CN207131969U - The rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel - Google Patents

The rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel Download PDF

Info

Publication number
CN207131969U
CN207131969U CN201721182463.XU CN201721182463U CN207131969U CN 207131969 U CN207131969 U CN 207131969U CN 201721182463 U CN201721182463 U CN 201721182463U CN 207131969 U CN207131969 U CN 207131969U
Authority
CN
China
Prior art keywords
vehicle frame
rail
pump pipe
concrete
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721182463.XU
Other languages
Chinese (zh)
Inventor
李刚
戴志勇
杨帆
黄海斌
黄丙寅
高娃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 17th Bureau Group Co Ltd Pujia Branch
Original Assignee
China Railway 17th Bureau Group Co Ltd Pujia Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 17th Bureau Group Co Ltd Pujia Branch filed Critical China Railway 17th Bureau Group Co Ltd Pujia Branch
Priority to CN201721182463.XU priority Critical patent/CN207131969U/en
Application granted granted Critical
Publication of CN207131969U publication Critical patent/CN207131969U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is specially the rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in a kind of subway tunnel, solves the problems, such as in existing subway tunnel to exist when solid concrete roabed is cast-in-place because plugging occurs in long and work progress for concrete pumping polluted to be difficult to clear up.Pump pipe bracket body includes vehicle frame, vehicle frame is provided with wheel carrier at left and right sides of bottom, wheel carrier is connected with rail wheel, the left and right ends of vehicle frame are provided with bail, bail is connected with draw bar and puller bolt, the positioning square tube of front and rear distribution is provided with left and right sides of vehicle frame top, supporting leg is plugged with positioning square tube, supporting leg top is connected with semicircle arcuation supporting plate, the front and rear sides of semicircle arcuation supporting plate are provided with puller bolt, arc distributor chute is provided with below the afterbody of semicircle arcuation supporting plate, rotating shaft is provided with arc distributor chute.The utility model shortens pumping distance, avoids the pollution in subway tunnel small space.

Description

The rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel
Technical field
Track construction servicing unit is the utility model is related to, solid concrete roabed cast-in-place construction is used in specially a kind of subway tunnel Rail-mounted concrete pump pipe carrier.
Background technology
Subway has turned into the important means of conveyance in city, and at present, Subway Tunnel is tunneled using shield machine more, synchronous peace Fill arc section of jurisdiction and form circular cross section separate tunnel.Narrow space in separate type subway tunnel, construction logistics condition are very tired Difficulty, cast-in-place solid concrete roabed prior art are constructed to be pusher, i.e., since in station the propelling construction into tunnel paragraph by paragraph, until entering Enter next station, be specially:The section of track is assembled, utilizes rail-mounted transport vehicle(Walking is on the track for just pouring completion)By the section of track Front laying point is pushed to forward, uses small-sized unit of laying a railway track successively(Two linkage small-sized straddle trucks)Aid in section of track handling and just Position, binding structure reinforcing bar, adjusting means is coordinated to carry out section of track locus adjustment using accurate measurement means, it is mixed using long range Solidifying soil pumping(Or hopper)Technique pours railway roadbed concrete, and welding rail gap forms gapless track.
The greatest drawback of this construction method is that logistics vehicles must walk to be poured on shaping railway roadbed track new,《Specification》 Regulation before concrete strength is not up to more than the 70% of design strength must not bearing load effect, newly poured for that purpose it is necessary to wait Build railway roadbed concrete strength satisfaction《Specification》Requesting party can arrange rail row transport, have a strong impact on construction speed;When the duration is urgent, Railway roadbed concrete strength is often forced in not yet to reach《Specification》Bearing load before it is required that, railway roadbed concrete cracking seriously be present Hidden danger of quality, therefore transport weight of material every time and need to strictly be limited, cause that risk is big, work efficiency is low, cost is high.
Monolithic roadbed track category longitudinal strip structure, cast-in-place concrete solid concrete roabed use pumped concrete earth process more, Openr construction site is mostly using horizontal pumping or suspension bucket material-uploading style, but in the tunnel of narrow space or subway, only Distance can often be pumped up to hundreds of meters using longitudinal direction pumping material-uploading style.Before each pump concrete, low-grade cement must be first used Mortar carries out pipeline moistening, is hindered to remove to clean ponding in pipeline while examine pipeline sealing and reduce pipeline mill, when Mortar is considerable when pipeline is longer, and waste disposal can only be used as by moistening the mortar after pipe;After the pump concrete end of job, also need Pump line is cleaned with water, the sewage after cleaning need to focus on;Once generating pump blockage in operation is, it is necessary to thoroughly remove in pipe All concrete, the Concrete contamination scene cleared out, and job site need to be thoroughly cleared out before its solidification;Due to pumping distance Long, profit pipe, plugging, to wash pipe amount of pollutant big, in addition construction site narrow space, and pollutant is cleared up and is inconvenient, or even is caused The hardening of discarded concrete, increases the amount of labour used and construction cost.
The content of the invention
The utility model in order to solve solid concrete roabed in existing subway tunnel it is cast-in-place when exist because concrete pumping is apart from mistake Plugging occurs in long and work progress and pollutes the problem of being difficult to cleaning, there is provided solid concrete roabed is cast-in-place in a kind of subway tunnel The rail-mounted concrete pump pipe carrier of construction.
The utility model is achieved by the following technical solution:Solid concrete roabed cast-in-place construction rail in a kind of subway tunnel Line concrete pump pipe carrier, it is made up of several pump pipe bracket bodies, pump pipe bracket body includes vehicle frame, vehicle frame bottom The left and right sides be provided with the wheel carrier of left and right distribution, wheel carrier is connected with rail wheel by wheel shaft, and the left and right ends of vehicle frame are all provided with Bail is equipped with, bail is connected with draw bar, and draws ring-side wall and be screwed with the puller bolt contacted with draw bar, vehicle frame top The left and right sides be provided with the positioning square tube of front and rear distribution, position and supporting leg be plugged with square tube, the connection of supporting leg top There is semicircle arcuation supporting plate, the front and rear sides of semicircle arcuation supporting plate are provided with puller bolt, the tail of semicircle arcuation supporting plate Arc distributor chute is provided with below portion, the rotating shaft fixed with semicircle arcuation supporting plate is provided with arc distributor chute.
During construction, to concrete transportation and Operation Van's marshalling can be poured, concrete pump is set on flat car, utilizes power supply As power, on road with putting some concrete hoppers on dressing plate car, with draw bar by some pump pipe bracket body roots It is integral according to concrete road bed one-time-concreting length connection, concrete pump pipe then is installed in semicircle arcuation supporting plate, mixed Coagulating the pump pipe union of native pump line all should be arranged on outside pump pipe bracket body in order to connect and dismantle.Using locomotive by pump line support Frame body pushes to railway roadbed and pours setting so that traction locomotive and the flat car for carrying concrete hopper and concrete pump are equal It is parked in and pours on track beyond operation area, proceeds by and pour operation, in casting process, locomotive traction working train batch (-type) It is mobile(One sleepers spacing of advance every time), by manual control arc distributor chute, concrete enters the railway roadbed road heart and rail In the sleeper gap of both sides, the purpose accurately poured to railway roadbed is realized.
Before concreting operation, concrete pump pipe interior AT STATION should carry out leak check and pump line moistening in advance, To ensure pump concrete normal operation, profit pipe mortar, which should be deposited on platform, to be focused on, after the completion of pouring operation, Operation Van Group returns to station and cleaned, and when plugging occurring in operation process, Operation Van's group returns is cleared up in station.Overcome existing Exist when solid concrete roabed is cast-in-place in subway tunnel and polluted because plugging occurs in long and work progress for concrete pumping The problem of being difficult to cleaning.
Some adjustment holes being mutually matched are provided with positioning square tube and supporting leg, latch, arc are provided with adjustment hole The front and rear sides of distributor chute are provided with handle.
It can be achieved to fix in semicircle arcuation supporting plate by the way that the adjustment hole for positioning square tube and supporting leg is mutually matched into connection Pump line according to be actually needed carry out up and down adjust, be advantageous to pouring construction.
The utility model is simple in construction, reasonable in design, due to laying waste road in advance, can increase the freight volume of each section of track, greatly Width improves section of track laying efficiency;Transport load does not enter in railway roadbed pouring molding region, and the too early bearing load of railway roadbed can be avoided to make With railway roadbed crack is induced, concrete pump is placed in working train front portion, shortens and pump distance, reduces pump tube length input, profit pipe, blocks up Waste caused by pipe;Concreting operation is carried out using dinkey traction pump line movement, concrete can accurately enter mould, reduce Artificial refining workload;Hopper, concrete pump, pump line etc. are interior AT STATION to concentrate cleaning, is easy to wastewater reuse approach, reduces in hole Pollution, improve environment in hole;The utility model has the characteristics that to improve work efficiency, reduces construction cost, in subway tunnel and city Solid concrete roabed concrete pouring construction occasion in the narrow working spaces such as the long bridge of light rail, there is wide popularizing application prospect.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 schematic side view.
In figure:1- vehicle frames, 2- wheel carriers, 3- rail wheels, 4- wheel shafts, 5- positioning square tubes, 6- supporting legs, 7- latches, 8- Curved support groove, 9- puller bolts, 10- bails, 10.1- puller bolts, 11- draw bars, 12- tubulose distributor chutes, 12.1- rotating shafts, 12.2- handles.
Embodiment
The utility model is further elaborated with reference to Fig. 1 and Fig. 2, solid concrete roabed cast-in-place construction is used in a kind of subway tunnel Rail-mounted concrete pump pipe carrier, it is made up of several pump pipe bracket bodies, pump pipe bracket body includes vehicle frame 1, vehicle frame 1 The wheel carrier 2 of left and right distribution is provided with left and right sides of bottom, wheel carrier 2 is connected with rail wheel 3, the left and right of vehicle frame 1 by wheel shaft 4 Both ends are provided with bail 10, and bail 10 is connected with draw bar 11, and the side wall of bail 10 is screwed with and contacted with draw bar 11 Puller bolt 10.1, the positioning square tube 5 of front and rear distribution is provided with left and right sides of the top of vehicle frame 1, positions in square tube 5 and inserts Supporting leg 6 is connected to, the top of supporting leg 6 is connected with semicircle arcuation supporting plate 8, and the front and rear sides of semicircle arcuation supporting plate 8 are respectively provided with There is puller bolt 9, be provided with arc distributor chute 12 below the afterbody of semicircle arcuation supporting plate 8, set on arc distributor chute 12 It is equipped with the rotating shaft 12.1 fixed with semicircle arcuation supporting plate 8.
Some adjustment holes being mutually matched are provided with positioning square tube 5 and supporting leg 6, latch 7, arc are provided with adjustment hole The front and rear sides of shape distributor chute 12 are provided with handle 12.2.

Claims (2)

  1. A kind of 1. rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel, it is characterised in that:If be by What dry pump pipe bracket body formed, pump pipe bracket body includes vehicle frame(1), vehicle frame(1)It is provided with left and right sides of bottom The wheel carrier of left and right distribution(2), wheel carrier(2)Pass through wheel shaft(4)It is connected with rail wheel(3), vehicle frame(1)Left and right ends be provided with Bail(10), bail(10)It is connected with draw bar(11), and bail(10)Side wall is screwed with and draw bar(11)Contact Puller bolt(10.1), vehicle frame(1)The positioning square tube of front and rear distribution is provided with left and right sides of top(5), position square tube(5) Inside it is plugged with supporting leg(6), supporting leg(6)Top is connected with semicircle arcuation supporting plate(8), semicircle arcuation supporting plate(8)'s Front and rear sides are provided with puller bolt(9), semicircle arcuation supporting plate(8)Afterbody below be provided with arc distributor chute (12), arc distributor chute(12)On be provided with and semicircle arcuation supporting plate(8)Fixed rotating shaft(12.1).
  2. 2. the rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel according to claim 1, its It is characterised by:Position square tube(5)And supporting leg(6)On be provided with some adjustment holes being mutually matched, be provided with adjustment hole slotting Pin(7), arc distributor chute(12)Front and rear sides be provided with handle(12.2).
CN201721182463.XU 2017-09-15 2017-09-15 The rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel Active CN207131969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721182463.XU CN207131969U (en) 2017-09-15 2017-09-15 The rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721182463.XU CN207131969U (en) 2017-09-15 2017-09-15 The rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel

Publications (1)

Publication Number Publication Date
CN207131969U true CN207131969U (en) 2018-03-23

Family

ID=61638852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721182463.XU Active CN207131969U (en) 2017-09-15 2017-09-15 The rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel

Country Status (1)

Country Link
CN (1) CN207131969U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109722955A (en) * 2018-12-28 2019-05-07 贵州大学 A kind of railway traffic engineering construction auxiliary equipment
CN110541332A (en) * 2019-08-14 2019-12-06 中铁六局集团有限公司 construction method of railway integral ballast bed in narrow tunnel
CN115369979A (en) * 2022-09-09 2022-11-22 中国二十冶集团有限公司 Construction device and construction method for large-diameter drainage pipeline in limited space

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109722955A (en) * 2018-12-28 2019-05-07 贵州大学 A kind of railway traffic engineering construction auxiliary equipment
CN110541332A (en) * 2019-08-14 2019-12-06 中铁六局集团有限公司 construction method of railway integral ballast bed in narrow tunnel
CN115369979A (en) * 2022-09-09 2022-11-22 中国二十冶集团有限公司 Construction device and construction method for large-diameter drainage pipeline in limited space

Similar Documents

Publication Publication Date Title
CN107653755B (en) Solid concrete roabed, which pours, in Subway Tunnel separate tunnel inverse makees formula construction method
CN207131969U (en) The rail-mounted concrete pump pipe carrier of solid concrete roabed cast-in-place construction in subway tunnel
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN104863375A (en) Multifunctional circulation transport cart
CN204715774U (en) Multi-functional revolution transport vehicle
CN102635369A (en) Construction method for integrally pouring inverted arch concrete by matching trestle with top formwork
CN109518544A (en) A kind of subway precast track plate railway roadbed laying method
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN203847130U (en) Cast-in-situ inverted arch lining trolley and concrete curing system capable of being synchronously constructed along with boring of TMB (tunnel boring machine)
CN111593621A (en) Movable pump pipe concrete pouring system for ballastless track integral ballast bed
CN101122116B (en) Tunnel-passing box beam flange plate back pouring method and special die carrier device for the same
CN105171911A (en) Bottom mold trolley
CN108952768A (en) A kind of stage apparatus of Shield tunnel secondary grouting
CN202755277U (en) Monolithic track bed construction system
CN208203298U (en) A kind of big punching block of rail type side wall
CN107100648B (en) Auxiliary facility and method for tunnel plain concrete lining construction
CN202248906U (en) Concrete transportation device for pouring lateral baffle block of ballast-free track of high-speed rail
CN206888997U (en) Tunnel plain concrete lining construction auxiliary equipment
CN202181900U (en) Inverted arch sliding mode concrete tunnel lining steel mould trolley
CN207159723U (en) Cast-in-place rail-mounted 3 cloth funnels of concrete of solid concrete roabed in subway tunnel
CN206477855U (en) A kind of counter-force for pushing away stepping for TBM Quick airs provides device
CN207672429U (en) A kind of cast-in-place guardrail activity tool car of highway bridge
WO2021223558A1 (en) Special operation vehicle for emergency traffic maintenance
CN202090592U (en) Right-angled corner template
CN217206472U (en) Tunnel invert lining is pour and is removed chute device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant