WO2021004100A1 - Manufacturing and installing method for ceiling painting - Google Patents

Manufacturing and installing method for ceiling painting Download PDF

Info

Publication number
WO2021004100A1
WO2021004100A1 PCT/CN2020/082411 CN2020082411W WO2021004100A1 WO 2021004100 A1 WO2021004100 A1 WO 2021004100A1 CN 2020082411 W CN2020082411 W CN 2020082411W WO 2021004100 A1 WO2021004100 A1 WO 2021004100A1
Authority
WO
WIPO (PCT)
Prior art keywords
ceiling
painted
paint
painting
keel
Prior art date
Application number
PCT/CN2020/082411
Other languages
French (fr)
Chinese (zh)
Inventor
练超
郭伟民
刘超
Original Assignee
上海建为历保科技股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 上海建为历保科技股份有限公司 filed Critical 上海建为历保科技股份有限公司
Publication of WO2021004100A1 publication Critical patent/WO2021004100A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44CPRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
    • B44C5/00Processes for producing special ornamental bodies
    • B44C5/04Ornamental plaques, e.g. decorative panels, decorative veneers
    • B44C5/0461Ornamental plaques, e.g. decorative panels, decorative veneers used as wall coverings
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09DCOATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
    • C09D5/00Coating compositions, e.g. paints, varnishes or lacquers, characterised by their physical nature or the effects produced; Filling pastes
    • C09D5/06Artists' paints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like

Definitions

  • the invention relates to the technical field of indoor decoration, in particular to a method for manufacturing and installing ceiling colored drawings.
  • Indoor suspended ceiling refers to a decoration on the top of a house's living environment. Simply put, it refers to the decoration of the ceiling, which is one of the important parts of interior decoration.
  • the suspended ceiling has the functions of heat preservation, heat insulation, sound insulation, and sound absorption. It is also used for electrical, ventilation and air conditioning, communications, and fire protection and alarm pipeline equipment.
  • Concealed layer, home decoration ceiling is a common link in home decoration, and it occupies a very important position in the whole room decoration. Painting and decorating the ceiling of the room can not only beautify the indoor environment, but also create a colorful interior space artistic image.
  • the present invention provides a ceiling painting manufacturing and installation method, which has the advantages of high installation efficiency and avoidance of easily bumping against the wall when disassembling the scaffold, and solves the problem of low efficiency and easy bumping when disassembling the scaffold. The problem to the wall.
  • a ceiling color painting manufacturing and installation method including the following steps:
  • Ceiling panel treatment The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
  • Pigment preparation According to the selected pattern color, the required colored drawing pigments are prepared.
  • the colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14- 16%, varnish 3-10%, curing agent 15-30%.
  • Bounce line While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
  • the keel plays a supporting effect and role.
  • the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
  • boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
  • Painted panel installation The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
  • the colored paint includes the following raw materials in parts by weight: talc 21-21.5%, white latex 23-25%, thinner 9-10%, colored paint 15-16%, varnish 4-10 %, curing agent 17.5%-28%.
  • the colored paint includes the following raw materials in parts by weight: 22-23% of talc, 25-26% of white latex, 9-10% of diluent, 15-16% of colored paint, 6-10% of varnish %, curing agent 15-23%.
  • the colored paint includes the following raw materials in parts by weight: 22-23% of talc, 25-26% of white latex, 8-9% of diluent, 14-15% of colored paint, 7-10% of varnish %, curing agent 17-24%.
  • the colored paint includes the following raw materials in parts by weight: 22.5-23% of talc powder, 25-26% of white latex, 9-10% of diluent, 15-16% of colored paint, 6-10% of varnish %, curing agent 15-22.5%.
  • the colored paint includes the following raw materials in parts by weight: 21-23% of talc powder, 25-26% of white latex, 8.5-10% of thinner, 15-16% of colored paint, 5-10% of varnish %, curing agent 15-25.5%.
  • the colored paint includes the following raw materials in parts by weight: 22-23% of talc powder, 24.5-26% of white latex, 9-10% of diluent, 15-16% of colored paint, 6-10% of varnish %, curing agent 15-23.5%.
  • the colored paint includes the following raw materials in parts by weight: talc 21.5-22.5%, white latex 25-26%, thinner 9-9.5%, painted paint 15-16%, varnish 4-10 %, curing agent 16-25.5%.
  • the present invention provides a method for manufacturing and installing ceiling color painting, which has the following beneficial effects:
  • the method of manufacturing and installing the ceiling color painting After the ceiling panel is painted, the time for the ceiling panel to dry is used for elastic line and planning of the position line of the installation position line of the keel, so that the skeleton, boom, keel and The ceiling panel is installed to achieve the purpose of effective use of time, which in turn can improve the work efficiency of the staff.
  • the method of manufacturing and installation of the ceiling color painting after the ceiling panel is installed, when the scaffold is disassembled, the scaffold must be dismantled strictly in accordance with the scaffold dismantling requirements, so as to avoid the failure to follow the scaffold dismantling requirements in the process of dismantling the scaffold.
  • the overturning of the scaffold causes scratches on the indoor wall, thereby achieving the purpose of improving the safety factor of the staff and preventing the wall from being scratched when the scaffold is removed.
  • a method for manufacturing and installing ceiling color painting including the following steps:
  • Ceiling panel treatment The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
  • Pigment preparation According to the color of the selected pattern, the required colored drawing pigments are prepared.
  • the colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
  • Bounce line While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
  • the keel plays a supporting effect and role.
  • the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
  • boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
  • Painted panel installation The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
  • a method for manufacturing and installing ceiling color painting including the following steps:
  • Ceiling panel treatment The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
  • Pigment preparation According to the color of the selected pattern, the required colored drawing pigments are prepared.
  • the colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
  • Bounce line While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
  • the keel plays a supporting effect and role.
  • the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
  • boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
  • Painted panel installation The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
  • a method for manufacturing and installing ceiling color painting including the following steps:
  • Ceiling panel treatment The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
  • Pigment preparation According to the color of the selected pattern, the required colored drawing pigments are prepared.
  • the colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
  • Bounce line While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
  • the keel plays a supporting effect and role.
  • the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
  • boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
  • Painted panel installation The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
  • a method for manufacturing and installing ceiling color painting including the following steps:
  • Ceiling panel treatment The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
  • Pigment preparation According to the color of the selected pattern, the required colored drawing pigments are prepared.
  • the colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
  • Bounce line While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
  • the keel plays a supporting effect and role.
  • the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
  • boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
  • Painted panel installation The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
  • a method for manufacturing and installing ceiling color painting including the following steps:
  • Ceiling panel treatment The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
  • Pigment preparation According to the color of the selected pattern, the required colored drawing pigments are prepared.
  • the colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
  • Bounce line While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
  • the keel plays a supporting effect and role.
  • the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
  • boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
  • Painted panel installation The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
  • Embodiment 6 is a diagrammatic representation of Embodiment 6
  • a method for manufacturing and installing ceiling color painting including the following steps:
  • Ceiling panel treatment The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
  • Pigment preparation According to the color of the selected pattern, the required colored drawing pigments are prepared.
  • the colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
  • Bounce line While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
  • the keel plays a supporting effect and role.
  • the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
  • boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
  • Painted panel installation The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
  • the ceiling color painting manufacturing and installation method after the ceiling panel painting is completed, at the same time use the ceiling panel to dry time for elastic line and planning the position line of the installation position line of the keel, so that the frame and boom , Keel and ceiling panel installation, to achieve the purpose of effective use of time, and thus can play a role in improving the work efficiency of the staff, after the ceiling panel is installed, when the scaffold is disassembled, the scaffold must be disassembled in strict compliance with the scaffold removal requirements , Avoid the scaffold toppling and scratching the indoor wall due to failure to follow the scaffold removal requirements during the process of disassembling the scaffold, so as to improve the safety factor of the staff and prevent the wall from scratching when the scaffold is dismantled.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Electromagnetism (AREA)
  • Structural Engineering (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)
  • Paints Or Removers (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention relates to the technical field of indoor decoration, and discloses a manufacturing and installing method for ceiling painting. Said method comprises the following steps: 1. performing painting on ceiling panels: a. selecting a pattern: choosing the style type one likes according to one's own preferences and choose the pattern one wants to paint; b. ceiling panel processing: since base layer processing of a wall surface is important, when painting on emulsion paint-coated panels, it is needed to perform leveling, primer coating and pattern planning on the panels; and c. formulation of pigment: according to the colors of the selected pattern, the required painting pigment is formulated, i.e. the components of the painting pigment. In the manufacturing and installing method for ceiling painting, after the ceiling panels are painted, while the ceiling panels are being air-dried operations such as making marking lines with a carpenter's ink marker and planning the installation position lines of ceiling runners are simultaneously carried out, so as to install the framework, the booms, the runners, and the ceiling panels, thereby achieving the purpose of effectively using time, and further achieving the effect of improving the working efficiency of a worker.

Description

一种顶棚彩绘制造安装方法Method for manufacturing and installing ceiling colored painting 技术领域Technical field
本发明涉及室内装修技术领域,具体为一种顶棚彩绘制造安装方法。The invention relates to the technical field of indoor decoration, in particular to a method for manufacturing and installing ceiling colored drawings.
背景技术Background technique
室内吊顶是指房屋居住环境的顶部装修的一种装饰。简单的说,就是指天花板的装饰,是室内装饰的重要部分之一,吊顶具有保温,隔热,隔声,吸声的作用,也是电气、通风空调、通信和防火和报警管线设备等工程的隐蔽层,家装吊顶是家装中常见的环节,在整个居室装饰中占有相当重要的地位,对居室顶棚进行彩绘装饰,不仅能美化室内环境,还能营造出丰富多彩的室内空间艺术形象。Indoor suspended ceiling refers to a decoration on the top of a house's living environment. Simply put, it refers to the decoration of the ceiling, which is one of the important parts of interior decoration. The suspended ceiling has the functions of heat preservation, heat insulation, sound insulation, and sound absorption. It is also used for electrical, ventilation and air conditioning, communications, and fire protection and alarm pipeline equipment. Concealed layer, home decoration ceiling is a common link in home decoration, and it occupies a very important position in the whole room decoration. Painting and decorating the ceiling of the room can not only beautify the indoor environment, but also create a colorful interior space artistic image.
目前在对室内顶棚彩绘及安装时存在工作人员效率较低的问题。At present, there is a problem of low staff efficiency when painting and installing indoor ceilings.
技术问题technical problem
针对现有技术的不足,本发明提供了一种顶棚彩绘制造安装方法,具备安装效率较高和能够避免在拆卸脚手架时容易磕碰到墙壁等优点,解决了效率较低和在拆卸脚手架时容易磕碰到墙壁的问题。In view of the shortcomings of the prior art, the present invention provides a ceiling painting manufacturing and installation method, which has the advantages of high installation efficiency and avoidance of easily bumping against the wall when disassembling the scaffold, and solves the problem of low efficiency and easy bumping when disassembling the scaffold. The problem to the wall.
技术解决方案Technical solutions
在为实现上述顶棚彩绘制造安装方法的目的,本发明提供如下技术方案:一种顶棚彩绘制造安装方法,包括以下步骤:In order to achieve the purpose of the above-mentioned ceiling color painting manufacturing and installation method, the present invention provides the following technical solution: a ceiling color painting manufacturing and installation method, including the following steps:
1)进行顶棚面板彩绘:1) Carry out ceiling panel painting:
a.选图:根据自己的喜好选择自己喜欢的风格类型,选择自己所要彩绘的图案。a. Picture selection: Choose the style you like according to your preferences, and choose the pattern you want to paint.
b.顶棚面板处理:墙面的基层处理比较重要,在刷好乳胶漆的面板上画画,要对面板找平、刷底漆和图案规划。b. Ceiling panel treatment: The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
c.配颜料:对照所选图案色彩配制所需彩绘颜料,所述彩绘颜料组分,包括:滑石粉21-23%、白乳胶24-26%、稀释剂8-10%、彩绘漆14-16%、光油3-10%、固化剂15-30%。c. Pigment preparation: According to the selected pattern color, the required colored drawing pigments are prepared. The colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14- 16%, varnish 3-10%, curing agent 15-30%.
d.准备上色:首先,在要彩绘的面板下方地板铺满报纸或是其他隔离物,以免弄脏地面,按照选图在事先画好的图案轮廓的墙壁上涂颜料,一定要用力均匀,如果用力不均会产生斑纹,如果以产生斑纹请不要心急,可以再涂一遍盖住原来的斑纹。d. Prepare to paint: First, cover the floor under the panel to be painted with newspapers or other spacers to avoid soiling the ground. According to the selected picture, apply paint on the wall with the outline of the pattern drawn in advance, and it must be evenly applied. If the force is uneven, markings will occur. If it is caused, please don't worry, you can apply it again to cover the original markings.
e.修改和维护:有些地方的色彩不是很满意,调和所需颜色再涂一遍,画完后保持通风,待干透后,方可触碰。e. Modification and maintenance: the color in some places is not very satisfactory, re-paint it again after reconciling the required color. After painting, keep it ventilated and wait until it is dry before touching it.
2)弹线:在彩绘后面板风干的同时,根据图纸的标高及顶棚位置尺寸和已测定的中心线,弹出顶棚主骨架位置线。2) Bounce line: While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
3)规划龙骨的安装位置线:龙骨是起到支撑的效果和作用,在塑料扣板尺寸大小确定的情况下,可以根据板材的规格来进行龙骨的尺寸和位置线的规划,在位置线上标出基准线。3) Planning the installation position line of the keel: the keel plays a supporting effect and role. When the size of the plastic gusset is determined, the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
4)安装主骨架:主龙骨安装后要及时的根据之前设计的高度来进行位置的确定,可以拉出标高控制线,从一端开始,在安装的同时进行吊杆高度的调整,控制好龙骨架的平整度,等大面平整后,对一些翘边的龙骨进行调整,要保证平整度符合施工要求,在施工时候要注意预留出照明线出口。4) Install the main frame: After the main keel is installed, the position should be determined according to the previously designed height in time. You can pull out the elevation control line, start from one end, and adjust the height of the boom while installing to control the dragon frame. After the large surface is flattened, adjust some warped keels to ensure that the flatness meets the construction requirements, and pay attention to the lighting line exit during construction.
5)安装吊杆:吊杆的安装是要符合具体的施工压球,主要包括下面几点:吊杆要有足够的制程能力、吊杆要提前做好防锈处理、吊杆距主龙骨端不能超过300mm,避免主龙骨出现下坠等现象。5) Installation of boom: The installation of boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
6)边龙骨安装:边龙骨安装要紧挨着主龙骨进行使用,安装好之后要对主龙骨和边龙骨进行检查,看是不是平整。6) Side keel installation: The side keel should be installed next to the main keel. After installation, the main keel and the side keel should be checked to see if it is level.
7)彩绘面板安装:彩绘面板在安装时候要使用专用连接件,要注意的是在安装时候要根据实际尺寸来进行裁剪,尤其是最后一块板材,将彩绘面板稍微弯曲后放入进去,保证整体的效果。7) Painted panel installation: The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
8)脚手架拆除:拆卸脚手架时必须按脚手架拆除要求进行,并进行室内墙壁保护,防止将室内墙壁砸坏。8) Scaffolding removal: When disassembling the scaffolding, it must be carried out according to the scaffolding removal requirements, and the indoor wall protection should be carried out to prevent the indoor wall from being damaged.
优选的,所述彩绘颜料包括以下重量份数配比的原料:滑石粉21-21.5%、白乳胶23-25%、稀释剂9-10%、彩绘漆15-16%、光油4-10%、固化剂17.5-28%。Preferably, the colored paint includes the following raw materials in parts by weight: talc 21-21.5%, white latex 23-25%, thinner 9-10%, colored paint 15-16%, varnish 4-10 %, curing agent 17.5%-28%.
优选的,所述彩绘颜料包括以下重量份数配比的原料:滑石粉22-23%、白乳胶25-26%、稀释剂9-10%、彩绘漆15-16%、光油6-10%、固化剂15-23%。Preferably, the colored paint includes the following raw materials in parts by weight: 22-23% of talc, 25-26% of white latex, 9-10% of diluent, 15-16% of colored paint, 6-10% of varnish %, curing agent 15-23%.
优选的,所述彩绘颜料包括以下重量份数配比的原料:滑石粉22-23%、白乳胶25-26%、稀释剂8-9%、彩绘漆14-15%、光油7-10%、固化剂17-24%。Preferably, the colored paint includes the following raw materials in parts by weight: 22-23% of talc, 25-26% of white latex, 8-9% of diluent, 14-15% of colored paint, 7-10% of varnish %, curing agent 17-24%.
优选的,所述彩绘颜料包括以下重量份数配比的原料:滑石粉22.5-23%、白乳胶25-26%、稀释剂9-10%、彩绘漆15-16%、光油6-10%、固化剂15-22.5%。Preferably, the colored paint includes the following raw materials in parts by weight: 22.5-23% of talc powder, 25-26% of white latex, 9-10% of diluent, 15-16% of colored paint, 6-10% of varnish %, curing agent 15-22.5%.
优选的,所述彩绘颜料包括以下重量份数配比的原料:滑石粉21-23%、白乳胶25-26%、稀释剂8.5-10%、彩绘漆15-16%、光油5-10%、固化剂15-25.5%。Preferably, the colored paint includes the following raw materials in parts by weight: 21-23% of talc powder, 25-26% of white latex, 8.5-10% of thinner, 15-16% of colored paint, 5-10% of varnish %, curing agent 15-25.5%.
优选的,所述彩绘颜料包括以下重量份数配比的原料:滑石粉22-23%、白乳胶24.5-26%、稀释剂9-10%、彩绘漆15-16%、光油6-10%、固化剂15-23.5%。Preferably, the colored paint includes the following raw materials in parts by weight: 22-23% of talc powder, 24.5-26% of white latex, 9-10% of diluent, 15-16% of colored paint, 6-10% of varnish %, curing agent 15-23.5%.
优选的,所述彩绘颜料包括以下重量份数配比的原料:滑石粉21.5-22.5%、白乳胶25-26%、稀释剂9-9.5%、彩绘漆15-16%、光油4-10%、固化剂16-25.5%。Preferably, the colored paint includes the following raw materials in parts by weight: talc 21.5-22.5%, white latex 25-26%, thinner 9-9.5%, painted paint 15-16%, varnish 4-10 %, curing agent 16-25.5%.
有益效果Beneficial effect
在与现有技术相比,本发明提供了一种顶棚彩绘制造安装方法,具备以下有益效果:Compared with the prior art, the present invention provides a method for manufacturing and installing ceiling color painting, which has the following beneficial effects:
1、该顶棚彩绘制造安装方法,在对顶棚面板彩绘完成后,同时利用顶棚面板晾干的时间进行弹线以及规划龙骨的安装位置线的位置线等工作,以便对骨架、吊杆、龙骨和顶棚面板安装,达到有效利用时间的目的,进而能够起到提高工作人员工作效率的作用。1. The method of manufacturing and installing the ceiling color painting. After the ceiling panel is painted, the time for the ceiling panel to dry is used for elastic line and planning of the position line of the installation position line of the keel, so that the skeleton, boom, keel and The ceiling panel is installed to achieve the purpose of effective use of time, which in turn can improve the work efficiency of the staff.
2、该顶棚彩绘制造安装方法,在对顶棚面板安装完成后,在对脚手架进行拆卸时,严格遵守脚手架拆除要求对脚手架进行拆卸,避免在拆卸脚手架的过程中因未按照守脚手架拆除要求进行而导致脚手架倾倒对室内墙壁造成刮伤,进而达到提高工作人员安全系数和防止脚手架拆卸时刮伤墙壁的目的。2. The method of manufacturing and installation of the ceiling color painting, after the ceiling panel is installed, when the scaffold is disassembled, the scaffold must be dismantled strictly in accordance with the scaffold dismantling requirements, so as to avoid the failure to follow the scaffold dismantling requirements in the process of dismantling the scaffold. The overturning of the scaffold causes scratches on the indoor wall, thereby achieving the purpose of improving the safety factor of the staff and preventing the wall from being scratched when the scaffold is removed.
本发明的实施方式Embodiments of the invention
在下面将结合本发明的实施例,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In the following, the technical solutions in the embodiments of the present invention will be described clearly and completely in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.
实施例一:Example one:
一种顶棚彩绘制造安装方法,包括以下步骤:A method for manufacturing and installing ceiling color painting, including the following steps:
1)进行顶棚面板彩绘:1) Carry out ceiling panel painting:
a.选图:根据自己的喜好选择自己喜欢的风格类型,选择自己所要彩绘的图案。a. Picture selection: Choose the style you like according to your preferences, and choose the pattern you want to paint.
b.顶棚面板处理:墙面的基层处理比较重要,在刷好乳胶漆的面板上画画,要对面板找平、刷底漆和图案规划。b. Ceiling panel treatment: The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
c.配颜料:对照所选图案色彩配制所需彩绘颜料,彩绘颜料组分,包括:滑石粉21-23%、白乳胶24-26%、稀释剂8-10%、彩绘漆14-16%、光油3-10%、固化剂15-30%。c. Pigment preparation: According to the color of the selected pattern, the required colored drawing pigments are prepared. The colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
d.准备上色:首先,在要彩绘的面板下方地板铺满报纸或是其他隔离物,以免弄脏地面,按照选图在事先画好的图案轮廓的墙壁上涂颜料,一定要用力均匀,如果用力不均会产生斑纹,如果以产生斑纹请不要心急,可以再涂一遍盖住原来的斑纹。d. Prepare to paint: First, cover the floor under the panel to be painted with newspapers or other spacers to avoid soiling the ground. According to the selected picture, apply paint on the wall with the outline of the pattern drawn in advance, and it must be evenly applied. If the force is uneven, markings will occur. If it is caused, please don't worry, you can apply it again to cover the original markings.
e.修改和维护:有些地方的色彩不是很满意,调和所需颜色再涂一遍,画完后保持通风,待干透后,方可触碰。e. Modification and maintenance: the color in some places is not very satisfactory, re-paint it again after reconciling the required color. After painting, keep it ventilated and wait until it is dry before touching it.
2)弹线:在彩绘后面板风干的同时,根据图纸的标高及顶棚位置尺寸和已测定的中心线,弹出顶棚主骨架位置线。2) Bounce line: While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
3)规划龙骨的安装位置线:龙骨是起到支撑的效果和作用,在塑料扣板尺寸大小确定的情况下,可以根据板材的规格来进行龙骨的尺寸和位置线的规划,在位置线上标出基准线。3) Planning the installation position line of the keel: the keel plays a supporting effect and role. When the size of the plastic gusset is determined, the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
4)安装主骨架:主龙骨安装后要及时的根据之前设计的高度来进行位置的确定,可以拉出标高控制线,从一端开始,在安装的同时进行吊杆高度的调整,控制好龙骨架的平整度,等大面平整后,对一些翘边的龙骨进行调整,要保证平整度符合施工要求,在施工时候要注意预留出照明线出口。4) Install the main frame: After the main keel is installed, the position should be determined according to the previously designed height in time. You can pull out the elevation control line, start from one end, and adjust the height of the boom while installing to control the dragon frame. After the large surface is flattened, adjust some warped keels to ensure that the flatness meets the construction requirements, and pay attention to the lighting line exit during construction.
5)安装吊杆:吊杆的安装是要符合具体的施工压球,主要包括下面几点:吊杆要有足够的制程能力、吊杆要提前做好防锈处理、吊杆距主龙骨端不能超过300mm,避免主龙骨出现下坠等现象。5) Installation of boom: The installation of boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
6)边龙骨安装:边龙骨安装要紧挨着主龙骨进行使用,安装好之后要对主龙骨和边龙骨进行检查,看是不是平整。6) Side keel installation: The side keel should be installed next to the main keel. After installation, the main keel and the side keel should be checked to see if it is level.
7)彩绘面板安装:彩绘面板在安装时候要使用专用连接件,要注意的是在安装时候要根据实际尺寸来进行裁剪,尤其是最后一块板材,将彩绘面板稍微弯曲后放入进去,保证整体的效果。7) Painted panel installation: The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
8)脚手架拆除:拆卸脚手架时必须按脚手架拆除要求进行,并进行室内墙壁保护,防止将室内墙壁砸坏。8) Scaffolding removal: When disassembling the scaffolding, it must be carried out according to the scaffolding removal requirements, and the indoor wall protection should be carried out to prevent the indoor wall from being damaged.
实施例二:Embodiment two:
一种顶棚彩绘制造安装方法,包括以下步骤:A method for manufacturing and installing ceiling color painting, including the following steps:
1)进行顶棚面板彩绘:1) Carry out ceiling panel painting:
a.选图:根据自己的喜好选择自己喜欢的风格类型,选择自己所要彩绘的图案。a. Picture selection: Choose the style you like according to your preferences, and choose the pattern you want to paint.
b.顶棚面板处理:墙面的基层处理比较重要,在刷好乳胶漆的面板上画画,要对面板找平、刷底漆和图案规划。b. Ceiling panel treatment: The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
c.配颜料:对照所选图案色彩配制所需彩绘颜料,彩绘颜料组分,包括:滑石粉21-23%、白乳胶24-26%、稀释剂8-10%、彩绘漆14-16%、光油3-10%、固化剂15-30%。c. Pigment preparation: According to the color of the selected pattern, the required colored drawing pigments are prepared. The colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
d.准备上色:首先,在要彩绘的面板下方地板铺满报纸或是其他隔离物,以免弄脏地面,按照选图在事先画好的图案轮廓的墙壁上涂颜料,一定要用力均匀,如果用力不均会产生斑纹,如果以产生斑纹请不要心急,可以再涂一遍盖住原来的斑纹。d. Prepare to paint: First, cover the floor under the panel to be painted with newspapers or other spacers to avoid soiling the ground. According to the selected picture, apply paint on the wall with the outline of the pattern drawn in advance, and it must be evenly applied. If the force is uneven, markings will occur. If it is caused, please don't worry, you can apply it again to cover the original markings.
e.修改和维护:有些地方的色彩不是很满意,调和所需颜色再涂一遍,画完后保持通风,待干透后,方可触碰。e. Modification and maintenance: the color in some places is not very satisfactory, re-paint it again after reconciling the required color. After painting, keep it ventilated and wait until it is dry before touching it.
2)弹线:在彩绘后面板风干的同时,根据图纸的标高及顶棚位置尺寸和已测定的中心线,弹出顶棚主骨架位置线。2) Bounce line: While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
3)规划龙骨的安装位置线:龙骨是起到支撑的效果和作用,在塑料扣板尺寸大小确定的情况下,可以根据板材的规格来进行龙骨的尺寸和位置线的规划,在位置线上标出基准线。3) Planning the installation position line of the keel: the keel plays a supporting effect and role. When the size of the plastic gusset is determined, the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
4)安装主骨架:主龙骨安装后要及时的根据之前设计的高度来进行位置的确定,可以拉出标高控制线,从一端开始,在安装的同时进行吊杆高度的调整,控制好龙骨架的平整度,等大面平整后,对一些翘边的龙骨进行调整,要保证平整度符合施工要求,在施工时候要注意预留出照明线出口。4) Install the main frame: After the main keel is installed, the position should be determined according to the previously designed height in time. You can pull out the elevation control line, start from one end, and adjust the height of the boom while installing to control the dragon frame. After the large surface is flattened, adjust some warped keels to ensure that the flatness meets the construction requirements, and pay attention to the lighting line exit during construction.
5)安装吊杆:吊杆的安装是要符合具体的施工压球,主要包括下面几点:吊杆要有足够的制程能力、吊杆要提前做好防锈处理、吊杆距主龙骨端不能超过300mm,避免主龙骨出现下坠等现象。5) Installation of boom: The installation of boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
6)边龙骨安装:边龙骨安装要紧挨着主龙骨进行使用,安装好之后要对主龙骨和边龙骨进行检查,看是不是平整。6) Side keel installation: The side keel should be installed next to the main keel. After installation, the main keel and the side keel should be checked to see if it is level.
7)彩绘面板安装:彩绘面板在安装时候要使用专用连接件,要注意的是在安装时候要根据实际尺寸来进行裁剪,尤其是最后一块板材,将彩绘面板稍微弯曲后放入进去,保证整体的效果。7) Painted panel installation: The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
8)脚手架拆除:拆卸脚手架时必须按脚手架拆除要求进行,并进行室内墙壁保护,防止将室内墙壁砸坏。8) Scaffolding removal: When disassembling the scaffolding, it must be carried out according to the scaffolding removal requirements, and the indoor wall protection should be carried out to prevent the indoor wall from being damaged.
实施例三:Example three:
一种顶棚彩绘制造安装方法,包括以下步骤:A method for manufacturing and installing ceiling color painting, including the following steps:
1)进行顶棚面板彩绘:1) Carry out ceiling panel painting:
a.选图:根据自己的喜好选择自己喜欢的风格类型,选择自己所要彩绘的图案。a. Picture selection: Choose the style you like according to your preferences, and choose the pattern you want to paint.
b.顶棚面板处理:墙面的基层处理比较重要,在刷好乳胶漆的面板上画画,要对面板找平、刷底漆和图案规划。b. Ceiling panel treatment: The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
c.配颜料:对照所选图案色彩配制所需彩绘颜料,彩绘颜料组分,包括:滑石粉21-23%、白乳胶24-26%、稀释剂8-10%、彩绘漆14-16%、光油3-10%、固化剂15-30%。c. Pigment preparation: According to the color of the selected pattern, the required colored drawing pigments are prepared. The colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
d.准备上色:首先,在要彩绘的面板下方地板铺满报纸或是其他隔离物,以免弄脏地面,按照选图在事先画好的图案轮廓的墙壁上涂颜料,一定要用力均匀,如果用力不均会产生斑纹,如果以产生斑纹请不要心急,可以再涂一遍盖住原来的斑纹。d. Prepare to paint: First, cover the floor under the panel to be painted with newspapers or other spacers to avoid soiling the ground. According to the selected picture, apply paint on the wall with the outline of the pattern drawn in advance, and it must be evenly applied. If the force is uneven, markings will occur. If it is caused, please don't worry, you can apply it again to cover the original markings.
e.修改和维护:有些地方的色彩不是很满意,调和所需颜色再涂一遍,画完后保持通风,待干透后,方可触碰。e. Modification and maintenance: the color in some places is not very satisfactory, re-paint it again after reconciling the required color. After painting, keep it ventilated and wait until it is dry before touching it.
2)弹线:在彩绘后面板风干的同时,根据图纸的标高及顶棚位置尺寸和已测定的中心线,弹出顶棚主骨架位置线。2) Bounce line: While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
3)规划龙骨的安装位置线:龙骨是起到支撑的效果和作用,在塑料扣板尺寸大小确定的情况下,可以根据板材的规格来进行龙骨的尺寸和位置线的规划,在位置线上标出基准线。3) Planning the installation position line of the keel: the keel plays a supporting effect and role. When the size of the plastic gusset is determined, the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
4)安装主骨架:主龙骨安装后要及时的根据之前设计的高度来进行位置的确定,可以拉出标高控制线,从一端开始,在安装的同时进行吊杆高度的调整,控制好龙骨架的平整度,等大面平整后,对一些翘边的龙骨进行调整,要保证平整度符合施工要求,在施工时候要注意预留出照明线出口。4) Install the main frame: After the main keel is installed, the position should be determined according to the previously designed height in time. You can pull out the elevation control line, start from one end, and adjust the height of the boom while installing to control the dragon frame. After the large surface is flattened, adjust some warped keels to ensure that the flatness meets the construction requirements, and pay attention to the lighting line exit during construction.
5)安装吊杆:吊杆的安装是要符合具体的施工压球,主要包括下面几点:吊杆要有足够的制程能力、吊杆要提前做好防锈处理、吊杆距主龙骨端不能超过300mm,避免主龙骨出现下坠等现象。5) Installation of boom: The installation of boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
6)边龙骨安装:边龙骨安装要紧挨着主龙骨进行使用,安装好之后要对主龙骨和边龙骨进行检查,看是不是平整。6) Side keel installation: The side keel should be installed next to the main keel. After installation, the main keel and the side keel should be checked to see if it is level.
7)彩绘面板安装:彩绘面板在安装时候要使用专用连接件,要注意的是在安装时候要根据实际尺寸来进行裁剪,尤其是最后一块板材,将彩绘面板稍微弯曲后放入进去,保证整体的效果。7) Painted panel installation: The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
8)脚手架拆除:拆卸脚手架时必须按脚手架拆除要求进行,并进行室内墙壁保护,防止将室内墙壁砸坏。8) Scaffolding removal: When disassembling the scaffolding, it must be carried out according to the scaffolding removal requirements, and the indoor wall protection should be carried out to prevent the indoor wall from being damaged.
实施例四:Embodiment four:
一种顶棚彩绘制造安装方法,包括以下步骤:A method for manufacturing and installing ceiling color painting, including the following steps:
1)进行顶棚面板彩绘:1) Carry out ceiling panel painting:
a.选图:根据自己的喜好选择自己喜欢的风格类型,选择自己所要彩绘的图案。a. Picture selection: Choose the style you like according to your preferences, and choose the pattern you want to paint.
b.顶棚面板处理:墙面的基层处理比较重要,在刷好乳胶漆的面板上画画,要对面板找平、刷底漆和图案规划。b. Ceiling panel treatment: The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
c.配颜料:对照所选图案色彩配制所需彩绘颜料,彩绘颜料组分,包括:滑石粉21-23%、白乳胶24-26%、稀释剂8-10%、彩绘漆14-16%、光油3-10%、固化剂15-30%。c. Pigment preparation: According to the color of the selected pattern, the required colored drawing pigments are prepared. The colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
d.准备上色:首先,在要彩绘的面板下方地板铺满报纸或是其他隔离物,以免弄脏地面,按照选图在事先画好的图案轮廓的墙壁上涂颜料,一定要用力均匀,如果用力不均会产生斑纹,如果以产生斑纹请不要心急,可以再涂一遍盖住原来的斑纹。d. Prepare to paint: First, cover the floor under the panel to be painted with newspapers or other spacers to avoid soiling the ground. According to the selected picture, apply paint on the wall with the outline of the pattern drawn in advance, and it must be evenly applied. If the force is uneven, markings will occur. If it is caused, please don't worry, you can apply it again to cover the original markings.
e.修改和维护:有些地方的色彩不是很满意,调和所需颜色再涂一遍,画完后保持通风,待干透后,方可触碰。e. Modification and maintenance: the color in some places is not very satisfactory, re-paint it again after reconciling the required color. After painting, keep it ventilated and wait until it is dry before touching it.
2)弹线:在彩绘后面板风干的同时,根据图纸的标高及顶棚位置尺寸和已测定的中心线,弹出顶棚主骨架位置线。2) Bounce line: While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
3)规划龙骨的安装位置线:龙骨是起到支撑的效果和作用,在塑料扣板尺寸大小确定的情况下,可以根据板材的规格来进行龙骨的尺寸和位置线的规划,在位置线上标出基准线。3) Planning the installation position line of the keel: the keel plays a supporting effect and role. When the size of the plastic gusset is determined, the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
4)安装主骨架:主龙骨安装后要及时的根据之前设计的高度来进行位置的确定,可以拉出标高控制线,从一端开始,在安装的同时进行吊杆高度的调整,控制好龙骨架的平整度,等大面平整后,对一些翘边的龙骨进行调整,要保证平整度符合施工要求,在施工时候要注意预留出照明线出口。4) Install the main frame: After the main keel is installed, the position should be determined according to the previously designed height in time. You can pull out the elevation control line, start from one end, and adjust the height of the boom while installing to control the dragon frame. After the large surface is flattened, adjust some warped keels to ensure that the flatness meets the construction requirements, and pay attention to the lighting line exit during construction.
5)安装吊杆:吊杆的安装是要符合具体的施工压球,主要包括下面几点:吊杆要有足够的制程能力、吊杆要提前做好防锈处理、吊杆距主龙骨端不能超过300mm,避免主龙骨出现下坠等现象。5) Installation of boom: The installation of boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
6)边龙骨安装:边龙骨安装要紧挨着主龙骨进行使用,安装好之后要对主龙骨和边龙骨进行检查,看是不是平整。6) Side keel installation: The side keel should be installed next to the main keel. After installation, the main keel and the side keel should be checked to see if it is level.
7)彩绘面板安装:彩绘面板在安装时候要使用专用连接件,要注意的是在安装时候要根据实际尺寸来进行裁剪,尤其是最后一块板材,将彩绘面板稍微弯曲后放入进去,保证整体的效果。7) Painted panel installation: The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
8)脚手架拆除:拆卸脚手架时必须按脚手架拆除要求进行,并进行室内墙壁保护,防止将室内墙壁砸坏。8) Scaffolding removal: When disassembling the scaffolding, it must be carried out according to the scaffolding removal requirements, and the indoor wall protection should be carried out to prevent the indoor wall from being damaged.
实施例五:Embodiment five:
一种顶棚彩绘制造安装方法,包括以下步骤:A method for manufacturing and installing ceiling color painting, including the following steps:
1)进行顶棚面板彩绘:1) Carry out ceiling panel painting:
a.选图:根据自己的喜好选择自己喜欢的风格类型,选择自己所要彩绘的图案。a. Picture selection: Choose the style you like according to your preferences, and choose the pattern you want to paint.
b.顶棚面板处理:墙面的基层处理比较重要,在刷好乳胶漆的面板上画画,要对面板找平、刷底漆和图案规划。b. Ceiling panel treatment: The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
c.配颜料:对照所选图案色彩配制所需彩绘颜料,彩绘颜料组分,包括:滑石粉21-23%、白乳胶24-26%、稀释剂8-10%、彩绘漆14-16%、光油3-10%、固化剂15-30%。c. Pigment preparation: According to the color of the selected pattern, the required colored drawing pigments are prepared. The colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
d.准备上色:首先,在要彩绘的面板下方地板铺满报纸或是其他隔离物,以免弄脏地面,按照选图在事先画好的图案轮廓的墙壁上涂颜料,一定要用力均匀,如果用力不均会产生斑纹,如果以产生斑纹请不要心急,可以再涂一遍盖住原来的斑纹。d. Prepare to paint: First, cover the floor under the panel to be painted with newspapers or other spacers to avoid soiling the ground. According to the selected picture, apply paint on the wall with the outline of the pattern drawn in advance, and it must be evenly applied. If the force is uneven, markings will occur. If it is caused, please don't worry, you can apply it again to cover the original markings.
e.修改和维护:有些地方的色彩不是很满意,调和所需颜色再涂一遍,画完后保持通风,待干透后,方可触碰。e. Modification and maintenance: the color in some places is not very satisfactory, re-paint it again after reconciling the required color. After painting, keep it ventilated and wait until it is dry before touching it.
2)弹线:在彩绘后面板风干的同时,根据图纸的标高及顶棚位置尺寸和已测定的中心线,弹出顶棚主骨架位置线。2) Bounce line: While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
3)规划龙骨的安装位置线:龙骨是起到支撑的效果和作用,在塑料扣板尺寸大小确定的情况下,可以根据板材的规格来进行龙骨的尺寸和位置线的规划,在位置线上标出基准线。3) Planning the installation position line of the keel: the keel plays a supporting effect and role. When the size of the plastic gusset is determined, the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
4)安装主骨架:主龙骨安装后要及时的根据之前设计的高度来进行位置的确定,可以拉出标高控制线,从一端开始,在安装的同时进行吊杆高度的调整,控制好龙骨架的平整度,等大面平整后,对一些翘边的龙骨进行调整,要保证平整度符合施工要求,在施工时候要注意预留出照明线出口。4) Install the main frame: After the main keel is installed, the position should be determined according to the previously designed height in time. You can pull out the elevation control line, start from one end, and adjust the height of the boom while installing to control the dragon frame. After the large surface is flattened, adjust some warped keels to ensure that the flatness meets the construction requirements, and pay attention to the lighting line exit during construction.
5)安装吊杆:吊杆的安装是要符合具体的施工压球,主要包括下面几点:吊杆要有足够的制程能力、吊杆要提前做好防锈处理、吊杆距主龙骨端不能超过300mm,避免主龙骨出现下坠等现象。5) Installation of boom: The installation of boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
6)边龙骨安装:边龙骨安装要紧挨着主龙骨进行使用,安装好之后要对主龙骨和边龙骨进行检查,看是不是平整。6) Side keel installation: The side keel should be installed next to the main keel. After installation, the main keel and the side keel should be checked to see if it is level.
7)彩绘面板安装:彩绘面板在安装时候要使用专用连接件,要注意的是在安装时候要根据实际尺寸来进行裁剪,尤其是最后一块板材,将彩绘面板稍微弯曲后放入进去,保证整体的效果。7) Painted panel installation: The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
8)脚手架拆除:拆卸脚手架时必须按脚手架拆除要求进行,并进行室内墙壁保护,防止将室内墙壁砸坏。8) Scaffolding removal: When disassembling the scaffolding, it must be carried out according to the scaffolding removal requirements, and the indoor wall protection should be carried out to prevent the indoor wall from being damaged.
实施例六:Embodiment 6:
一种顶棚彩绘制造安装方法,包括以下步骤:A method for manufacturing and installing ceiling color painting, including the following steps:
1)进行顶棚面板彩绘:1) Carry out ceiling panel painting:
a.选图:根据自己的喜好选择自己喜欢的风格类型,选择自己所要彩绘的图案。a. Picture selection: Choose the style you like according to your preferences, and choose the pattern you want to paint.
b.顶棚面板处理:墙面的基层处理比较重要,在刷好乳胶漆的面板上画画,要对面板找平、刷底漆和图案规划。b. Ceiling panel treatment: The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
c.配颜料:对照所选图案色彩配制所需彩绘颜料,彩绘颜料组分,包括:滑石粉21-23%、白乳胶24-26%、稀释剂8-10%、彩绘漆14-16%、光油3-10%、固化剂15-30%。c. Pigment preparation: According to the color of the selected pattern, the required colored drawing pigments are prepared. The colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14-16% , 3-10% varnish, 15-30% curing agent.
d.准备上色:首先,在要彩绘的面板下方地板铺满报纸或是其他隔离物,以免弄脏地面,按照选图在事先画好的图案轮廓的墙壁上涂颜料,一定要用力均匀,如果用力不均会产生斑纹,如果以产生斑纹请不要心急,可以再涂一遍盖住原来的斑纹。d. Prepare to paint: First, cover the floor under the panel to be painted with newspapers or other spacers to avoid soiling the ground. According to the selected picture, apply paint on the wall with the outline of the pattern drawn in advance, and it must be evenly applied. If the force is uneven, markings will occur. If it is caused, please don't worry, you can apply it again to cover the original markings.
e.修改和维护:有些地方的色彩不是很满意,调和所需颜色再涂一遍,画完后保持通风,待干透后,方可触碰。e. Modification and maintenance: the color in some places is not very satisfactory, re-paint it again after reconciling the required color. After painting, keep it ventilated and wait until it is dry before touching it.
2)弹线:在彩绘后面板风干的同时,根据图纸的标高及顶棚位置尺寸和已测定的中心线,弹出顶棚主骨架位置线。2) Bounce line: While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
3)规划龙骨的安装位置线:龙骨是起到支撑的效果和作用,在塑料扣板尺寸大小确定的情况下,可以根据板材的规格来进行龙骨的尺寸和位置线的规划,在位置线上标出基准线。3) Planning the installation position line of the keel: the keel plays a supporting effect and role. When the size of the plastic gusset is determined, the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
4)安装主骨架:主龙骨安装后要及时的根据之前设计的高度来进行位置的确定,可以拉出标高控制线,从一端开始,在安装的同时进行吊杆高度的调整,控制好龙骨架的平整度,等大面平整后,对一些翘边的龙骨进行调整,要保证平整度符合施工要求,在施工时候要注意预留出照明线出口。4) Install the main frame: After the main keel is installed, the position should be determined according to the previously designed height in time. You can pull out the elevation control line, start from one end, and adjust the height of the boom while installing to control the dragon frame. After the large surface is flattened, adjust some warped keels to ensure that the flatness meets the construction requirements, and pay attention to the lighting line exit during construction.
5)安装吊杆:吊杆的安装是要符合具体的施工压球,主要包括下面几点:吊杆要有足够的制程能力、吊杆要提前做好防锈处理、吊杆距主龙骨端不能超过300mm,避免主龙骨出现下坠等现象。5) Installation of boom: The installation of boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
6)边龙骨安装:边龙骨安装要紧挨着主龙骨进行使用,安装好之后要对主龙骨和边龙骨进行检查,看是不是平整。6) Side keel installation: The side keel should be installed next to the main keel. After installation, the main keel and the side keel should be checked to see if it is level.
7)彩绘面板安装:彩绘面板在安装时候要使用专用连接件,要注意的是在安装时候要根据实际尺寸来进行裁剪,尤其是最后一块板材,将彩绘面板稍微弯曲后放入进去,保证整体的效果。7) Painted panel installation: The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
8)脚手架拆除:拆卸脚手架时必须按脚手架拆除要求进行,并进行室内墙壁保护,防止将室内墙壁砸坏。8) Scaffolding removal: When disassembling the scaffolding, it must be carried out according to the scaffolding removal requirements, and the indoor wall protection should be carried out to prevent the indoor wall from being damaged.
综上所述,该顶棚彩绘制造安装方法,在对顶棚面板彩绘完成后,同时利用顶棚面板晾干的时间进行弹线以及规划龙骨的安装位置线的位置线等工作,以便对骨架、吊杆、龙骨和顶棚面板安装,达到有效利用时间的目的,进而能够起到提高工作人员工作效率的作用,在对顶棚面板安装完成后,在对脚手架进行拆卸时,严格遵守脚手架拆除要求对脚手架进行拆卸,避免在拆卸脚手架的过程中因未按照守脚手架拆除要求进行而导致脚手架倾倒对室内墙壁造成刮伤,进而达到提高工作人员安全系数和防止脚手架拆卸时刮伤墙壁的目的。To sum up, the ceiling color painting manufacturing and installation method, after the ceiling panel painting is completed, at the same time use the ceiling panel to dry time for elastic line and planning the position line of the installation position line of the keel, so that the frame and boom , Keel and ceiling panel installation, to achieve the purpose of effective use of time, and thus can play a role in improving the work efficiency of the staff, after the ceiling panel is installed, when the scaffold is disassembled, the scaffold must be disassembled in strict compliance with the scaffold removal requirements , Avoid the scaffold toppling and scratching the indoor wall due to failure to follow the scaffold removal requirements during the process of disassembling the scaffold, so as to improve the safety factor of the staff and prevent the wall from scratching when the scaffold is dismantled.
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art can understand that various changes, modifications, and substitutions can be made to these embodiments without departing from the principle and spirit of the present invention. And variations, the scope of the present invention is defined by the appended claims and their equivalents.
工业实用性Industrial applicability
在此处键入工业实用性描述段落。Type a paragraph describing industrial applicability here.
序列表自由内容Sequence Listing Free Content
在此处键入序列表自由内容描述段落。Type here the free content description paragraph of the sequence listing.

Claims (8)

  1. 一种顶棚彩绘制造安装方法,其特征在于,包括以下步骤:A method for manufacturing and installing ceiling color painting, which is characterized in that it comprises the following steps:
    1)进行顶棚面板彩绘:1) Carry out ceiling panel painting:
    a.选图:根据自己的喜好选择自己喜欢的风格类型,选择自己所要彩绘的图案。a. Picture selection: Choose the style you like according to your preferences, and choose the pattern you want to paint.
    b.顶棚面板处理:墙面的基层处理比较重要,在刷好乳胶漆的面板上画画,要对面板找平、刷底漆和图案规划。b. Ceiling panel treatment: The basic treatment of the wall surface is more important. When drawing on the latex paint panel, the panel should be leveled, painted and patterned.
    c.配颜料:对照所选图案色彩配制所需彩绘颜料,所述彩绘颜料组分,包括:滑石粉21-23%、白乳胶24-26%、稀释剂8-10%、彩绘漆14-16%、光油3-10%、固化剂15-30%。c. Pigment preparation: According to the selected pattern color, the required colored drawing pigments are prepared. The colored drawing pigment components include: talc 21-23%, white latex 24-26%, thinner 8-10%, and painted paint 14- 16%, varnish 3-10%, curing agent 15-30%.
    d.准备上色:首先,在要彩绘的面板下方地板铺满报纸或是其他隔离物,以免弄脏地面,按照选图在事先画好的图案轮廓的墙壁上涂颜料,一定要用力均匀,如果用力不均会产生斑纹,如果以产生斑纹请不要心急,可以再涂一遍盖住原来的斑纹。d. Prepare to paint: First, cover the floor under the panel to be painted with newspapers or other spacers to avoid soiling the ground. According to the selected picture, apply paint on the wall with the outline of the pattern drawn in advance, and it must be evenly applied. If the force is uneven, markings will occur. If it is caused, please don't worry, you can apply it again to cover the original markings.
    e.修改和维护:有些地方的色彩不是很满意,调和所需颜色再涂一遍,画完后保持通风,待干透后,方可触碰。e. Modification and maintenance: the color in some places is not very satisfactory, re-paint it again after reconciling the required color. After painting, keep it ventilated and wait until it is dry before touching it.
    2)弹线:在彩绘后面板风干的同时,根据图纸的标高及顶棚位置尺寸和已测定的中心线,弹出顶棚主骨架位置线。2) Bounce line: While the painted back panel is air-dried, the main frame position line of the ceiling will pop up according to the elevation of the drawing, the size of the ceiling position and the determined centerline.
    3)规划龙骨的安装位置线:龙骨是起到支撑的效果和作用,在塑料扣板尺寸大小确定的情况下,可以根据板材的规格来进行龙骨的尺寸和位置线的规划,在位置线上标出基准线。3) Planning the installation position line of the keel: the keel plays a supporting effect and role. When the size of the plastic gusset is determined, the size and position line of the keel can be planned according to the specifications of the plate, and the position line Mark the baseline.
    4)安装主骨架:主龙骨安装后要及时的根据之前设计的高度来进行位置的确定,可以拉出标高控制线,从一端开始,在安装的同时进行吊杆高度的调整,控制好龙骨架的平整度,等大面平整后,对一些翘边的龙骨进行调整,要保证平整度符合施工要求,在施工时候要注意预留出照明线出口。4) Install the main frame: After the main keel is installed, the position should be determined according to the previously designed height in time. You can pull out the elevation control line, start from one end, and adjust the height of the boom while installing to control the dragon frame. After the large surface is flattened, adjust some warped keels to ensure that the flatness meets the construction requirements, and pay attention to the lighting line exit during construction.
    5)安装吊杆:吊杆的安装是要符合具体的施工压球,主要包括下面几点:吊杆要有足够的制程能力、吊杆要提前做好防锈处理、吊杆距主龙骨端不能超过300mm,避免主龙骨出现下坠等现象。5) Installation of boom: The installation of boom must conform to the specific construction pressure ball, mainly including the following points: the boom must have sufficient process capacity, the boom must be rust-proof in advance, and the boom must be away from the end of the main keel. It should not exceed 300mm to prevent the main keel from falling.
    6)边龙骨安装:边龙骨安装要紧挨着主龙骨进行使用,安装好之后要对主龙骨和边龙骨进行检查,看是不是平整。6) Side keel installation: The side keel should be installed next to the main keel. After installation, the main keel and the side keel should be checked to see if it is level.
    7)彩绘面板安装:彩绘面板在安装时候要使用专用连接件,要注意的是在安装时候要根据实际尺寸来进行裁剪,尤其是最后一块板材,将彩绘面板稍微弯曲后放入进去,保证整体的效果。7) Painted panel installation: The painted panel should be installed with special connectors. It should be noted that it should be cut according to the actual size during installation, especially the last piece of board. The painted panel is slightly bent and put in to ensure the whole Effect.
    8)脚手架拆除:拆卸脚手架时必须按脚手架拆除要求进行,并进行室内墙壁保护,防止将室内墙壁砸坏。8) Scaffolding removal: When disassembling the scaffolding, it must be carried out according to the scaffolding removal requirements, and the indoor wall protection should be carried out to prevent the indoor wall from being damaged.
  2. 根据权利要求1所述的一种顶棚彩绘制造安装方法,其特征在于,所述彩绘颜料包括以下重量份数配比的原料:滑石粉21-21.5%、白乳胶23-25%、稀释剂9-10%、彩绘漆15-16%、光油4-10%、固化剂17.5-28%。The method for manufacturing and installing ceiling color painting according to claim 1, wherein the color painting pigment comprises the following raw materials in parts by weight: talcum powder 21-21.5%, white latex 23-25%, thinner 9 -10%, painted paint 15-16%, varnish 4-10%, curing agent 17.5%-28%.
  3. 根据权利要求1所述的一种顶棚彩绘制造安装方法,其特征在于,所述彩绘颜料包括以下重量份数配比的原料:滑石粉22-23%、白乳胶25-26%、稀释剂9-10%、彩绘漆15-16%、光油6-10%、固化剂15-23%。The method for manufacturing and installing ceiling color painting according to claim 1, wherein the color painting pigment comprises the following raw materials in parts by weight: 22-23% talc, 25-26% white latex, and 9 -10%, painted paint 15-16%, varnish 6-10%, curing agent 15-23%.
  4. 根据权利要求1所述的一种顶棚彩绘制造安装方法,其特征在于,所述彩绘颜料包括以下重量份数配比的原料:滑石粉22-23%、白乳胶25-26%、稀释剂8-9%、彩绘漆14-15%、光油7-10%、固化剂17-24%。The method for manufacturing and installing ceiling color painting according to claim 1, wherein the color painting pigment comprises the following raw materials in parts by weight: 22-23% talc, 25-26% white latex, and 8 -9%, painted paint 14-15%, varnish 7-10%, curing agent 17-24%.
  5. 根据权利要求1所述的一种顶棚彩绘制造安装方法,其特征在于,所述彩绘颜料包括以下重量份数配比的原料:滑石粉22.5-23%、白乳胶25-26%、稀释剂9-10%、彩绘漆15-16%、光油6-10%、固化剂15-22.5%。The method for manufacturing and installing ceiling color painting according to claim 1, wherein the color painting pigment comprises the following raw materials in parts by weight: talcum powder 22.5-23%, white latex 25-26%, thinner 9 -10%, painted paint 15-16%, varnish 6-10%, curing agent 15-22.5%.
  6. 根据权利要求1所述的一种顶棚彩绘制造安装方法,其特征在于,所述彩绘颜料包括以下重量份数配比的原料:滑石粉21-23%、白乳胶25-26%、稀释剂8.5-10%、彩绘漆15-16%、光油5-10%、固化剂15-25.5%。The method for manufacturing and installing ceiling color painting according to claim 1, wherein the color painting pigment comprises the following raw materials in parts by weight: 21-23% talc, 25-26% white latex, and 8.5 parts by weight. -10%, painted paint 15-16%, varnish 5-10%, curing agent 15-25.5%.
  7. 根据权利要求1所述的一种顶棚彩绘制造安装方法,其特征在于,所述彩绘颜料包括以下重量份数配比的原料:滑石粉22-23%、白乳胶24.5-26%、稀释剂9-10%、彩绘漆15-16%、光油6-10%、固化剂15-23.5%。The method for manufacturing and installing ceiling colored painting according to claim 1, wherein the colored painting pigment comprises the following raw materials in parts by weight: 22-23% talc powder, 24.5-26% white latex, and 9 -10%, painted paint 15-16%, varnish 6-10%, curing agent 15-23.5%.
  8. 根据权利要求1所述的一种顶棚彩绘制造安装方法,其特征在于,所述彩绘颜料包括以下重量份数配比的原料:滑石粉21.5-22.5%、白乳胶25-26%、稀释剂9-9.5%、彩绘漆15-16%、光油4-10%、固化剂16-25.5%。The method for manufacturing and installing ceiling color painting according to claim 1, wherein the color painting pigment comprises the following raw materials in parts by weight: talc 21.5-22.5%, white latex 25-26%, thinner 9 -9.5%, painted paint 15-16%, varnish 4-10%, curing agent 16-25.5%.
PCT/CN2020/082411 2019-07-10 2020-03-31 Manufacturing and installing method for ceiling painting WO2021004100A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910618858.7A CN110306712A (en) 2019-07-10 2019-07-10 A kind of ceiling colored drawing manufacture installation method
CN201910618858.7 2019-07-10

Publications (1)

Publication Number Publication Date
WO2021004100A1 true WO2021004100A1 (en) 2021-01-14

Family

ID=68080774

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/082411 WO2021004100A1 (en) 2019-07-10 2020-03-31 Manufacturing and installing method for ceiling painting

Country Status (2)

Country Link
CN (1) CN110306712A (en)
WO (1) WO2021004100A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306712A (en) * 2019-07-10 2019-10-08 上海建为历保科技股份有限公司 A kind of ceiling colored drawing manufacture installation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101804750A (en) * 2010-04-27 2010-08-18 赵良新 Manufacture method of ancient architecture color painting
US20120317915A1 (en) * 2011-06-16 2012-12-20 Chicago Metallic Corporation Self-Hanging Notched Ceiling Tile
CN103122697A (en) * 2013-02-05 2013-05-29 山西太行建设开发有限公司 Installation method of indoor large-scale suspended ceiling
CN107629654A (en) * 2017-09-29 2018-01-26 天长市墨缘玻璃建材有限公司 A kind of base coat and its processing technology for coromandel laquer glass
CN108086561A (en) * 2017-12-21 2018-05-29 合肥市艾美莱装饰有限公司 The method of construction and decoration furred ceiling
CN109403530A (en) * 2018-11-19 2019-03-01 苏州美瑞德建筑装饰有限公司 Starry sky moulding colored drawing art Integral ceiling mounting structure
CN110306712A (en) * 2019-07-10 2019-10-08 上海建为历保科技股份有限公司 A kind of ceiling colored drawing manufacture installation method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101804750A (en) * 2010-04-27 2010-08-18 赵良新 Manufacture method of ancient architecture color painting
US20120317915A1 (en) * 2011-06-16 2012-12-20 Chicago Metallic Corporation Self-Hanging Notched Ceiling Tile
CN103122697A (en) * 2013-02-05 2013-05-29 山西太行建设开发有限公司 Installation method of indoor large-scale suspended ceiling
CN107629654A (en) * 2017-09-29 2018-01-26 天长市墨缘玻璃建材有限公司 A kind of base coat and its processing technology for coromandel laquer glass
CN108086561A (en) * 2017-12-21 2018-05-29 合肥市艾美莱装饰有限公司 The method of construction and decoration furred ceiling
CN109403530A (en) * 2018-11-19 2019-03-01 苏州美瑞德建筑装饰有限公司 Starry sky moulding colored drawing art Integral ceiling mounting structure
CN110306712A (en) * 2019-07-10 2019-10-08 上海建为历保科技股份有限公司 A kind of ceiling colored drawing manufacture installation method

Also Published As

Publication number Publication date
CN110306712A (en) 2019-10-08

Similar Documents

Publication Publication Date Title
CN108841274B (en) Preparation method and construction process of multi-dimensional stone-like paint
WO2021004100A1 (en) Manufacturing and installing method for ceiling painting
CN110607106A (en) Sand-containing multicolor paint of simulated stone paint and preparation method thereof
TW201439407A (en) Building board and method for producing building board
CN103589261A (en) Weather-resistant water-based multielement multicolour paint used for building exterior walls
Ochilova Technology of painting works in construction
CN106284890A (en) A kind of construction method of art colored stone paint
CN109252666A (en) A kind of terrace construction technique
CN103252309B (en) Method for processing surface of plastic wood-imitating floor
CN205777208U (en) Flexible texture coating body of wall
CN201908415U (en) Wall decorative board layer structure
JP3400878B2 (en) Natural stone tone coating method and natural stone tone paint composition used therefor
CN102704636B (en) Indoor antique glass fiber reinforced cement (GRC) combined column and antique colored drawing beam decoration system and construction method thereof
CN109486310A (en) A kind of aqueous stone-like coating and its manufacturing method
CN202596185U (en) Ceiling and shaping locating system for ceiling
CN208088713U (en) A kind of water-soluble colorful coating decoration wall
KR102575468B1 (en) Finishing Material and Finishing Layer Formed by the Finishing Material
JP2006021120A (en) Method for forming pattern coating film
CN214515794U (en) Texture paint construction structure on austenitic pine board
TW201805510A (en) Manufacturing method of post-made fair-faced concrete template lines and holes capable of improving shortcomings of the prior art that has a rough surface, lengthy concrete solidification time, high construction costs and inconsistent quality
JP2829481B2 (en) Repair paint
CN110700526A (en) Construction method for spraying stone-like paint on dry hanging plate surface of outer wall
JPH05263485A (en) Interior finish panel and its manufacture
JP2002136916A (en) Pattern coating film forming method
JP4895540B2 (en) Pressing tool and pattern forming method using the same

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20836945

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 20836945

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 20836945

Country of ref document: EP

Kind code of ref document: A1

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205 DATED 24.06.2022)

122 Ep: pct application non-entry in european phase

Ref document number: 20836945

Country of ref document: EP

Kind code of ref document: A1