CN102691406B - Ceiling model positioning system and construction method - Google Patents

Ceiling model positioning system and construction method Download PDF

Info

Publication number
CN102691406B
CN102691406B CN201210184811.2A CN201210184811A CN102691406B CN 102691406 B CN102691406 B CN 102691406B CN 201210184811 A CN201210184811 A CN 201210184811A CN 102691406 B CN102691406 B CN 102691406B
Authority
CN
China
Prior art keywords
moulding
ceiling
chi
navigation system
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210184811.2A
Other languages
Chinese (zh)
Other versions
CN102691406A (en
Inventor
周国良
王小磊
吴安然
陈燕
刘丽娜
戴五平
王卫新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Suming Decoration Co Ltd
Original Assignee
Suzhou Suming Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Suming Decoration Co Ltd filed Critical Suzhou Suming Decoration Co Ltd
Priority to CN201210184811.2A priority Critical patent/CN102691406B/en
Publication of CN102691406A publication Critical patent/CN102691406A/en
Application granted granted Critical
Publication of CN102691406B publication Critical patent/CN102691406B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a ceiling model positioning system. The system is characterized by comprising a plurality of ruler blocks, at least one spring bar for connecting the ruler blocks and at least one pair of locking nuts, wherein each ruler block is provided with a temporary fixing hole and a connecting duct; a plurality of ruler blocks are connected in series with the spring bar through the connecting holes; a bolt matched with each locking nut is arranged at each of two ends of the spring bar; and the locking nuts are screwed on the bolts to form a positioning flexible ruler. A method comprises the following steps of: spreading a first layer of base plate on a keel; sticking a lofting drawing; customizing the positioning flexible ruler, and fixing the positioning flexible ruler according to the lofting drawing; spreading panel base strips and a panel; detaching the positioning flexible ruler; and integrally spraying latex paint to the panel and grooves. The positioning flexible ruler is customized by using the arc partition principle, so that construction of a ceiling of any drawing is realized; the construction is convenient; and the flexible ruler can be reused and is flexible and convenient.

Description

A kind of ceiling suspended ceiling moulding navigation system and construction method
Technical field
The present invention relates to a kind of indoor decoration orientation tool and construction method, relate in particular to a kind of ceiling suspended ceiling moulding navigation system and construction method, be specially adapted to irregular suspended ceiling modeling location and use, improve efficiency of construction and quality, simplify working process.
Background technology
Along with people increase day by day for the requirement of live and work environment, the application of furred ceiling is also more and more extensive, and become the important component part of Modern Interior Decoration, not only can bring into play the effect that absorbs and reflect sound equipment, illumination, ventilation and waterproof, but also can beautify indoor environment and improve whole indoor artistic effect.Furred ceiling is the indispensable decoration project of interior decoration, often by furred ceiling by hanging head, keel and decoration panel, form, the keel installation process of its high and medium furred ceiling mainly contains the assembling of location, ground, lifts to this two step of absolute altitude.
Ground location assembling refers to according to design drawing the moulding of furred ceiling is projected to ground, then with three-ply board or five-layer plywood by the subpoint location that is linked in sequence, thereby form, design desired moulding, finally according to formed moulding, make the mock-up of 1: 1; Hanging height refers to the reproduced model moulding assembling is promoted to absolute altitude place by setting up scaffold or lifting means to absolute altitude.
Yet there is following some deficiency in current construction method and orientation tool:
(1) when the process of ground location assembling, due to three-ply board or these positioning device structures of five-layer plywood very unstable, thereby in the process of location easily distortion cause the inaccurate and distortion of formed model accuracy;
(2) after the location of furred ceiling completes, these three-ply boards or five-layer plywood cannot reuse, simultaneously corresponding each different furred ceiling need to be produced different mock-ups, these mock-ups are difficult to rationally again reclaim and use, so not only increased the installation cost of furred ceiling, but also reduced efficiency of construction;
(3) emerging in an endless stream due to Modern Decorative effect, the moulding of furred ceiling is more complicated and changeable, unique and be rich in characteristic, no longer be confined to square-folded straight line moulding, increasing camber line, irregular line plastic furred ceiling have increased the difficulty of Design Orientation to constructor, need to expend a large amount of man power and materials and position, otherwise be difficult to reach the effect of these suspended ceiling modelings;
(4) in hang ceiling panel, design the moulding of ribbon formula, the groove moulding of arc is set on panel, the bore of these grooves is less and be curve modeling, the working space of inside grooves is less, therefore be easy to cause that end face location is inaccurate, arc is yielding, cannot carry out effective coating operation, easily breaks the generation of the problems such as external corner of groove.
Summary of the invention
The object of the invention is to provide a kind of ceiling suspended ceiling moulding navigation system and construction method, by using this navigation system and corresponding construction method, make the ceiling construction of irregular moulding more convenient, improve stability, the accuracy of location, efficiency of construction is high, recyclable recycling, more environmental protection, and reduced installation cost.
For achieving the above object, the technical solution used in the present invention is: a kind of ceiling suspended ceiling moulding navigation system, comprise that a plurality of chi pieces, at least one connect spring and at least one pair of locking nut of each chi piece, described in each, chi piece is provided with the temporary fixed hole of longitudinally running through chi piece and the connection duct of laterally running through chi piece, a plurality of described chi pieces are serially connected with on described spring by described connection duct, the two ends of described spring are respectively equipped with the double-screw bolt coordinating with described locking nut, described locking nut is bolted on described double-screw bolt, forms location tape.
In technique scheme, described chi piece can adopt bakelite to make, according to the needs of detail of design line plastic, select to be applicable to the spring of length, chi piece is serially connected with on spring successively through connecting duct, and the two ends that are positioned at spring are respectively equipped with double-screw bolt, treat that chi piece serial connection is complete, with locking nut, by the locking of chi piece, form location tape.Due between chi piece and chi piece, with spring, be connected in series, utilize arc to separate principle, location tape can be at will crooked, meet the lines tendency needs of irregular detail of design, constructor, according to the tendency of detail of design lines, arranges the position of each piece chi piece, then with hold-down screw, in temporary fixed hole, is screwed into, the trend of stationary positioned tape, conforms to detail of design.After treating that panel is laid along location tape, hold-down screw on each chi piece is taken out, just dismountable location tape, and the location tape of pulling down can be turned on the locking nut at two ends, chi piece is pulled down to recovery, so, just can avoid corresponding each pattern moulding analogue formation, the chi piece that simultaneously forms location tape can Reusability, has reduced construction cost, has accelerated efficiency of construction.
In technique scheme, the upper and lower connection duct that is respectively equipped with of described chi piece, described in each, connect in duct, be provided with one described in spring, described in each the two ends of spring be bolted with one respectively described in locking nut, described temporary fixed hole is positioned at the centre in two described connection ducts.
In technique scheme, also comprise a plurality of hold-down screws, described hold-down screw and described temporary fixed hole match, and described hold-down screw is connected with modeling skeleton through this temporary fixed hole.
In technique scheme, the width of the width of described chi piece and moulding groove adapts, and the thickness of chi piece is higher than moulding depth of groove 5mm at least.After laying complete panel, remove location tape, just form moulding groove, meet detail of design needs.
In technique scheme, between described locking nut and described location tape end face, be provided with pad.
For achieving the above object, the method and technology scheme that the present invention adopts is: a kind of ceiling suspended ceiling moulding construction method, comprises the following steps:
(1) according to the moulding of design, customize a plurality of chi pieces, chi piece is concatenated into location tape with spring;
(2) according to detail of design, make modeling skeleton, and be lifted in the lump on ceiling with substrate skeleton, along modeling skeleton, first floor skin plate is installed on lightgage steel joist to this first floor skin plate edge and the phase amalgamation of described modeling skeleton edge;
(3), along modeling skeleton tendency, location tape is fixed in modeling skeleton through temporary fixed hole through hold-down screw;
(4) along the tendency of location tape, panel base bar is passed to first floor skin plate through screw, be fixed on lightgage steel joist;
(5) along the tendency of location tape, second layer erecting of panel, on display panel substrate, and is done to surfacing to second layer skin plate;
(6) remove hold-down screw, remove location tape, form and reserve the groove on panel, groove is carried out to surfacing;
(7) counter plate and groove are done whole emulsion paint spraying.
In technique scheme, the surfacing in described step (5) is, to second layer skin plate surface batch putty 3 times, and the sanding of polishing.
In technique scheme, the surfacing in described step (6) is, to groove floor, use the floating rule of same width to carry out putty and repair levelling, and the sanding of polishing.
In technique scheme, during described step (2) lifting modeling skeleton, according to design drawing size, suspended ceiling modeling setting-out was projected on ground in 1: 1, make modeling skeleton, again according to detail of design size 1: 1, in the mode of three one arcs, by ground back projection to ceiling, determine moulding hoisting point position, then lift modeling skeleton.
Because technique scheme is used, the present invention compared with prior art has following advantages:
1. in the present invention, by plural piece chi piece, be serially connected with on spring, locking nut by spring two ends is fixed, form the location tape mutually suitable with detail of design, rely on the retractility of spring, adjust the position of each piece chi piece, the tendency that meets modeling skeleton (being detail of design), and fix through temporary fixed hole and substrate with hold-down screw, constructor just can lay panel base bar and panel along location tape tendency subsequently, finally remove location tape, just formed the groove consistent with detail of design, realize the ribbon design of hang ceiling panel, easy construction, avoid analogue formation repeatedly, improve efficiency of construction, locating tape can recover independently chi piece by removing locking nut simultaneously, thereby realizes recycling use, has reduced construction cost, also more environmental protection,
2. according to the tendency of detail of design, tape is located in bending, and the temporary fixed hole on chi piece is fixed with hold-down screw, thereby obtains precise positioning, and moulding stability is high, is easy to the laying of second layer skin plate, has guaranteed the perfection of later stage coating effect;
In the present invention when to camber line moulding, according to realizing detail of design, select the splicing of one or more tape to be shaped, guaranteed continuity, fluency, the naturality of moulding, make finished product more attractive in appearance, saved model in the past and done the trouble at angle.
Accompanying drawing explanation
Fig. 1 locates the structural representation of tape in the embodiment of the present invention one;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the use state diagram of locating tape in the embodiment of the present invention one;
Fig. 4 is the structural representation of chi piece in Fig. 1;
Fig. 5 is the construction positioning states schematic diagram of locating tape in the embodiment of the present invention one;
Fig. 6 is the schematic diagram of construction method step in the embodiment of the present invention one (1)~(4);
Fig. 7 is the schematic diagram of construction method step in the embodiment of the present invention one (5)~(7).
Wherein: 1, chi piece; 2, spring; 3, locking nut; 4, temporary fixed hole; 5, connect duct; 6, double-screw bolt; 7, pad; 8, location tape; 9, arc groove; 10, hold-down screw; 11, first floor skin plate; 12, lightgage steel joist; 13, modeling skeleton; 14, panel base bar; 15, second layer skin plate; 16, putty; 17, groove.
The specific embodiment
Below in conjunction with drawings and Examples, the invention will be further described:
Embodiment mono-: shown in Fig. 1~7, a kind of roof suspended ceiling modeling navigation system, comprise a plurality of chi pieces 1, article 2, connect 5mm spring 2 and 2 pairs of locking nuts 3 of each chi piece 1, described in each, chi piece 1 is provided with the temporary fixed hole 4 of longitudinally running through chi piece 1 and the connection duct 5 of laterally running through chi piece 1, a plurality of described chi pieces 1 are serially connected with on described spring 2 by described connection duct 5, the two ends of described spring 2 are respectively equipped with the double-screw bolt 6 coordinating with described locking nut 3, described locking nut 3 through pad 7 be bolted in described on, form location tape 8 (as shown in Figure 3), the number of chi piece 1, the length of spring 2 adapts with the pattern lines length at construction place to be positioned, the width of the width of described chi piece 1 and moulding groove adapts, the thickness of chi piece 1 is higher than moulding depth of groove 5mm.
As shown in Figure 2, described chi piece 1 is bakelite piece, the upper and lower connection duct 5 that is respectively equipped with of chi piece 1, described in each, connect in duct 5, be provided with one described in spring 2, described in each the two ends of spring 2 be bolted with one respectively described in locking nut 3, described temporary fixed hole 4 is positioned at the centre in two described connection ducts 5.A corresponding hold-down screw 10 on each piece chi piece 1, described hold-down screw 10 mates with described temporary fixed hole 4, and described hold-down screw 10 connects through these temporary fixed hole 4 modeling skeleton 13.
Construction method, as shown in Figure 6,7, comprises the following steps:
(1) according to the moulding of design, customize a plurality of chi pieces 1, chi piece 1 use spring 2 is concatenated into location tape 8, according to the pattern length of design, make one or more location tape 8;
(2) according to design drawing size, suspended ceiling modeling setting-out was projected on ground in 1: 1, make modeling skeleton 13, again according to detail of design size 1: 1, in the mode of three one arcs, by ground back projection, to ceiling, determine moulding hoisting point position, then lift modeling skeleton 13 and lightgage steel joist 12 on ceiling, along modeling skeleton 13, first floor skin plate 11 is installed on lightgage steel joist 12 to these first floor skin plate 11 edges and described modeling skeleton 13 edge phase amalgamations;
(3) along modeling skeleton 13 tendencies, one or more location tape 8 is fixed in modeling skeleton 13 through temporary fixed hole 4 through hold-down screw 10, piece together the ribbon moulding conforming to detail of design;
(4) along the tendency of location tape 8, panel base bar 14 is passed to first floor skin plate 11 through screw, be fixed on lightgage steel joist 12;
(5) along the tendency of location tape 8, second layer skin plate 15 is layed on panel base bar 14, and to second layer skin plate 15 surface batch 3 times putty 16, and the sanding of polishing;
(6) remove hold-down screw 10, remove location tape 8, form and reserve the groove 17 on panel 15, to groove floor, use the floating rule of same width to carry out putty 16 and repair levelling, and the sanding of polishing;
(7) second layer skin plate 15 and groove 17 are done to whole emulsion paint spraying.
The principle of utilizing arc to separate, by the combination of polylith chi piece 1, by the telescopic resilience of spring 2, is imbued with the ability that location tape 8 has crooked radian arbitrarily and moulding, meets the needs of detail of design.After second layer skin plate 15 has been laid, remove soft 8 chis in location, form the arc groove 9 (as shown in Figure 5) consistent with detail of design, and the location tape 8 being removed is detachable, recycling use, reduce construction cost, with the method construction, the continuity of moulding, fluency, naturality are better.

Claims (9)

1. a ceiling suspended ceiling moulding navigation system, it is characterized in that: comprise that a plurality of chi pieces, at least one connect spring and at least one pair of locking nut of each chi piece, described in each, chi piece is provided with the temporary fixed hole of longitudinally running through chi piece and the connection duct of laterally running through chi piece, a plurality of described chi pieces are serially connected with on described spring by described connection duct, the two ends of described spring are respectively equipped with the double-screw bolt coordinating with described locking nut, described locking nut is bolted on described double-screw bolt, forms location tape.
2. ceiling suspended ceiling moulding navigation system according to claim 1, it is characterized in that: the upper and lower connection duct that is respectively equipped with of described chi piece, described in each, connect in duct, be provided with one described in spring, described in each the two ends of spring be bolted with one respectively described in locking nut, described temporary fixed hole is positioned at the centre in two described connection ducts.
3. ceiling suspended ceiling moulding navigation system according to claim 1 and 2, is characterized in that: also comprise a plurality of hold-down screws, described hold-down screw and described temporary fixed hole match, and described hold-down screw is connected with modeling skeleton through this temporary fixed hole.
4. ceiling suspended ceiling moulding navigation system according to claim 1, is characterized in that: the width of described chi piece matches with the width of moulding groove, and the thickness of chi piece is higher than moulding depth of groove 5mm at least.
5. ceiling suspended ceiling moulding navigation system according to claim 1, is characterized in that: between described locking nut and described location tape end face, be provided with pad.
6. right to use requires the construction method that the navigation system described in 1 is carried out ceiling suspended ceiling moulding, comprises the following steps:
(1) according to the moulding of design, customize a plurality of chi pieces, chi piece is concatenated into location tape with spring;
(2) according to detail of design, make modeling skeleton, and be lifted in the lump on ceiling with substrate skeleton, along modeling skeleton, first floor skin plate is installed on lightgage steel joist to this first floor skin plate edge and the phase amalgamation of described modeling skeleton edge;
(3) along modeling skeleton, walking to locate tape is fixed on first floor skin plate through temporary fixed hole through hold-down screw;
(4) along the tendency of location tape, panel base bar is passed to first floor skin plate through screw, be fixed on lightgage steel joist;
(5) along the tendency of location tape, second layer erecting of panel, on display panel substrate, and is done to surfacing to second layer skin plate;
(6) remove hold-down screw, remove location tape, form and reserve the groove on panel, groove is carried out to surfacing;
(7) counter plate and groove are done whole emulsion paint spraying.
7. navigation system according to claim 6 is carried out the construction method of ceiling suspended ceiling moulding, it is characterized in that: the surfacing in described step (5) is, to second layer skin plate surface batch putty 3 times, and the sanding of polishing.
8. navigation system according to claim 6 is carried out the construction method of ceiling suspended ceiling moulding, it is characterized in that: the surfacing in described step (6) is, and to groove floor, use the floating rule of same width to carry out putty and repair levelling, and the sanding of polishing.
9. navigation system according to claim 6 is carried out the construction method of ceiling suspended ceiling moulding, it is characterized in that: during described step (2) lifting modeling skeleton, according to design drawing size, 1:1 projects to suspended ceiling modeling setting-out on ground, make modeling skeleton, again according to detail of design size 1:1, in the mode of three one arcs, by ground back projection to ceiling, determine moulding hoisting point position, then lift modeling skeleton.
CN201210184811.2A 2012-06-07 2012-06-07 Ceiling model positioning system and construction method Active CN102691406B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210184811.2A CN102691406B (en) 2012-06-07 2012-06-07 Ceiling model positioning system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210184811.2A CN102691406B (en) 2012-06-07 2012-06-07 Ceiling model positioning system and construction method

Publications (2)

Publication Number Publication Date
CN102691406A CN102691406A (en) 2012-09-26
CN102691406B true CN102691406B (en) 2014-08-20

Family

ID=46857130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210184811.2A Active CN102691406B (en) 2012-06-07 2012-06-07 Ceiling model positioning system and construction method

Country Status (1)

Country Link
CN (1) CN102691406B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912089B (en) * 2014-04-18 2016-06-08 中建八局第二建设有限公司 A kind of construction method of the lifting furred ceiling of auditorium
CN104612306B (en) * 2014-12-20 2017-02-01 山西五建集团有限公司 Construction method of large-space multi-layer multi-curved-surface special-shaped aluminum magnesium alloy profile suspended ceiling
CN105672657B (en) * 2016-01-27 2018-01-30 湖南省第五工程有限公司 A kind of ceiling method
CN106351425A (en) * 2016-08-30 2017-01-25 江苏嘉洋华联建筑装饰股份有限公司 Construction process for repeated modeling ceiling
CN109515040A (en) * 2018-11-18 2019-03-26 满洪流 A kind of curve tracing tape and curve mapping arrangements

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5653083A (en) * 1995-09-29 1997-08-05 Owens-Corning Fiberglas Technology, Inc. Raisable side guides for apparatus for paying out an insulation support sheet
CN201221190Y (en) * 2008-06-26 2009-04-15 上海桐井建材有限公司 Leveling apparatus of vertical and horizontal directions of light steel keel frame
CN102409790A (en) * 2011-08-23 2012-04-11 周建成 Seamless suspended ceiling device and installation method thereof
CN202596185U (en) * 2012-06-07 2012-12-12 苏州苏明装饰有限公司 Ceiling and shaping locating system for ceiling

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5653083A (en) * 1995-09-29 1997-08-05 Owens-Corning Fiberglas Technology, Inc. Raisable side guides for apparatus for paying out an insulation support sheet
CN201221190Y (en) * 2008-06-26 2009-04-15 上海桐井建材有限公司 Leveling apparatus of vertical and horizontal directions of light steel keel frame
CN102409790A (en) * 2011-08-23 2012-04-11 周建成 Seamless suspended ceiling device and installation method thereof
CN202596185U (en) * 2012-06-07 2012-12-12 苏州苏明装饰有限公司 Ceiling and shaping locating system for ceiling

Also Published As

Publication number Publication date
CN102691406A (en) 2012-09-26

Similar Documents

Publication Publication Date Title
CN102691406B (en) Ceiling model positioning system and construction method
CN105569251B (en) Device for split-level ceiling and installation method
CN104612306B (en) Construction method of large-space multi-layer multi-curved-surface special-shaped aluminum magnesium alloy profile suspended ceiling
CN202596185U (en) Ceiling and shaping locating system for ceiling
CN103696547B (en) A kind ofly decorate the modularization mounting method of solid on wall and decorative module
CN102535807B (en) Modular wall tile pre-bonding structure and construction method thereof
CN205530908U (en) Furred ceiling falls a grade device
CN104405092A (en) Mould-transferring construction method for natural stone paint of outer wall
CN203834779U (en) Two-level suspended ceiling decoration sectional material
CN1192151C (en) Horizon adjustable wooden floor board and its paving process
CN201908415U (en) Wall decorative board layer structure
CN204781758U (en) Portable decoration wallboard
CN100585112C (en) Installation method for building decorative board
CN206681304U (en) Floor panel assembly
CN209145197U (en) Plaster board wall external corner structure
CN206987259U (en) A kind of building decoration wallboard
CN104989057A (en) Concave-convex clamp groove type composite multi-layer wall surface suspended ceiling decoration integrated board
CN210598022U (en) Skirting line assembly with face decoration closing-in function
CN106150003A (en) The mounting structure of the wooden pedal of a kind of cement stairway and be mounted directly method
CN210857883U (en) Top corner line piece and top corner sliding rail for surface decoration closing-in
CN210263691U (en) Internal corner splicing decoration strip
WO2021004100A1 (en) Manufacturing and installing method for ceiling painting
CN110434563A (en) The manufacture craft of seamless welding sculpture
CN203230126U (en) T-shaped plate connecting piece
CN204059701U (en) A kind of Integral ceiling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 215000 Xiangcheng District, Jiangsu Province, Yang Cheng Road, No. 98, No.

Applicant after: Suzhou Suming Decoration Co., Ltd.

Address before: 215000 Xiangcheng District, Jiangsu Province, Yang Cheng Road, No. 98, No.

Applicant before: Suzhou Suming Decoration Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant