CN204059701U - A kind of Integral ceiling - Google Patents

A kind of Integral ceiling Download PDF

Info

Publication number
CN204059701U
CN204059701U CN201420341223.XU CN201420341223U CN204059701U CN 204059701 U CN204059701 U CN 204059701U CN 201420341223 U CN201420341223 U CN 201420341223U CN 204059701 U CN204059701 U CN 204059701U
Authority
CN
China
Prior art keywords
panel
keel
secondary joist
installation portion
joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420341223.XU
Other languages
Chinese (zh)
Inventor
奉涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Jinqi Home Furnishing Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420341223.XU priority Critical patent/CN204059701U/en
Application granted granted Critical
Publication of CN204059701U publication Critical patent/CN204059701U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a kind of Integral ceiling, its structure comprises main joist, secondary joist, auxiliary keel, the first panel and the second panel.First panel comprises veneer and is arranged on the first installation portion of veneer dual-side, first panel is installed between adjacent secondary joist by the first installation portion, second panel comprises compound plate and is arranged on compound plate both sides, for the second installation portion coordinated with secondary joist, the area of compound plate is the area of at least two veneer splicings, across at least three secondary joists about the second panel, secondary joist comprise the second panel left and right outermost two first time keel and two first time keel between second time keel, auxiliary keel vertical rack is located on two first time keel, the part that second time keel stride across the second panel is amputated, second time keel are amputated the rear suspension end formed and be suspended to auxiliary keel.Its furred ceiling face moulding of this Integral ceiling is enriched changeable, and can adapt to large-area electrical appliance module.

Description

A kind of Integral ceiling
Technical field
The invention relates to indoor suspended ceiling technical field, particularly relates to a kind of Integral ceiling.
Background technology
Integral ceiling is simple owing to installing, flexible arrangement, easy to maintenance and be widely used.Existing Integral ceiling, by electrical function module and furred ceiling assembly, is all made into the combined module of standard specification, integrates during installation, make installation more convenient, but the laying mounting structure that also therefore result in Integral ceiling is more single.Feel dull inflexible by shape, erecting of panel of the same size to be formed geometry furred ceiling face in keel to people, cannot be formed and enrich changeable aesthetic effect, be difficult to meet the demand of owner for beautiful decoration degree.And when its area taken of some electrical appliance module is greater than the area of single standard specification panel, extremely inconvenience is installed.
Summary of the invention
The object of the invention is avoid above-mentioned weak point of the prior art and provide a kind of furred ceiling face moulding to enrich changeable Integral ceiling, and this Integral ceiling can install large-sized panel to adapt to large-area electrical appliance module.
The object of the invention is achieved through the following technical solutions:
Provide a kind of Integral ceiling, comprise main joist, secondary joist and the first panel, main joist is fixedly lifted on smallpox, secondary joist is equally lifted on main joist, first panel comprises veneer and is arranged on edge, the described veneer left and right sides along secondary joist direction, for the first installation portion coordinated with secondary joist, first panel is installed between adjacent secondary joist by described first installation portion, also comprise the second panel and auxiliary keel, second panel comprises compound plate and is arranged on edge, the described compound plate left and right sides along secondary joist direction, for the second installation portion coordinated with secondary joist, the area of described compound plate is the area of at least two described veneer splicings, across at least three secondary joists about the second panel, be positioned at outermost two secondary joists in the second panel left and right for first time keel, auxiliary keel are located on two first time keel perpendicular to secondary joist orientation stand or are erected on the secondary joist that is positioned at outside first time keel, secondary joist between two first time keel be for the second time keel, the part that second time keel stride across the second panel is amputated to dodge the second panel, second time keel are amputated the rear suspension end formed and be suspended to auxiliary keel.
Wherein, described secondary joist two bottom sides be provided with paving limit, by by described first installation portion lay in described paving limit to set up the first panel in secondary joist, by by described second installation portion lay in described paving limit to set up the second panel in secondary joist.
Wherein, described secondary joist is triangular keel, first panel is buckle structure, first panel is inserted by the first installation portion and is fastened on described triangular keel to install the first panel, second panel is buckle structure, and the second panel is inserted by the second installation portion and is fastened on described triangular keel to install the second panel.
Wherein, along perpendicular to secondary joist direction, before and after described veneer, both sides of the edge are provided with the first baffle plate, the two ends, left and right of described first baffle plate are provided with and half lack portion for what dodge secondary joist.
Wherein, described first panel is shape, the consistent size of foursquare first panel, described first installation portion and described first baffle plate.
Wherein, along perpendicular to secondary joist direction, before and after described compound plate, both sides of the edge are provided with second baffle, the two ends, left and right of described second baffle are provided with and half lack portion for what dodge secondary joist.
Wherein, the two ends of described second installation portion are provided with described half and lack portion, and described second baffle being provided with the fastening mounting structure identical with described second installation portion, installing for coordinating with secondary joist.
Wherein, described second panel is shape, the consistent size of foursquare second panel, described second installation portion and described second baffle.
Wherein, described auxiliary keel are connected with every root first time keel and second time keel respectively by clip.
The beneficial effect of the invention:
The furred ceiling face of a kind of Integral ceiling of the invention is by being made up of with shape, the second panel not of uniform size the first panel of standard specification, second panel of shape changeable has enriched the moulding in furred ceiling face, install by the second panel of different size shape and the first panel are carried out different assembled arrangement, the furred ceiling face of different shape can be constructed, the pattern in furred ceiling face is enriched changeable.And second global shape of panel, size equal shape, the size that several first panels are spliced, no matter make the second panel in design, produce, or on the in-site installation in later stage, all convenient and simple.Second panel is at least across three secondary joists, and its area is comparatively large, can mate the larger electrical appliance module of area occupied thereon, can according to actual conditions, and the various electrical appliance module of compliance, versatility is high.
Accompanying drawing explanation
Accompanying drawing is utilized to be described further innovation and creation, but the embodiment in accompanying drawing does not form any restriction to the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the following drawings.
Fig. 1 is the structural representation of a kind of Integral ceiling of embodiment 1.
Fig. 2 is the structural representation of another angle of a kind of Integral ceiling of embodiment 1.
Fig. 3 is the structural representation of the first panel of embodiment 1.
Fig. 4 is the structural representation of the second panel of embodiment 1.
Reference numeral:
1-main joist,
2-secondary joist, 21-first time keel, 22-second time keel, 23-assists keel,
3-first panel, 31-veneer, 32-first installation portion, 33-first baffle plate, 34-half lacks portion,
4-second panel, 41-compound plate, 42-second installation portion, 43-second baffle.44-half lacks portion, 45-electrical appliance module.
Detailed description of the invention
With the following Examples the invention is further described.
embodiment 1
One of detailed description of the invention of a kind of Integral ceiling of the invention, as depicted in figs. 1 and 2, comprises main joist 1, secondary joist 2, first panel 3 and the second panel 4.
Main joist 1 is fixedly lifted on smallpox, secondary joist 2 is equally lifted on main joist 1 time, and in the present embodiment, secondary joist 2 is preferably triangular keel, first panel 3 and the second panel 4 are all preferably buckle structure, and the first panel 3 and the second panel 4 composite assembly form furred ceiling face on secondary joist 2.
As shown in Figure 3, first panel 3 comprises veneer 31 and the first installation portion 32, first installation portion 32 is arranged on edge, veneer 31 left and right sides along secondary joist 2 direction, first installation portion 32 is mainly used in carrying out with secondary joist 2 coordinating to install the first panel 32 on secondary joist 2, in the present embodiment, first panel 3 is buckle structure, the structure of the first installation portion 32 is the installing plate upwards extended along the edge of veneer 31, length direction along described installing plate is provided with the convex button matched with the triangle button of described triangular keel, by the described installing plate on the first installation portion 32 of the first panel 3 both sides is inserted described triangular keel, and make the described convex button on described installation portion be fastened on the triangle button of described triangular keel to install the first panel 3 between two adjacent secondary joists 2.
Be respectively arranged with the first baffle plate 33 along perpendicular to both sides of the edge before and after the direction of secondary joist 2, veneer 31, the first baffle plate 33 be set and can block fit clearance between the first adjacent panel 3, also can strengthen the intensity of the first panel 3 simultaneously.Especially, be partly cut away at the first baffle plate about 33 two ends and form half scarce portion 34, for dodging secondary joist 2, as shown in figures 1 and 3.Preferably, first panel 3 design becomes foursquare first panel 3, simultaneously, by the shape of the first baffle plate 33, be dimensioned to the shape with the first installation portion 32, size is consistent, namely arrange half at the first installation portion 32 two ends equally and lack portion 34, the fastening mounting structure that design is identical with the first installation portion 32 on the first baffle plate 33 simultaneously, namely on the first baffle plate 33, the convex button identical with the first installation portion 32 is provided with, thus make the first baffle plate 33 also can insert and be installed on secondary joist 2, like this, first panel 3 can be installed regardless of direction when mounted, make on-the-spot installation easier.
As shown in Figure 4, second panel 4 comprises compound plate 41 and the second installation portion 42, second installation portion 42 is arranged on edge, compound plate 41 left and right sides along the direction of secondary joist 2, second installation portion 42 and the first installation portion 32 similar, second panel 4 is installed in secondary joist for coordinating with secondary joist, second panel 4 is similarly buckle structure, and the second installation portion 42 is insert secondary joist 2 to install the second panel 4 with manner equally.Similar with the first panel 3, the second panel 4 same before and after compound plate 41 both sides of the edge be provided with the second baffle 43 perpendicular to secondary joist 2, the left and right sides of second baffle 43 is provided with too and half lacks portion 44 for what dodge secondary joist 2.
In addition, in order to make installation more diversified, better arbitrarily collocation, the half scarce portion 44 identical with the two ends of second baffle 43 is provided with at the two ends of the second installation portion 42, on second baffle 43, be provided with the fastening mounting structure identical with the second installation portion 42 simultaneously, so just second baffle 43 can be used for coordinating installation second panel 4 with secondary joist 2, the second panel 4 level is selected 90 degree, the transverse direction of the second panel 4 can be installed and change into longitudinal installation.Further, when the second panel 4 is foursquare second panel, now, by the shape of second baffle 43, be dimensioned to the shape with the second installation portion 42, size is consistent, namely arrange half at the second installation portion 42 two ends equally and lack portion 44, the fastening mounting structure that design is identical with the second installation portion 42 on second baffle 43 simultaneously, namely on second baffle 43, the convex button identical with the second installation portion 42 is provided with, thus make second baffle 43 also can insert and be installed on secondary joist 2, like this, second panel 4 can be installed regardless of direction when mounted, make on-the-spot installation easier.
The feature of the second panel 4 is, the size and shape of its compound plate 41 is the size and shape that at least two veneers 31 splice composition.Can splice the second panel of different geometries by the permutation and combination that veneer 31 is different, difform second panel enriches changeable furred ceiling face by different combined and spliced can presenting again from the first panel 3 of standard specification.In the present embodiment, particularly, compound plate 41 is that four veneers 31 arrange the square compound plate of splicing composition by two row two.
In order to the electrical appliance module of larger area can be installed on the second panel 4, the Integral ceiling of the invention, across at least three secondary joists 2 about the second panel 4 being defined as on furred ceiling, to ensure its area.At this, setting is positioned at outermost two secondary joists of the second panel about 42 for first time keel 21, and the secondary joist 2 between two first time keel 21 be keel 22 for the second time, as depicted in figs. 1 and 2.Because the second panel 4 is specially three in the present embodiment across at least three secondary joist 2(), two first time keel 21 between second time keel 2 stride across above the second panel 4, and can interfere with the second baffle 43 on the second panel 4 and the electrical appliance module 45 be arranged on the second panel 4, therefore partial cutaway second time keel 22 being striden across the second panel 4 is needed to fall, to dodge the second panel 4, and second time keel 2 can be suspended on auxiliary keel 23 by the suspension end being amputated rear formation, auxiliary keel 23 are located on two first time keel 21 perpendicular to secondary joist 2 direction fixed mount, or be erected at be positioned at two first time keel 21 outside secondary joist 2 on, with two first time keel 21 to sling the suspension end of for the second time keel 22 for fulcrum, coordinate main joist 1, keep the balance of second time keel 22 firm, as depicted in figs. 1 and 2.In order to save material, cost-saving, in actual production, second time keel 22 can be adopted to be used as auxiliary keel 23 by the part that amputation is fallen.
embodiment 2
The detailed description of the invention two of a kind of Integral ceiling of the invention, the main technical schemes of the present embodiment is identical with embodiment 1, in the present embodiment unaccounted feature, adopts the explanation in embodiment 1, no longer repeats at this.The difference of the present embodiment and embodiment 1 is, secondary joist 2 does not adopt triangular keel, first panel 3 and the second panel 4 are not buckle structure yet, but the two bottom sides of secondary joist 2 is provided with paving limit, the installation of the first panel 3 be by by the first installation portion 32 lay of the first panel 3 on described paving limit, thus first surface grillage is located on secondary joist 2, in like manner, the installation of the second panel 4 be by by the second installation portion 42 lay of the second panel 4 on described paving limit, thus realize the second panel rack to be located on secondary joist 2.
Finally should be noted that; above embodiment is only in order to illustrate the technical scheme of the invention; but not the restriction to the invention protection domain; although done to explain to the invention with reference to preferred embodiment; those of ordinary skill in the art is to be understood that; can modify to the technical scheme of the invention or equivalent replacement, and not depart from essence and the scope of the invention technical scheme.

Claims (9)

1. an Integral ceiling, comprise main joist, secondary joist and the first panel, main joist is fixedly lifted on smallpox, secondary joist is equally lifted on main joist, first panel comprises veneer and is arranged on edge, the described veneer left and right sides along secondary joist direction, for the first installation portion coordinated with secondary joist, first panel is installed between adjacent secondary joist by described first installation portion, it is characterized in that: also comprise the second panel and auxiliary keel, second panel comprises compound plate and is arranged on edge, the described compound plate left and right sides along secondary joist direction, for the second installation portion coordinated with secondary joist, the area of described compound plate is the area of at least two described veneer splicings, across at least three secondary joists about the second panel, be positioned at outermost two secondary joists in the second panel left and right for first time keel, auxiliary keel are located on two first time keel perpendicular to secondary joist orientation stand or are erected on the secondary joist that is positioned at outside first time keel, secondary joist between two first time keel be for the second time keel, the part that second time keel stride across the second panel is amputated to dodge the second panel, second time keel are amputated the rear suspension end formed and be suspended to auxiliary keel.
2. a kind of Integral ceiling according to claim 1, it is characterized in that: described secondary joist two bottom sides is provided with paving limit, by by described first installation portion lay in described paving limit to set up the first panel in secondary joist, by by described second installation portion lay in described paving limit to set up the second panel in secondary joist.
3. a kind of Integral ceiling according to claim 1, it is characterized in that: described secondary joist is triangular keel, first panel is buckle structure, first panel is inserted by the first installation portion and is fastened on described triangular keel to install the first panel, second panel is buckle structure, and the second panel is inserted by the second installation portion and is fastened on described triangular keel to install the second panel.
4. a kind of Integral ceiling according to claim 3, is characterized in that: along perpendicular to secondary joist direction, before and after described veneer, both sides of the edge are provided with the first baffle plate, and the two ends, left and right of described first baffle plate are provided with and half lack portion for what dodge secondary joist.
5. a kind of Integral ceiling according to claim 4, is characterized in that: described first panel is shape, the consistent size of foursquare first panel, described first installation portion and described first baffle plate.
6. a kind of Integral ceiling according to claim 3 or 5, is characterized in that: along perpendicular to secondary joist direction, before and after described compound plate, both sides of the edge are provided with second baffle, and the two ends, left and right of described second baffle are provided with and half lack portion for what dodge secondary joist.
7. a kind of Integral ceiling according to claim 6, is characterized in that: the two ends of described second installation portion are provided with described half and lack portion, and described second baffle being provided with the fastening mounting structure identical with described second installation portion, installing for coordinating with secondary joist.
8. a kind of Integral ceiling according to claim 7, is characterized in that: described second panel is shape, the consistent size of foursquare second panel, described second installation portion and described second baffle.
9. a kind of Integral ceiling according to claim 1, is characterized in that: described auxiliary keel are connected with every root first time keel and second time keel respectively by clip.
CN201420341223.XU 2014-06-25 2014-06-25 A kind of Integral ceiling Expired - Fee Related CN204059701U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420341223.XU CN204059701U (en) 2014-06-25 2014-06-25 A kind of Integral ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420341223.XU CN204059701U (en) 2014-06-25 2014-06-25 A kind of Integral ceiling

Publications (1)

Publication Number Publication Date
CN204059701U true CN204059701U (en) 2014-12-31

Family

ID=52201244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420341223.XU Expired - Fee Related CN204059701U (en) 2014-06-25 2014-06-25 A kind of Integral ceiling

Country Status (1)

Country Link
CN (1) CN204059701U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086719A (en) * 2017-12-30 2018-05-29 浙江亚厦装饰股份有限公司 Assembled toilet and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086719A (en) * 2017-12-30 2018-05-29 浙江亚厦装饰股份有限公司 Assembled toilet and its installation method
CN108086719B (en) * 2017-12-30 2019-03-29 浙江亚厦装饰股份有限公司 Assembled toilet and its installation method

Similar Documents

Publication Publication Date Title
CN106760136A (en) A kind of leveling mounting structure of hang ceiling panel plate stitch
CN202810097U (en) Combined keel structure
CN111188448B (en) Unit type adjustable suspended ceiling structure
CN204386007U (en) A kind of secondary furred ceiling section bar
CN204059701U (en) A kind of Integral ceiling
JP5861903B1 (en) Indirect lighting structure unit parts
CN107514088B (en) Integrated modular flat top and construction method thereof
CN204059709U (en) A kind of Integral ceiling
CN104328851A (en) Curtain wall
CN203947655U (en) A kind of hanging piece for low floor height Integral ceiling
CN207691368U (en) A kind of back box connecting elements
CN207405849U (en) Integrated modular flat-top
CN104533005A (en) Ceiling connecting piece and ceiling with ceiling connecting pieces
CN204609095U (en) The furred ceiling of a kind of furred ceiling connector and use furred ceiling connector
CN205100489U (en) Semicircular tile mounting structure
CN109780481B (en) Spliced lamp and fixing support thereof
CN206346380U (en) A kind of leveling mounting structure of hang ceiling panel plate stitch
CN209353532U (en) The hold-down support of light steel keel partition
CN205189199U (en) Suspended ceiling keel articulates piece
CN110629955A (en) Assembled aluminum alloy combined modeling wall
CN205444785U (en) Decorative board connection structure for wall of tape form base
CN204691157U (en) A kind of stone material dry suspending connector
CN217000471U (en) Embedded building panel, external wall panel and suspended ceiling
CN206667567U (en) Plaster tablet suspended ceiling keel
CN205038939U (en) Easily adorn advertising light boxes

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171018

Address after: 528429, 3 cards of the first floor shop of Ma Xin dormitory building 2, Kai Yip North Road, Zhongshan, Guangdong

Patentee after: Zhongshan Jin Kai Mstar Technology Ltd

Address before: 511400 Guangdong city of Guangzhou province Panyu Dashi Binjiang Luyuan green building 1003 in 2

Patentee before: Feng Tao

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180930

Address after: 611200 122 Chen Lan Road, Chongzhou Economic Development Zone, Chengdu, Sichuan

Patentee after: Chengdu Jin Kai Mstar Technology Ltd

Address before: 528429 Ma Xin shop, No. 2 Kai Ye Bei Road, Huangpu town, Zhongshan, Guangdong, 3 cards.

Patentee before: Zhongshan Jin Kai Mstar Technology Ltd

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 611200 122 Chen Lan Road, Chongzhou Economic Development Zone, Chengdu, Sichuan

Patentee after: Chengdu Jinqi home furnishing Co., Ltd

Address before: 611200 122 Chen Lan Road, Chongzhou Economic Development Zone, Chengdu, Sichuan

Patentee before: CHENGDU JINQI MATERIAL TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141231

Termination date: 20210625

CF01 Termination of patent right due to non-payment of annual fee