Prior art keywords
side wall
grouting
water
subway station
plugging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911063687.2A
Other languages
Chinese (zh)
Inventor
邓长飞
乔国强
刘创印
王栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201911063687.2A priority Critical patent/CN110777860A/en
Publication of CN110777860A publication Critical patent/CN110777860A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/04Watertight packings for use under hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to the technical field of subway maintenance, in particular to a method for plugging water leakage on a side wall of a subway station by back grouting. Including drilling, installation slip casting tube head, drainage pressure release, slip casting pipe shutoff, the side wall outside is equipped with waterproofing membrane, and the waterproofing membrane outside is equipped with envelope, puts at the central point of side wall seepage and adopts the water drilling puncher drilling, and the hole depth extremely envelope surface, downthehole installation slip casting pipe and carry out the drainage pressure release of a period of time, treat that intraductal rivers diminish after connect the slip casting pipe and pour into cement and the mixed thick liquid of water glass, fill the gap between waterproofing membrane and envelope, block groundwater seepage flow passageway, reach the effect from the shutoff behind one's back. The invention has good leakage water plugging effect and high speed, fundamentally solves the difficult problem of repeated leakage treatment of the side wall of the station, and provides more reliable quality assurance for later station operation. The invention is mainly applied to the aspect of sealing the leakage water of the side wall of the subway.

Description

Method for grouting and plugging back of side wall leakage water of subway station
Technical Field
The invention relates to the technical field of subway maintenance, in particular to a method for plugging water leakage on a side wall of a subway station by back grouting.
Background
Urban subway generally has the characteristics that the design burial depth is big, service life is long as alleviating the important carrier of ground traffic pressure, because side wall waterproofing membrane and concrete self defect in the work progress often lead to the different degree leakage water phenomenon to appear in the side wall, influence structure service function, cause the potential safety hazard to later stage station operation, the leaking stoppage method commonly used at present: the concrete crack surface is grooved, and the plugging mode of injecting epoxy resin into the grouting needle head is buried, and the method has the following problems: firstly, the leakage stopping mode is not thorough, the leakage problem cannot be solved fundamentally, and the repeated leakage condition is easy to occur; secondly, the repeated leakage needs to be treated repeatedly, the period is long, and the cost is high; thirdly, the surface of the concrete is only plugged, so that the internal leakage of the concrete cannot be well solved, the structural steel bars are easy to rust along with the passage of time, and the structural quality cannot be guaranteed; therefore, a more efficient and rapid plugging method which can treat both symptoms and root causes is needed.
Disclosure of Invention
In order to overcome the defects in the prior art, the invention provides the method for grouting and plugging the back of the side wall leakage water of the subway station.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows:
a method for plugging the back of the side wall of a subway station by grouting water comprises the following steps:
a. selecting the central position of the side wall permeated with water for drilling, wherein the drilling depth is up to the surface of the enclosure structure;
b. installing a grouting pipe in the hole;
c. turning threads on the exposed part of the grouting pipe, connecting a tee joint, connecting ball valves on two sides of the tee joint, and connecting a slurry pipe outside the ball valves;
d. after the grouting pipe is installed, opening the ball valve to drain water, and draining accumulated water in a gap between the waterproof coiled material and the enclosure structure;
e. after accumulated water is drained completely, grouting is carried out, cement paste is injected firstly, and after a certain amount of cement paste is filled in the gap, cement paste and water glass are injected simultaneously;
f. and after grouting is finished, plugging the grouting pipe.
In the step a, the position of the side wall reinforcing steel bar is determined by adopting a radar scanner before drilling, so that the side wall stressed reinforcing steel bar is prevented from being cut off during drilling.
And the grouting pipe in the step b is a grouting pipe with the diameter of 40 mm.
And e, controlling the grouting pressure of the cement paste in the step e to be 0.3MPa to 1MPa, and controlling the grouting pressure of the water glass to be 0.5 MPa to 1.5 MPa.
Compared with the prior art, the invention has the beneficial effects that:
the radar scanner location has guaranteed the accuracy nature of drilling, has improved drainage and slip casting effect, utilizes the tee bend, carries out drainage and slip casting through two pipelines, makes construction speed accelerate, fundamentally high-efficient, the quick difficult problem of solving the side wall percolating water.
Drawings
FIG. 1 is a schematic view of the construction of the present invention;
FIG. 2 is a flow chart of the construction process of the present invention;
in the figure: 1 is a side wall, 2 is an enclosure structure, 3 is a waterproof coiled material, 4 is a grouting pipe, 401 is a tee joint, 402 is a ball valve, 403 is a slurry pipe, and 5 is a gap.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 and 2, a method for plugging the back of a side wall of a subway station by grouting water comprises the following steps:
a. selecting the central position of the side wall 1 for water penetration to drill a hole, wherein the hole diameter is 42mm, the drilling depth reaches the surface of the enclosure structure 2, so that grouting materials are diffused towards the periphery by taking the grouting pipe 4 as the center, and if the area of leaked water is large, hole repairing can be considered;
b. installing a grouting pipe 4 in the hole, wherein the grouting pipe 4 is 500mm into the side wall, and if the wall is smaller in thickness, the grouting pipe is arranged outside the side wall 1;
c. the exposed part of the outer wall of the grouting pipe 4 is threaded and is used for connecting a tee joint 6, two sides of the tee joint 6 are connected with ball valves 7, and the outer sides of the ball valves 7 are connected with a slurry pipe 8;
d. after the grouting pipe 4 is installed, the ball valve 7 is opened to drain water, accumulated water in a gap 5 between the waterproof coiled material 3 and the enclosure structure 2 is drained, usually for 5-8 hours, and subsequent grouting work is facilitated to be smoothly carried out;
e. after accumulated water is drained completely, grouting is carried out, cement slurry is injected firstly, after a certain amount of cement slurry is filled in the gap 5, the cement slurry and water glass are injected simultaneously through the slurry pipes 8 on two sides of the tee joint 6, the water-cement ratio of the cement slurry is 0.8:1, the cement is ordinary silica 32.5 portland cement, and the water glass is a water solution of sodium silicate;
f. and after grouting, plugging the grouting pipe 4, firstly screwing off the tee joint 6 of the grouting pipe, cutting the exposed part of the grouting pipe 4 flat along the surface of the side wall 1 by using a grinding wheel machine, chiseling off the slurry condensed in the pipe, and then fully filling the grouting pipe 4 with micro-expansion fine stone concrete with a grade higher than that of the side wall 1.
Preferably, in the step a, the position of the side wall reinforcing steel bar is determined by a radar scanner before drilling, so that the side wall stressed reinforcing steel bar is prevented from being cut off during drilling.
Preferably, the grouting pipe in the step b is a grouting pipe with the diameter of 40 mm.
Preferably, the grouting pressure of the cement paste in the step e is controlled to be 0.3MPa to 1MPa, and the grouting pressure of the water glass is controlled to be 0.5 MPa to 1.5 MPa.
Although only the preferred embodiments of the present invention have been described in detail, the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art, and all changes are encompassed in the scope of the present invention.

Claims (4)

1. A method for grouting and plugging the back of a side wall of a subway station after water leakage is characterized by comprising the following steps:
selecting the central position of the side wall permeated with water for drilling, wherein the drilling depth is up to the surface of the enclosure structure;
installing a grouting pipe in the hole;
turning threads on the exposed part of the grouting pipe, connecting a tee joint, connecting ball valves on two sides of the tee joint, and connecting a slurry pipe outside the ball valves;
after the grouting pipe is installed, opening the ball valve to drain water, and draining accumulated water in a gap between the waterproof coiled material and the enclosure structure;
after accumulated water is drained completely, grouting is carried out, cement paste is injected firstly, and after a certain amount of cement paste is filled in the gap, cement paste and water glass are injected simultaneously;
and after grouting is finished, plugging the grouting pipe.
2. The method for plugging the side wall of the subway station by grouting water on the back of the subway station as claimed in claim 1, wherein: in the step a, the position of the side wall reinforcing steel bar is determined by adopting a radar scanner before drilling, so that the side wall stressed reinforcing steel bar is prevented from being cut off during drilling.
3. The method for plugging the side wall of the subway station by grouting water on the back of the subway station as claimed in claim 1, wherein: and the grouting pipe in the step b is a grouting pipe with the diameter of 40 mm.
4. The method for plugging the side wall of the subway station by grouting water on the back of the subway station as claimed in claim 1, wherein: and e, controlling the grouting pressure of the cement paste in the step e to be 0.3MPa to 1MPa, and controlling the grouting pressure of the water glass to be 0.5 MPa to 1.5 MPa.
CN201911063687.2A 2019-11-04 2019-11-04 Method for grouting and plugging back of side wall leakage water of subway station Pending CN110777860A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911063687.2A CN110777860A (en) 2019-11-04 2019-11-04 Method for grouting and plugging back of side wall leakage water of subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911063687.2A CN110777860A (en) 2019-11-04 2019-11-04 Method for grouting and plugging back of side wall leakage water of subway station

Publications (1)

Publication Number Publication Date
CN110777860A true CN110777860A (en) 2020-02-11

Family

ID=69388627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911063687.2A Pending CN110777860A (en) 2019-11-04 2019-11-04 Method for grouting and plugging back of side wall leakage water of subway station

Country Status (1)

Country Link
CN (1) CN110777860A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113107018A (en) * 2021-05-21 2021-07-13 北京中煤矿山工程有限公司 Method for treating leakage water of underground structure crack
CN114607414A (en) * 2022-03-15 2022-06-10 中铁十局集团有限公司 Method for repairing concrete defects of side wall of subway station

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08158393A (en) * 1994-12-07 1996-06-18 Shigeo Nagahama Cut-off method of concrete underground structure
CN101864778A (en) * 2010-06-30 2010-10-20 广东省基础工程公司 Method for leaking stoppage of external wall of underground structure
CN103437790A (en) * 2013-08-23 2013-12-11 西安建筑科技大学 Method for blocking underground water
CN105780781A (en) * 2016-04-28 2016-07-20 中国水电基础局有限公司 Fast plugging method for deep foundation pit
CN106320189A (en) * 2016-08-30 2017-01-11 中铁四局集团第四工程有限公司 Transverse reinforcing construction method of existing railway line T beam

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08158393A (en) * 1994-12-07 1996-06-18 Shigeo Nagahama Cut-off method of concrete underground structure
CN101864778A (en) * 2010-06-30 2010-10-20 广东省基础工程公司 Method for leaking stoppage of external wall of underground structure
CN103437790A (en) * 2013-08-23 2013-12-11 西安建筑科技大学 Method for blocking underground water
CN105780781A (en) * 2016-04-28 2016-07-20 中国水电基础局有限公司 Fast plugging method for deep foundation pit
CN106320189A (en) * 2016-08-30 2017-01-11 中铁四局集团第四工程有限公司 Transverse reinforcing construction method of existing railway line T beam

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
建设部施工管理司: "《1992年度土木建筑国家级工法汇编》", 30 November 1992 *
谭代强等: "《2011海峡两岸岩土工程/地工技术交流研讨会大陆部分论文选》", 31 May 2011, 知识产权出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113107018A (en) * 2021-05-21 2021-07-13 北京中煤矿山工程有限公司 Method for treating leakage water of underground structure crack
CN113107018B (en) * 2021-05-21 2022-09-02 北京中煤矿山工程有限公司 Method for treating leakage water of underground structure crack
CN114607414A (en) * 2022-03-15 2022-06-10 中铁十局集团有限公司 Method for repairing concrete defects of side wall of subway station

Similar Documents

Publication Publication Date Title
CN107387123B (en) The construction method of pressure grouting leak stopping is carried out for shield duct piece piece leakage phenomenon
CN103277120B (en) A kind of non-fully deeply freeze vertical thaw after water burst prevention and controls
CN100557146C (en) Fast plugging device for deep foundation pit precipitation well
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN108517899A (en) Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall
CN105350556A (en) New material underground structure leakage stoppage construction technology
CN107761753A (en) A kind of foundation ditch water burst rapid rescue slip casting method for blocking
CN103410119A (en) Method for water interception curtain grouting in leakage concrete
CN101666234A (en) Fracture rock no-slurry-blocking wall compound grouting construction method
CN111424613B (en) Method for treating through cracks of roller compacted concrete dam
CN110777860A (en) Method for grouting and plugging back of side wall leakage water of subway station
CN106894428A (en) Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation
CN203939060U (en) Slight seepage block structure of underground continuous wall
CN109853633A (en) A kind of external sealing treatment process of basement bottom board leakage
CN108755723A (en) A kind of removable dewatering well well mouth sealing device and slip casting plugging construction method
CN214940041U (en) Water leakage prevention structure of diaphragm wall
CN109056734A (en) Diaphram wall defect grouting mending construction method
WO2018214143A1 (en) Construction method for plugging dewatering well having penetrating bottom plate in foundation pit
CN105781580A (en) Tunnel crack repair method
CN114197508B (en) Easy-to-seal water draining device, manufacturing method and using method thereof
CN107975376B (en) Connecting structure of tunnel shield jacking pipe and vertical pipeline and construction method
CN112901222B (en) Treatment process for concrete water seepage cracks of inverted arch of tunnel
CN205314085U (en) A biliquid slip casting system that is used for cement and water glass solution
CN210946855U (en) Plugging device for dewatering well
CN110359472A (en) A kind of base pit dewatering well plugging device and its application method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200211

RJ01 Rejection of invention patent application after publication