CN108952772A - More voussoir tunnels steelframe - Google Patents

More voussoir tunnels steelframe Download PDF

Info

Publication number
CN108952772A
CN108952772A CN201811005521.0A CN201811005521A CN108952772A CN 108952772 A CN108952772 A CN 108952772A CN 201811005521 A CN201811005521 A CN 201811005521A CN 108952772 A CN108952772 A CN 108952772A
Authority
CN
China
Prior art keywords
steel column
voussoir
steelframe
vault
lateral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811005521.0A
Other languages
Chinese (zh)
Inventor
张延年
马恕君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201811005521.0A priority Critical patent/CN108952772A/en
Publication of CN108952772A publication Critical patent/CN108952772A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E21D11/183Supporting means for arch members, not provided for in E21D11/22

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention belongs to tunnel reinforcement technical field, in particular to a kind of more voussoir tunnels steelframe.Including oblique short steel column, voussoir, lateral steel column, bottom support bracket, sustained release pad, backing plate, prepared screw-bolt hole, connection sleeve, vault steel column;Voussoir includes tip threaded portion and ring pads, and bottom support bracket includes precast base part and reserves cast-in-place position.The present invention intends to solve the problems, such as that narrow-bore tunnel supporting vault is givey, profile steel frame is overcome to lead to the defect for being readily bent or surrendering vulnerable to concentration of local load or Eccentric Load.Reserve multiple voussoir positions, multiple voussoirs are set, previous voussoir number deficiency bring steelframe and country rock connectivity problem are avoided, connectivity problem between traditional voussoir and steelframe is improved, increases sustained release pad with ground connected component, absorb small deformation stress, using light high steel column, weaken steelframe effect of weight, size economy, can prefabrication, be functional more comprehensive steelframe.

Description

More voussoir tunnels steelframe
Technical field
The invention belongs to tunnel reinforcement technical field, in particular to a kind of more voussoir tunnels steelframe.
Background technique
China is the country on mountain more than one, and southwest 80% is mountainous region, accounts for about the 30% of national mountainous region area.This piece soil It lives on the ground a national more than 20, the city of more than 100,000,000 people, subway, highway, railway are the main traffic modes of people's trip.It is existing The valuable source of country is had become in, road, for promoting national economy to increase, improving people's living standard, maintenance country peace Congruence all has important value.The development of road is not only the composition portion of economic needs and human civilization and modernization Point.And there is vital effect in tunnel as the important node in road.It is obtained in the construction of tunnel construction in recent years Rapid development.Qinling Zhongnanshan Mountain vcehicular tunnel, single long 18.02km in hole, double hole one-way traffics, the construction scale world One, China highway tunnel most.The Xiamen tunnel Xiang An is China's Mainland First big cross section seabed tunnel, to China's tunnel construction The progress and development of technology, diminution and world-class gap, play the role of landmark.At present in the port pearl built Tunnel segment in Australia's bridge spanning the sea also represents the forefront of tunnel development.
The supporting of subterranean tunnel has preliminary bracing and later period supporting.Just branch is generally in preliminary bracing, is exactly just to have excavated to adopt Some support patterns, for example with regard to simple anchor pole suspended net shotcrete supporting when wall rock condition, wall rock condition difference words are just used Section-steel support, then spray anchor.Later period supporting is called secondary lining, and it is exactly with lining trolley casting concrete that referred to as two, which serve as a contrast,.It is small disconnected In excavation and support processes, constructor is always easy to ignore geological conditions in face tunnel, it is believed that tunnel diameter of section is small, country rock after excavation From arching, country rock can be within the scope of self-supporting, so can hardly meet voussoir on steelframe under normal circumstances when supporting construction and be more than 5, the steelframe of narrow-bore tunnel is supported always to be easy to happen axial bias, premature surrender as a result,;It is bonded between steelframe and country rock It is not close, due to excavate country rock surface be not it is smooth, be easy to happen stress raisers phenomenon at the position contacted with steelframe, increase The big probability of steelframe damage and excessive possibility is lost, cannot function as permanent support, increase the cost of tunnel construction, need two Except secondary excavation construction, the environmental protection concept of tunnel construction has also been violated.
It is connected not closely in short, previous narrow-bore tunnel is always likely to encounter between component and component in Bracing Process;Component It is not bonded between country rock, the problems such as steelframe bottom easily occurs to country rock Slideslip.
Summary of the invention
For the technical problem more than solving, the present invention develops a kind of more wedges for the above-mentioned existing deficiency there are technology Block tunnel steelframe can improve profile steel frame vulnerable to local collection for solving the problems, such as that narrow-bore tunnel supporting vault is givey Middle load and Eccentric Load lead to the defect for being readily bent or surrendering, and connectivity problem between traditional voussoir and steelframe are improved, with ground Base connected component increases sustained release pad, absorbs small deformation stress, using light high steel column, weakens steelframe effect of weight, is a kind of function It can the more comprehensive steelframe of property.
The technical solution adopted by the present invention:
A kind of more voussoir tunnels steelframe, including tiltedly short steel column, voussoir, lateral steel column, bottom support bracket, sustained release pad, backing plate, reserved spiral shell Keyhole, connection sleeve and vault steel column;Wherein voussoir includes tip threaded portion, ring pads;Bottom support bracket includes precast base portion Divide and reserve cast-in-place position;
Backing plate is embedded in ground, and backing plate is close in sustained release pad downside, and upside connects with bottom support bracket, and the bottom end of lateral steel column is fallen Seat reserves cast-in-place position in bottom support bracket;In addition to lateral steel column bottom section, oblique short steel column is uniformly welded on lateral steel On column and vault steel column, vault steel column is connected by connection sleeve with lateral steel column and is inserted into bolt in prepared screw-bolt hole, It screws firm;Voussoir is evenly distributed on steelframe and is anchored in country rock.
Further, the backing plate is rigid, and when steelframe stress, backing plate can replace ground stress.
Further, sustained release pad is elastic, absorbable part stress or offset due to steelframe stress generate to Under thin tail sheep.
Further, voussoir increases tip threaded portion, ring pads compared to previous traditional voussoir, and tip threaded portion is abided by Bolt support mechanism is followed, voussoir fits closely steelframe and country rock in the form anchored, increases ring pads and reduces steelframe and wedge The friction of block contact portion, meanwhile, ring pads can play the role of reduction steelframe stress and deform.
Further, by oblique short steel column fixed range between the steel column and steel column, using triangular truss structure Supporting way.
Further, the weak location in steel column, voussoir are that one end is contacted with steelframe, the other end and oblique short steel column With the connection point contact of lateral steel column, or the connection point contact with oblique short steel column and vault steel column, the work of supplementary support is played With.
Further, tiltedly short steel column and the lateral steel column are structure as a whole, and oblique short steel column and vault steel column are integrated knot Structure, can be by prefabrication, and produces in batches, and the specification of quality is more unified, time saving and energy saving when constructing tunnel.
Further, the construction method of more voussoir tunnels steelframe, comprising the following steps:
First part is the splicing installation of steelframe, and second part is taking a seat for bottom support bracket;
A. it when steelframe is installed, first by the fixed vault steel column of voussoir, finds the position of vault steel column accurately, then inserts tip threaded portion Enter in country rock, the contact portion of voussoir and vault steel column is ring pads;
B. the left and right sides is constructed simultaneously, and lateral steel column and vault steel column are connected, inserted by the connection sleeve in lateral steel column Enter in the connection sleeve of vault steel column, after alignment aims at prepared screw-bolt hole, in a manner of bolted, bolt is inserted into reserved spiral shell In keyhole, lateral steel column is connected with vault steel column and is finished;
C. 2 voussoirs of the lateral steel column close to vault of two sides are fixed respectively, and taking a seat for bottom support bracket is applied for two sides simultaneously at this time The bottom end insertion bottom support bracket of lateral steel column is reserved cast-in-place position by work;
D. it when steelframe splicing installation does not operate, estimates lateral steel column bottom end and is projected in ground location, preset backing plate and sustained release pad Position, after installing backing plate and sustained release pad, the insertion of lateral steel column slowly moves bottom support bracket while reserving cast-in-place position Onto sustained release pad, after the completion of insertion operation and moving operation, whether calibration steelframe occurs laterally offset, such as occurs, please slowly moves Cast-in-place position is being reserved to adjust deviation in the bottom end for moving lateral steel column, does not deviate such as, then carries out last 1 step;
E. it by 2 last voussoirs in the rest position close to bottom support bracket, is embedded in country rock and cast-in-place position will be reserved Gap and rest position, placing concrete fill up.
Beneficial effects of the present invention:
Beneficial effects of the present invention are specifically divided into following aspect:
1. backing plate of the invention be it is rigid, be embedded in ground in, as a part of ground, when steelframe stress, backing plate replace Ground stress weakens the loss to subsoil.
2. sustained release pad of the invention be it is elastic, can absorb part stress or offset due to steelframe stress generate it is downward Thin tail sheep, while playing slow releasing function.
3. the tip threaded portion that voussoir includes, ring pads and tip threaded portion follow bolt support mechanism, voussoir is with anchor Solid form steelframe and country rock are fitted closely.
4. voussoir of the invention increases tip threaded portion, ring pads, tip threaded portion compared to previous traditional voussoir Have followed bolt support mechanism, fitted closely steelframe and country rock in the form of anchoring, while increasing ring pads, avoid steelframe with The friction of voussoir contact portion, meanwhile, ring pads can play the role of reply when small deformation occurs for steelframe stress.
5. using triangular truss structure by oblique short steel column fixed range and distance between steel column and steel column of the invention Supporting way, keep steel frame construction more firm, size economy.
6. voussoir one end of the invention is contacted with steelframe, one end and oblique short steel column and lateral steel column or vault steel column (9) Point contact is connected, in the weak location of steel column, plays supplementary support and fixed effect.
7. oblique short steel column of the invention and lateral steel column are structure as a whole, oblique short steel column and vault steel column are structure as a whole, The two can be by prefabrication, and can be mass, and the specification of quality is more unified, time saving and energy saving when constructing tunnel.
8. avoiding traditional steelframe from fully relying on voussoir to avoid steel in insertion bottom support bracket in lateral steel column bottom end of the invention For frame to the trend of country rock Slideslip, bottom support bracket not only acts as fixing seat effect, while contacting closer by steelframe and ground, It avoids that lateral sliding occurs.
Detailed description of the invention
Fig. 1 is the more voussoir tunnel steelframe overall schematics of the present invention;
Fig. 2 is voussoir schematic diagram of the present invention;
Fig. 3 is the lateral steel column of the present invention and vault steel column connection schematic diagram;
Fig. 4 is bottom support bracket schematic diagram of the present invention;
In figure, 1 for oblique short steel column, 2 it is voussoir, 3 is lateral steel column, 4 is bottom support bracket, 5 is sustained release pad, 6 is backing plate, 7 is pre- Stay bolt hole, 8 be connection sleeve, 9 be vault steel column, 2-1 is tip threaded portion, 2-2 is ring pads, 4-1 is precast base portion Divide and 4-2 is to reserve cast-in-place position.
Specific embodiment
The present invention is described in further detail in the following with reference to the drawings and specific embodiments, but cannot be interpreted as them Limiting the scope of the present invention.
Embodiment: as Figure 1-Figure 4, a kind of more voussoir tunnels steelframe, including tiltedly short steel column 1, voussoir 2, lateral steel column 3, bottom support bracket 4, sustained release pad 5, backing plate 6, prepared screw-bolt hole 7, connection sleeve 8 and vault steel column 9;
The backing plate 6 be it is rigid, be embedded in ground in, the sustained release pad 5 be it is elastic, sustained release pad 5 on the downside of be close to backing plate 6, Upside connects with bottom support bracket 4, and the bottom end of lateral steel column 3 is seated in bottom support bracket 4 and reserves cast-in-place position 4-2;Except lateral Outside 3 bottom section of steel column, oblique short steel column 1 is uniformly welded on lateral steel column 3 and vault steel column 9, vault steel column 9 and lateral steel Column 3 is connected by connection sleeve 8 and is inserted into bolt in prepared screw-bolt hole 7, is screwed firm;Voussoir 2 is evenly distributed in steel On frame and it is anchored in country rock;
By oblique short 1 fixed range of steel column between the steel column and steel column, using the supporting way of triangular truss structure;
The weak location in steel column, voussoir 2 are that one end is contacted with steelframe, the other end and tiltedly short steel column 1 and lateral steel column 3 Connection point contact, or the connection point contact with oblique short steel column 1 and vault steel column 9;
Tiltedly short steel column 1 and the lateral steel column 3 are structure as a whole, and oblique short steel column 1 and vault steel column 9 are structure as a whole;
The construction method of more voussoir tunnels steelframe, comprising the following steps:
First part is the splicing installation of steelframe, and second part is taking a seat for bottom support bracket 4;
A. when steelframe is installed, first by the fixed vault steel column 9 of voussoir 2, the position of vault steel column 9 is found accurately, then by tip threaded portion Divide in 2-1 insertion country rock, the contact portion of voussoir 2 and vault steel column 9 is ring pads 2-2;
B. the left and right sides is constructed simultaneously, lateral steel column 3 is connected with vault steel column 9, by the connection sleeve in lateral steel column 3 In the connection sleeve 8 of 8 insertion vault steel columns 9, after alignment aims at prepared screw-bolt hole 7, in a manner of bolted, bolt is inserted into In prepared screw-bolt hole 7, lateral steel column 3 and the connection of vault steel column 9 are finished;
C. 2 voussoirs 2 of the lateral steel column 3 close to vault of two sides are fixed respectively, and taking a seat for bottom support bracket 4 is same for two sides at this time When construct, insertion bottom support bracket 4 in the bottom end of lateral steel column 3 is reserved into cast-in-place position 4-2;
D. it when steelframe splicing installation does not operate, estimates lateral 3 bottom end of steel column and is projected in ground location, preset backing plate 6 and sustained release The position of pad 5, after installing backing plate 6 and sustained release pad 5, lateral steel column 3 is inserted into bottom support bracket while reserving cast-in-place position 4-2 4 are slowly moved on sustained release pad 5, and after the completion of insertion operation and moving operation, whether calibration steelframe occurs laterally offset, such as send out Raw, cast-in-place position 4-2 is being reserved to adjust deviation in the bottom end for please slowly moving lateral steel column 3, does not deviate such as, then carries out last 1 step;
E. it by 2 last voussoirs 2 in the rest position close to bottom support bracket 4, is embedded in country rock and cast-in-place position will be reserved The gap of 4-2 and rest position, placing concrete fill up.
As shown in Figure 2 and Figure 4, voussoir 2 includes tip threaded portion 2-1, ring pads 2-2;Bottom support bracket 4 includes precast base Part 4-1 and reserve cast-in-place position 4-2.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (8)

1. a kind of more voussoir tunnels steelframe, it is characterised in that: including oblique short steel column (1), voussoir (2), lateral steel column (3), bottom Support (4), sustained release pad (5), backing plate (6), prepared screw-bolt hole (7), connection sleeve (8) and vault steel column (9);Wherein voussoir (2) Including tip threaded portion (2-1), ring pads (2-2);Bottom support bracket (4) includes precast base part (4-1) and reserves cast-in-place position Set (4-2);
Backing plate (6) is embedded in ground, is close to backing plate (6) on the downside of sustained release pad (5), cushion (5) upside and bottom support bracket (4) Connect, the bottom end of lateral steel column (3) is seated in precast base part (4-1) and reserves cast-in-place position (4-2);Except lateral steel column (3) outside bottom section, voussoir (2) is evenly distributed on steelframe and is anchored in country rock, and oblique short steel column (1) is welded on lateral steel On the diagonal line that column (3) and voussoir (2) surround or on diagonal line that vault steel column (9) and voussoir (2) surround, vault steel column (9) It is connected with lateral steel column (3) by connection sleeve (8) and is inserted into bolt in prepared screw-bolt hole (7), is screwed firm.
2. more voussoir tunnels steelframe according to claim 1, it is characterised in that: backing plate (6) is rigid.
3. more voussoir tunnels steelframe according to claim 1, it is characterised in that: sustained release pad (5) is elastic.
4. more voussoir tunnels steelframe according to claim 1, it is characterised in that: voussoir (2) includes ring pads (2-2) and tip Threaded portion (2-1) simultaneously follows bolt support mechanism, and voussoir (2) is fitted closely steelframe and country rock in the form of anchoring.
5. more voussoir tunnels steelframe according to claim 1, it is characterised in that: pass through oblique short steel column between steel column and steel column (1) fixed range, using the supporting way of triangular truss structure.
6. more voussoir tunnels steelframe according to claim 1, it is characterised in that: in the weak location of steel column, voussoir (2) is equal Contacted for one end with steelframe, the connection point contact of the other end and oblique short steel column (1) and lateral steel column (3), or with tiltedly short steel column (1) With the connection point contact of vault steel column (9).
7. more voussoir tunnels steelframe according to claim 1, it is characterised in that: oblique short steel column (1) and lateral steel column (3) are Integral structure, oblique short steel column (1) and vault steel column (9) are structure as a whole.
The construction method of the tunnel of voussoir more than 8. steelframe, it is characterised in that: the following steps are included:
First part is the splicing installation of steelframe, and second part is taking a seat for bottom support bracket (4);
It is first fixed vault steel column (9) by voussoir (2) when steelframe is installed, the position of vault steel column (9) is found accurately, then by tip spiral shell Line part (2-1) is inserted into country rock, and the contact portion of voussoir (2) and vault steel column (9) is ring pads (2-2);
The left and right sides is constructed simultaneously, and lateral steel column (3) and vault steel column (9) are connected, by the connection in lateral steel column (3) Sleeve (8) is inserted into the connection sleeve (8) of vault steel column (9), after alignment aims at prepared screw-bolt hole (7), with bolted side Bolt is inserted into prepared screw-bolt hole (7) by formula, and lateral steel column (3) and vault steel column (9) connection finish;
2 voussoirs (2) of the lateral steel column (3) close to vault of two sides are fixed respectively, and bottom support bracket (4) take a seat, and are at this time two Side is constructed simultaneously, and cast-in-place position (4-2) is reserved in bottom end insertion bottom support bracket (4) of lateral steel column (3);
When steelframe splicing installation does not operate, estimates lateral steel column (3) bottom end and be projected in ground location, it is gentle to preset backing plate (6) The position for releasing pad (5), after installing backing plate (6) and sustained release pad (5), the same of cast-in-place position (4-2) is reserved in lateral steel column (3) insertion When bottom support bracket (4) is slowly moved on sustained release pad (5), after the completion of insertion operation and moving operation, whether calibration steelframe is sent out Raw laterally offset, such as occurs, cast-in-place position (4-2) is being reserved to adjust deviation, such as in the bottom end for please slowly moving lateral steel column (3) It does not deviate, then carries out last 1 step;
By 2 last voussoirs (2) in the rest position close to bottom support bracket (4), it is embedded in country rock and cast-in-place position will be reserved Gap and the rest position of (4-2) are set, placing concrete fills up.
CN201811005521.0A 2018-08-30 2018-08-30 More voussoir tunnels steelframe Withdrawn CN108952772A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811005521.0A CN108952772A (en) 2018-08-30 2018-08-30 More voussoir tunnels steelframe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811005521.0A CN108952772A (en) 2018-08-30 2018-08-30 More voussoir tunnels steelframe

Publications (1)

Publication Number Publication Date
CN108952772A true CN108952772A (en) 2018-12-07

Family

ID=64473566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811005521.0A Withdrawn CN108952772A (en) 2018-08-30 2018-08-30 More voussoir tunnels steelframe

Country Status (1)

Country Link
CN (1) CN108952772A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441797A (en) * 2020-04-30 2020-07-24 重庆交通大学 Prefabricated arch for reinforcing and maintaining tunnel lining
CN115405338A (en) * 2022-09-22 2022-11-29 中铁十四局集团隧道工程有限公司 Subway construction top strutting arrangement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441797A (en) * 2020-04-30 2020-07-24 重庆交通大学 Prefabricated arch for reinforcing and maintaining tunnel lining
CN115405338A (en) * 2022-09-22 2022-11-29 中铁十四局集团隧道工程有限公司 Subway construction top strutting arrangement
CN115405338B (en) * 2022-09-22 2023-05-09 中铁十四局集团隧道工程有限公司 Subway construction top strutting arrangement

Similar Documents

Publication Publication Date Title
CN101775987B (en) Zero spacing construction method for overlapping part of upper main tunnel and lower main tunnel of underground overpass
CN208702427U (en) More voussoir tunnels steelframe
CN108952772A (en) More voussoir tunnels steelframe
CN102352601A (en) Tunnel type composite anchorage
CN108999076A (en) A kind of the class socket joint connection structure and its construction method of column and adjacent members
CN207109812U (en) A kind of reinforced anchor rod support system
CN108708742A (en) Combined retaining structure for concrete pipe sheet anchor pole deviation
CN111350530A (en) Tunnel anchor anchorage
CN103470268B (en) The asymmetric double-hole tunnel structure of zero spacing and construction method thereof
CN106120542A (en) Can be applicable to assembled pier and the construction technology thereof of seismic fortification intensity upper zone
CN108979663A (en) A kind of main structure of subway station construction method using interim middle spacer post support
CN208633857U (en) A kind of frictional drainage anchor rod of fibrous material
CN108894799A (en) The light high type of large cross-section tunnel combines steelframe
CN208718676U (en) Combined retaining structure for concrete pipe sheet anchor pole deviation
CN208167505U (en) It is a kind of to hold the Abutment Reinforcement structure for tilting a miniature clump of piles using end
CN106283938B (en) The compound framing type support rail girder construction of medium-and low-speed maglev two-wire excavation location pile foundation
CN208870608U (en) The light high type of large cross-section tunnel combines steelframe
CN106283952B (en) Medium-and low-speed maglev two-wire excavation location pile foundation joist framing type support rail girder construction
CN206157489U (en) Moderate -low speed magnetic levitation double -line excavation location supporting beam of pile foundation framing type support rail girder construction
CN209339959U (en) Across the tunnel construction in soft area
CN111535078B (en) End thorn area reinforcing structure and construction method
CN212583725U (en) Tunnel anchor anchorage
CN206157494U (en) Moderate -low speed magnetic levitation traffic engineering single line excavation location supporting beam of pile foundation formula support rail girder construction
CN208330425U (en) A kind of hollow prestressing force grouted anchor bar
CN206219896U (en) Medium-and low-speed maglev traffic engineering two-wire excavation location pile foundation joist type support rail girder construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181207

WW01 Invention patent application withdrawn after publication