CN202596185U - Ceiling and shaping locating system for ceiling - Google Patents
Ceiling and shaping locating system for ceiling Download PDFInfo
- Publication number
- CN202596185U CN202596185U CN 201220264830 CN201220264830U CN202596185U CN 202596185 U CN202596185 U CN 202596185U CN 201220264830 CN201220264830 CN 201220264830 CN 201220264830 U CN201220264830 U CN 201220264830U CN 202596185 U CN202596185 U CN 202596185U
- Authority
- CN
- China
- Prior art keywords
- ceiling
- moulding
- chi
- spring
- ruler
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a ceiling and shaping locating system for a ceiling. The locating system is characterized by comprising a plurality of ruler blocks, at least one spring strip connected with each ruler block, and at least a pair of fastening nuts, wherein each ruler block is provided with a temporary fixing holes which penetrates the ruler block longitudinally and a connecting hole channel which penetrates the ruler block transversely. The plurality of the ruler blocks are connected to the spring strips in series through the connecting hole channel. Two ends of the spring strip are respectively provided with a stud matched with each fastening nut. The fastening nuts are connected to the studs to form a locating flexible ruler. As an arc partition principle is used to form the locating flexible ruler, the locating system achieves ceiling construction of an arbitrary design, the construction is convenient, the flexible ruler can be used repeatedly, and the locating system is flexible and convenient.
Description
Technical field
The utility model relates to a kind of indoor decoration orientation tool, relates in particular to a kind of ceiling furred ceiling moulding navigation system, is specially adapted to irregular furred ceiling moulding location and uses, and improves efficiency of construction and quality, simplifies working process.
Background technology
Along with people's increases for the live and work environment requirement day by day; The application of furred ceiling also more and more widely; And become the important component part of Modern Interior Decoration; Not only can bring into play absorption and reflection sound equipment, illumination, ventilation and waterproof effect, but also can beautify indoor environment and improve whole indoor artistic effect.Furred ceiling is the indispensable decoration project of interior decoration, often by furred ceiling forms by hanging head, keel and facing plate, the keel installation process of its high and medium furred ceiling mainly contains the location, ground and assembles, lifts to this two step of absolute altitude.
Ground location assembling is meant according to design drawing the moulding of furred ceiling is projected to ground, then with three-ply board or five-layer plywood with the subpoint location that is linked in sequence, design desired moulding thereby form, make 1: 1 mock-up at last according to formed moulding; Hang high then being meant the reproduced model moulding that assembles is promoted to the absolute altitude place through setting up scaffold or lifting means to absolute altitude.
Yet, some deficiency below present job practices and orientation tool exist:
(1) when the process of location, ground assembling, because three-ply board or these positioning device structures of five-layer plywood are very unstable, thereby easy deformation causes the inaccurate and distortion of formed model accuracy in location process;
(2) after accomplish the location of furred ceiling; These three-ply boards or five-layer plywood can't reuse; Simultaneously corresponding each different furred ceiling need be produced different mock-ups; These mock-ups are difficult to rationally reclaim once more use, thus not only increased the installation cost of furred ceiling, but also reduced efficiency of construction;
(3) emerging in an endless stream owing to the Modern Decorative effect; The moulding of furred ceiling is more complicated and changeable; Unique and be rich in characteristic, no longer be confined to square-folded straight line moulding, increasing camber line, irregular line plastic furred ceiling have increased the difficulty of Design Orientation to the constructor; Need the man power and material of labor to position, otherwise be difficult to reach the effect of these furred ceiling moulding;
(4) design ribbon formula moulding on hang ceiling panel; The groove moulding of arc promptly is set on panel; The bore of these grooves is less and be curve modeling; Therefore the working space of inside grooves is less, is easy to cause that the end face location is inaccurate, arc is yielding, can't carry out effective coating operation, is prone to break the generation of the problems such as external corner of groove.
Summary of the invention
The utility model purpose provides a kind of ceiling furred ceiling moulding navigation system; Through using this navigation system and corresponding construction method, make the furred ceiling construction of irregular moulding more convenient, improve stability, the accuracy of location; Efficiency of construction is high; Recyclable utilization again, more environmental protection, and reduced installation cost.
For achieving the above object; The technical scheme that the utility model adopts is: a kind of ceiling furred ceiling moulding navigation system; Comprise that a plurality of chi pieces, at least one connect spring and at least one pair of locking nut of each chi piece; Each said chi piece is provided with the temporary fixed hole of vertically running through the chi piece and laterally runs through the connection duct of chi piece, and a plurality of said chi pieces are serially connected with on the said spring through said connection duct, and the two ends of said spring are respectively equipped with the double-screw bolt that cooperates with said locking nut; Said locking nut is bolted on the said double-screw bolt, constitutes the location tape.
In the technique scheme, said chi piece can adopt bakelite to process, according to the needs of detail of design line plastic; Select to be fit to the spring of length; The chi piece is serially connected with on the spring through connecting the duct successively, and the two ends that are positioned at spring are respectively equipped with double-screw bolt, treat that chi piece serial connection finishes; With the locking of chi piece, constitute the location tape with locking nut.Owing to be connected in series with spring between chi piece and the chi piece, utilize arc to separate principle, locate at will bending of tape; Satisfy the lines tendency needs of irregular detail of design; The constructor arranges the position of each piece chi piece according to the tendency of detail of design lines, then is screwed in temporary fixed hole with hold-down screw; The trend of stationary positioned tape conforms to detail of design.After treating that panel finishes along location tape laying, the hold-down screw on each chi piece is taken out just dismountable location tape; And the location tape of pulling down can be turned on the locking nut at two ends, and the chi piece is pulled down recovery, so; Just can avoid all analogue formations of corresponding each pattern moulding; The chi piece of forming the location tape simultaneously can use repeatedly, has reduced construction cost, has accelerated efficiency of construction.
In the technique scheme; The upper and lower connection duct that is respectively equipped with of said chi piece; Be provided with a said spring in each said connection duct, the two ends of each said spring are bolted with a said locking nut respectively, and said temporary fixed hole is positioned at the centre in two said connection ducts.
In the technique scheme, also comprise the plurality of fixed screw, said hold-down screw and said temporary fixed hole are complementary, and said hold-down screw is connected with modeling skeleton through this temporary fixed hole.
In the technique scheme, the width of the width of said chi piece and moulding groove adapts, and the thickness of chi piece is higher than moulding depth of groove 5mm at least.After laying finishes panel, remove the location tape, just form the moulding groove, meet the detail of design needs.
In the technique scheme, be provided with pad between said locking nut and the said location tape end face.
Job practices may further comprise the steps:
(1) moulding according to design customizes a plurality of chi pieces, and the chi piece is concatenated into the location tape with spring;
(2) make modeling skeleton according to detail of design, and be lifted in the lump on the ceiling,, the first floor skin plate is installed on the lightgage steel joist this first floor skin plate edge and the amalgamation mutually of said modeling skeleton edge along modeling skeleton with the substrate skeleton;
(3), will locate tape and pass temporary fixed hole through hold-down screw and be fixed on the modeling skeleton along the modeling skeleton tendency;
(4) along the tendency of location tape, panel base bar is passed the first floor skin plate through screw, be fixed on the lightgage steel joist;
(5) along the tendency of location tape, second layer panel is installed on the display panel substrate, and second layer skin plate is done surfacing;
(6) remove hold-down screw, remove the location tape, form and reserve the groove on panel, groove is carried out surfacing;
(7) counter plate and groove are done whole emulsion paint spraying.
In the technique scheme, the surfacing in the said step (5) does, to second layer skin plate surface batch putty 3 times, and the polishing sanding.
In the technique scheme, the surfacing in the said step (6) does, use floating rule with width to carry out putty to groove floor and repair levelling, and the polishing sanding.
In the technique scheme, during said step (2) lifting modeling skeleton, project to furred ceiling moulding setting-out on the ground according to design drawing size 1: 1; Make modeling skeleton; Again according to detail of design size 1: 1, with the mode of three one arcs, by ground back projection to ceiling; Confirm the moulding hoisting point position, then lift modeling skeleton.
Because the technique scheme utilization, the utility model compared with prior art has advantage:
1. be serially connected with on the spring by plural piece chi piece in the utility model, fix, constitute the location tape mutually suitable with detail of design by the locking nut at spring two ends; Rely on the retractility of spring, adjust the position of each piece chi piece, meet the tendency of modeling skeleton (being detail of design); And fix through temporary fixed hole and substrate with hold-down screw, the constructor just can lay panel base bar and panel along location tape tendency subsequently, removes the location tape at last; Just formed and the corresponding to groove of detail of design, realized the ribbon design of hang ceiling panel, easy construction; Avoid analogue formation repeatedly, improve efficiency of construction; Locating tape simultaneously can recover independently chi piece through removing locking nut, thereby realizes recycling use, has reduced construction cost, also more environmental protection;
2. according to the tendency of detail of design, tape is located in bending, and fixes with the temporary fixed hole of hold-down screw on the chi piece, thereby obtains precisely location, and the stable height of moulding, is easy to the laying of second layer skin plate, has guaranteed the perfection of later stage coating effect;
In the utility model to the camber line moulding time, according to realizing detail of design, select for use one or more tape splicing to be shaped, guaranteed continuity, fluency, the naturality of moulding, make finished product more attractive in appearance, saved in the past model and done the trouble at angle.
Description of drawings
Fig. 1 is the structural representation of location tape among the utility model embodiment one;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the user mode figure of location tape among the utility model embodiment one;
Fig. 4 is the structural representation of chi piece among Fig. 1;
Fig. 5 is the construction positioning states sketch map of location tape among the utility model embodiment one;
Fig. 6 is the sketch map of construction method step among the utility model embodiment one (1)~(4);
Fig. 7 is the sketch map of construction method step among the utility model embodiment one (5)~(7).
Wherein: 1, chi piece; 2, spring; 3, locking nut; 4, temporary fixed hole; 5, connect the duct; 6, double-screw bolt; 7, pad; 8, location tape; 9, arc groove; 10, hold-down screw; 11, first floor skin plate; 12, lightgage steel joist; 13, modeling skeleton; 14, panel base bar; 15, second layer skin plate; 16, putty; 17, groove.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further described:
Embodiment one: shown in Fig. 1~7; A kind of roof furred ceiling moulding navigation system; Comprise 1,2 5mm spring 2 and 2 pairs of locking nuts 3 that connect each chi piece 1 of a plurality of chi pieces, each said chi piece 1 is provided with the temporary fixed hole 4 of vertically running through chi piece 1 and the connection duct 5 of laterally running through chi piece 1, and a plurality of said chi pieces 1 are serially connected with on the said spring 2 through said connection duct 5; The two ends of said spring 2 are respectively equipped with the double-screw bolt 6 that cooperates with said locking nut 3; Said locking nut 3 through pad 7 be bolted in said on, constitute location tape 8 (as shown in Figure 3), the length of the number of chi piece 1, spring 2 adapts with the pattern lines length at construction place to be positioned; The width of the width of said chi piece 1 and moulding groove adapts, and the thickness of chi piece 1 is higher than moulding depth of groove 5mm.
As shown in Figure 2; Said chi piece 1 is the bakelite piece; The chi piece 1 upper and lower connection duct 5 that is respectively equipped with; Be provided with a said spring 2 in each said connection duct 5, the two ends of each said spring 2 are bolted with a said locking nut 3 respectively, and said temporary fixed hole 4 is positioned at the centre in two said connection ducts 5.Corresponding hold-down screw 10 on each piece chi piece 1, said hold-down screw 10 and said temporary fixed hole 4 couplings, said hold-down screw 10 connects through these temporary fixed hole 4 modeling skeleton 13.
The job practices of present embodiment like Fig. 6, shown in 7, may further comprise the steps:
(1) moulding according to design customizes a plurality of chi pieces 1, and chi piece 1 usefulness spring 2 is concatenated into location tape 8, according to the pattern length of design, makes one or more location tape 8;
(2) project to furred ceiling moulding setting-out on the ground according to design drawing size 1: 1, make modeling skeleton 13, again according to detail of design size 1: 1; With the mode of three one arcs, to ceiling, confirm the moulding hoisting point position by ground back projection; Then lift modeling skeleton 13 and lightgage steel joist 12 on ceiling; Along modeling skeleton 13, first floor skin plate 11 is installed on the lightgage steel joist 12 these first floor skin plate 11 edges and the amalgamation mutually of said modeling skeleton 13 edges;
(3) along modeling skeleton 13 tendencies, one or more location tape 8 is passed temporary fixed hole 4 through hold-down screw 10 be fixed on the modeling skeleton 13, piece together the ribbon moulding that conforms to detail of design;
(4) along the tendency of location tape 8, panel base bar 14 is passed first floor skin plate 11 through screw, be fixed on the lightgage steel joist 12;
(5) along the tendency of location tape 8, second layer skin plate 15 is layed on the panel base bar 14, and to second layer skin plate 15 surface batch 3 times putty 16, and the polishing sanding;
(6) remove hold-down screw 10, remove location tape 8, form and reserve the groove 17 on panel 15, use floating rule to carry out putty 16 repairing levellings with width to groove floor, and the polishing sanding;
(7) second layer skin plate 15 and groove 17 are done whole emulsion paint spraying.
The principle of utilizing arc to separate through the combination of polylith chi piece 1, by the telescopic resilience of spring 2, is imbued with the ability that location tape 8 has crooked radian arbitrarily and moulding, satisfies the needs of detail of design.After second layer skin plate 15 is laid and accomplished, remove soft 8 chis in location, form the arc groove 9 (as shown in Figure 5) consistent with detail of design; And the location tape 8 that is removed is detachable, and recycling use reduces construction cost; With the method construction, the continuity of moulding, fluency, naturality are better.
Claims (5)
1. ceiling furred ceiling moulding navigation system; It is characterized in that: comprise that a plurality of chi pieces, at least one connect spring and at least one pair of locking nut of each chi piece; Each said chi piece is provided with the temporary fixed hole of vertically running through the chi piece and laterally runs through the connection duct of chi piece; A plurality of said chi pieces are serially connected with on the said spring through said connection duct; The two ends of said spring are respectively equipped with the double-screw bolt that cooperates with said locking nut, and said locking nut is bolted on the said double-screw bolt, constitute the location tape.
2. ceiling furred ceiling moulding navigation system according to claim 1; It is characterized in that: the upper and lower connection duct that is respectively equipped with of said chi piece; Be provided with a said spring in each said connection duct; The two ends of each said spring are bolted with a said locking nut respectively, and said temporary fixed hole is positioned at the centre in two said connection ducts.
3. ceiling furred ceiling moulding navigation system according to claim 1 and 2 is characterized in that: also comprise the plurality of fixed screw, said hold-down screw and said temporary fixed hole are complementary, and said hold-down screw is connected with modeling skeleton through this temporary fixed hole.
4. ceiling furred ceiling moulding navigation system according to claim 1, it is characterized in that: the width of said chi piece matches with the width of moulding groove, and the thickness of chi piece is higher than moulding depth of groove 5mm at least.
5. ceiling furred ceiling moulding navigation system according to claim 1 is characterized in that: be provided with pad between said locking nut and the said location tape end face.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220264830 CN202596185U (en) | 2012-06-07 | 2012-06-07 | Ceiling and shaping locating system for ceiling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220264830 CN202596185U (en) | 2012-06-07 | 2012-06-07 | Ceiling and shaping locating system for ceiling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202596185U true CN202596185U (en) | 2012-12-12 |
Family
ID=47313733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220264830 Withdrawn - After Issue CN202596185U (en) | 2012-06-07 | 2012-06-07 | Ceiling and shaping locating system for ceiling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202596185U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102691406A (en) * | 2012-06-07 | 2012-09-26 | 苏州苏明装饰有限公司 | Ceiling model positioning system and construction method |
CN108952179A (en) * | 2018-07-16 | 2018-12-07 | 深圳市中建南方建设集团有限公司 | A kind of bumps mirror surface wall of the moulding and construction method of smallpox |
-
2012
- 2012-06-07 CN CN 201220264830 patent/CN202596185U/en not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102691406A (en) * | 2012-06-07 | 2012-09-26 | 苏州苏明装饰有限公司 | Ceiling model positioning system and construction method |
CN102691406B (en) * | 2012-06-07 | 2014-08-20 | 苏州苏明装饰股份有限公司 | Ceiling model positioning system and construction method |
CN108952179A (en) * | 2018-07-16 | 2018-12-07 | 深圳市中建南方建设集团有限公司 | A kind of bumps mirror surface wall of the moulding and construction method of smallpox |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105569251B (en) | Device for split-level ceiling and installation method | |
CN102691406B (en) | Ceiling model positioning system and construction method | |
CN109267712A (en) | A kind of wall decoration method | |
CN202596185U (en) | Ceiling and shaping locating system for ceiling | |
CN205530908U (en) | Furred ceiling falls a grade device | |
CN106609583A (en) | A functional wall surface plastic panel | |
CN102535807B (en) | Modular wall tile pre-bonding structure and construction method thereof | |
CN210917935U (en) | Assembled integrated upgrade version gypsum board top wall | |
CN103696547A (en) | Modular mounting method of geometrical decorations on wall and decoration modules | |
CN105328545A (en) | Double-face grinding mechanism for gypsum board | |
CN107268849A (en) | Modularization environment protection wall board wall surface decoration system | |
CN102888966A (en) | Combined type wall plate and combined type wall plate system used for interior decoration | |
CN204781758U (en) | Portable decoration wallboard | |
CN201908415U (en) | Wall decorative board layer structure | |
CN100585112C (en) | Installation method for building decorative board | |
CN210598022U (en) | Skirting line assembly with face decoration closing-in function | |
CN210622231U (en) | Novel stainless steel skirting line | |
CN104989057A (en) | Concave-convex clamp groove type composite multi-layer wall surface suspended ceiling decoration integrated board | |
CN210263690U (en) | External corner assembly | |
CN210857883U (en) | Top corner line piece and top corner sliding rail for surface decoration closing-in | |
CN210263691U (en) | Internal corner splicing decoration strip | |
CN106150003A (en) | The mounting structure of the wooden pedal of a kind of cement stairway and be mounted directly method | |
TW201710584A (en) | Construction method of post-fabricating old building wall surface into exposed concrete without needs of templates and grouting, thereby reducing cost and increasing construction efficiency | |
CN206987259U (en) | A kind of building decoration wallboard | |
CN204475661U (en) | Novel partition plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 215000 Xiangcheng District, Jiangsu Province, Yang Cheng Road, No. 98, No. Patentee after: Suzhou Suming Decoration Co., Ltd. Address before: 215000 Xiangcheng District, Jiangsu Province, Yang Cheng Road, No. 98, No. Patentee before: Suzhou Suming Decoration Co.,Ltd. |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20121212 Effective date of abandoning: 20140820 |
|
RGAV | Abandon patent right to avoid regrant |