A kind of summer construction concrete curing film covering device
Technical field
The present invention relates to technical field of building construction more particularly to a kind of summer construction concrete curing overlay film to fill
It sets.
Background technique
In construction, after casting and compacting of concrete, why hardening can be gradually condensed, be primarily due to cement aquation
As a result, and hydration then needs temperature and humidity condition appropriate, therefore in order to guarantee that concrete has suitable hardening item
Part increases its intensity constantly, it is necessary to conserve to concrete.
After concrete casting, in summer, hot climate when being air-dried, is such as conserved, concrete water branch not in time
Evaporate it is too fast, formed dehydrating phenomena, the cement granules for having formed gelinite can be prevented from abundant aquation, cannot be converted into stable
Crystallization, lacks enough cohesive forces, to sheet can occur in concrete surface or powdery falls off, in addition, concrete not yet
When having enough intensity, the premature evaporation of moisture can also generate biggish contraction distortion, cup shake occur, so in coagulation
After native pouring molding, it is necessary to keep temperature appropriate and enough humidity within a certain period of time, traditional maintenance process is substantially
It is maintenance work to be carried out by watering, but in summer, hot climate when being air-dried, needs to carry out every once the disconnected time
Sprinkling maintenance occupies a large amount of labo r resources, greatly reduces construction efficiency, for this purpose, we have proposed a kind of buildings of summer to apply
Work concrete curing film covering device.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of summer construction concrete curing film covering device,
Have the advantages of overlay film water lock, solve in summer, hot climate, when being air-dried, is spilt every once the disconnected time
The problem of water curing occupies a large amount of labo r resources, greatly reduces construction efficiency.
(2) technical solution
To realize above-mentioned technical problem, the present invention provides such a summer construction concrete curing overlay films to fill
It sets, including two the first mounting plates, the upper and lower ends in the left side of two first mounting plates have been respectively fixedly connected with first and have added
Solid rod and the second reinforcing bar, first reinforcing bar and the second reinforcing bar are fixedly connected with the side of pull rod one end, described in two
The upper and lower ends on the right side of the first mounting plate have been respectively fixedly connected with first connecting rod and the second connecting rod, the first connecting rod
It is fixedly connected with one end of the second connecting rod with the upper and lower ends on the left of the second mounting plate, first mounting plate and the second installation
It is provided with sprinkling maintenance mechanism at the top of plate, is provided with position dampening mechanism on the right side of second mounting plate, two described
Overlay film maintenance mechanism is provided between one mounting plate, the top between two first mounting plates is fixedly connected with third connection
Bar, the bottom between two first mounting plates and the second mounting plate are connected with rubber wheel, two second installations
Position guiding mechanism is provided between plate, the top between two second mounting plates is fixedly connected with the 4th connecting rod.
Further, the sprinkling maintenance mechanism includes water tank and water pump, and the two sides at the water tank both ends are fixed to be connected
It is connected to the first mounting rod, the bottom of two first mounting rods is respectively fixedly connected in the first mounting plate and the second mounting plate
The top fixation at top, the water tank is communicated with filler pipe, and the screw top of the filler pipe is socketed with sealing cover, the water pump
Side be fixedly connected on the left side of one of them the second mounting plate, fixation is communicated with suction hose at the water suction of the water pump, institute
The fixed connection in top of suction hose is stated in the bottom of water tank, the drainage position fixation of the water pump is communicated with drainpipe, the draining
The bottom of pipe is fixed to be communicated with isocon, and the two sides for shunting bottom of the tube are fixedly connected on the top of two the second connecting rods,
The middle part fixation for shunting bottom of the tube is communicated with spray head.
Further, the position dampening mechanism includes fixed link, and one end of the fixed link is fixedly connected on second
The right side of mounting plate is fixedly connected with firm bar at the top of the fixed link, is fixedly connected on second at the top of the firm bar
The right side of mounting plate, the side of the bottom of fixed are fixedly connected with telescopic rod, and the bottom of the telescopic rod is fixedly connected with
Bottom plate, the outer surface movable sleeve of the telescopic rod are connected to the first spring, are fixedly connected on fixed link at the top of first spring
Bottom, the bottom of first spring is fixedly connected on the top of bottom plate, and the side of the bottom base plate is fixedly connected with three
Gusset is connected with pinch roller between two set squares.
Further, overlay film maintenance mechanism includes first bearing and second bearing, and the first bearing is embedded in
Top on the inside of one of them first mounting plate, the inner ring of the first bearing, which is fixed, is plugged with the second mounting rod, and described second
Mounting rod is connected with motion bar, one end fixing sleeve of the motion bar far from the second mounting rod far from one end of first bearing
It is connected to stop collar, the stop collar is fixedly connected with kelly, the outer surface pivot bush unit of the kelly far from the side of motion bar
There is casing, the outer surface movable sleeve of the kelly is connected to second spring, and the second bearing is embedded in another the first mounting plate
The inner ring fixation at the top of inside, the second bearing is plugged with third mounting rod, and the middle part at the top of the third mounting rod is opened
Equipped with card slot, the kelly is plugged on the inside of card slot far from one end activity of stop collar, and the third mounting rod is located at casing
Inside.
Further, one end of the second spring is fixedly connected on side of the stop collar far from motion bar, and described second
The other end of spring is fixedly connected on one end of casing.
Further, the position guiding mechanism includes there are two 3rd bearing, and two 3rd bearings are inlayed respectively
Bottom between two the second mounting plates, interference is connected with guide rod between two 3rd bearings, the guide rod
Outer surface fixing sleeve is connected to guide roller.
(3) beneficial effect
The present invention provides a kind of summer construction concrete curing film covering devices, have following
The utility model has the advantages that
1, the summer construction concrete curing film covering device, is particularly suitable in summer construction, concrete
Temperature appropriate and enough humidity are kept after pouring molding, film roll is mounted in overlay film maintenance mechanism by people, by film
One end be bonded in the surface of concrete around position guiding mechanism, people pull pull rod, drive the maintenance film covering device mobile,
So that the film in film roll is unclamped in the rotation of overlay film maintenance mechanism, by the compression of position dampening mechanism so that film bond exists
The surface of concrete can be received in water the inside of film after overlay film, avoid in summer, hot climate, when being air-dried, water
Divide evaporation too fast, needs to improve the construction effect of concrete curing every needing the problem of carrying out sprinkling maintenance once the disconnected time
Rate ensure that the enough intensity of concrete.
2, the summer construction concrete curing film covering device, passes through the setting of sprinkling maintenance mechanism, pump working
Operation is adsorbed the water in water tank by suction hose, is sprayed from spray head by drainpipe and isocon, to concrete
Surface, which is constantly sprinkled water, carries out maintenance work, avoids when hot climate, being air-dried, sheet or powder occurs in concrete surface
Shape falls off, and ensure that the enough cohesive forces of concrete.
3, the summer construction concrete curing film covering device is beaten by being used cooperatively for filler pipe and sealing cover
Sealing cover is opened, people can add water to the inside of water tank by filler pipe, facilitate the addition of curing water inside water tank, tighten
Sealing cover ensure that the leakproofness of water tank, avoid the maintenance film covering device when moving, the curing water inside water tank flies everywhere
It splashes, causes the waste of water resource.
4, the summer construction concrete curing film covering device plays curing water and is put by the setting of water tank
The effect set, facilitates constantly to sprinkle water to the surface of concrete and carries out maintenance work, while the weight of water tank applies rubber wheel
Add certain pressure, so that mobile rubber wheel plays levelling effect to the surface of concrete, improves practicability.
5, the summer construction concrete curing film covering device, the setting of mechanism is conserved by overlay film, and people pull
The maintenance film covering device is mobile so that the film in film roll is unclamped in the rotation of overlay film maintenance mechanism so that film be covered on it is mixed
The surface of soil is coagulated, water can be received in film after overlay film, be prevented the loss of moisture, cause the environment of a Self-curing, avoid
After concreting molding, the phenomenon that concrete is dehydrated, the enough intensity of concrete ensure that.
6, the summer construction concrete curing film covering device, passes through kelly, third mounting rod, card slot and casing
It is used cooperatively, by casing to close to the movement of one end of stop collar, so that casing is separated with third mounting rod, moves up motion bar
So that film roll, can be socketed in the outer surface of motion bar, facilitate the installation and replacement of film roll by kelly and exact separation.
7, summer construction concrete curing film covering device, by the setting of second spring, on the one hand to casing
Fixed effect is played, falling for casing is avoided, while under the action of second spring bounce, being had to casing certain
Motive force ensure that the stability and reliability of film roll installation so that casing is socketed in the outer surface of third mounting rod.
8, summer construction concrete curing film covering device, by the setting of position dampening mechanism, to film pine
The one end opened applies certain pressure, and film is attached to the surface of concrete, so that film was bonded with the surface of concrete
It is more close, it ensure that the effect of water lock, avoid the loss and volatilization of moisture in concrete, play the effect of maintenance,
Meanwhile the rotation of overlay film maintenance mechanism can be made, the film in film roll is unclamped, facilitates and the surface of concrete is covered
Film process.
9, summer construction concrete curing film covering device, by the setting of position guiding mechanism, to release
Film plays the effect of guiding, so that film is preferably attached to the surface of concrete, while reducing overlay film maintenance mechanism
Coefficient of friction in rotary course guarantees the rotating accuracy of overlay film maintenance mechanism, avoids the occurrence of the stuck phenomenon of film, improve
The working efficiency of concrete curing overlay film.
Detailed description of the invention
Fig. 1 is structure of the invention side view;
Fig. 2 is structure of the invention rearview;
Fig. 3 is the first mounting plates structure rearview of the invention;
Fig. 4 is the second mounting plates structure rearview of the invention;
Fig. 5 is partial enlarged view at the A of Fig. 3 of the present invention.
In figure: 1 first mounting plate, 2 first reinforcing bars, 3 second reinforcing bars, 4 pull rods, 5 first connecting rods, 6 second connections
Bar, 7 second mounting plates, 8 sprinkling maintenance mechanisms, 801 water tanks, 802 first mounting rods, 803 filler pipes, 804 sealing covers, 805 water
Pump, 806 suction hoses, 807 drainpipes, 808 isocons, 809 spray heads, 9 position dampening mechanisms, 901 fixed links, 902 firm bars,
903 telescopic rods, 904 first springs, 905 bottom plates, 906 set squares, 907 pinch rollers, 10 overlay films maintenance mechanism, 1001 first bearings,
1002 second mounting rods, 1003 motion bars, 1004 stop collars, 1005 second springs, 1006 kellies, 1007 third mounting rods,
1008 card slots, 1009 casings, 1010 second bearings, 11 third connecting rods, 12 rubber wheels, 13 position guiding mechanisms, 1301 thirds
Bearing, 1302 guide rods, 1303 guide rollers, 14 the 4th connecting rods.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-5, a kind of summer construction concrete curing film covering device, including two the first mounting plates 1 are please referred to,
The upper and lower ends in the left side of two the first mounting plates 1 have been respectively fixedly connected with the first reinforcing bar 2 and the second reinforcing bar 3, and first adds
Solid rod 2 and the second reinforcing bar 3 are fixedly connected with the side of 4 one end of pull rod, the upper and lower ends point on the right side of two the first mounting plates 1
It is not fixedly connected with first connecting rod 5 and the second connecting rod 6, one end and the second installation of first connecting rod 5 and the second connecting rod 6
The upper and lower ends in 7 left side of plate are fixedly connected, and the top of the first mounting plate 1 and the second mounting plate 7 is provided with sprinkling maintenance mechanism 8,
Sprinkling maintenance mechanism 8 includes that water tank 801 and water pump 805 by the setting of water tank 801 play the effect of placement to curing water
Fruit, facilitates constantly to sprinkle water to the surface of concrete and carries out maintenance work, while the weight of water tank 801 applies rubber wheel 12
Certain pressure improves practicability, water tank so that mobile rubber wheel 12 plays levelling effect to the surface of concrete
The two sides at 801 both ends are fixedly connected to the first mounting rod 802, and the bottom of two the first mounting rods 802 is respectively fixedly connected with
The top fixation at the top of the first mounting plate 1 and the second mounting plate 7, water tank 801 is communicated with filler pipe 803, the top of filler pipe 803
Portion's screw thread is socketed with sealing cover 804, by being used cooperatively for filler pipe 803 and sealing cover 804, opens sealing cover 804, Ren Menke
To add water to the inside of water tank 801 by filler pipe 803, the addition of 801 inside curing water of water tank is facilitated, sealing cover is tightened
804, it ensure that the leakproofness of water tank 801, avoid the maintenance film covering device when moving, the curing water four inside water tank 801
Place splashes, and causes the waste of water resource, the side of water pump 805 is fixedly connected on the left side of one of them the second mounting plate 7, water pump
Fixed at 805 water suction to be communicated with suction hose 806, the fixed connection in the top of suction hose 806 is in the bottom of water tank 801, water pump 805
Drainage position it is fixed be communicated with drainpipe 807, the bottom fixation of drainpipe 807 is communicated with isocon 808,808 bottom of isocon
Two sides be fixedly connected on the tops of two the second connecting rods 6, the middle part fixation of 808 bottom of isocon is communicated with spray head 809, leads to
The setting of sprinkling maintenance mechanism 8 is crossed, the water in water tank 801 is adsorbed by suction hose 806, led to by the work operation of water pump 805
It crosses drainpipe 807 and isocon 808 is sprayed from spray head 809, constantly sprinkle water to the surface of concrete and carry out maintenance work, keep away
Exempt from when hot climate, being air-dried, sheet occurs in concrete surface or powdery falls off, and ensure that the enough bondings of concrete
Power.
The right side of second mounting plate 7 is provided with position dampening mechanism 9, and position dampening mechanism 9 includes fixed link 901, Gu
One end of fixed pole 901 is fixedly connected on the right side of the second mounting plate 7, and the top of fixed link 901 is fixedly connected with firm bar 902,
The top of firm bar 902 is fixedly connected on the right side of the second mounting plate 7, and the side of 901 bottom of fixed link is fixedly connected with flexible
Bar 903, the bottom of telescopic rod 903 are fixedly connected with bottom plate 905, and the outer surface movable sleeve of telescopic rod 903 is connected to the first spring
904, the top of the first spring 904 is fixedly connected on the bottom of fixed link 901, and the bottom of the first spring 904 is fixedly connected on bottom
The top of plate 905, the side of 905 bottom of bottom plate are fixedly connected with set square 906, are connected between two set squares 906
Pinch roller 907, by the setting of position dampening mechanism 9, the one end unclamped to film applies certain pressure, film is attached to mixed
Coagulate soil surface so that film be bonded with the surface of concrete more closely, ensure that the effect of water lock, avoid coagulation
The loss and volatilization of moisture in soil, play the effect of maintenance, meanwhile, overlay film maintenance mechanism 10 can be made to rotate, by film
Film on roller unclamps, and facilitates and carries out coating processing to the surface of concrete.
Overlay film maintenance mechanism 10 is provided between two the first mounting plates 1, it includes first bearing that overlay film, which conserves mechanism 10,
1001 and second bearing 1002, first bearing 1001 is embedded in the top of one of them first mounting plate, 1 inside, first bearing
1001 inner ring is fixed to be plugged with the second mounting rod 1002, and the second mounting rod 1002 connects far from one end activity of first bearing 1001
It is connected to motion bar 1003, motion bar 1003 is fixedly attached restraining position ring block 1004, stop collar far from one end of the second mounting rod 1002
1004 sides far from motion bar 1003 are fixedly connected with kelly 1006, and the outer surface movable sleeve of kelly 1006 is connected to casing
1009, the outer surface movable sleeve of kelly 1006 is connected to second spring 1005, and one end of second spring 1005 is fixedly connected on limit
Side of the ring 1004 far from motion bar 1003, the other end of second spring 1005 are fixedly connected on one end of casing 1009, pass through
On the one hand the setting of second spring 1005 plays fixed effect to casing 1009, avoid falling for casing 1009, simultaneously
Under the action of 1005 bounce of second spring, there is certain motive force to casing 1009, so that casing 1009 is socketed in third
The outer surface of mounting rod 1007 ensure that the stability and reliability of film roll installation, second bearing 1010 are embedded in another
The inner ring fixation at the top of 1 inside of the first mounting plate, second bearing 1010 is plugged with third mounting rod 1007, third mounting rod
The middle part at 1007 tops offers card slot 1008, and kelly 1006 is plugged on card slot 1008 far from one end activity of stop collar 1004
Inside, by being used cooperatively for kelly 1006, third mounting rod 1007, card slot 1008 and casing 1009, by casing 1009 to leaning on
One end of nearly stop collar 1004 is mobile, so that casing 1009 is separated with third mounting rod 1007, moving up motion bar 1003 makes
It obtains kelly 1006 to separate with card slot 1008, film roll can be socketed in the outer surface of motion bar 1003, facilitate film roll
Installation and replacement, third mounting rod 1007 are located at the inside of casing 1009, and the setting of mechanism 10 is conserved by overlay film, and people pull
The maintenance film covering device is mobile, so that the film in film roll is unclamped in the rotation of overlay film maintenance mechanism 10, so that film is covered on
The surface of concrete can be received in water in film after overlay film, prevent the loss of moisture, cause the environment of a Self-curing, keep away
After having exempted from concreting molding, the phenomenon that concrete is dehydrated, the enough intensity of concrete ensure that.
Top between two the first mounting plates 1 is fixedly connected with third connecting rod 11, two the first mounting plates 1 and second
Bottom between mounting plate 7 is connected with rubber wheel 12, is provided with position guiding mechanism 13 between two the second mounting plates 7,
Position guiding mechanism 13 includes there are two 3rd bearing 1303, and two 3rd bearings 1303 are embedded in two the second mounting plates respectively
Bottom between 7, interference is connected with guide rod 1302, the outer surface fixing sleeve of guide rod 1302 between two 3rd bearings 1303
It is connected to guide roller 1303, by the setting of position guiding mechanism 13, the effect of guiding is played to the film of release, so that film
It preferably is attached to the surface of concrete, while reducing the coefficient of friction in overlay film maintenance 10 rotary course of mechanism, guarantees to cover
Film conserves the rotating accuracy of mechanism 10, avoids the occurrence of the stuck phenomenon of film, improves the working efficiency of concrete curing overlay film.
Top between two the second mounting plates 7 is fixedly connected with the 4th connecting rod 14, the summer construction coagulation
Soil maintenance film covering device, be particularly suitable in summer construction, concreting molding after keep temperature appropriate and enough
Humidity, film roll is mounted in overlay film maintenance mechanism 10, one end of film is bonded around position guiding mechanism 13 by people
On the surface of concrete, people pull pull rod 4, drive the maintenance film covering device mobile, so that the rotation of overlay film maintenance mechanism 10 will
Film in film roll unclamps, by the compression of position dampening mechanism 9 so that film bond can behind the surface of concrete, overlay film
It water is received in the inside of film, avoids in summer, hot climate, when being air-dried, moisture evaporation is too fast, needs every one
The disconnected time just needs the problem of carrying out sprinkling maintenance, improves the construction efficiency of concrete curing, ensure that concrete is enough
Intensity.
Working principle: one end of casing 1009 to close stop collar 1004 is mobile, so that casing 1009 and third are installed
Bar 1007 separates, and moves up motion bar 1003 and kelly 1006 is separated with card slot 1008, film roll can be socketed in work
Kelly 1006 is plugged on the inside of card slot 1008 by the outer surface of lever 1003, unclamps casing 1009, anti-in second spring 1005
Under the action of elastic force, there is certain motive force to casing 1009, so that casing 1009 is socketed in the appearance of third mounting rod 1007
Face ensure that the stability and reliability of film roll installation, and the film in film roll is unclamped, by one end of release around guiding
Roller 1303 is bonded in the surface of concrete, so that pinch roller 907 is located at the top of film, when in use, people pull pull rod 4, can
So that the concrete curing film covering device is mobile, the work of water pump 805 operation by suction hose 806 by the water in water tank 801 into
Row absorption, is sprayed from spray head 809 by drainpipe 807 and isocon 808, constantly sprinkles water and support to the surface of concrete
Operation is protected, by the compression of one end that pinch roller 907 unclamps film, so that the rotation of motion bar 1003 is loose by the film in film roll
It opens, so that film is covered on the surface of concrete.
Control mode of the invention is automatically controlled by controller, the skill that the control circuit of controller passes through this field
Art personnel's simple programming can be realized, and the offer of power supply also belongs to the common knowledge of this field, and the present invention is mainly used to protect
Mechanical device is protected, so the present invention is not explained control mode and circuit connection.
In conclusion the summer construction concrete curing film covering device, is particularly suitable in summer construction,
Temperature appropriate and enough humidity are kept after concreting molding, film roll is mounted on overlay film maintenance mechanism 10 by people
On, one end of film is bonded in the surface of concrete around position guiding mechanism 13, people pull pull rod 4, drive the maintenance
Film covering device is mobile, so that the film in film roll is unclamped in the rotation of overlay film maintenance mechanism 10, passes through the pressure of position dampening mechanism 9
Tightly make film bond water can be received in the inside of film behind the surface of concrete, overlay film, avoids in summer, weather is scorching
Heat, when being air-dried, moisture evaporation is too fast, needs to improve mixed every needing the problem of carrying out sprinkling maintenance once the disconnected time
The construction efficiency of solidifying soil maintenance, ensure that the enough intensity of concrete.
By the setting of sprinkling maintenance mechanism 8, the work of water pump 805 operation by suction hose 806 by the water in water tank 801 into
Row absorption, is sprayed from spray head 809 by drainpipe 807 and isocon 808, constantly sprinkles water and support to the surface of concrete
Operation is protected, is avoided when hot climate, being air-dried, sheet occurs in concrete surface or powdery falls off, and ensure that concrete
Enough cohesive forces.
By the setting of position dampening mechanism 9, the one end unclamped to film applies certain pressure, film is attached to mixed
Coagulate soil surface so that film be bonded with the surface of concrete more closely, ensure that the effect of water lock, avoid coagulation
The loss and volatilization of moisture in soil, play the effect of maintenance, meanwhile, overlay film maintenance mechanism 10 can be made to rotate, by film
Film on roller unclamps, and facilitates and carries out coating processing to the surface of concrete.
The setting of mechanism 10 is conserved by overlay film, people pull the maintenance film covering device mobile, so that overlay film conserves mechanism
The film in film roll is unclamped in 10 rotations, so that film is covered on the surface of concrete, water can be received in film after overlay film
In, the loss of moisture is prevented, the environment of a Self-curing is caused, after avoiding concreting molding, concrete is dehydrated
The phenomenon that, it ensure that the enough intensity of concrete.
By the setting of position guiding mechanism 13, the effect of guiding is played to the film of release, so that film is better
It is attached to the surface of concrete, while reducing the coefficient of friction in overlay film maintenance 10 rotary course of mechanism, guarantees overlay film maintenance
The rotating accuracy of mechanism 10 avoids the occurrence of the stuck phenomenon of film, improves the working efficiency of concrete curing overlay film.
The configuration of the present invention is simple, design are reasonable and easy to operate, solve in summer, hot climate, when being air-dried, often
Every needing the problem of carrying out sprinkling maintenance, occupying a large amount of labo r resources, greatly reduce construction efficiency once the disconnected time.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.