CN108952768A - A kind of stage apparatus of Shield tunnel secondary grouting - Google Patents
A kind of stage apparatus of Shield tunnel secondary grouting Download PDFInfo
- Publication number
- CN108952768A CN108952768A CN201810999049.0A CN201810999049A CN108952768A CN 108952768 A CN108952768 A CN 108952768A CN 201810999049 A CN201810999049 A CN 201810999049A CN 108952768 A CN108952768 A CN 108952768A
- Authority
- CN
- China
- Prior art keywords
- slip casting
- paralell
- secondary grouting
- shield tunnel
- wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007569 slipcasting Methods 0.000 claims abstract description 44
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 31
- 239000010959 steel Substances 0.000 claims abstract description 31
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 15
- 239000011248 coating agent Substances 0.000 claims abstract description 14
- 238000000576 coating method Methods 0.000 claims abstract description 14
- 238000003466 welding Methods 0.000 claims description 9
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 239000004033 plastic Substances 0.000 claims description 4
- 229920003023 plastic Polymers 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 12
- 239000000463 material Substances 0.000 abstract description 4
- 230000013011 mating Effects 0.000 description 6
- 239000004568 cement Substances 0.000 description 3
- 239000012530 fluid Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 241001669679 Eleotris Species 0.000 description 1
- 241000826860 Trapezium Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 235000019353 potassium silicate Nutrition 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
- E21D9/122—Working or loading platforms
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention relates to a kind of stage apparatus of Shield tunnel secondary grouting, belong to water conservancy and hydropower civil engineering technical field, including slip casting paralell, bottom traveling wheel, lateral support wheel, skirting board, coating steel pipe railing, water butt, ladder, the bottom rear end sides of slip casting paralell install a bottom traveling wheel respectively, ladder is fixedly installed on the bracket and slip casting paralell of one of bottom traveling wheel, water butt is mounted on the bottom of slip casting paralell, the lower front of slip casting paralell is equipped with the lateral support wheel being obliquely installed, slip casting paralell top rear is equipped with coating steel pipe railing and skirting board, skirting board is located at the lower part of coating steel pipe railing.The present invention improves the utilization of small space in hole, reduces the security risk of operation in hole;Reduce interference of other operations to secondary grouting operation in hole, improve construction efficiency, accelerate shield-tunneling construction progress, saves a large amount of duration;Reduce artificial, material investment, saves cost.
Description
Technical field
The invention belongs to water conservancy and hydropower civil engineering technical fields, specifically, being related to a kind of Shield tunnel secondary grouting
Stage apparatus.
Background technique
When Shield tunnel tunneling construction, the mobile assembled matter for generating faulting of slab ends and influencing section of jurisdiction occurs for section of jurisdiction position in order to prevent
Amount, needs to synchronize slip casting (cement mortar).Because synchronous grouting is lacked along with the indispensable quality such as large-scale cavity
It falls into, causes section of jurisdiction to generate load, increase tunnel security risk.In order to guarantee the whole stress of section of jurisdiction, need to section of jurisdiction
It is timely carried out after wall secondary grouting (cement slurry), the cavity after the wall of section of jurisdiction is filled up.When carrying out secondary grouting construction, need to match
The parking space of the construction materials such as equipment and water tank, waterglass, bagged cement such as standby blender, double-fluid grouting machine, in this way
Space shared by a set of secondary grouting system is relatively large, and mating trailer is not provided with corresponding secondary grouting system after shield machine
System, and narrow space in Shield tunnel, secondary grouting construction can only carry out on pedestrian passage.Often applied in progress secondary grouting
Working hour, personnel's passage in hole will be unfavorable for the safety management of operation in hole, and easily cause channel by very big interference
And its pollution of surrounding devices, destroy civilized construction image clean and tidy in hole.
Therefore, it is necessary to which a secondary grouting platform is arranged in mating trailer tail portion after shield machine, make secondary grouting operation
It is separated with exit passageway in hole, meets the safety construction requirement in hole.
Summary of the invention
In order to solve the problems, such as background technique, the present invention provides a kind of convenience, practical Shield tunnel are secondary
The stage apparatus of slip casting separates secondary grouting operation with exit passageway in hole, reduces to other works carried out in Shield tunnel
The interference of industry, guarantees the clean and tidy of operating environment, and energy save the cost generates preferable social and economic benefit.
To achieve the above object, the present invention is achieved through the following technical solutions:
The stage apparatus of the Shield tunnel secondary grouting include slip casting paralell 1, bottom traveling wheel 2, lateral support wheel 3,
Coating steel pipe railing 5, water butt 6, ladder 7, the bottom rear end sides of the slip casting paralell 1 are separately installed with a bottom
Traveling wheel 2 is fixedly installed with ladder 7 on the bracket and slip casting paralell 1 of one of bottom traveling wheel 2, and water butt 6 is mounted on
The bottom of slip casting paralell 1, the lower front of slip casting paralell 1 are equipped with the lateral support wheel 3 being obliquely installed, and slip casting is flat
1 top rear of rack is equipped with coating steel pipe railing 5.
Further, the lower part of the coating steel pipe railing 5 is provided with skirting board 4, and it is flat that skirting board 4 is also secured to slip casting
On rack 1.
Preferably, H profile steel welding production of the slip casting paralell 1 using HW150 × 150mm.
Preferably, two bottom traveling wheels 2 are triangularly arranged with a lateral support wheel 3, and tilting moment is
0。
Preferably, the bottom traveling wheel 2 is the concave steel wheel that diameter is 350mm.
Preferably, the lateral support wheel 3 is the rigid plastics wheel that diameter is 150mm.
Beneficial effects of the present invention:
Use of the invention improves the utilization of small space in hole, reduces the security risk of operation in hole;Reduce in hole
Interference of other operations to secondary grouting operation, improves construction efficiency, accelerates shield-tunneling construction progress, saves a large amount of work
Phase;Eliminate the later period construct exclusively for secondary grouting and the operation platform set up, reduce artificial, material investment, saved at
This.
Detailed description of the invention
Fig. 1 is main view of the invention;
Fig. 2 is left view of the invention;
Fig. 3 is the schematic diagram of slip casting paralell of the present invention.
In figure, 1- slip casting paralell, the bottom 2- traveling wheel, 3- lateral support wheel, 4- skirting board, 5- coating steel pipe railing,
6- water butt, 7- ladder.
Specific embodiment
Below in conjunction with the embodiment of the present invention and attached drawing, technical solution in the embodiment of the present invention carries out clear, complete
Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on this
Embodiment in invention, every other reality obtained by those of ordinary skill in the art without making creative efforts
Example is applied, shall fall within the protection scope of the present invention.
As shown in Figure 1-3, the stage apparatus of the Shield tunnel secondary grouting includes slip casting paralell 1, bottom walking
2, lateral support wheel 3, skirting board 4, coating steel pipe railing 5, water butt 6, ladder 7 are taken turns, behind the bottom of the slip casting paralell 1
End two sides are separately installed with a bottom traveling wheel 2, fix on the bracket and slip casting paralell 1 of one of bottom traveling wheel 2
Ladder 7 is installed, water butt 6 is mounted on the bottom of slip casting paralell 1, and the diameter of water butt 6 is 600mm, and being equipped with water butt 6 has
Effect avoids the in disorder phenomenon of work surface pipeline.The lower front of slip casting paralell 1 is equipped with the lateral branch being obliquely installed
Support wheel 3, two bottom traveling wheels 2 are triangularly arranged with a lateral support wheel 3, and tilting moment is 0, is greatly improved
The safety of operating environment.1 top rear of slip casting paralell is equipped with coating steel pipe railing 5 and skirting board 4, and skirting board 4
In the lower part of coating steel pipe railing 5, during slip casting, place can be kicked by the cement slurry of 4 sole of skirting board.
The slip casting paralell 1 uses the H profile steel welding production of HW150 × 150mm.
The bottom traveling wheel 2 is the concave steel wheel that diameter is 350mm.
The lateral support wheel 3 is the rigid plastics wheel that diameter is 150mm.
Installation method of the invention is as follows:
1) production of slip casting paralell 1 processing: slip casting paralell 1 uses the H profile steel welding production of HW150 × 150mm, first to each group
Cutting stock is carried out at component, then the welding of each H profile steel component is integral, finally checkered steel plate is welded on paralell 1.
2) bottom traveling wheel 2 is processed: the concave that the bottom traveling wheel 2 on secondary grouting paralell 1 is 350mm using diameter
The steel plate of steel wheel, the H profile steel of HW150 × 150mm and 20mm thickness makes, and 20mm thick steel plate is cut into having a size of 180mm × 390mm
Rectangle (4), H profile steel Cutting Length 520mm(2 part), recombinant weld integral (2).
3) lateral support wheel 3 is processed: the rigid plastics wheel and 20mm thick steel plate that lateral support wheel 3 is 150mm using diameter
Production, it is respectively 390mm × 100mm that 20mm thick steel plate, which is cut into size, and each one, the rectangle of 230mm × 100mm, and bottom
The upper bottom 120mm of 230mm, the right-angled trapezium of high 80mm one, recombinant welding are integral.
4) each component of machine-shaping is transported to the tail portion of mating trailer after shield machine using battery truck in hole, uses trailer
Sunpender combination chain block on the tailstock of tail portion is lifted, installation site as needed, temporarily by 1 spot welding of slip casting paralell
It is temporarily fixed in the tail portion of trailer, then carries out the two bottom traveling wheels 2 and a lateral support wheel 3 of 1 bottom of slip casting paralell
Welding unclamp again tailstock after bottom traveling wheel 2 and lateral support wheel 3 are welded according to track and section of jurisdiction intrados position
Sunpender and chain block, finally install 1 bottom of slip casting paralell water butt 6 and welding 1 upper height of slip casting paralell be
The coating steel pipe railing 5 of 1.2m high and the small ladder 7 of tail portion.
The working principle of the invention:
Orbit Matching in two bottom traveling wheels 2 and tunnel, lateral support wheel 3 is contacted with the side wall of tunnel, with two bottoms
Traveling wheel 2 forms triangle load-carrying members, guarantees the stability of entire stage apparatus, to also ensure that slip casting paralell 1 guarantees
In the state of relative level, at work, staff can carry out secondary grouting work on slip casting paralell 1.
It is usually small in subway tunnel and the lesser tunnel of some sections, the more spaces of shield inboard installation.Secondary grouting is usual
Using single fluid grouting machine or double-fluid grouting machine, while secondary grouting need to usually carry out mixing, i.e. secondary grouting inside shield machine
Equipment, material need biggish slip casting space to realize, generate contradiction with the small space of shield machine.For this purpose, the present invention is main
It connect to form individual slip casting trolley with shield machine by rear mating carriage track, it is mobile simultaneously during shield machine driving
Realize that secondary grouting follows up in time.
Use of the invention improves the utilization of small space in hole, reduces the security risk of operation in hole;Reduce
Interference of other operations to secondary grouting operation, improves construction efficiency in hole, accelerates shield-tunneling construction progress, saves a large amount of
Duration;Eliminate the later period construct exclusively for secondary grouting and the operation platform set up, reduce artificial, material investment, save
Cost.
The invention enables secondary grouting working spaces and exit passageway in hole to separate, and makes full use of narrow in Shield tunnel
Space reduces interference of other operations in hole to secondary grouting operation;Operation in a safe and reliable hole is provided simultaneously
Environment ensure that the safety construction image in Shield tunnel;Mating trailer after shield machine can be followed to go ahead together, no
The reuse that mating carriage track, sleeper are removed after influence shield machine.
Finally, it is stated that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although by upper
It states preferred embodiment the present invention is described in detail, however, those skilled in the art should understand that, can be in form
Various changes are made to it in upper and details, without departing from claims of the present invention limited range.
Claims (7)
1. a kind of stage apparatus of Shield tunnel secondary grouting, it is characterised in that: the platform of the Shield tunnel secondary grouting
Device include slip casting paralell (1), bottom traveling wheel (2), lateral support wheel (3), coating steel pipe railing (5), water butt (6),
Ladder (7), the bottom rear end sides of the slip casting paralell (1) are separately installed with a bottom traveling wheel (2), one of them
It is fixedly installed with ladder (7) on the bracket and slip casting paralell (1) of bottom traveling wheel (2), water butt (6) is mounted on slip casting platform
The bottom of frame (1), the lower front of slip casting paralell (1) are equipped with the lateral support wheel (3) being obliquely installed, slip casting platform
Frame (1) top rear is equipped with coating steel pipe railing (5).
2. a kind of stage apparatus of Shield tunnel secondary grouting according to claim 1, it is characterised in that: described is zinc-plated
The lower part of steel pipe railing (5) is provided with skirting board (4), and skirting board (4) is also secured on slip casting paralell (1).
3. a kind of stage apparatus of Shield tunnel secondary grouting according to claim 1, it is characterised in that: the slip casting
Paralell (1) uses the H profile steel welding production of HW150 × 150mm.
4. a kind of stage apparatus of Shield tunnel secondary grouting according to claim 1, it is characterised in that: two bottom lines
It walks wheel (2) to be triangularly arranged with a lateral support wheel (3), and tilting moment is 0.
5. a kind of stage apparatus of Shield tunnel secondary grouting according to claim 1 or 4, it is characterised in that: described
Bottom traveling wheel (2) is the concave steel wheel that diameter is 350mm.
6. a kind of stage apparatus of Shield tunnel secondary grouting according to claim 1 or 4, it is characterised in that: described
Lateral support wheel (3) is the rigid plastics wheel that diameter is 150mm.
7. a kind of stage apparatus of Shield tunnel secondary grouting according to claim 1 or 2, it is characterised in that: described
The height of coating steel pipe railing (5) is 1.2m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810999049.0A CN108952768A (en) | 2018-08-30 | 2018-08-30 | A kind of stage apparatus of Shield tunnel secondary grouting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810999049.0A CN108952768A (en) | 2018-08-30 | 2018-08-30 | A kind of stage apparatus of Shield tunnel secondary grouting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108952768A true CN108952768A (en) | 2018-12-07 |
Family
ID=64473660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810999049.0A Pending CN108952768A (en) | 2018-08-30 | 2018-08-30 | A kind of stage apparatus of Shield tunnel secondary grouting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108952768A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110030003A (en) * | 2019-04-03 | 2019-07-19 | 中船第九设计研究院工程有限公司 | A kind of the anti-collapse excavating device and its technique of tunnel construction |
CN110566233A (en) * | 2019-09-20 | 2019-12-13 | 成龙建设集团有限公司 | method for duct piece wall post-grouting in shield tunnel construction of full-section hard rock stratum |
CN113585811A (en) * | 2021-08-19 | 2021-11-02 | 中铁十四局集团大盾构工程有限公司 | Assembled movable crawling ladder for large-diameter shield tunnel |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11173072A (en) * | 1997-12-11 | 1999-06-29 | Ohbayashi Corp | Chemical grouting method and chemical grouting equipment |
CN101864969A (en) * | 2010-03-19 | 2010-10-20 | 中铁十四局集团有限公司 | Segment caulking and hand hole blocking trolley for large-diameter shield tunnel |
CN204877488U (en) * | 2015-07-09 | 2015-12-16 | 中铁十二局集团有限公司 | A bracket device that can walk that is used for tunnel no. 2 lining side wall operations |
CN205477636U (en) * | 2016-02-25 | 2016-08-17 | 天津智导科技有限公司 | Underground railway track moving platform |
CN205591817U (en) * | 2016-05-06 | 2016-09-21 | 中国铁建电气化局集团第二工程有限公司 | Railway tunnel lateral wall construction tower wagon |
CN207470205U (en) * | 2017-11-22 | 2018-06-08 | 中国水利水电第八工程局有限公司 | A kind of tunnel concrete maintenance repairing trolley |
-
2018
- 2018-08-30 CN CN201810999049.0A patent/CN108952768A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11173072A (en) * | 1997-12-11 | 1999-06-29 | Ohbayashi Corp | Chemical grouting method and chemical grouting equipment |
CN101864969A (en) * | 2010-03-19 | 2010-10-20 | 中铁十四局集团有限公司 | Segment caulking and hand hole blocking trolley for large-diameter shield tunnel |
CN204877488U (en) * | 2015-07-09 | 2015-12-16 | 中铁十二局集团有限公司 | A bracket device that can walk that is used for tunnel no. 2 lining side wall operations |
CN205477636U (en) * | 2016-02-25 | 2016-08-17 | 天津智导科技有限公司 | Underground railway track moving platform |
CN205591817U (en) * | 2016-05-06 | 2016-09-21 | 中国铁建电气化局集团第二工程有限公司 | Railway tunnel lateral wall construction tower wagon |
CN207470205U (en) * | 2017-11-22 | 2018-06-08 | 中国水利水电第八工程局有限公司 | A kind of tunnel concrete maintenance repairing trolley |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110030003A (en) * | 2019-04-03 | 2019-07-19 | 中船第九设计研究院工程有限公司 | A kind of the anti-collapse excavating device and its technique of tunnel construction |
CN110030003B (en) * | 2019-04-03 | 2021-05-07 | 中船第九设计研究院工程有限公司 | Anti-collapse excavation device for tunnel construction and process thereof |
CN110566233A (en) * | 2019-09-20 | 2019-12-13 | 成龙建设集团有限公司 | method for duct piece wall post-grouting in shield tunnel construction of full-section hard rock stratum |
CN113585811A (en) * | 2021-08-19 | 2021-11-02 | 中铁十四局集团大盾构工程有限公司 | Assembled movable crawling ladder for large-diameter shield tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201246169Y (en) | Tunnel development synchronous lining formwork trolley | |
CN102345461B (en) | Subsequent project and shield driving parallel construction method for long-distance railway tunnel | |
CN109538238A (en) | A kind of tunnel arch prefabricated pipe section constructing device and control method | |
CN108952768A (en) | A kind of stage apparatus of Shield tunnel secondary grouting | |
CN103032073B (en) | Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method | |
CN104564102B (en) | A kind of tunnel lining concrete grouting device | |
CN100482891C (en) | Method for building railway bridge and simple support T beam bridge | |
CN103277110A (en) | Construction method of overlapped shield tunnel | |
CN105952482A (en) | Self-propelled tunnel invert lining trolley | |
CN101831888B (en) | 1200 tonner water conservancy aqueduct transportation and erection equipment | |
CN203685216U (en) | Composite grouting system for shield passing-through section | |
CN102061926A (en) | TBM tunneling and secondary lining synchronous construction method at mucking of continuous belt conveyor and trolley | |
CN202659247U (en) | Back templates and combined steel die for tunnel inverted arch construction | |
CN104018426A (en) | Steel truss installation method | |
CN104180658B (en) | A kind of installation method of sintering machine dust pelletizing system | |
CN203499697U (en) | Trolley used for concrete construction of various cross sections through mining method | |
CN204662270U (en) | A kind of case girder transferring system | |
CN105736012A (en) | Concrete grouting device for tunnel lining | |
CN208184749U (en) | A kind of shield well side wall haunch every template node structure | |
CN207538841U (en) | A kind of hydraulic tunnel inverted arch cambered surface slip form construction device | |
CN207131969U (en) | The rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel | |
CN204267046U (en) | A kind of tunnel lining concrete grouting device | |
CN105927247A (en) | Large section full-automatic mechanical numeric control bogie and construction method thereof | |
CN208718683U (en) | A kind of stage apparatus of Shield tunnel secondary grouting | |
CN206816265U (en) | A kind of air channel arch combined retaining structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181207 |