CN108952179A - A kind of bumps mirror surface wall of the moulding and construction method of smallpox - Google Patents
A kind of bumps mirror surface wall of the moulding and construction method of smallpox Download PDFInfo
- Publication number
- CN108952179A CN108952179A CN201810774864.7A CN201810774864A CN108952179A CN 108952179 A CN108952179 A CN 108952179A CN 201810774864 A CN201810774864 A CN 201810774864A CN 108952179 A CN108952179 A CN 108952179A
- Authority
- CN
- China
- Prior art keywords
- moulding
- smallpox
- installation
- sunpender
- metope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
- E04B9/225—Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like hanging at a distance below the supporting construction
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Finishing Walls (AREA)
Abstract
A kind of concave-convex mirror surface wall of moulding involved in the present invention and the construction method of smallpox, it includes unwrapping wire positioning process, spool wiring, lamp of air conditioner positioning process, smallpox lightgage steel joist lifts process, the wooden moulding in-depth processing, the pre-buried process of built-in fitting, the hidden sealing plate process of smallpox, smallpox emulsion paint base process, the wooden moulding installation, lamp installation and mirror installation procedure.Construction method similar with the prior art is compared to each other, and the present invention has the effect of simple to operate, construction is simple.
Description
[technical field]
The present invention relates to a kind of a kind of concave-convex mirror surface walls of moulding and the construction method of smallpox for the realm of building construction.
[background technique]
As living standard is continuously improved and develops, house decoration, which has become, meets the one of the pursuit of consumer's quality of life
Part.It lies fallow, is clean, comfortable environment can bring good mood to consumer.However, in the prior art, decorative house wall
Wall has various mode, the direct coating white coating having, and some is laid with the ceramic tile etc. of various styles.But in wall
Upper decoration white coating is laid with ceramic tile, after a period of time to be used, by extraneous moisture, and the invasion of the factors such as wind-force,
The coating for being coated on metope is easy to fall off;The ceramic tile of the laying is easy to fall off or loosens, to bring to consumer
Very poor effect.
[summary of the invention]
In view of this, technical problem to be solved by the invention is to provide a kind of simple to operate, construction is simple it is recessed
The mirror surface wall of convex moulding and the construction method of smallpox.
Above-mentioned technical problem is solved thus, and the technical solution in the present invention uses the mirror surface wall and day of a kind of concave-convex moulding
Colored construction method comprising unwrapping wire positioning process, spool wiring, air-conditioning and lamps and lanterns positioning process, the lifting of smallpox lightgage steel joist
Process, the wooden moulding in-depth, the processing pre-buried process of built-in fitting, the hidden sealing plate process of smallpox, smallpox emulsion paint base process, the wooden moulding
Installation, lamp installation and mirror installation procedure;Unwrapping wire positioning process: utilizing 3D stereoscan technology, by GPS positioning,
The level point of metope and smallpox above with timber template in equal height marks, and different shaping curved surface is put by even point solid
Line positions the accurate unwrapping wire of moulding smallpox and metope, allows every a line and each node seamless connection, guarantees blank size
It is accurate;Then, wall, smallpox basal plane are cleaned, it is desirable that basal plane is smooth, and no sharp object, Wu Mingshui is placed by drawing
Line orientation;It when placing lines, is required first according to construction design drawing, by the planar dimension of moulding bookcase, curve folding degree, mark
Height, position are all placed and are measured;Since moulding is that concave plane curve makes full use of wooden unit when placing lines
Line the zig zag plane of curve is showed, with wood particle be embedded in wall, produce moulding curve, with filament pull out curve arc
Degree, sees whether to meet the requirements, and by repeatedly modifying, carries out drawing in-depth, final determining moulding positioning.
It further limits, the spool wiring, air-conditioning and lamps and lanterns positioning process include spool deposition step, lamps and lanterns positioning
Step and air-conditioning install positioning step;Spool deposition step: to metope and smallpox burst at the seams slot when, it is first good with line of ink marker bullet, side
Just it positions, pipe face and metope are reserved more than or equal to 15 millimeters of powder grieshoch, prevent metope from cracking;The cable tubing of arrangement metope is walked
Turning is reduced when line and avoids wall mirror, prevents from being damaged by electric hammer or nail;Power supply line must not have connector in pipe, can not will be electric
Source line is directly daubed into metope, to guarantee that power supply line can be pulled and be replaced;The line of reserved air-conditioning, lamps and lanterns and all electric appliances of sound equipment
Position;Lamps and lanterns positioning step: each lamps and lanterns point placed by drawing checks whether to meet drawing requirement, if rushes with smallpox moulding
It is prominent;Air-conditioning installs positioning step: first determining air-conditioner host installation site, the secondary lamps and lanterns for avoiding moulding, selection setting fresh air
Mouthful and return air inlet position, re-optimization drawing requirement judges whether to meet the requirements, if drawing meet the requirements it is i.e. mountable.
It further limits, the smallpox lightgage steel joist lifting process includes snap the line step, fixed suspender member step, Yi Jian
Fill main joist step;Snap the line step: being first ferreted out level point with level on each corner or wall column, pops up levelling line, by hanging
Top plan view, concrete roof pop-up main joist position, main joist should from furred ceiling center to both sides separate, spacing be less than or
Equal to 1000 millimeters, and mark the fixed point of sunpender;1000 millimeters of the fixed point spacing of sunpender;Such as encounter consolidating for Liang Dao and pipeline
Fixed point is greater than design and regulatory requirements, should increase the fixed point of sunpender;Fixed hanging rod piece step: it is hung using expansion bolt fixation
Hanging rod part, furred ceiling and length of boom on ceiling are respectively smaller than 1000 millimeters, use diameter for 8 millimeters of sunpender;Sunpender is done
Antirust treatment, sunpender are fixed on floor with expansion bolt, and with impact electric hammer punching, the aperture in the hole should be slightly larger than expansion bolt
Diameter;Suspended ceiling lamp, air port and access hole should set additional sunpender;Install main joist step: main joist should be hung on sunpender,
The main joist spacing is between 900 millimeters to 1000 millimeters;Main joist is divided into lightgage steel joist and main tee;Main joist
The distance of cantilever segment is less than or equal to 300 millimeters, on the contrary then should increase sunpender;The part of two adjacent main joists merges docking;
The banjo fixing butt jointing of adjacent main joist will mutually stagger;Main joist should level substantially after hanging up properly;If there is big moulding ceiling, moulding
Certain applications angle steel or band steel are welded into frame, and are connected firmly with floor;Increase sunpender at moulding needing to install, reinforces branch
Support force amount.
It further limits, the wood moulding in-depth processing, the pre-buried process of built-in fitting: the wooden facing is optimized according to drawing to be added
Work determines the length of each radian on the wooden facing by actual conditions, because the height of every batten is different, needs to unite
One determines node, unified that expansion joint is arranged, to achieve the purpose that beautiful and facilitate installation;Since mould board is too long, so all
Preset installation is taken, scene splicing is installed after plant produced is good, equal numbering between each plate;Between every block of mould board
Sunpender built-in fitting is disposed, the installation of finished product is facilitated;The material of mould board is Miao's offset plate, which is by flame-retardant plywood and richness
The black titanium wire drawing fire-proof plate of beautify-house is constituted;White brushing lacquer is sprayed in factory, size is determined by drawing radian.
It further limits, the hidden sealing plate process of smallpox: before formal hidden sealing plate construction, first being measured with horizontal tube
Whether the line of ink marker of metope bullet is horizontal, it is ensured that the level of ground line avoids the furred ceiling generation inclination of installation or there are high and low fall;Nail
It is after making keel frame, frame is fixed on the wall, to go through whether the spacing between each frame is less than or equal to 300 millis
Rice, just there is enough fastness in this way;On the contrary then plasterboard is easy, fracture;The hidden sealing plate of plasterboard, because facing is white,
The drywall screw for sweeping paint stainless steel material fixes plasterboard, prevents nail from getting rusty, to ensure that plasterboard is beautiful for a long time;Stone
Hole for nailing on cream plate is handled usually using antirust hole for nailing putty;9 centimetres of folder is needed in the position of air conditioning air outlet and lamps and lanterns
Plate carries out sealing plate, to prevent the inadequate power carrying of plasterboard;Existing gap 801 glue and land plaster between two block gypsum plates
Mixture filling, it is on the contrary then apparent crack can be generated.
It further limits, smallpox emulsion paint base process: completely scraping first pass great Bai putty, it, will with sand paper after dry
Putty slag, the mottling of metope polish polishing, then clean up smallpox;Then, second time great Bai putty is completely scraped, after dry,
Polishing is polished with sand paper, and putty is mended again again to individual places;Gypsum putty can be mended again if any macroscopic void, after dry, then use sand
Paper polishes flat and cleans up;Puttying processing is only carried out in the moulding smallpox of substrate surface.
It further limits, the wood moulding installation, lamp installation and mirror installation procedure: is carried out after mould board to scene
Pre-splicing, after confirmation there are cavity in every block of plate, sunpender passes through laminate and connects with built-in fitting, is fixed;To all
Moulding is installed the installation of laggard portable lighter tool and mirror.
Advantageous effects of the invention: because the mirror surface wall of moulding concave-convex in the technical program and the construction method of smallpox are adopted
With unwrapping wire positioning process, spool wiring, lamp of air conditioner positioning process, smallpox lightgage steel joist lift process, the wooden moulding in-depth processing,
The pre-buried process of built-in fitting, the hidden sealing plate process of smallpox, smallpox emulsion paint base process, the wooden moulding installation, lamp installation and mirror
Sub- installation procedure, construction method similar with the prior art are compared to each other, and the present invention has simple to operate, construction is simple effect
Fruit.
With reference to the accompanying drawings and examples, described in further detail to technical solution of the present invention.
[Detailed description of the invention]
Fig. 1 is the concave-convex mirror surface wall of moulding and the schematic diagram of smallpox in the present invention.
[specific embodiment]
In order to be clearer and more clear technical problems, technical solutions and advantages to be solved, tie below
Drawings and examples are closed, the present invention is described in more detail.It should be appreciated that specific embodiment described herein is only to solve
The present invention is released, is not intended to limit the present invention.
It please refers to shown in Fig. 1, illustrates a kind of concave-convex mirror surface wall of moulding and the construction method of smallpox below with reference to embodiment,
It includes unwrapping wire positioning process, spool wiring, air-conditioning and lamps and lanterns positioning process, smallpox lightgage steel joist lifting process, the wooden moulding depth
Change processing, the pre-buried process of built-in fitting, the hidden sealing plate process of smallpox, smallpox emulsion paint base process, the wooden moulding installation, lamp installation
And mirror installation procedure.
Unwrapping wire positioning process: 3D stereoscan technology is utilized, by GPS positioning, in metope and smallpox above with timber
Template is marked in the level point of equal height, and different shaping curved surface makes the essence of moulding smallpox and metope by the even three-dimensional unwrapping wire of point
True unwrapping wire positioning, allows every a line and each node seamless connection, guarantees the accurate of blank size;Then, wall, day are cleaned
Flower basal plane, it is desirable that basal plane is smooth, no sharp object, and Wu Mingshui carries out placement line orientation by drawing;It is first when placing lines
It is first required according to construction design drawing, by the planar dimension of moulding bookcase, curve folding degree, absolute altitude, position is all placed and measurement
Out;Since moulding is that concave plane curve makes full use of the line of wooden unit by the zig zag plane of curve when placing lines
Show, be embedded in wall with wood particle, produce moulding curve, pulls out curve radian with filament, see whether to meet the requirements, pass through
Repeatedly modification carries out drawing in-depth, final to determine moulding positioning.
Spool wiring, air-conditioning and the lamps and lanterns positioning process includes spool deposition step, lamps and lanterns positioning step, Yi Jikong
Adjust installation positioning step.Spool deposition step: to metope and smallpox burst at the seams slot when, it is first good with line of ink marker bullet, facilitate positioning, pipe face
It is reserved more than or equal to 15 millimeters of powder grieshoch with metope, prevent metope from cracking;When arranging the cable tubing cabling of metope, reduces and turn
It is curved and avoid wall mirror, it prevents from being damaged by electric hammer or nail;Power supply line must not have connector in pipe, can not directly smear power supply line
Enter in metope, to guarantee that power supply line can be pulled and be replaced;The line position of reserved air-conditioning, lamps and lanterns and all electric appliances of sound equipment;Lamps and lanterns are fixed
Position step: each lamps and lanterns point placed by drawing checks whether to meet drawing requirement, if conflict with smallpox moulding;Air-conditioning peace
It fills positioning step: first determining air-conditioner host installation site, the secondary lamps and lanterns for avoiding moulding, selection setting fresh wind port and return air inlet
Position, re-optimization drawing requirement judges whether to meet the requirements, if drawing meet the requirements it is i.e. mountable.
The smallpox lightgage steel joist lifting process includes snap the line step, fixed suspender member step, and installation main joist step
Suddenly;Snap the line step: being first ferreted out level point with level on each corner or wall column, pops up levelling line, by ceiling plane figure,
Concrete roof pops up the position of main joist, and main joist should be separated from furred ceiling center to both sides, and spacing is less than or equal to 1000 millis
Rice, and mark the fixed point of sunpender;1000 millimeters of the fixed point spacing of sunpender;The fixed point for such as encountering Liang Dao and pipeline, which is greater than, to be set
Meter and regulatory requirements should increase the fixed point of sunpender, fixed hanging rod piece step: using the fixed hanging rod piece of expansion bolt, day
Furred ceiling and length of boom on card are respectively smaller than 1000 millimeters, use diameter for 8 millimeters of sunpender;Sunpender does antirust treatment,
Sunpender is fixed on floor with expansion bolt, and with impact electric hammer punching, the aperture in the hole should be slightly larger than the diameter of expansion bolt;It hangs
Washer luminaire, air port and access hole should set additional sunpender, and install main joist step: main joist should be hung on sunpender, the main dragon
Bone spacing is between 900 millimeters to 1000 millimeters;Main joist is divided into lightgage steel joist and main tee;The cantilever segment of main joist
Distance is less than or equal to 300 millimeters, on the contrary then should increase sunpender;The part of two adjacent main joists merges docking;Adjacent main dragon
The banjo fixing butt jointing of bone will mutually stagger;Main joist should level substantially after hanging up properly;If there is big moulding ceiling, contoured section application
Angle steel or band steel are welded into frame, and are connected firmly with floor;Increase sunpender at moulding needing to install, reinforces bracing force.
The wood moulding in-depth processing, the pre-buried process of built-in fitting: the wooden facing optimizes processing according to drawing, presses practical feelings
Condition reasonably determines the length of each radian on the wooden facing, because the height of every batten is different, needs unified true
Determine node, it is unified that expansion joint is set, to achieve the purpose that beautiful and facilitate installation;Since mould board is too long, all take preset
Installation, scene splicing is installed after plant produced is good, equal numbering between each plate;Sunpender is disposed between every block of mould board
Built-in fitting facilitates the installation of finished product;The material of mould board is Miao's offset plate, which is by flame-retardant plywood and the black titanium of rich beautify-house
Wire drawing fire-proof plate is constituted;White brushing lacquer is sprayed in factory, size is determined by drawing radian.
The hidden sealing plate process of smallpox: before formal hidden sealing plate construction, the ink of metope bullet is first measured with horizontal tube
Whether line is horizontal, it is ensured that the level of ground line avoids the furred ceiling generation inclination of installation or there are high and low fall;Nail makes keel frame
It is after frame, frame is fixed on the wall, it goes through whether the spacing between each frame is less than or equal to 300 millimeters, just has in this way
Enough fastness;On the contrary then plasterboard is easy, fracture;The hidden sealing plate of plasterboard sweeps paint with stainless because facing is white
The fixed plasterboard of the drywall screw of steel material, prevents nail from getting rusty, to ensure that plasterboard is beautiful for a long time;Hole for nailing on plasterboard
It would generally be handled with antirust hole for nailing putty;It needs 9 centimetres of clamping plate to carry out sealing plate in the position of air conditioning air outlet and lamps and lanterns, prevents
The only inadequate power carrying of plasterboard;801 glue of existing gap and the filling of land plaster mixture between two block gypsum plates, instead
Then generate apparent crack in the future.
Smallpox emulsion paint base process: completely scraping first pass great Bai putty, after dry, with sand paper by the putty of metope
Slag, mottling polish polishing, then clean up smallpox;Then, second time great Bai putty is completely scraped to be polished after dry with sand paper
Polishing, and putty is mended again again to individual places;Gypsum putty can be mended again if any macroscopic void, after dry, then polished flat with sand paper
And it cleans up;Puttying processing is only carried out in the moulding smallpox of substrate surface.
The wood moulding installation, lamp installation and mirror installation procedure: mould board is pre-splicing to carrying out after live, to be checked
It looks into errorless rear every block of plate there are cavity, sunpender passes through laminate and connects with built-in fitting, is fixed;It is installed to all moulding
The installation of laggard portable lighter tool and mirror.
In conclusion because the construction method of the concave-convex moulding mirror surface wall in the technical program and smallpox is using unwrapping wire positioning work
Sequence, spool wiring, lamp of air conditioner positioning process, smallpox lightgage steel joist lift process, the wooden moulding in-depth processing, the pre-buried work of built-in fitting
Sequence, the hidden sealing plate process of smallpox, smallpox emulsion paint base process, the wooden moulding installation, lamp installation and mirror installation procedure, with
The similar construction method of the prior art is compared to each other, and the present invention has the effect of construction is simple simple to operate.
Preferred embodiments of the present invention have been described above with reference to the accompanying drawings, not thereby limiting the scope of the invention.This
Field technical staff without departing from the scope and spirit of the invention in made by any modifications, equivalent replacements, and improvements, should all this
Within the interest field of invention.
Claims (7)
1. a kind of bumps mirror surface wall of the moulding and construction method of smallpox comprising unwrapping wire positioning process, spool wiring, air-conditioning and
Lamps and lanterns positioning process, smallpox lightgage steel joist lift process, the wooden moulding in-depth, the processing pre-buried process of built-in fitting, the hidden sealing plate of smallpox
Process, smallpox emulsion paint base process, the wooden moulding installation, lamp installation and mirror installation procedure;It is characterized by: unwrapping wire is fixed
Position process: 3D stereoscan technology is utilized, by GPS positioning, in metope and smallpox above with timber template in equal height
Level point mark, different shaping curved surface positions the accurate unwrapping wire of moulding smallpox and metope by the even three-dimensional unwrapping wire of point, allows every
A line and each node seamless connection, guarantee the accurate of blank size;Then, wall, smallpox basal plane are cleaned, it is desirable that basal plane
Smooth, no sharp object, Wu Mingshui carries out placement line orientation by drawing;When placing lines, first according to design drawing
Paper requirement, by the planar dimension of moulding bookcase, curve folding degree, absolute altitude, position is all placed and is measured;Since moulding is not
Regular planar curve makes full use of the line of wooden unit to show the zig zag plane of curve, is embedded in wood particle when placing lines
Wall produces moulding curve, pulls out curve radian with filament, sees whether to meet the requirements, and by repeatedly modifying, carries out drawing
In-depth, it is final to determine moulding positioning.
2. a kind of concave-convex mirror surface wall of moulding as described in claim 1 and the construction method of smallpox, it is characterised in that: described
Spool wiring, air-conditioning and lamps and lanterns positioning process include spool deposition step, lamps and lanterns positioning step and air-conditioning installation positioning step
Suddenly;Spool deposition step: to metope and smallpox burst at the seams slot when, it is first good using line of ink marker bullet, facilitate positioning, pipe face and metope are reserved
More than or equal to 15 millimeters powder grieshoch, prevent metope from cracking;It arranges and reduces turning when the cable tubing cabling of metope and avoid
Wall mirror prevents from being damaged by electric hammer or nail;Power supply line must not have connector in pipe, can not directly daub into power supply line in metope,
To guarantee that power supply line can be pulled and be replaced;The line position of reserved air-conditioning, lamps and lanterns and all electric appliances of sound equipment;Lamps and lanterns positioning step: it presses
Each lamps and lanterns point that drawing is placed, checks whether to meet drawing requirement, if conflict with smallpox moulding;Air-conditioning installation positioning step
It is rapid: first determine air-conditioner host installation site, the secondary lamps and lanterns for avoiding moulding, the position of fresh wind port and return air inlet is arranged in selection,
Re-optimization drawing requirement judges whether to meet the requirements, if drawing meet the requirements it is i.e. mountable.
3. a kind of concave-convex mirror surface wall of moulding as described in claim 1 and the construction method of smallpox, it is characterised in that: the day
Flower lightgage steel joist lifting process includes snap the line step, fixed suspender member step, and installation main joist step;Snap the line step: first
It is ferreted out level point on each corner or wall column with level, pops up levelling line, by ceiling plane figure, is popped up in concrete roof
The position of main joist, main joist should be separated from furred ceiling center to both sides, and spacing is less than or equal to 1000 millimeters, and marks sunpender
Fixed point;1000 millimeters of the fixed point spacing of sunpender;The fixed point for such as encountering Liang Dao and pipeline is greater than design and regulatory requirements, answers
Increase the fixed point of sunpender;Fixed hanging rod piece step: it using the fixed hanging rod piece of expansion bolt, furred ceiling on ceiling and hangs
Pole length is respectively smaller than 1000 millimeters, uses diameter for 8 millimeters of sunpender;Sunpender does antirust treatment, and sunpender is solid with expansion bolt
It is scheduled on floor, with impact electric hammer punching, the aperture in the hole should be slightly larger than the diameter of expansion bolt;Suspended ceiling lamp, air port and inspection
Additional sunpender should be set by repairing mouth;Install main joist step: main joist should be hung on sunpender, and the main joist spacing is between 900 millis
Rice is between 1000 millimeters;Main joist is divided into lightgage steel joist and main tee;The distance of the cantilever segment of main joist is less than or equal to
It is 300 millimeters, on the contrary then sunpender should be increased;The part of two adjacent main joists merges docking;The banjo fixing butt jointing of adjacent main joist is wanted
It mutually staggers;Main joist should level substantially after hanging up properly;If there is big moulding ceiling, contoured section application angle steel or band steel welding
It is connected firmly at frame, and with floor;Increase sunpender at moulding needing to install, reinforces bracing force.
4. a kind of concave-convex mirror surface wall of moulding as described in claim 1 and the construction method of smallpox, it is characterised in that: the wood
Moulding in-depth processing, the pre-buried process of built-in fitting: the wooden facing optimizes processing according to drawing, and reasonably wood is adornd by actual conditions
The length of each radian on face determines, because the height of every batten is different, needs unified determining node, unified to be arranged
Expansion joint, to achieve the purpose that beautiful and facilitate installation;Since mould board is too long, so all taking preset installation, factory is raw
Produce good rear scene splicing installation, equal numbering between each plate;Sunpender built-in fitting is disposed between every block of mould board, it is convenient
The installation of finished product;The material of mould board is Miao's offset plate, which is by flame-retardant plywood and the black titanium wire drawing fire-proof plate of rich beautify-house
It constitutes;White brushing lacquer is sprayed in factory, size is determined by drawing radian.
5. a kind of concave-convex mirror surface wall of moulding as described in claim 1 and the construction method of smallpox, it is characterised in that: the day
Spend hidden sealing plate process: before formal hidden sealing plate construction, whether the line of ink marker that metope bullet is first measured with horizontal tube is horizontal, it is ensured that
The level of ground line avoids the furred ceiling generation inclination of installation or there are high and low fall;After nail makes keel frame, frame is fixed
On the wall, whether the spacing that go through between each frame is less than or equal to 300 millimeters, just there is enough fastness in this way;Instead
Then plasterboard be easy sink, fracture;The hidden sealing plate of plasterboard sweeps the dry wall that paint uses stainless steel material because facing is white
Fixed plasterboard is followed closely, prevents nail from getting rusty, to ensure that plasterboard is beautiful for a long time;Hole for nailing on plasterboard is usually using antirust
Hole for nailing putty is handled;9 centimetres of clamping plate is needed to carry out sealing plate in the position of air conditioning air outlet and lamps and lanterns, it is inadequate to prevent plasterboard
Power carrying;801 glue of existing gap and the filling of land plaster mixture, on the contrary then can generate bright between two block gypsum plates
Aobvious crack.
6. a kind of concave-convex mirror surface wall of moulding as described in claim 1 and the construction method of smallpox, it is characterised in that: the day
Flower emulsion paint base process: completely scraping first pass great Bai putty and putty slag, the mottling of metope polished polishing with sand paper after dry,
Then smallpox is cleaned up;Then, it completely scrapes second time great Bai putty and polishes polishing with sand paper, and to individual places after dry
Mend putty again again;Gypsum putty can be mended again if any macroscopic void, after dry, then with sand paper polished flat and cleaned up;In base
The moulding smallpox on surface only carries out Puttying processing.
7. a kind of concave-convex mirror surface wall of moulding as described in claim 1 and the construction method of smallpox, it is characterised in that: the wood
Moulding installation, lamp installation and mirror installation procedure: pre-splicing, every block of plate after confirmation is carried out after mould board to scene
Interior sunpender passes through laminate and connects with built-in fitting there are cavity, is fixed;To all moulding be installed laggard portable lighter tool and
The installation of mirror.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810774864.7A CN108952179A (en) | 2018-07-16 | 2018-07-16 | A kind of bumps mirror surface wall of the moulding and construction method of smallpox |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810774864.7A CN108952179A (en) | 2018-07-16 | 2018-07-16 | A kind of bumps mirror surface wall of the moulding and construction method of smallpox |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108952179A true CN108952179A (en) | 2018-12-07 |
Family
ID=64481183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810774864.7A Pending CN108952179A (en) | 2018-07-16 | 2018-07-16 | A kind of bumps mirror surface wall of the moulding and construction method of smallpox |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108952179A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736484A (en) * | 2019-01-15 | 2019-05-10 | 上海尤安建筑设计股份有限公司 | Clear water brick parametrization spells brick building method |
CN109736518A (en) * | 2018-12-30 | 2019-05-10 | 中铁十四局集团有限公司 | Interior decoration construction method |
CN111889962A (en) * | 2020-06-24 | 2020-11-06 | 上海市建筑装饰工程集团有限公司 | Assembling construction method for large-area multi-curve complex artistic facing |
CN111894223A (en) * | 2020-06-24 | 2020-11-06 | 上海市建筑装饰工程集团有限公司 | Method for separating, externally processing and installing large-area multi-curved-surface artistic ribbon |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050247013A1 (en) * | 2004-05-04 | 2005-11-10 | Polycrete Systems, Ltd | Reinforced polymer panel and method for building construction |
CN202596185U (en) * | 2012-06-07 | 2012-12-12 | 苏州苏明装饰有限公司 | Ceiling and shaping locating system for ceiling |
CN103206066A (en) * | 2013-05-08 | 2013-07-17 | 内蒙古兴泰建筑有限责任公司 | Construction method of laminated suspension gypsum plaster board combinational suspended ceiling |
CN105089184A (en) * | 2015-08-11 | 2015-11-25 | 中建二局第三建筑工程有限公司 | Multi-curved concrete hollow modelling wall construction method and rhombic hollow structure formwork |
CN105421773A (en) * | 2015-10-30 | 2016-03-23 | 深圳市亚泰国际建设股份有限公司 | Construction method for light steel skeleton special-shaped model suspended ceiling |
CN106121218A (en) * | 2016-06-23 | 2016-11-16 | 青岛海川建设集团有限公司 | Polymorphic structure plank sheathing construction technology |
CN106193514A (en) * | 2016-08-23 | 2016-12-07 | 中建八局第二建设有限公司 | Irregular hyperboloid bamboo aluminum composite plate construction method |
CN106760560A (en) * | 2017-03-30 | 2017-05-31 | 青岛新华友建工集团股份有限公司 | Complicated arc list construction of Pyramid engineering method |
-
2018
- 2018-07-16 CN CN201810774864.7A patent/CN108952179A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050247013A1 (en) * | 2004-05-04 | 2005-11-10 | Polycrete Systems, Ltd | Reinforced polymer panel and method for building construction |
CN202596185U (en) * | 2012-06-07 | 2012-12-12 | 苏州苏明装饰有限公司 | Ceiling and shaping locating system for ceiling |
CN103206066A (en) * | 2013-05-08 | 2013-07-17 | 内蒙古兴泰建筑有限责任公司 | Construction method of laminated suspension gypsum plaster board combinational suspended ceiling |
CN105089184A (en) * | 2015-08-11 | 2015-11-25 | 中建二局第三建筑工程有限公司 | Multi-curved concrete hollow modelling wall construction method and rhombic hollow structure formwork |
CN105421773A (en) * | 2015-10-30 | 2016-03-23 | 深圳市亚泰国际建设股份有限公司 | Construction method for light steel skeleton special-shaped model suspended ceiling |
CN106121218A (en) * | 2016-06-23 | 2016-11-16 | 青岛海川建设集团有限公司 | Polymorphic structure plank sheathing construction technology |
CN106193514A (en) * | 2016-08-23 | 2016-12-07 | 中建八局第二建设有限公司 | Irregular hyperboloid bamboo aluminum composite plate construction method |
CN106760560A (en) * | 2017-03-30 | 2017-05-31 | 青岛新华友建工集团股份有限公司 | Complicated arc list construction of Pyramid engineering method |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736518A (en) * | 2018-12-30 | 2019-05-10 | 中铁十四局集团有限公司 | Interior decoration construction method |
CN109736484A (en) * | 2019-01-15 | 2019-05-10 | 上海尤安建筑设计股份有限公司 | Clear water brick parametrization spells brick building method |
CN111889962A (en) * | 2020-06-24 | 2020-11-06 | 上海市建筑装饰工程集团有限公司 | Assembling construction method for large-area multi-curve complex artistic facing |
CN111894223A (en) * | 2020-06-24 | 2020-11-06 | 上海市建筑装饰工程集团有限公司 | Method for separating, externally processing and installing large-area multi-curved-surface artistic ribbon |
CN111894223B (en) * | 2020-06-24 | 2023-05-02 | 上海市建筑装饰工程集团有限公司 | Method for separating, externally processing and installing large-area multi-curved-surface artistic ribbon |
CN111889962B (en) * | 2020-06-24 | 2023-06-06 | 上海市建筑装饰工程集团有限公司 | Assembly construction method for large-area multi-curve complex artistic facing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108952179A (en) | A kind of bumps mirror surface wall of the moulding and construction method of smallpox | |
CN103510631B (en) | A kind of indoor sound insulation constructing structure and construction method thereof | |
CN104032925B (en) | CSI house wall ground Stilt layer construction method | |
CN208792663U (en) | A kind of room finishing system | |
CN105421773A (en) | Construction method for light steel skeleton special-shaped model suspended ceiling | |
CN110439169A (en) | A kind of Thistle board ceiling construction process | |
CN204163299U (en) | For the indoor integrated finishing assembly of integration | |
CN105464309A (en) | Integral indoor decorating method and integral indoor decorating component | |
CN109057250A (en) | Assembled toilet construction method | |
CN205382610U (en) | Abnormal shape suspended ceiling structure | |
CN103321393A (en) | Interior wall plastering construction method | |
JP5861903B1 (en) | Indirect lighting structure unit parts | |
CN106760137A (en) | A kind of receipts side of adjustable decoration panel surplus and its application | |
CN104712121A (en) | Tile surface composite board | |
CN208777622U (en) | A kind of nodal wood type indoor wall facing panel cladding system | |
CN207919955U (en) | A kind of overlay film aluminium sheet metope mounting structure | |
CN207988307U (en) | Facing is in the plaster tablet suspended ceiling structure of metal effect | |
CN208996248U (en) | A kind of inner wall surface structure of main body wall | |
CN206438699U (en) | A kind of interchangeable decorating structure | |
CN105604287A (en) | Paving method of prefabricated composite wallboards | |
CN205035969U (en) | Integral wall plates | |
CN108824740A (en) | A kind of nodal wood type indoor wall facing panel cladding system | |
CN108978851A (en) | A kind of improvement room finishing system and decoration method | |
CN209585404U (en) | Gypsum furred ceiling | |
CN204040284U (en) | A kind of stone material composite honeycomb board installation of ceiling system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181207 |