number Publication Date
CN106836214A true CN106836214A (en) 2017-06-13
CN106836214B CN106836214B (en) 2018-11-06

Family

ID=59128701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710077368.1A Active CN106836214B (en) 2017-02-06 2017-02-06 Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect processing

Country Status (1)

Country Link
CN (1) CN106836214B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056734A (en) * 2018-08-27 2018-12-21 上海市基础工程集团有限公司 Diaphram wall defect grouting mending construction method
CN109322337A (en) * 2018-11-13 2019-02-12 上海市基础工程集团有限公司 Cast-in-situ bored pile pile body defect-restoration method therefor
CN109403353A (en) * 2018-11-15 2019-03-01 长沙理工大学 A kind of processing method of diaphram wall collapse hole
CN109736313A (en) * 2019-01-03 2019-05-10 中国水利水电第十工程局有限公司 Drill-pouring end-bearing pile handles pile bottom sediment technique using coring hole grouting behind shaft or drift lining
CN109853538A (en) * 2018-12-12 2019-06-07 湖南化工地质工程勘察院有限责任公司 Cast-in-place concrete pile pile foundation reinforcing structure and its construction method
CN110106876A (en) * 2019-05-15 2019-08-09 中铁八局集团第三工程有限公司 A kind of diplopore grouting construction method
CN110805034A (en) * 2019-11-14 2020-02-18 江苏长江机械化基础工程有限公司 Circumferential rotation swinging grouting reinforcement construction method for defected cast-in-place pile composite pipe combined pile
CN112726590A (en) * 2020-12-31 2021-04-30 南通大学 Method for processing quality defects of cast-in-situ bored pile
CN113774970A (en) * 2021-08-05 2021-12-10 深圳宏业基岩土科技股份有限公司 Cast-in-place pile socketed section defect repairing construction method
CN113818503A (en) * 2021-09-07 2021-12-21 深圳宏业基岩土科技股份有限公司 Cast-in-place pile socketed section defect repairing construction method
CN113897962A (en) * 2021-10-27 2022-01-07 福建建中岩土工程有限责任公司 Novel underground continuous wall sediment treatment method
CN114251085A (en) * 2021-11-30 2022-03-29 中国石油天然气股份有限公司 Method and device for evaluating sealing capability of simulated shaft collapse sediment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07292663A (en) * 1994-04-27 1995-11-07 Shimizu Corp Additional driving construction and method by new steel-pipe pile making use of existing steel-pipe pile
CN101713189A (en) * 2008-10-06 2010-05-26 吴保全 Construction process of floral tube dry filling piles
CN105672348A (en) * 2016-01-27 2016-06-15 重庆大学 Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN106120783A (en) * 2016-07-11 2016-11-16 广州市鲁班建筑集团股份有限公司 Bored concrete pile removing slag from pile bottom reinforcement process method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07292663A (en) * 1994-04-27 1995-11-07 Shimizu Corp Additional driving construction and method by new steel-pipe pile making use of existing steel-pipe pile
CN101713189A (en) * 2008-10-06 2010-05-26 吴保全 Construction process of floral tube dry filling piles
CN105672348A (en) * 2016-01-27 2016-06-15 重庆大学 Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN106120783A (en) * 2016-07-11 2016-11-16 广州市鲁班建筑集团股份有限公司 Bored concrete pile removing slag from pile bottom reinforcement process method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056734A (en) * 2018-08-27 2018-12-21 上海市基础工程集团有限公司 Diaphram wall defect grouting mending construction method
CN109322337A (en) * 2018-11-13 2019-02-12 上海市基础工程集团有限公司 Cast-in-situ bored pile pile body defect-restoration method therefor
CN109403353A (en) * 2018-11-15 2019-03-01 长沙理工大学 A kind of processing method of diaphram wall collapse hole
CN109853538A (en) * 2018-12-12 2019-06-07 湖南化工地质工程勘察院有限责任公司 Cast-in-place concrete pile pile foundation reinforcing structure and its construction method
CN109736313A (en) * 2019-01-03 2019-05-10 中国水利水电第十工程局有限公司 Drill-pouring end-bearing pile handles pile bottom sediment technique using coring hole grouting behind shaft or drift lining
CN110106876A (en) * 2019-05-15 2019-08-09 中铁八局集团第三工程有限公司 A kind of diplopore grouting construction method
CN110805034A (en) * 2019-11-14 2020-02-18 江苏长江机械化基础工程有限公司 Circumferential rotation swinging grouting reinforcement construction method for defected cast-in-place pile composite pipe combined pile
CN112726590A (en) * 2020-12-31 2021-04-30 南通大学 Method for processing quality defects of cast-in-situ bored pile
CN113774970A (en) * 2021-08-05 2021-12-10 深圳宏业基岩土科技股份有限公司 Cast-in-place pile socketed section defect repairing construction method
CN113818503A (en) * 2021-09-07 2021-12-21 深圳宏业基岩土科技股份有限公司 Cast-in-place pile socketed section defect repairing construction method
CN113897962A (en) * 2021-10-27 2022-01-07 福建建中岩土工程有限责任公司 Novel underground continuous wall sediment treatment method
CN114251085A (en) * 2021-11-30 2022-03-29 中国石油天然气股份有限公司 Method and device for evaluating sealing capability of simulated shaft collapse sediment
CN114251085B (en) * 2021-11-30 2023-01-20 中国石油天然气股份有限公司 Method and device for evaluating sealing capability of simulated shaft collapse sediment

Also Published As

Publication number Publication date
CN106836214B (en) 2018-11-06

Similar Documents

Publication Publication Date Title
CN106836214B (en) Rotary digging bored concrete pile pile body collapse hole or the construction method of pile bottom sediment mass defect processing
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
AU2020101047A4 (en) Method for filling underground cavity in bedrock by grouting and hydraulic filling device
CN103541359B (en) Method for repairing and treating quality defect of cast-in-place pile
CN100510274C (en) Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN110952953B (en) Pressure-maintaining plugging device for horizontal directional drill hole and water gushing treatment method using same
JP7257086B2 (en) Comprehensive Construction Method for Low Overburden Sections of Tunnels
CN103437351B (en) Treatment method of deviation and fracture remediation of pile body of filling pile
CN105350953A (en) Measuring method for coal seam gas pressure in complicated geological condition
CN108222043B (en) Curtain sand gushing treatment method and curtain sand gushing treatment pipe
CN107983761A (en) The method for repairing and constructing of heavy metal and VOCs combined contamination soils
CN110409433B (en) Construction system and method for performing foundation treatment by using cast-in-place pile with steel sleeve
WO2023178908A1 (en) High-pressure pre-filled karst cave pile foundation construction method
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN109024706A (en) A kind of foundation pit waterproof curtain breakthrough inside method for blocking
CN109736303A (en) It is a kind of to press pour water soil static pressure pipe pile structure and construction method
CN203702071U (en) Water inrush preventing drill ejecting device for water exploration and grouting construction of vertical shaft
CN103174135B (en) Repair method of unqualified post-grouting bored concrete pile
CN106223329A (en) A kind of construction method of full-sleeve rotary churning pile
CN109322337A (en) Cast-in-situ bored pile pile body defect-restoration method therefor
CN113089655A (en) Construction method in three-pipe rotary spraying pile pit in flowing water environment
CN108677959A (en) A kind of grouting tube and grouting construction method suitable for mortar depositing construction under the conditions of limited space
CN109881696B (en) HPPG (high Performance Poly propylene glycol) bottom sealing construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Ji Fengling

Inventor after: Zhou Aizhong

Inventor after: Meng Zhaohui

Inventor after: Li Qiang

Inventor after: Wu Yin

Inventor before: Ji Fengling

Inventor before: Zhou Aizhong

Inventor before: Meng Zhaohui

TA01 Transfer of patent application right

Effective date of registration: 20170527

Address after: 518060 Nanhai Road, Guangdong, Shenzhen, No. 3688, No.

Applicant after: Shenzhen University

Address before: 518060 School of civil engineering, Shenzhen University, Guangdong, Shenzhen, A429

Applicant before: Ji Fengling

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant