CN208718676U - Combined retaining structure for concrete pipe sheet anchor pole deviation - Google Patents
Combined retaining structure for concrete pipe sheet anchor pole deviation Download PDFInfo
- Publication number
- CN208718676U CN208718676U CN201821414216.2U CN201821414216U CN208718676U CN 208718676 U CN208718676 U CN 208718676U CN 201821414216 U CN201821414216 U CN 201821414216U CN 208718676 U CN208718676 U CN 208718676U
- Authority
- CN
- China
- Prior art keywords
- section
- anchor
- concrete pipe
- pipe sheet
- jurisdiction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a kind of combined retaining structures for concrete pipe sheet anchor pole deviation, belong to tunnel support field.The utility model includes concrete pipe sheet interconnected and two parts of grouted anchor bar: concrete pipe sheet is made of the longitudinally connected hole in section of jurisdiction, section of jurisdiction lateral connection sawtooth, bolthole, section of jurisdiction main body;Grouted anchor bar is made of anchor pole anchor head, bolt grouting anchoring section, grouted anchor bar, rubber pad, ball pad, anchorage;Connection between concrete pipe sheet and grouted anchor bar realizes that wherein rubber pad is made using high resiliency, corrosion-resistant, anti-aging rubber material by rubber pad, spherical cushion plate and anchorage.The utility model bearing capacity is high, easy for construction, speed of application is fast, good economical benefit, and supporting effect is good, shortens working hour, reduction cost, for there are the anchor poles of deviation directly just to construct in work progress.
Description
Technical field
The utility model belongs to tunnel support field, more particularly to a kind of joint for concrete pipe sheet anchor pole deviation
Supporting construction.
Background technique
With the aggravation of Urbanization in China, the development of urban track traffic is growing day by day, by 2015, China's rail
Road traffic total kilometrage reaches 3286 kilometers, and 25 112 routes of city of Ji Jiyou are open to traffic operation.And the traffic of stream of people in rush hour is dredged
For dissipating and fast going on a journey, Underground Rail Transit is more advantageous compared to road traffic, and shield construction is Underground Rail Transit
Main engineering method in construction.In addition, shield tunnel tends to the promotion of Chinese Machinery Industry upgrading and construction technology level
Great burying development.To get over river tunnel over strait and coal mine tunnel under deep earth as representative, the developing direction of great burying shield tunnel from now on.Tunnel
Road design of its support is overly conservative under certain conditions, causes to waste, however in some conditions again due to structure design of tunnel mistake
In weakness, there are biggish security risks, bring biggish security risk to the construction and the operation in later period of Tunnel Engineering.Mesh
Preceding main method for tunnel construction has Mining Method, cut and cover method, shield method, underground diaphragm wall method, immersed tunnelling method etc..
Shield duct piece is the main mounting structure of shield-tunneling construction, is the innermost layer barrier in tunnel, carries and resists soil layer pressure
The effect of power, groundwater pressure and some special loads.Shield duct piece is the permanent lining, secondary lining structure of shield tunnel, shield pipe
Tablet quality is directly related to the total quality and safety in tunnel, influences the waterproof performance and endurance quality in tunnel.Shield duct piece
Production generallys use high-strength water-tight concrete, and to ensure reliable load and waterproof performance, production mainly utilizes finished product section of jurisdiction
Mold is i.e. plastic after sealing placing concrete.
Anchor pole is the most basic component part of roadway support in contemporary coal mine, it is by the surrounding rock consolidation in tunnel one
It rises, makes country rock itself supporting itself.Present anchor pole is applied not only to mine, is also used in engineering technology, side slope, tunnel, dam body
Carry out main body reinforcing.Anchor pole is connect as the tensional element for going deep into stratum, its one end with engineering structure, and the other end gos deep into stratum
In, whole anchor pole is divided into free segment and anchoring section, and free segment refers to the region that the pulling force at anchor pole head is reached to anchoring body, function
It can be that prestressing force is applied to anchor pole.Anchor pole is connect as the tensional element for going deep into stratum, its one end with engineering structure, the other end
Go deep into stratum, whole anchor pole is divided into free segment and anchoring section, and free segment, which refers to, reaches anchoring body for the pulling force at anchor pole head
Region, function are to apply prestressing force to anchor pole;Anchoring section refers to the region that cement slurry bonds presstressed reinforcing steel and soil layer,
Function is to increase the bonding rubbing action of anchoring body and soil layer, increases the pressure-bearing effect of anchoring body, the pulling force of free segment is passed
To soil body depths.
In the 1960s, Austrian engineer proposes theory of new Austrian tunnelling method on the basis of engineering actual combat, the theory is strong
It adjusts and using self carries out roadway support, be not traditional to stablize the tunnel after excavation by supporting construction
Road.From New Austrian Tunneling Method propose since, it is worldwide from surrounding rock supporting technology burst out formula development.It is soft that Dong Fangting proposes relaxation zone
Weak country rock sprays wrong support theory, which thinks, relaxation zone can occurs in hole week after excavating with road.The broken swollen change of Broken Zone Surrounding Rock
Shape is only the main object of tunnel support, and soft rock tunnel relaxation zone range is generally large, " large deformation, difficult supporting " outstanding problem.
The maximum feature of Norwegian law (abbreviation NTM) is using steel fiber reinforced shotcerte as permanent support.Wet shot steel
Fiber concrete shows that jet power is strong better than the main aspect of common pneumatically placed concrete, and rebound degree is low, uniform quality, ring
Border condition is good, operation safety, it is not necessary to carry out anti-corrosion treatment, can prevent from being electrolysed and preventing accelerated corrosion.Steel fibre is reinforced
Method can save labour.Fibrous concrete can be such that stiffener is distributed on entire rock mass, and conventional grid method for strengthening
The lining cutting of construction is in undulating on scraggly rock mass, has more or less error amount with the calibration line of name.
Ductule support reinforcement is suitable for weak surrounding rock, fault belt and the shallow embedding location etc. of rock joint development.It is small
Conduit supporting is similar to pipe shed support principle, and ductule is laid in a ring on the outside of excavation contour line, becomes annular Load -carring arch.
Steel tube shed and ductule can act as support action in the tunnel of Unfavorable geology, grasp tunnel geology concrete condition
Under the premise of, use can be integrated, saves cost to a certain extent.Grid and bracing members can be classified as building support one kind,
The former is only used in combination with concrete, its support action of competence exertion, and cannot play carrying effect immediately.And the latter can be with
Immediately, carrying effect is independently played.
For current engineering reality, the tunneling technique in China gradually develops, and the difficulty of tunnel construction gradually increases, anchor
Bar is during construction, due to being influenced by construction personnel, construction machinery, field engineering condition, most of anchor pole
Can all occur the unfavorable factors such as offset, dislocation after mounting, when especially carrying out carrying out combined supporting with shield duct piece, these are not
Sharp factor will influence whether entirely to construct.
A kind of combined retaining structure for concrete pipe sheet anchor pole deviation of the utility model integrates many merits,
Have the advantages of following several respects: bearing capacity is high, easy for construction, speed of application is fast, good economical benefit, and supporting effect is good, shortens
Working hour reduces cost, for there are the anchor poles of deviation directly just to construct in work progress.
Utility model content
In order to solve above-mentioned technical problem, the utility model provides a kind of for concrete pipe sheet anchor pole deviation
Combined retaining structure, mainly for developing clear a kind of good integrity, power transmission, simple structure, safe and reliable and easy for construction
Concrete pipe sheet-grouted anchor bar combined retaining structure, can be effectively solved there are the concrete pipe sheet in anchor pole deviation tunnel with
Grouted anchor bar combined supporting.
The technical solution adopted in the utility model is as follows:
A kind of combined retaining structure for concrete pipe sheet anchor pole deviation is infused by concrete pipe sheet, anchor pole anchor head, anchor pole
Starch anchoring section, grouted anchor bar, rubber pad, spherical cushion plate, anchorage composition;Combined supporting knot for concrete pipe sheet anchor pole deviation
Structure includes concrete pipe sheet interconnected and two parts of grouted anchor bar;
The concrete pipe sheet is made of the longitudinally connected hole in section of jurisdiction, section of jurisdiction lateral connection sawtooth, bolthole, section of jurisdiction main body,
The main body of concrete pipe sheet is section of jurisdiction main body, and the both direction up and down of section of jurisdiction main body is respectively provided with there are two the longitudinally connected hole in section of jurisdiction,
The two sides of section of jurisdiction main body are provided with section of jurisdiction lateral connection sawtooth, and the section of jurisdiction lateral connection sawtooth of two sides is occlusive state, left and right two
The tooth engaged quantity at end differs one;Section of jurisdiction main body is provided centrally with bolthole, and bolthole is a cavity;Concrete pipe sheet
Between lateral connection is engaged by staggered lateral connection sawtooth, the section of jurisdiction for passing through alignment by bolt between concrete pipe sheet is vertical
It is longitudinally connected to connecting hole.
The grouted anchor bar is by anchor pole anchor head, bolt grouting anchoring section, grouted anchor bar, rubber pad, spherical cushion plate, anchorage group
At;The front end of anchor pole is anchor pole anchor head, and the rear end of anchor pole anchor head is bolt grouting anchoring section, and bolt grouting anchoring section includes anchor
Bar slip casting anchoring section main body, bolt grouting anchoring section injected hole;The interior anchor of anchor pole anchor head and bolt grouting anchoring section composition anchor pole
Gu section;The rear end of bolt grouting anchoring section is grouted anchor bar, and grouted anchor bar includes grouted anchor bar injected hole, grouted anchor bar main body,
The main body of grouted anchor bar is grouted anchor bar main body, and anchor rod main body is internally provided with grouted anchor bar injected hole, and grouted anchor bar rear end is
Rubber pad, the rear end of rubber pad are spherical cushion plate, and the rear end of spherical cushion plate is anchorage, and grouted anchor bar sequentially passes through rubber pad, ball
Shape backing plate and anchorage;
Rubber pad is squeezed by anchor extruding spherical cushion plate, spherical cushion plate between the concrete pipe sheet and grouted anchor bar to connect
It connects, rubber pad is squeezed adjust automatically form, rubber pad and concrete pipe sheet and confining pressure directly forms close sealing.
Further, the rubber pad is made of high resiliency, corrosion-resistant, anti-aging rubber material.
The utility model has the beneficial effects that
The effect and advantage of the utility model are that bearing capacity is high, easy for construction, speed of application is fast, good economical benefit, supporting
Effect is good, shortens working hour, reduction cost, for there are the anchor poles of deviation directly just to construct in work progress.
Detailed description of the invention
Fig. 1 is a kind of combined retaining structure schematic diagram for concrete pipe sheet anchor pole deviation of the utility model.
Fig. 2 is grouted anchor bar schematic diagram in Fig. 1.
Fig. 3 is concrete pipe sheet connection schematic diagram in Fig. 1.
Fig. 4 is that concrete pipe sheet-grouted anchor bar connects diagrammatic cross-section.
In figure, 1 is concrete pipe sheet;1-1 is the longitudinally connected hole in section of jurisdiction;1-2 is section of jurisdiction lateral connection sawtooth;1-3 is anchor
Rod aperture;1-4 is section of jurisdiction main body;2 be anchor pole anchor head;3 be bolt grouting anchoring section;3-1 is bolt grouting anchoring section main body;3-2
For bolt grouting anchoring section injected hole;4 be grouted anchor bar;4-1 is grouted anchor bar injected hole;4-2 is grouted anchor bar main body;5 are
Rubber pad;6 be spherical cushion plate;7 be anchorage.
Specific embodiment
In order to further illustrate the utility model, the utility model is retouched in detail with reference to the accompanying drawings and embodiments
It states, but they cannot be interpreted as to the restriction to scope of protection of the utility model.
Embodiment: as shown in Figure 1 to 4, a kind of combined retaining structure for concrete pipe sheet anchor pole deviation, including phase
The concrete pipe sheet 1 to connect and two parts of grouted anchor bar;
The concrete pipe sheet 1 is by the longitudinally connected hole 1-1 in section of jurisdiction, section of jurisdiction lateral connection sawtooth 1-2, bolthole 1-3, section of jurisdiction
The main body of main body 1-4 composition, concrete pipe sheet 1 is section of jurisdiction main body 1-4, and the both direction up and down of section of jurisdiction main body 1-4 is provided with
The longitudinally connected hole 1-1 in two sections of jurisdiction, the two sides of section of jurisdiction main body 1-4 are provided with section of jurisdiction lateral connection sawtooth 1-2, and the section of jurisdiction of two sides is horizontal
It is occlusive state to connection sawtooth 1-2, the tooth engaged quantity of left and right ends differs one;Section of jurisdiction main body 1-4's is provided centrally with
Bolthole 1-3, bolthole 1-3 are a cavities;
The grouted anchor bar by anchor pole anchor head 2, bolt grouting anchoring section 3, grouted anchor bar 4, rubber pad 5, spherical cushion plate 6,
Anchorage 7 forms;The front end of anchor pole is anchor pole anchor head 2, and the rear end of anchor pole anchor head 2 is bolt grouting anchoring section 3, bolt grouting anchor
Gu section 3 includes bolt grouting anchoring section main body 3-1, bolt grouting anchoring section injected hole 3-2;Anchor pole anchor head 2 and bolt grouting anchor
Gu the grouted part of the composition anchor pole of section 3;The rear end of bolt grouting anchoring section 3 is grouted anchor bar 4, and grouted anchor bar 4 includes slip casting anchor
Bar injected hole 4-1, grouted anchor bar main body 4-2, the main body of grouted anchor bar 4 are grouted anchor bar main body 4-2, inside anchor rod main body 4-2
It is provided with grouted anchor bar injected hole 4-1,4 rear end of grouted anchor bar is rubber pad 5, and rubber pad 5 is using high resiliency, corrosion-resistant, anti-ageing
The rubber material of change is made, and the rear end of rubber pad 5 is spherical cushion plate 6, and the rear end of spherical cushion plate 6 is anchorage 7, grouted anchor bar 4 according to
It is secondary to pass through rubber pad 5, spherical cushion plate 6 and anchorage 7.
As shown in figure 3, the connection between the concrete pipe sheet 1 be divided into lateral connection with it is longitudinally connected;Lateral connection is
It is attached between concrete pipe sheet 1 by section of jurisdiction lateral connection sawtooth 1-2, two pieces of sections of jurisdiction is aligned, two block concretes are utilized
Lateral connection sawtooth 1-2 between section of jurisdiction 1 is engaged;It is longitudinally connected to be attached using segment bolt, concrete pipe sheet 1 it
Between be aligned the longitudinally connected hole 1-1 in section of jurisdiction, bolt pass through the longitudinally connected hole 1-1 in section of jurisdiction, tighten bolt and nut.
As shown in figure 4, squeezing spherical cushion plate 6, ball pad by anchorage 7 between the concrete pipe sheet 1 and grouted anchor bar
Plate 6 squeezes rubber pad 5 and connects, and rubber pad 5 is squeezed adjust automatically form, and rubber pad 5 and concrete pipe sheet 1 and confining pressure are direct
Form closely sealing.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art
For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and
Retouching also should be regarded as the protection scope of the utility model.
Claims (2)
1. a kind of combined retaining structure for concrete pipe sheet anchor pole deviation, including concrete pipe sheet (1), anchor pole anchor head (2),
Bolt grouting anchoring section (3), grouted anchor bar (4), rubber pad (5), spherical cushion plate (6), anchorage (7), it is characterised in that: the use
In the combined retaining structure of concrete pipe sheet anchor pole deviation include concrete pipe sheet interconnected (1) and two portions of grouted anchor bar
Point;
The concrete pipe sheet (1) by the longitudinally connected hole in section of jurisdiction (1-1), section of jurisdiction lateral connection sawtooth (1-2), bolthole (1-3),
Section of jurisdiction main body (1-4) composition, the main body of concrete pipe sheet (1) are section of jurisdiction main body (1-4), two up and down of section of jurisdiction main body (1-4)
Direction is respectively provided with there are two the longitudinally connected hole in section of jurisdiction (1-1), and the two sides of section of jurisdiction main body (1-4) are provided with section of jurisdiction lateral connection sawtooth
(1-2), the section of jurisdiction lateral connection sawtooth (1-2) of two sides are occlusive state, and the tooth engaged quantity of left and right ends differs one;Section of jurisdiction
Main body (1-4) is provided centrally with bolthole (1-3), and bolthole (1-3) is a cavity;Concrete pipe sheet passes through between (1)
Staggered lateral connection sawtooth (1-2) is engaged lateral connection, is indulged between concrete pipe sheet (1) by the section of jurisdiction that bolt passes through alignment
It is longitudinally connected to connecting hole (1-1);
The grouted anchor bar is by anchor pole anchor head (2), bolt grouting anchoring section (3), grouted anchor bar (4), rubber pad (5), ball pad
Plate (6), anchorage (7) composition;The front end of anchor pole is anchor pole anchor head (2), and the rear end of anchor pole anchor head (2) is bolt grouting anchoring section
(3), bolt grouting anchoring section (3) includes bolt grouting anchoring section main body (3-1), bolt grouting anchoring section injected hole (3-2);Anchor
The grouted part of bar anchor head (2) and bolt grouting anchoring section (3) composition anchor pole;The rear end of bolt grouting anchoring section (3) is slip casting
Anchor pole (4), grouted anchor bar (4) include grouted anchor bar injected hole (4-1), grouted anchor bar main body (4-2), the master of grouted anchor bar (4)
Body is grouted anchor bar main body (4-2), and anchor rod main body (4-2) is internally provided with grouted anchor bar injected hole (4-1), grouted anchor bar (4)
Rear end is rubber pad (5), and the rear end of rubber pad (5) is spherical cushion plate (6), and the rear end of spherical cushion plate (6) is anchorage (7), slip casting
Anchor pole (4) sequentially passes through rubber pad (5), spherical cushion plate (6) and anchorage (7);
Spherical cushion plate (6) are squeezed by anchorage (7) between the concrete pipe sheet (1) and grouted anchor bar, spherical cushion plate (6) squeezes
Rubber pad (5) connection, rubber pad (5) are squeezed adjust automatically form, and rubber pad (5) and concrete pipe sheet (1) and confining pressure are straight
It connects to form close sealing.
2. the combined retaining structure according to claim 1 for concrete pipe sheet anchor pole deviation, it is characterised in that: described
Rubber pad (5) is made of high resiliency, corrosion-resistant, anti-aging rubber material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821414216.2U CN208718676U (en) | 2018-08-30 | 2018-08-30 | Combined retaining structure for concrete pipe sheet anchor pole deviation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821414216.2U CN208718676U (en) | 2018-08-30 | 2018-08-30 | Combined retaining structure for concrete pipe sheet anchor pole deviation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208718676U true CN208718676U (en) | 2019-04-09 |
Family
ID=65980278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821414216.2U Expired - Fee Related CN208718676U (en) | 2018-08-30 | 2018-08-30 | Combined retaining structure for concrete pipe sheet anchor pole deviation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208718676U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593894A (en) * | 2019-09-16 | 2019-12-20 | 重庆大学 | Novel shield tunnel concrete pipe piece miniature reinforcing pile |
WO2021213094A1 (en) * | 2020-04-19 | 2021-10-28 | 中铁上海工程局集团有限公司 | Fragmented prefabricated structure of deep and large open caisson |
-
2018
- 2018-08-30 CN CN201821414216.2U patent/CN208718676U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593894A (en) * | 2019-09-16 | 2019-12-20 | 重庆大学 | Novel shield tunnel concrete pipe piece miniature reinforcing pile |
CN110593894B (en) * | 2019-09-16 | 2020-12-25 | 重庆大学 | Novel shield tunnel concrete pipe piece miniature reinforcing pile |
WO2021213094A1 (en) * | 2020-04-19 | 2021-10-28 | 中铁上海工程局集团有限公司 | Fragmented prefabricated structure of deep and large open caisson |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106437726B (en) | Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method | |
CN201560780U (en) | Ultra-small clear distance tunnel rock pillar pre-stress opposite-pull anchor rod structure | |
CN206942764U (en) | The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole | |
CN201746840U (en) | Foundation pit support system equipped with a plurality of inclined rear anchors capable of recycling | |
CN208136927U (en) | A kind of soil cutting side slope supporting construction | |
CN206956742U (en) | High precipitous rock roadbed side slope repair system | |
CN209924998U (en) | Shallow earthing shield tunnel is worn road reinforcement protection architecture down | |
CN103410161A (en) | Slant grouting control steel anchor pipe frame and construction method thereof | |
CN102605793B (en) | Moisture transfer and ecological management method for loess slope | |
CN108589723A (en) | Band only starches the segmentation hollow grouting anchor of the segmenting slip casting of branch sleeve | |
CN208718676U (en) | Combined retaining structure for concrete pipe sheet anchor pole deviation | |
CN103670446B (en) | Circular diversion tunnel 2/3 circle concrete-liner construction method | |
CN110645018B (en) | Mine underground strong dynamic pressure roadway prestress anchor-charging integrated supporting structure and method | |
CN108708742A (en) | Combined retaining structure for concrete pipe sheet anchor pole deviation | |
CN206219897U (en) | Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure | |
CN109208545A (en) | A kind of manmade landscape, artificial landscape's Construction of Overflow Dam method with effect of energy dissipation | |
CN108374674B (en) | Six pilot tunnels, 12 step Underground Space Excavation method for protecting support | |
CN205934940U (en) | Anchor structure of rock matter side slope | |
CN108678790A (en) | A kind of frictional drainage anchor rod of fibrous material | |
US11821316B1 (en) | System and construction method of single-layer lining tunnel structure based on mine-tunnelling method | |
CN108532647A (en) | A kind of structure and method of the antiseismic liquefaction uplifting in subway station | |
CN208293630U (en) | A kind of structural system of the antiseismic liquefaction uplifting in subway station | |
CN208633857U (en) | A kind of frictional drainage anchor rod of fibrous material | |
CN207672344U (en) | Railway bed karez location pin-connected panel foundation stabilization construction | |
CN206157485U (en) | Moderate -low speed magnetic levitation single line excavation location pile foundation combined type support rail roof beam transition section structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200402 Address after: No. 320-336 Shengli Road, Xinzhou District, Shangrao City, Jiangxi Province Patentee after: Jiangxi Fengshun Construction Engineering Co., Ltd Address before: Hunnan Hunnan Road Shenyang city Liaoning province 110168 No. 9 Patentee before: SHENYANG JIANZHU University |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190409 Termination date: 20200830 |
|
CF01 | Termination of patent right due to non-payment of annual fee |