CN108979179A - A kind of summer construction concrete curing film covering device - Google Patents

A kind of summer construction concrete curing film covering device Download PDF

Info

Publication number
CN108979179A
CN108979179A CN201810822904.0A CN201810822904A CN108979179A CN 108979179 A CN108979179 A CN 108979179A CN 201810822904 A CN201810822904 A CN 201810822904A CN 108979179 A CN108979179 A CN 108979179A
Authority
CN
China
Prior art keywords
fixedly connected
mounting
film
rod
mounting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810822904.0A
Other languages
Chinese (zh)
Other versions
CN108979179B (en
Inventor
张海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Youlinsheng Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810822904.0A priority Critical patent/CN108979179B/en
Priority to CN202010494547.7A priority patent/CN111608405B/en
Publication of CN108979179A publication Critical patent/CN108979179A/en
Application granted granted Critical
Publication of CN108979179B publication Critical patent/CN108979179B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/246Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets

Abstract

The present invention relates to technical field of building construction, and disclose a kind of summer construction concrete curing film covering device, including two the first mounting plates, the upper and lower ends in the left side of two first mounting plates have been respectively fixedly connected with the first reinforcing bar and the second reinforcing bar, first reinforcing bar and the second reinforcing bar are fixedly connected with the side of pull rod one end, the upper and lower ends on the right side of two first mounting plates have been respectively fixedly connected with first connecting rod and the second connecting rod, one end of the first connecting rod and the second connecting rod is fixedly connected with the upper and lower ends on the left of the second mounting plate.The present invention can make film bond on the surface of concrete, water can be received in the inside of film after overlay film, it avoids in summer, hot climate, when being air-dried, moisture evaporation is too fast, needs every needing the problem of carrying out sprinkling maintenance once the disconnected time, the construction efficiency for improving concrete curing ensure that the enough intensity of concrete.

Description

A kind of summer construction concrete curing film covering device
Technical field
The present invention relates to technical field of building construction more particularly to a kind of summer construction concrete curing overlay film to fill It sets.
Background technique
In construction, after casting and compacting of concrete, why hardening can be gradually condensed, be primarily due to cement aquation As a result, and hydration then needs temperature and humidity condition appropriate, therefore in order to guarantee that concrete has suitable hardening item Part increases its intensity constantly, it is necessary to conserve to concrete.
After concrete casting, in summer, hot climate when being air-dried, is such as conserved, concrete water branch not in time Evaporate it is too fast, formed dehydrating phenomena, the cement granules for having formed gelinite can be prevented from abundant aquation, cannot be converted into stable Crystallization, lacks enough cohesive forces, to sheet can occur in concrete surface or powdery falls off, in addition, concrete not yet When having enough intensity, the premature evaporation of moisture can also generate biggish contraction distortion, cup shake occur, so in coagulation After native pouring molding, it is necessary to keep temperature appropriate and enough humidity within a certain period of time, traditional maintenance process is substantially It is maintenance work to be carried out by watering, but in summer, hot climate when being air-dried, needs to carry out every once the disconnected time Sprinkling maintenance occupies a large amount of labo r resources, greatly reduces construction efficiency, for this purpose, we have proposed a kind of buildings of summer to apply Work concrete curing film covering device.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of summer construction concrete curing film covering device, Have the advantages of overlay film water lock, solve in summer, hot climate, when being air-dried, is spilt every once the disconnected time The problem of water curing occupies a large amount of labo r resources, greatly reduces construction efficiency.
(2) technical solution
To realize above-mentioned technical problem, the present invention provides such a summer construction concrete curing overlay films to fill It sets, including two the first mounting plates, the upper and lower ends in the left side of two first mounting plates have been respectively fixedly connected with first and have added Solid rod and the second reinforcing bar, first reinforcing bar and the second reinforcing bar are fixedly connected with the side of pull rod one end, described in two The upper and lower ends on the right side of the first mounting plate have been respectively fixedly connected with first connecting rod and the second connecting rod, the first connecting rod It is fixedly connected with one end of the second connecting rod with the upper and lower ends on the left of the second mounting plate, first mounting plate and the second installation It is provided with sprinkling maintenance mechanism at the top of plate, is provided with position dampening mechanism on the right side of second mounting plate, two described Overlay film maintenance mechanism is provided between one mounting plate, the top between two first mounting plates is fixedly connected with third connection Bar, the bottom between two first mounting plates and the second mounting plate are connected with rubber wheel, two second installations Position guiding mechanism is provided between plate, the top between two second mounting plates is fixedly connected with the 4th connecting rod.
Further, the sprinkling maintenance mechanism includes water tank and water pump, and the two sides at the water tank both ends are fixed to be connected It is connected to the first mounting rod, the bottom of two first mounting rods is respectively fixedly connected in the first mounting plate and the second mounting plate The top fixation at top, the water tank is communicated with filler pipe, and the screw top of the filler pipe is socketed with sealing cover, the water pump Side be fixedly connected on the left side of one of them the second mounting plate, fixation is communicated with suction hose at the water suction of the water pump, institute The fixed connection in top of suction hose is stated in the bottom of water tank, the drainage position fixation of the water pump is communicated with drainpipe, the draining The bottom of pipe is fixed to be communicated with isocon, and the two sides for shunting bottom of the tube are fixedly connected on the top of two the second connecting rods, The middle part fixation for shunting bottom of the tube is communicated with spray head.
Further, the position dampening mechanism includes fixed link, and one end of the fixed link is fixedly connected on second The right side of mounting plate is fixedly connected with firm bar at the top of the fixed link, is fixedly connected on second at the top of the firm bar The right side of mounting plate, the side of the bottom of fixed are fixedly connected with telescopic rod, and the bottom of the telescopic rod is fixedly connected with Bottom plate, the outer surface movable sleeve of the telescopic rod are connected to the first spring, are fixedly connected on fixed link at the top of first spring Bottom, the bottom of first spring is fixedly connected on the top of bottom plate, and the side of the bottom base plate is fixedly connected with three Gusset is connected with pinch roller between two set squares.
Further, overlay film maintenance mechanism includes first bearing and second bearing, and the first bearing is embedded in Top on the inside of one of them first mounting plate, the inner ring of the first bearing, which is fixed, is plugged with the second mounting rod, and described second Mounting rod is connected with motion bar, one end fixing sleeve of the motion bar far from the second mounting rod far from one end of first bearing It is connected to stop collar, the stop collar is fixedly connected with kelly, the outer surface pivot bush unit of the kelly far from the side of motion bar There is casing, the outer surface movable sleeve of the kelly is connected to second spring, and the second bearing is embedded in another the first mounting plate The inner ring fixation at the top of inside, the second bearing is plugged with third mounting rod, and the middle part at the top of the third mounting rod is opened Equipped with card slot, the kelly is plugged on the inside of card slot far from one end activity of stop collar, and the third mounting rod is located at casing Inside.
Further, one end of the second spring is fixedly connected on side of the stop collar far from motion bar, and described second The other end of spring is fixedly connected on one end of casing.
Further, the position guiding mechanism includes there are two 3rd bearing, and two 3rd bearings are inlayed respectively Bottom between two the second mounting plates, interference is connected with guide rod between two 3rd bearings, the guide rod Outer surface fixing sleeve is connected to guide roller.
(3) beneficial effect
The present invention provides a kind of summer construction concrete curing film covering devices, have following
The utility model has the advantages that
1, the summer construction concrete curing film covering device, is particularly suitable in summer construction, concrete Temperature appropriate and enough humidity are kept after pouring molding, film roll is mounted in overlay film maintenance mechanism by people, by film One end be bonded in the surface of concrete around position guiding mechanism, people pull pull rod, drive the maintenance film covering device mobile, So that the film in film roll is unclamped in the rotation of overlay film maintenance mechanism, by the compression of position dampening mechanism so that film bond exists The surface of concrete can be received in water the inside of film after overlay film, avoid in summer, hot climate, when being air-dried, water Divide evaporation too fast, needs to improve the construction effect of concrete curing every needing the problem of carrying out sprinkling maintenance once the disconnected time Rate ensure that the enough intensity of concrete.
2, the summer construction concrete curing film covering device, passes through the setting of sprinkling maintenance mechanism, pump working Operation is adsorbed the water in water tank by suction hose, is sprayed from spray head by drainpipe and isocon, to concrete Surface, which is constantly sprinkled water, carries out maintenance work, avoids when hot climate, being air-dried, sheet or powder occurs in concrete surface Shape falls off, and ensure that the enough cohesive forces of concrete.
3, the summer construction concrete curing film covering device is beaten by being used cooperatively for filler pipe and sealing cover Sealing cover is opened, people can add water to the inside of water tank by filler pipe, facilitate the addition of curing water inside water tank, tighten Sealing cover ensure that the leakproofness of water tank, avoid the maintenance film covering device when moving, the curing water inside water tank flies everywhere It splashes, causes the waste of water resource.
4, the summer construction concrete curing film covering device plays curing water and is put by the setting of water tank The effect set, facilitates constantly to sprinkle water to the surface of concrete and carries out maintenance work, while the weight of water tank applies rubber wheel Add certain pressure, so that mobile rubber wheel plays levelling effect to the surface of concrete, improves practicability.
5, the summer construction concrete curing film covering device, the setting of mechanism is conserved by overlay film, and people pull The maintenance film covering device is mobile so that the film in film roll is unclamped in the rotation of overlay film maintenance mechanism so that film be covered on it is mixed The surface of soil is coagulated, water can be received in film after overlay film, be prevented the loss of moisture, cause the environment of a Self-curing, avoid After concreting molding, the phenomenon that concrete is dehydrated, the enough intensity of concrete ensure that.
6, the summer construction concrete curing film covering device, passes through kelly, third mounting rod, card slot and casing It is used cooperatively, by casing to close to the movement of one end of stop collar, so that casing is separated with third mounting rod, moves up motion bar So that film roll, can be socketed in the outer surface of motion bar, facilitate the installation and replacement of film roll by kelly and exact separation.
7, summer construction concrete curing film covering device, by the setting of second spring, on the one hand to casing Fixed effect is played, falling for casing is avoided, while under the action of second spring bounce, being had to casing certain Motive force ensure that the stability and reliability of film roll installation so that casing is socketed in the outer surface of third mounting rod.
8, summer construction concrete curing film covering device, by the setting of position dampening mechanism, to film pine The one end opened applies certain pressure, and film is attached to the surface of concrete, so that film was bonded with the surface of concrete It is more close, it ensure that the effect of water lock, avoid the loss and volatilization of moisture in concrete, play the effect of maintenance, Meanwhile the rotation of overlay film maintenance mechanism can be made, the film in film roll is unclamped, facilitates and the surface of concrete is covered Film process.
9, summer construction concrete curing film covering device, by the setting of position guiding mechanism, to release Film plays the effect of guiding, so that film is preferably attached to the surface of concrete, while reducing overlay film maintenance mechanism Coefficient of friction in rotary course guarantees the rotating accuracy of overlay film maintenance mechanism, avoids the occurrence of the stuck phenomenon of film, improve The working efficiency of concrete curing overlay film.
Detailed description of the invention
Fig. 1 is structure of the invention side view;
Fig. 2 is structure of the invention rearview;
Fig. 3 is the first mounting plates structure rearview of the invention;
Fig. 4 is the second mounting plates structure rearview of the invention;
Fig. 5 is partial enlarged view at the A of Fig. 3 of the present invention.
In figure: 1 first mounting plate, 2 first reinforcing bars, 3 second reinforcing bars, 4 pull rods, 5 first connecting rods, 6 second connections Bar, 7 second mounting plates, 8 sprinkling maintenance mechanisms, 801 water tanks, 802 first mounting rods, 803 filler pipes, 804 sealing covers, 805 water Pump, 806 suction hoses, 807 drainpipes, 808 isocons, 809 spray heads, 9 position dampening mechanisms, 901 fixed links, 902 firm bars, 903 telescopic rods, 904 first springs, 905 bottom plates, 906 set squares, 907 pinch rollers, 10 overlay films maintenance mechanism, 1001 first bearings, 1002 second mounting rods, 1003 motion bars, 1004 stop collars, 1005 second springs, 1006 kellies, 1007 third mounting rods, 1008 card slots, 1009 casings, 1010 second bearings, 11 third connecting rods, 12 rubber wheels, 13 position guiding mechanisms, 1301 thirds Bearing, 1302 guide rods, 1303 guide rollers, 14 the 4th connecting rods.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-5, a kind of summer construction concrete curing film covering device, including two the first mounting plates 1 are please referred to, The upper and lower ends in the left side of two the first mounting plates 1 have been respectively fixedly connected with the first reinforcing bar 2 and the second reinforcing bar 3, and first adds Solid rod 2 and the second reinforcing bar 3 are fixedly connected with the side of 4 one end of pull rod, the upper and lower ends point on the right side of two the first mounting plates 1 It is not fixedly connected with first connecting rod 5 and the second connecting rod 6, one end and the second installation of first connecting rod 5 and the second connecting rod 6 The upper and lower ends in 7 left side of plate are fixedly connected, and the top of the first mounting plate 1 and the second mounting plate 7 is provided with sprinkling maintenance mechanism 8, Sprinkling maintenance mechanism 8 includes that water tank 801 and water pump 805 by the setting of water tank 801 play the effect of placement to curing water Fruit, facilitates constantly to sprinkle water to the surface of concrete and carries out maintenance work, while the weight of water tank 801 applies rubber wheel 12 Certain pressure improves practicability, water tank so that mobile rubber wheel 12 plays levelling effect to the surface of concrete The two sides at 801 both ends are fixedly connected to the first mounting rod 802, and the bottom of two the first mounting rods 802 is respectively fixedly connected with The top fixation at the top of the first mounting plate 1 and the second mounting plate 7, water tank 801 is communicated with filler pipe 803, the top of filler pipe 803 Portion's screw thread is socketed with sealing cover 804, by being used cooperatively for filler pipe 803 and sealing cover 804, opens sealing cover 804, Ren Menke To add water to the inside of water tank 801 by filler pipe 803, the addition of 801 inside curing water of water tank is facilitated, sealing cover is tightened 804, it ensure that the leakproofness of water tank 801, avoid the maintenance film covering device when moving, the curing water four inside water tank 801 Place splashes, and causes the waste of water resource, the side of water pump 805 is fixedly connected on the left side of one of them the second mounting plate 7, water pump Fixed at 805 water suction to be communicated with suction hose 806, the fixed connection in the top of suction hose 806 is in the bottom of water tank 801, water pump 805 Drainage position it is fixed be communicated with drainpipe 807, the bottom fixation of drainpipe 807 is communicated with isocon 808,808 bottom of isocon Two sides be fixedly connected on the tops of two the second connecting rods 6, the middle part fixation of 808 bottom of isocon is communicated with spray head 809, leads to The setting of sprinkling maintenance mechanism 8 is crossed, the water in water tank 801 is adsorbed by suction hose 806, led to by the work operation of water pump 805 It crosses drainpipe 807 and isocon 808 is sprayed from spray head 809, constantly sprinkle water to the surface of concrete and carry out maintenance work, keep away Exempt from when hot climate, being air-dried, sheet occurs in concrete surface or powdery falls off, and ensure that the enough bondings of concrete Power.
The right side of second mounting plate 7 is provided with position dampening mechanism 9, and position dampening mechanism 9 includes fixed link 901, Gu One end of fixed pole 901 is fixedly connected on the right side of the second mounting plate 7, and the top of fixed link 901 is fixedly connected with firm bar 902, The top of firm bar 902 is fixedly connected on the right side of the second mounting plate 7, and the side of 901 bottom of fixed link is fixedly connected with flexible Bar 903, the bottom of telescopic rod 903 are fixedly connected with bottom plate 905, and the outer surface movable sleeve of telescopic rod 903 is connected to the first spring 904, the top of the first spring 904 is fixedly connected on the bottom of fixed link 901, and the bottom of the first spring 904 is fixedly connected on bottom The top of plate 905, the side of 905 bottom of bottom plate are fixedly connected with set square 906, are connected between two set squares 906 Pinch roller 907, by the setting of position dampening mechanism 9, the one end unclamped to film applies certain pressure, film is attached to mixed Coagulate soil surface so that film be bonded with the surface of concrete more closely, ensure that the effect of water lock, avoid coagulation The loss and volatilization of moisture in soil, play the effect of maintenance, meanwhile, overlay film maintenance mechanism 10 can be made to rotate, by film Film on roller unclamps, and facilitates and carries out coating processing to the surface of concrete.
Overlay film maintenance mechanism 10 is provided between two the first mounting plates 1, it includes first bearing that overlay film, which conserves mechanism 10, 1001 and second bearing 1002, first bearing 1001 is embedded in the top of one of them first mounting plate, 1 inside, first bearing 1001 inner ring is fixed to be plugged with the second mounting rod 1002, and the second mounting rod 1002 connects far from one end activity of first bearing 1001 It is connected to motion bar 1003, motion bar 1003 is fixedly attached restraining position ring block 1004, stop collar far from one end of the second mounting rod 1002 1004 sides far from motion bar 1003 are fixedly connected with kelly 1006, and the outer surface movable sleeve of kelly 1006 is connected to casing 1009, the outer surface movable sleeve of kelly 1006 is connected to second spring 1005, and one end of second spring 1005 is fixedly connected on limit Side of the ring 1004 far from motion bar 1003, the other end of second spring 1005 are fixedly connected on one end of casing 1009, pass through On the one hand the setting of second spring 1005 plays fixed effect to casing 1009, avoid falling for casing 1009, simultaneously Under the action of 1005 bounce of second spring, there is certain motive force to casing 1009, so that casing 1009 is socketed in third The outer surface of mounting rod 1007 ensure that the stability and reliability of film roll installation, second bearing 1010 are embedded in another The inner ring fixation at the top of 1 inside of the first mounting plate, second bearing 1010 is plugged with third mounting rod 1007, third mounting rod The middle part at 1007 tops offers card slot 1008, and kelly 1006 is plugged on card slot 1008 far from one end activity of stop collar 1004 Inside, by being used cooperatively for kelly 1006, third mounting rod 1007, card slot 1008 and casing 1009, by casing 1009 to leaning on One end of nearly stop collar 1004 is mobile, so that casing 1009 is separated with third mounting rod 1007, moving up motion bar 1003 makes It obtains kelly 1006 to separate with card slot 1008, film roll can be socketed in the outer surface of motion bar 1003, facilitate film roll Installation and replacement, third mounting rod 1007 are located at the inside of casing 1009, and the setting of mechanism 10 is conserved by overlay film, and people pull The maintenance film covering device is mobile, so that the film in film roll is unclamped in the rotation of overlay film maintenance mechanism 10, so that film is covered on The surface of concrete can be received in water in film after overlay film, prevent the loss of moisture, cause the environment of a Self-curing, keep away After having exempted from concreting molding, the phenomenon that concrete is dehydrated, the enough intensity of concrete ensure that.
Top between two the first mounting plates 1 is fixedly connected with third connecting rod 11, two the first mounting plates 1 and second Bottom between mounting plate 7 is connected with rubber wheel 12, is provided with position guiding mechanism 13 between two the second mounting plates 7, Position guiding mechanism 13 includes there are two 3rd bearing 1303, and two 3rd bearings 1303 are embedded in two the second mounting plates respectively Bottom between 7, interference is connected with guide rod 1302, the outer surface fixing sleeve of guide rod 1302 between two 3rd bearings 1303 It is connected to guide roller 1303, by the setting of position guiding mechanism 13, the effect of guiding is played to the film of release, so that film It preferably is attached to the surface of concrete, while reducing the coefficient of friction in overlay film maintenance 10 rotary course of mechanism, guarantees to cover Film conserves the rotating accuracy of mechanism 10, avoids the occurrence of the stuck phenomenon of film, improves the working efficiency of concrete curing overlay film.
Top between two the second mounting plates 7 is fixedly connected with the 4th connecting rod 14, the summer construction coagulation Soil maintenance film covering device, be particularly suitable in summer construction, concreting molding after keep temperature appropriate and enough Humidity, film roll is mounted in overlay film maintenance mechanism 10, one end of film is bonded around position guiding mechanism 13 by people On the surface of concrete, people pull pull rod 4, drive the maintenance film covering device mobile, so that the rotation of overlay film maintenance mechanism 10 will Film in film roll unclamps, by the compression of position dampening mechanism 9 so that film bond can behind the surface of concrete, overlay film It water is received in the inside of film, avoids in summer, hot climate, when being air-dried, moisture evaporation is too fast, needs every one The disconnected time just needs the problem of carrying out sprinkling maintenance, improves the construction efficiency of concrete curing, ensure that concrete is enough Intensity.
Working principle: one end of casing 1009 to close stop collar 1004 is mobile, so that casing 1009 and third are installed Bar 1007 separates, and moves up motion bar 1003 and kelly 1006 is separated with card slot 1008, film roll can be socketed in work Kelly 1006 is plugged on the inside of card slot 1008 by the outer surface of lever 1003, unclamps casing 1009, anti-in second spring 1005 Under the action of elastic force, there is certain motive force to casing 1009, so that casing 1009 is socketed in the appearance of third mounting rod 1007 Face ensure that the stability and reliability of film roll installation, and the film in film roll is unclamped, by one end of release around guiding Roller 1303 is bonded in the surface of concrete, so that pinch roller 907 is located at the top of film, when in use, people pull pull rod 4, can So that the concrete curing film covering device is mobile, the work of water pump 805 operation by suction hose 806 by the water in water tank 801 into Row absorption, is sprayed from spray head 809 by drainpipe 807 and isocon 808, constantly sprinkles water and support to the surface of concrete Operation is protected, by the compression of one end that pinch roller 907 unclamps film, so that the rotation of motion bar 1003 is loose by the film in film roll It opens, so that film is covered on the surface of concrete.
Control mode of the invention is automatically controlled by controller, the skill that the control circuit of controller passes through this field Art personnel's simple programming can be realized, and the offer of power supply also belongs to the common knowledge of this field, and the present invention is mainly used to protect Mechanical device is protected, so the present invention is not explained control mode and circuit connection.
In conclusion the summer construction concrete curing film covering device, is particularly suitable in summer construction, Temperature appropriate and enough humidity are kept after concreting molding, film roll is mounted on overlay film maintenance mechanism 10 by people On, one end of film is bonded in the surface of concrete around position guiding mechanism 13, people pull pull rod 4, drive the maintenance Film covering device is mobile, so that the film in film roll is unclamped in the rotation of overlay film maintenance mechanism 10, passes through the pressure of position dampening mechanism 9 Tightly make film bond water can be received in the inside of film behind the surface of concrete, overlay film, avoids in summer, weather is scorching Heat, when being air-dried, moisture evaporation is too fast, needs to improve mixed every needing the problem of carrying out sprinkling maintenance once the disconnected time The construction efficiency of solidifying soil maintenance, ensure that the enough intensity of concrete.
By the setting of sprinkling maintenance mechanism 8, the work of water pump 805 operation by suction hose 806 by the water in water tank 801 into Row absorption, is sprayed from spray head 809 by drainpipe 807 and isocon 808, constantly sprinkles water and support to the surface of concrete Operation is protected, is avoided when hot climate, being air-dried, sheet occurs in concrete surface or powdery falls off, and ensure that concrete Enough cohesive forces.
By the setting of position dampening mechanism 9, the one end unclamped to film applies certain pressure, film is attached to mixed Coagulate soil surface so that film be bonded with the surface of concrete more closely, ensure that the effect of water lock, avoid coagulation The loss and volatilization of moisture in soil, play the effect of maintenance, meanwhile, overlay film maintenance mechanism 10 can be made to rotate, by film Film on roller unclamps, and facilitates and carries out coating processing to the surface of concrete.
The setting of mechanism 10 is conserved by overlay film, people pull the maintenance film covering device mobile, so that overlay film conserves mechanism The film in film roll is unclamped in 10 rotations, so that film is covered on the surface of concrete, water can be received in film after overlay film In, the loss of moisture is prevented, the environment of a Self-curing is caused, after avoiding concreting molding, concrete is dehydrated The phenomenon that, it ensure that the enough intensity of concrete.
By the setting of position guiding mechanism 13, the effect of guiding is played to the film of release, so that film is better It is attached to the surface of concrete, while reducing the coefficient of friction in overlay film maintenance 10 rotary course of mechanism, guarantees overlay film maintenance The rotating accuracy of mechanism 10 avoids the occurrence of the stuck phenomenon of film, improves the working efficiency of concrete curing overlay film.
The configuration of the present invention is simple, design are reasonable and easy to operate, solve in summer, hot climate, when being air-dried, often Every needing the problem of carrying out sprinkling maintenance, occupying a large amount of labo r resources, greatly reduce construction efficiency once the disconnected time.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of summer construction concrete curing film covering device, including two the first mounting plates (1), it is characterised in that: The upper and lower ends in the left side of two first mounting plates (1) have been respectively fixedly connected with the first reinforcing bar (2) and the second reinforcing bar (3), first reinforcing bar (2) and the second reinforcing bar (3) are fixedly connected with the side of pull rod (4) one end, and two described first The upper and lower ends on the right side of mounting plate (1) have been respectively fixedly connected with first connecting rod (5) and the second connecting rod (6), and described first One end of connecting rod (5) and the second connecting rod (6) is fixedly connected with the upper and lower ends on the left of the second mounting plate (7), and described first It is provided with sprinkling maintenance mechanism (8) at the top of mounting plate (1) and the second mounting plate (7), is set on the right side of second mounting plate (7) It is equipped with position dampening mechanism (9), overlay film maintenance mechanism (10) is provided between two first mounting plates (1), described in two Top between first mounting plate (1) is fixedly connected with third connecting rod (11), two first mounting plates (1) and the second peace Bottom between loading board (7) is connected with rubber wheel (12), and position guiding is provided between two second mounting plates (7) Mechanism (13), the top between two second mounting plates (7) are fixedly connected with the 4th connecting rod (14).
2. a kind of summer construction concrete curing film covering device according to claim 1, it is characterised in that: described Sprinkling maintenance mechanism (8) includes water tank (801) and water pump (805), and the two sides at water tank (801) both ends are fixedly connected to First mounting rod (802), the bottom of two first mounting rods (802) are respectively fixedly connected in the first mounting plate (1) and The top fixation at the top of two mounting plates (7), the water tank (801) is communicated with filler pipe (803), the filler pipe (803) Screw top is socketed with sealing cover (804), and the side of the water pump (805) is fixedly connected on one of them second mounting plate (7) Left side, fixation is communicated with suction hose (806) at the water suction of the water pump (805), and the top of the suction hose (806) is fixed to be connected Lead to the bottom in water tank (801), the drainage position fixation of the water pump (805) is communicated with drainpipe (807), the drainpipe (807) bottom fixation is communicated with isocon (808), and the two sides of isocon (808) bottom are fixedly connected on two second The middle part fixation at the top of connecting rod (6), isocon (808) bottom is communicated with spray head (809).
3. a kind of summer construction concrete curing film covering device according to claim 2, it is characterised in that: described Position dampening mechanism (9) includes fixed link (901), and one end of the fixed link (901) is fixedly connected on the second mounting plate (7) Right side, be fixedly connected with firm bar (902) at the top of the fixed link (901), the top of the firm bar (902) is fixed to be connected The right side in the second mounting plate (7) is connect, the side of fixed link (901) bottom is fixedly connected with telescopic rod (903), described to stretch The bottom of contracting bar (903) is fixedly connected with bottom plate (905), and the outer surface movable sleeve of the telescopic rod (903) is connected to the first spring (904), the bottom of fixed link (901) is fixedly connected at the top of first spring (904), first spring (904) Bottom is fixedly connected on the top of bottom plate (905), and the side of bottom plate (905) bottom is fixedly connected with set square (906), and two Pinch roller (907) are connected between a set square (906).
4. a kind of summer construction concrete curing film covering device according to claim 3, it is characterised in that: described It includes first bearing (1001) and second bearing (1002) that overlay film, which conserves mechanism (10), and the first bearing (1001) is embedded in The inner ring fixation at the top on the inside of one of them first mounting plate (1), the first bearing (1001) is plugged with the second mounting rod (1002), second mounting rod (1002) is connected with motion bar (1003), institute far from the one end of first bearing (1001) It states motion bar (1003) and is fixedly attached restraining position ring block (1004), the stop collar far from the one end of the second mounting rod (1002) (1004) side far from motion bar (1003) is fixedly connected with kelly (1006), the outer surface movable sleeve of the kelly (1006) It is connected to casing (1009), the outer surface movable sleeve of the kelly (1006) is connected to second spring (1005), the second bearing (1010) it is embedded in the top on the inside of another first mounting plate (1), the inner ring fixation of the second bearing (1010) is plugged with Third mounting rod (1007), the middle part at the top of the third mounting rod (1007) offer card slot (1008), the kelly (1006) one end activity far from stop collar (1004) is plugged on the inside of card slot (1008), third mounting rod (1007) position In the inside of casing (1009).
5. a kind of summer construction concrete curing film covering device according to claim 4, it is characterised in that: described One end of second spring (1005) is fixedly connected on the side of stop collar (1004) far from motion bar (1003), the second spring (1005) the other end is fixedly connected on one end of casing (1009).
6. a kind of summer construction concrete curing film covering device according to claim 5, it is characterised in that: described Position guiding mechanism (13) includes there are two 3rd bearing (1303), and two 3rd bearings (1303) are embedded in two respectively Bottom between second mounting plate (7), interference is connected with guide rod (1302) between two 3rd bearings (1303), described The outer surface fixing sleeve of guide rod (1302) is connected to guide roller (1303).
CN201810822904.0A 2018-07-25 2018-07-25 Concrete curing and film covering device for summer building construction Active CN108979179B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810822904.0A CN108979179B (en) 2018-07-25 2018-07-25 Concrete curing and film covering device for summer building construction
CN202010494547.7A CN111608405B (en) 2018-07-25 2018-07-25 Concrete curing and film covering device for summer building construction and using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810822904.0A CN108979179B (en) 2018-07-25 2018-07-25 Concrete curing and film covering device for summer building construction

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202010494547.7A Division CN111608405B (en) 2018-07-25 2018-07-25 Concrete curing and film covering device for summer building construction and using method

Publications (2)

Publication Number Publication Date
CN108979179A true CN108979179A (en) 2018-12-11
CN108979179B CN108979179B (en) 2020-08-04

Family

ID=64550341

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202010494547.7A Active CN111608405B (en) 2018-07-25 2018-07-25 Concrete curing and film covering device for summer building construction and using method
CN201810822904.0A Active CN108979179B (en) 2018-07-25 2018-07-25 Concrete curing and film covering device for summer building construction

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202010494547.7A Active CN111608405B (en) 2018-07-25 2018-07-25 Concrete curing and film covering device for summer building construction and using method

Country Status (1)

Country Link
CN (2) CN111608405B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080544A (en) * 2019-05-07 2019-08-02 河北建设集团股份有限公司 A kind of construction concrete curing film covering device
CN110258233A (en) * 2019-06-27 2019-09-20 倡创(上海)咨询管理事务所 The construction method of concrete road surface
CN112726340A (en) * 2020-12-29 2021-04-30 刘淑艳 Highway surface concrete layer leveling equipment and method for avoiding maintenance film from curling
CN112761370A (en) * 2020-12-13 2021-05-07 芜湖小白葱信息科技有限公司 Laminating machine for maintaining cast-in-place concrete wall surface
CN112976267A (en) * 2019-12-17 2021-06-18 上海三航奔腾海洋工程有限公司 Constant temperature and humidity concrete maintenance device

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113026645A (en) * 2021-03-29 2021-06-25 标龙建设集团有限公司 Dust settling equipment for civil engineering and maintenance method
CN112982110A (en) * 2021-04-30 2021-06-18 河南城建学院 Curing means is used in road bridge concrete construction
CN113668342B (en) * 2021-07-28 2022-09-13 丁海霞 Construction is with having concrete tectorial membrane device who smooths function
CN114478062B (en) * 2022-02-28 2023-06-23 南昌工程学院 Maintenance device for hydraulic engineering construction concrete

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100485925B1 (en) * 2004-11-02 2005-04-29 주식회사 천일건축엔지니어링 종합건축사사무소 Apparatus for curing and covering apartment house slab-floor concrete
CN104594632A (en) * 2015-01-13 2015-05-06 金陵科技学院 Concrete curing trolley
CN204940871U (en) * 2015-09-09 2016-01-06 武汉科技大学 A kind of film sticking apparatus for the maintenance of concrete insulated column
CN205577448U (en) * 2016-05-11 2016-09-14 林其乐 Concrete construction roll extrusion and curing means
CN206101128U (en) * 2016-09-29 2017-04-19 内蒙古华颐乐牧业科技有限公司 Plastic film laying device
CN107724211A (en) * 2017-10-12 2018-02-23 无锡凹凸自动化科技有限公司 A kind of vibrated roller sprinkler system
CN207063556U (en) * 2017-07-04 2018-03-02 中国建筑第二工程局有限公司 Simple film lays instrument

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08291628A (en) * 1995-04-21 1996-11-05 Fujita Corp Curing device for screening
AU2000271137A1 (en) * 2000-03-21 2001-10-03 3M Innovative Properties Company Flame-sprayer for spraying curbs
CN103203863B (en) * 2013-04-19 2015-02-18 西南石油大学 Plastic cloth winding device applicable to seabed pipeline counter weight
CN204369196U (en) * 2014-12-16 2015-06-03 重庆谢氏胶粘制品有限公司 A kind of spray coating shielding membrane processing unit (plant) plastic sheeting reel installing mechanism
CN205955047U (en) * 2016-08-16 2017-02-15 北京大运伟业防水工程有限公司 Waterproofing membrane laying device
CN206438781U (en) * 2017-01-17 2017-08-25 内蒙古路桥工程技术检测有限责任公司 A kind of concrete curing device
CN206956706U (en) * 2017-04-21 2018-02-02 中国电建集团华东勘测设计研究院有限公司 Underwater laminating machine
CN107724216B (en) * 2017-10-17 2019-10-08 绍兴市梓昂新材料有限公司 A kind of concrete road curing means

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100485925B1 (en) * 2004-11-02 2005-04-29 주식회사 천일건축엔지니어링 종합건축사사무소 Apparatus for curing and covering apartment house slab-floor concrete
CN104594632A (en) * 2015-01-13 2015-05-06 金陵科技学院 Concrete curing trolley
CN204940871U (en) * 2015-09-09 2016-01-06 武汉科技大学 A kind of film sticking apparatus for the maintenance of concrete insulated column
CN205577448U (en) * 2016-05-11 2016-09-14 林其乐 Concrete construction roll extrusion and curing means
CN206101128U (en) * 2016-09-29 2017-04-19 内蒙古华颐乐牧业科技有限公司 Plastic film laying device
CN207063556U (en) * 2017-07-04 2018-03-02 中国建筑第二工程局有限公司 Simple film lays instrument
CN107724211A (en) * 2017-10-12 2018-02-23 无锡凹凸自动化科技有限公司 A kind of vibrated roller sprinkler system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080544A (en) * 2019-05-07 2019-08-02 河北建设集团股份有限公司 A kind of construction concrete curing film covering device
CN110080544B (en) * 2019-05-07 2021-05-25 河北建设集团股份有限公司 Concrete maintenance tectorial membrane device for construction
CN110258233A (en) * 2019-06-27 2019-09-20 倡创(上海)咨询管理事务所 The construction method of concrete road surface
CN112976267A (en) * 2019-12-17 2021-06-18 上海三航奔腾海洋工程有限公司 Constant temperature and humidity concrete maintenance device
CN112761370A (en) * 2020-12-13 2021-05-07 芜湖小白葱信息科技有限公司 Laminating machine for maintaining cast-in-place concrete wall surface
CN112726340A (en) * 2020-12-29 2021-04-30 刘淑艳 Highway surface concrete layer leveling equipment and method for avoiding maintenance film from curling

Also Published As

Publication number Publication date
CN111608405A (en) 2020-09-01
CN108979179B (en) 2020-08-04
CN111608405B (en) 2021-09-10

Similar Documents

Publication Publication Date Title
CN108979179A (en) A kind of summer construction concrete curing film covering device
CN110080544A (en) A kind of construction concrete curing film covering device
CN106000737B (en) A kind of mechanism being adjustable elevation angle of spray nozzle and the irrigation rig with the mechanism
CN107724216B (en) A kind of concrete road curing means
CN204385675U (en) A kind of dedusting cooling system of adjustable control spraying altitude
CN107889732A (en) A kind of rotary garden mist sprayer and preparation method thereof
CN106493015A (en) A kind of intelligent spray equipment
CN108496759A (en) road green belt watering device
CN215825566U (en) Prefabricated stand of bridge sprays maintenance structure
CN207003351U (en) A kind of engineering watering implement
CN106272928A (en) A kind of automatic maintenance device to building concrete
CN207169319U (en) A kind of dust from construction sites controlling device
CN207206708U (en) Mining under railways spray maintenance device
CN207954707U (en) A kind of composite material electric pole surface sand sifter
CN207974076U (en) A kind of construction dust-extraction unit
CN205912605U (en) Highway flower bed water spraying equipment
CN206566660U (en) Intelligent climbing frame spraying and dust-removing system
CN217232765U (en) Concrete maintenance device for construction
CN204126276U (en) Wall of High-building structure automatic spray curing system
CN107651978A (en) A kind of concrete curing device
CN214758118U (en) Green wall structure for municipal works
CN218574011U (en) Angle stroke electric actuator produces paint spraying apparatus
CN212660706U (en) Plant is planted and is used PVC pipe support structure
CN218715321U (en) Movable automatic spraying machine
CN214143201U (en) Curing means is used in concrete construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200709

Address after: 341000 Jinling Road, industrial park, Ganzhou economic and Technological Development Zone, Ganzhou City, Jiangxi Province

Applicant after: JIANGXI LONGZHENG TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 211800 Nanjing University of Technology, Nanjing, Pukou, Jiangsu Province, 30 Zhujiang South Road

Applicant before: Zhang Hai

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230506

Address after: Room 304, Office Building, Xiyu Road North (East Side), Ganzhou Economic and Technological Development Zone, Ganzhou City, Jiangxi Province, 341000

Patentee after: Jiangxi youlinsheng Construction Engineering Co.,Ltd.

Address before: 341000 Jinling Road, industrial park, Ganzhou economic and Technological Development Zone, Ganzhou City, Jiangxi Province

Patentee before: JIANGXI LONGZHENG TECHNOLOGY DEVELOPMENT Co.,Ltd.

TR01 Transfer of patent right