CN108919766A - A kind of safety in production integrated manager platform based on BIM technology - Google Patents

A kind of safety in production integrated manager platform based on BIM technology Download PDF

Info

Publication number
CN108919766A
CN108919766A CN201810853681.4A CN201810853681A CN108919766A CN 108919766 A CN108919766 A CN 108919766A CN 201810853681 A CN201810853681 A CN 201810853681A CN 108919766 A CN108919766 A CN 108919766A
Authority
CN
China
Prior art keywords
fire
safety
sensor
real
factory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810853681.4A
Other languages
Chinese (zh)
Other versions
CN108919766B (en
Inventor
李岳峰
梁秋芳
叶立军
陈建江
余天京
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZHONGBO INFORMATION ENGINEERING Co Ltd
Original Assignee
ZHEJIANG ZHONGBO INFORMATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZHONGBO INFORMATION ENGINEERING Co Ltd filed Critical ZHEJIANG ZHONGBO INFORMATION ENGINEERING Co Ltd
Priority to CN201810853681.4A priority Critical patent/CN108919766B/en
Publication of CN108919766A publication Critical patent/CN108919766A/en
Application granted granted Critical
Publication of CN108919766B publication Critical patent/CN108919766B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41875Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by quality surveillance of production
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/34Director, elements to supervisory
    • G05B2219/34465Safety, control of correct operation, abnormal states

Abstract

The invention discloses a kind of safety in production integrated manager platform based on BIM technology, including centring system, centring system passes through the sensor that connection is mounted in factory and the fire protection data and video information in camera reading factory or detection data and video information that former factory fire-fighting system is read by gateway;Centring system is connected with false alarm prevention detection system, and false alarm prevention detection system detection at least two class sensors receive fire signal alarm simultaneously;Centring system calculates dead boundary, evacuation boundary, evacuation route, rescue route and chain accident range according to the real-time headroom data, using chain value after the accident as final calculated value if having dangerous material within the scope of chain accident;Centring system is connected with HAZMAT vehicle path command system.This kind safety in production integrated manager platform carries out integration utilization to the fire-fighting system of existing enterprise, and can accurately calculate fire-fighting evacuation range, while can plan the optimum operation path of hazardous materials transportation vehicle.

Description

A kind of safety in production integrated manager platform based on BIM technology
Technical field
The invention belongs to safety management system field, specifically a kind of safety in production integrated manager based on BIM technology is flat Platform.
Background technique
For initial fire management system outside 119,110 alarm systems, others are all manually dispatch controls;Wherein Including:After receiving a crime report, fire brigade's selection, fire-fighting vehicle scheduling, fire fighter's outfit, fire line selection, the understanding of fire-fighting target, Floor layout is found fire hydrant etc., is manually carried out entirely.And manual dispatching be difficult to solve live fire cause and combustible substance and Traffic conditions, so that rescue means can not be implemented accurately, rescue speed is slow, and fire damage is caused to expand.
In the prior art, the substitution manual dispatching of three-dimensional fire management system gradually solves a series of fire-fighting under battle conditions The problems in.A kind of three-dimensional digital urban fire protection pre-control and management system as disclosed in Publication No. CN101763605A, by this System can quickly analyze rescue path, quickly understand and prepare the relief goods needed, divide dangerous Evacuation area etc., and Existing three-dimensional digital urban fire protection pre-control and management system is typically all the data of preparatory typing, and data accuracy is not high, to fire The division of calamity situation and dangerous Evacuation area is inaccurate;Enterprise present simultaneously is generally all each to have a set of fire-fighting system by oneself, such as Fruit carries out the unified installation of fire-fighting system again, and undoubtedly installation cost is huge, wastes original fire-fighting system;And existing three Generally only for inside plants, there is a situation where fire for dimension word urban fire control pre-control and management system, and there is no to hazardous materials transportation The transit route of vehicle provides planning, if hazardous materials transportation vehicle occurs near the biggish enterprise of dangerous material storage capacity passing by Explosion will lead to enterprise and subsequent explosion occur, therefore carrying out planning to the transit route of hazardous materials transportation vehicle is also administration of the prevention and control Prevent chain accident from occurring in system essential.
Summary of the invention
The present invention is in view of the shortcomings of the prior art, provide a kind of safety in production integrated manager platform based on BIM technology, this kind Safety in production integrated manager platform carries out integration utilization to the fire-fighting system of existing enterprise, and can accurately calculate fire-fighting Range is evacuated, while can plan the optimum operation path of hazardous materials transportation vehicle.
In order to solve the above-mentioned technical problem, the present invention is addressed by following technical proposals:It is a kind of based on BIM technology It keeps the safety in production integrated manager platform, including centring system, the centring system is received a crime report with 119 terminal, command scheduling terminal respectively It is connected with GPS terminal, the GPS terminal includes GPS GPS, GSM/GPRS Cellular Networks communication systems, GIS Manage information system and computer network communications system;The centring system includes the threedimensional model established with region actual scene, Factory's title, factory location information, dangerous goods warehouse location information, factory are had according to actual scene typing in the threedimensional model Facility information, dangerous material type and corresponding fire-extinguishing apparatus, fire-extinguishing apparatus location information and dangerous goods workshop information;Institute Centring system is stated by connecting fire protection data and video in the sensor being mounted in factory and camera reading factory Information or the detection data and video information that former factory fire-fighting system is read by gateway;The sensor includes temperature sensing Device, humidity sensor, pressure sensor and smoke sensor device;The centring system is connected with false alarm prevention detection system, described False alarm prevention detection system detection at least two class sensors receive fire signal alarm simultaneously;In shop equipment, dangerous goods It is provided with the allowance detector for real-time detection surplus in warehouse, fire-extinguishing apparatus warehouse and is connect with the centring system, The centring system extracted when receiving alarm signal alarm signal for the previous period in shop equipment in, dangerous goods The real-time headroom data to tend towards stability in warehouse, fire-extinguishing apparatus warehouse calculates dead boundary according to the real-time headroom data, dredges Boundary, evacuation route, rescue route and chain accident range are dissipated, with chain thing if there are dangerous material within the scope of chain accident Therefore the value after occurring is as final calculated value;The centring system is connected with HAZMAT vehicle path command system, and record is dangerous The hazardous classification of product vehicle transport, on HAZMAT vehicle installation for real-time detection surplus allowance detector and GPS positioning device calculates the coverage of HAZMAT vehicle, is advised according to the real-time dangerous material location information and surplus of threedimensional model Path is drawn with product dangerous goods warehouse and the dangerous material workshop of averting danger, record vehicle GPS location information in real time and passes through geography Generalized information system is imported after the conversion of coordinate and signal filtering, and shows the motion profile of HAZMAT vehicle on threedimensional model, is being transported Dynamic rail mark issues alarm signal when deviateing planning path.This kind keeps the safety in production integrated manager platform can be in real time in viewing area It factory's title, factory location information, dangerous goods warehouse location information, shop equipment information, dangerous material type and corresponding goes out Fiery equipment, fire-extinguishing apparatus location information and dangerous goods workshop information can simultaneously be observed in shop equipment and dangerous in real time The dangerous material surplus and the fire-extinguishing apparatus surplus in fire-extinguishing apparatus warehouse in article warehouse, and can indicate HAZMAT vehicle Best transportation route, and alarm signal is issued in HAZMAT vehicle off-target transportation route, prevent hazardous materials transportation process It is middle that chain accident occurs;Instruction rescue aid, dead boundary, evacuation can be calculated according to real-time headroom data when fire occurs Boundary, evacuation route, rescue route and chain accident range achieve the effect that calculate more accurate.
In above-mentioned technical proposal, it is preferred that the centring system is connected with query statistic system, is lost according to National Fire Statistics method, based on statistical analysis strategy, operation is carried out by the way of icon, by the typing of fire damage master data, Editor, modification and delete operation, establish common fire loss statistics mathematical model, realize corresponding statistical calculation, generate number According to.The safety in production integrated manager platform can easily carry out query statistic, be conducive to increase the understanding to fire, so as to It is enough rule of thumb to carry out optimization algorithm.
In above-mentioned technical proposal, it is preferred that the allowance detector is gravity sensor or pressure sensor.Using weight Force snesor or pressure sensor are at low cost, and accuracy in detection is high.
In above-mentioned technical proposal, it is preferred that the threedimensional model is by BIM technology and type of business classification garden enterprise Full garden mark is carried out by safety, mark embodies enterprise security grade by shade, thinner by clicking mark entrance The description of level enterprise to carry out comprehensive roaming and management to garden.It being capable of more convenient clearly full garden by classifying and marking Company information in area is roamed and is managed.
In above-mentioned technical proposal, it is preferred that read the detection data and video information of former factory fire-fighting system by gateway Method be:The access of enterprise's end sensor and detector is carried out using things-internet gateway, gateway is by reserving different agreement Sensor, camera and the fire fighting detector of multiple one-touch various brands of access of interface.By independent development things-internet gateway, The access of enterprise's end sensor and detector is carried out, after system carries out specific aim exploitation to gateway, each enterprise's different brands are passed The equipment such as sensor, camera, fire fighting detector only need access things-internet gateway, multiple interfaces that gateway passes through reserved different agreement It one-touch can access, realize low-cost system transformation and increased convenience.
In above-mentioned technical proposal, it is preferred that be associated with shop equipment with sensor physics and logic is embodied in threedimensional model In, and the dynamic data acquired to each equipment essential information and sensor is embodied in model in real time.To realize production vehicle Between equipment management visualization, facilitate management.
In above-mentioned technical proposal, it is preferred that the supervising platform is equipped with demo system, and demo system passes through to real-time danger The analysis of the data of product location information and surplus visually demonstrates explosion or fire in the three-dimensional model, and using different colours to not It is distinguished with the extent of injury, while enumerating the nearest enterprise warehouse harmful influence storage condition of explosive range.Convenient in emergency episode Specific aim rescue is carried out when generation, improves rescue efficiency, reduces secondary hazards.
Compared with prior art, the present invention having the advantages that:This kind keeps the safety in production integrated manager platform can be real When viewing area in factory's title, factory location information, dangerous goods warehouse location information, shop equipment information, dangerous material Type and corresponding fire-extinguishing apparatus, fire-extinguishing apparatus location information and dangerous goods workshop information simultaneously can observe work in real time The interior dangerous material surplus with dangerous goods warehouse of plant and the fire-extinguishing apparatus surplus in fire-extinguishing apparatus warehouse, and can refer to Show the best transportation route of HAZMAT vehicle, and issue alarm signal in HAZMAT vehicle off-target transportation route, prevents Chain accident occurs during hazardous materials transportation;Instruction rescue can be calculated according to real-time headroom data when fire occurs to set Standby, dead boundary, evacuation boundary, evacuation route, rescue route and chain accident range, reach and calculate more accurate effect Fruit.
Detailed description of the invention
Fig. 1 is the attachment structure schematic diagram of the embodiment of the present invention.
Specific embodiment
Present invention is further described in detail with specific embodiment with reference to the accompanying drawing:Referring to Fig. 1, one kind is based on The safety in production integrated manager platform of BIM technology, including centring system, the centring system receive a crime report respectively with 119 terminal, commander Dispatch terminal is connected with GPS terminal, and the GPS terminal includes GPS GPS, GSM/GPRS Cellular Networks communication system System, GIS GIS-Geographic Information System and computer network communications system;The centring system includes three established with region actual scene Dimension module has factory's title, factory location information, dangerous goods warehouse location to believe in the threedimensional model according to actual scene typing Breath, shop equipment information, dangerous material type and corresponding fire-extinguishing apparatus, fire-extinguishing apparatus location information and dangerous goods workshop Information;The sensor and camera that the centring system is mounted in factory by connection read the fire protection data in factory The detection data and video information of former factory fire-fighting system are read with video information or by gateway;The sensor includes temperature Sensor, humidity sensor, pressure sensor and smoke sensor device;The centring system is connected with false alarm prevention detection system, The false alarm prevention detection system detection at least two class sensors receive fire signal alarm simultaneously;Shop equipment is interior, dangerous It is provided with the allowance detector for real-time detection surplus in article warehouse, fire-extinguishing apparatus warehouse and connects with the centring system Connect, the centring system extracted when receiving alarm signal alarm signal for the previous period in shop equipment in, it is dangerous The real-time headroom data to tend towards stability in article warehouse, fire-extinguishing apparatus warehouse calculates dead side according to the real-time headroom data Boundary, evacuation boundary, evacuation route, rescue route and chain accident range, if chain accident within the scope of with dangerous material if with Chain value after the accident is as final calculated value;The centring system is connected with HAZMAT vehicle path command system, note The hazardous classification for recording HAZMAT vehicle transport, installation is used for the allowance detector of real-time detection surplus on HAZMAT vehicle And GPS positioning device, the coverage of HAZMAT vehicle is calculated, according to the real-time dangerous material location information of threedimensional model and remaining Planning path is measured with product dangerous goods warehouse and the dangerous material workshop of averting danger, record vehicle GPS location information in real time and is passed through Generalized information system is imported after the conversion of geographical coordinate and signal filtering, and shows the motion profile of HAZMAT vehicle on threedimensional model, Alarm signal is issued when motion profile deviates planning path.This kind keeps the safety in production integrated manager platform being capable of real-time observation area Yu Nei factory title, factory location information, dangerous goods warehouse location information, shop equipment information, dangerous material type and correspondence Fire-extinguishing apparatus, fire-extinguishing apparatus location information and dangerous goods workshop information and can observe in real time in shop equipment and The dangerous material surplus and the fire-extinguishing apparatus surplus in fire-extinguishing apparatus warehouse in dangerous goods warehouse, and can indicate dangerous material vehicle Best transportation route, and issue alarm signal in HAZMAT vehicle off-target transportation route, prevent hazardous materials transportation Chain accident occurs in the process;Can be calculated according to real-time headroom data when fire occurs instruction rescue aid, dead boundary, Boundary, evacuation route, rescue route and chain accident range are evacuated, achievees the effect that calculate more accurate.
The centring system is connected with query statistic system, statistics method is lost according to National Fire, based on statistical analysis Strategy carries out operation by the way of icon, by the typing of fire damage master data, editor, modification and delete operation, builds Common fire loss statistics mathematical model is found, realizes corresponding statistical calculation, generates data.The safety in production integrated manager is flat Platform can easily carry out query statistic, be conducive to increase the understanding to fire, so as to rule of thumb carry out optimization algorithm.
The allowance detector is gravity sensor or pressure sensor.Using gravity sensor or pressure sensor at This is low, and accuracy in detection is high.
Garden enterprise is carried out full garden mark by safety by BIM technology and type of business classification by the threedimensional model Note, mark embody enterprise security grade by shade, enter the description of more sub-layers time enterprise by clicking to mark come to garden Carry out comprehensive roaming and management.By classify and mark can the company information in more convenient clearly full garden overflow Trip and management.
It is by the detection data of the former factory's fire-fighting system of gateway reading and the method for video information:Using things-internet gateway The access of enterprise's end sensor and detector is carried out, gateway passes through the one-touch various product of access of the multiple interfaces for reserving different agreement Sensor, camera and the fire fighting detector of board.By independent development things-internet gateway, enterprise's end sensor and detector are carried out Access, system to gateway carry out specific aim exploitation after, each enterprise's different brands sensor, camera, fire fighting detector etc. Equipment only needs access things-internet gateway, and gateway one-touch can be accessed by reserving multiple interfaces of different agreement, realizes low cost The system reform and increased convenience.
Shop equipment is associated with sensor physics and logic is embodied in threedimensional model, and to each equipment essential information It is embodied in model in real time with the dynamic data of sensor acquisition.It is convenient to realize the visualization of workshop equipment management Management.
The supervising platform is equipped with demo system, and demo system passes through the data to real-time dangerous material location information and surplus Analysis is visually demonstrated explosion or fire in the three-dimensional model, and is distinguished using different colours to the different extents of injury, simultaneously Enumerate the nearest enterprise warehouse harmful influence storage condition of explosive range.Convenient for carrying out specific aim rescue when emergency episode occurs, mention High rescue efficiency reduces secondary hazards.

Claims (7)

1. a kind of safety in production integrated manager platform based on BIM technology, including centring system, the centring system respectively with 119 receive a crime report terminal, command scheduling terminals are connected with GPS terminal, and the GPS terminal includes GPS GPS, GSM/ GPRS Cellular Networks communication system, GIS GIS-Geographic Information System and computer network communications system;The centring system includes with region The threedimensional model that actual scene is established has factory's title, factory location information, danger according to actual scene typing in the threedimensional model Dangerous cartridges library location information, shop equipment information, dangerous material type and corresponding fire-extinguishing apparatus, fire-extinguishing apparatus location information and Dangerous goods workshop information;It is characterized in that:The sensor and take the photograph that the centring system is mounted in factory by connection The detection data of former factory fire-fighting system is read as the fire protection data and video information in head reading factory or by gateway And video information;The sensor includes temperature sensor, humidity sensor, pressure sensor and smoke sensor device;It is described Centring system is connected with false alarm prevention detection system, and the false alarm prevention detection system detection at least two class sensors receive fire simultaneously Calamity signal alarm;It is provided in shop equipment, in dangerous goods warehouse and fire-extinguishing apparatus warehouse for real-time detection surplus Allowance detector is simultaneously connect with the centring system, the centring system extracted when receiving alarm signal alarm signal it The real-time headroom data to tend towards stability in shop equipment in for the previous period, in dangerous goods warehouse, fire-extinguishing apparatus warehouse, Dead boundary, evacuation boundary, evacuation route, rescue route and chain accident range are calculated according to the real-time headroom data, if Have dangerous material then using chain value after the accident as final calculated value within the scope of chain accident;The centring system connection Dangerous product vehicle route command system, the hazardous classification of record HAZMAT vehicle transport, installs on HAZMAT vehicle and uses In the allowance detector and GPS positioning device of real-time detection surplus, the coverage of HAZMAT vehicle is calculated, according to three-dimensional The real-time dangerous material location information and surplus planning path of model are real with product dangerous goods warehouse and the dangerous material workshop of averting danger Shi Jilu vehicle GPS location information and by importing generalized information system after the conversion of geographical coordinate and signal filtering, and in threedimensional model The motion profile of upper display HAZMAT vehicle, issues alarm signal when motion profile deviates planning path.
2. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:It is described Centring system is connected with query statistic system, loses statistics method according to National Fire, based on statistical analysis strategy, using icon Mode carry out operation, by the typing of fire damage master data, editor, modification and delete operation, establish common fire Statistical mathematics model is lost, realizes corresponding statistical calculation, generates data.
3. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:It is described Allowance detector is gravity sensor or pressure sensor.
4. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:It is described Garden enterprise is carried out full garden mark by safety by BIM technology and type of business classification by threedimensional model, and mark presses color The depth embodies enterprise security grade, carries out comprehensive roaming to garden by clicking to mark into the description of more sub-layers time enterprise And management.
5. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:Pass through The detection data of the former factory's fire-fighting system of gateway reading and the method for video information are:Enterprises end biography is carried out using things-internet gateway The access of sensor and detector, gateway by the sensors of the various brands of the one-touch access of the multiple interfaces for reserving different agreement, Camera and fire fighting detector.
6. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:By work Plant is associated with sensor physics and logic is embodied in threedimensional model, and is acquired to each equipment essential information and sensor Dynamic data be embodied in model in real time.
7. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:It is described Supervising platform is equipped with demo system, and demo system is analyzed by the data to real-time dangerous material location information and surplus, in three-dimensional Explosion or fire are visually demonstrated in model, and the different extents of injury are distinguished using different colours, while enumerating explosion model Enclose nearest enterprise warehouse harmful influence storage condition.
CN201810853681.4A 2018-07-30 2018-07-30 BIM technology-based safety production integrated supervision platform Active CN108919766B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810853681.4A CN108919766B (en) 2018-07-30 2018-07-30 BIM technology-based safety production integrated supervision platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810853681.4A CN108919766B (en) 2018-07-30 2018-07-30 BIM technology-based safety production integrated supervision platform

Publications (2)

Publication Number Publication Date
CN108919766A true CN108919766A (en) 2018-11-30
CN108919766B CN108919766B (en) 2020-06-09

Family

ID=64416224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810853681.4A Active CN108919766B (en) 2018-07-30 2018-07-30 BIM technology-based safety production integrated supervision platform

Country Status (1)

Country Link
CN (1) CN108919766B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109583149A (en) * 2019-01-25 2019-04-05 中铁三局集团广东建设工程有限公司 Super large lid rolling stock section in-depth modernization system and its construction method based on BIM management
CN110750885A (en) * 2019-10-08 2020-02-04 上海建工五建集团有限公司 On-site fire safety monitoring method and system
CN111126904A (en) * 2019-12-16 2020-05-08 西南交通大学 ArcGIS-based dangerous goods transportation management method
CN111126506A (en) * 2019-12-30 2020-05-08 武汉壹坤达未来智能科技有限公司 Data fusion system and method for multi-brand fire detectors and intelligent fire-fighting acquisition terminal
CN112365609A (en) * 2021-01-12 2021-02-12 成都职业技术学院 BIM technology-based hardware equipment operating software visual representation method
CN113470346A (en) * 2021-05-18 2021-10-01 中国电建集团西北勘测设计研究院有限公司 BIM-based municipal engineering traffic accident emergency processing method and device
CN113721564A (en) * 2021-07-29 2021-11-30 太原重工股份有限公司 Intelligent workshop safety management system

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1170616A (en) * 1996-07-15 1998-01-21 中国科学技术大学 Automatic directional fire-extinguishing composite detector
CN101067744A (en) * 2007-06-06 2007-11-07 中国安全生产科学研究院 Dynamic monitoring system and method for fireworks and firecracks production storage and transportation process
CN101763605A (en) * 2010-01-28 2010-06-30 成都东哈科技有限公司 Three-dimensional digital urban fire protection pre-control and management system
CN202549037U (en) * 2012-04-19 2012-11-21 上海第二工业大学 Household wireless alarm device
CN202748906U (en) * 2012-08-12 2013-02-20 英森电气系统(上海)有限公司 Single-ultraviolet double-infrared compound flame detector
US20140207774A1 (en) * 2013-01-24 2014-07-24 Mark Walter Virtual Building Browser Systems and Methods
CN205015926U (en) * 2015-09-16 2016-02-03 王金刚 Multidimension BIM building fire system
CN105373852A (en) * 2015-11-11 2016-03-02 深圳市华阳国际工程设计股份有限公司 BIM-based personnel evacuation prompting system and method
CN105403681A (en) * 2015-12-16 2016-03-16 成都峰占科技有限公司 Water quality on-line monitoring instrument remote monitoring and control device and water quality on-line monitoring system
CN105869341A (en) * 2016-04-20 2016-08-17 中国石油化工股份有限公司 Visual fire alarm integrated monitoring method
CN105976551A (en) * 2016-06-22 2016-09-28 中铁二局集团勘测设计院有限责任公司 Fire alarm system based on BIM
CN106295870A (en) * 2016-08-04 2017-01-04 合肥景昇信息科技有限公司 Fire-fighting command plateform system based on three-dimensional map
US20170109981A1 (en) * 2015-10-16 2017-04-20 Honeywell International Inc. System and method of using a fire spread forecast and bim to guide occupants using smart signs
CN206489681U (en) * 2016-12-08 2017-09-12 中国建筑东北设计研究院有限公司 A kind of intelligent fire hazard monitoring warning system based on BIM
CN107194564A (en) * 2017-05-16 2017-09-22 武汉科技大学 Intelligent and safe evacuating system based on BIM
CN107563549A (en) * 2017-08-22 2018-01-09 深圳市泰和安科技有限公司 A kind of best-effort path generation method, device and equipment based on BIM models
CN107679275A (en) * 2017-08-31 2018-02-09 中国建筑第八工程局有限公司 A kind of fire-fighting life-saving evacuation analogy method based on BIM technology

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1170616A (en) * 1996-07-15 1998-01-21 中国科学技术大学 Automatic directional fire-extinguishing composite detector
CN101067744A (en) * 2007-06-06 2007-11-07 中国安全生产科学研究院 Dynamic monitoring system and method for fireworks and firecracks production storage and transportation process
CN101763605A (en) * 2010-01-28 2010-06-30 成都东哈科技有限公司 Three-dimensional digital urban fire protection pre-control and management system
CN202549037U (en) * 2012-04-19 2012-11-21 上海第二工业大学 Household wireless alarm device
CN202748906U (en) * 2012-08-12 2013-02-20 英森电气系统(上海)有限公司 Single-ultraviolet double-infrared compound flame detector
US20140207774A1 (en) * 2013-01-24 2014-07-24 Mark Walter Virtual Building Browser Systems and Methods
CN205015926U (en) * 2015-09-16 2016-02-03 王金刚 Multidimension BIM building fire system
US20170109981A1 (en) * 2015-10-16 2017-04-20 Honeywell International Inc. System and method of using a fire spread forecast and bim to guide occupants using smart signs
CN105373852A (en) * 2015-11-11 2016-03-02 深圳市华阳国际工程设计股份有限公司 BIM-based personnel evacuation prompting system and method
CN105403681A (en) * 2015-12-16 2016-03-16 成都峰占科技有限公司 Water quality on-line monitoring instrument remote monitoring and control device and water quality on-line monitoring system
CN105869341A (en) * 2016-04-20 2016-08-17 中国石油化工股份有限公司 Visual fire alarm integrated monitoring method
CN105976551A (en) * 2016-06-22 2016-09-28 中铁二局集团勘测设计院有限责任公司 Fire alarm system based on BIM
CN106295870A (en) * 2016-08-04 2017-01-04 合肥景昇信息科技有限公司 Fire-fighting command plateform system based on three-dimensional map
CN206489681U (en) * 2016-12-08 2017-09-12 中国建筑东北设计研究院有限公司 A kind of intelligent fire hazard monitoring warning system based on BIM
CN107194564A (en) * 2017-05-16 2017-09-22 武汉科技大学 Intelligent and safe evacuating system based on BIM
CN107563549A (en) * 2017-08-22 2018-01-09 深圳市泰和安科技有限公司 A kind of best-effort path generation method, device and equipment based on BIM models
CN107679275A (en) * 2017-08-31 2018-02-09 中国建筑第八工程局有限公司 A kind of fire-fighting life-saving evacuation analogy method based on BIM technology

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109583149A (en) * 2019-01-25 2019-04-05 中铁三局集团广东建设工程有限公司 Super large lid rolling stock section in-depth modernization system and its construction method based on BIM management
CN110750885A (en) * 2019-10-08 2020-02-04 上海建工五建集团有限公司 On-site fire safety monitoring method and system
CN111126904A (en) * 2019-12-16 2020-05-08 西南交通大学 ArcGIS-based dangerous goods transportation management method
CN111126904B (en) * 2019-12-16 2023-01-03 西南交通大学 ArcGIS-based dangerous goods transportation management method
CN111126506A (en) * 2019-12-30 2020-05-08 武汉壹坤达未来智能科技有限公司 Data fusion system and method for multi-brand fire detectors and intelligent fire-fighting acquisition terminal
CN112365609A (en) * 2021-01-12 2021-02-12 成都职业技术学院 BIM technology-based hardware equipment operating software visual representation method
CN113470346A (en) * 2021-05-18 2021-10-01 中国电建集团西北勘测设计研究院有限公司 BIM-based municipal engineering traffic accident emergency processing method and device
CN113721564A (en) * 2021-07-29 2021-11-30 太原重工股份有限公司 Intelligent workshop safety management system

Also Published As

Publication number Publication date
CN108919766B (en) 2020-06-09

Similar Documents

Publication Publication Date Title
CN108919766A (en) A kind of safety in production integrated manager platform based on BIM technology
CN107330579A (en) A kind of HSE risk stratifications managing and control system
CN110543986A (en) Intelligent monitoring system and monitoring method for external hidden danger of power transmission line
CN104729587B (en) A kind of monitoring system and method for large-scale power Material Transportation
CN107274075A (en) A kind of HSE risk datas stage division
CN101763605A (en) Three-dimensional digital urban fire protection pre-control and management system
CN107194564A (en) Intelligent and safe evacuating system based on BIM
CN103558827A (en) Mine emergency command communication and management information system
CN110262355A (en) Intelligent mine management system and method based on intelligent mine control platform
CN105099790B (en) Ring peace management method and its interactive system based on mobile internet
CN109799799A (en) Chemical industrial park big data analysis platform
CN114399265A (en) Electric power engineering construction project overall process management and control system
Zhang et al. A transport monitoring system for cultural relics protection based on blockchain and internet of things
CN207177958U (en) Coal mine down-hole personnel injures early warning system
CN104748795A (en) Large-scale power equipment transportation monitoring system and method
CN113554371A (en) Hierarchical management-based hazardous chemical substance transportation comprehensive management method, device and system
CN117273466B (en) Dangerous cargo container yard risk analysis system based on petri net
CN201732292U (en) Safety monitoring system of dangerous goods logistics
CN106200532A (en) A kind of hazardous materials transportation management system and method
Reis et al. Network management by smartphones sensors thresholds in an integrated control system for hazardous materials transportation
CN107911655A (en) Intelligence handling based on AR perform method and system
CN115424212B (en) Electric power operation site violation identification system and application thereof
CN116502886A (en) Burn power plant wisdom security protection system
CN107934864A (en) Explosion proof forklift itself monitoring and managing method and control system
CN207249677U (en) A kind of construction site safety monitoring system integrated based on RFID and BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Safety Production Integrated Supervision Platform Based on BIM Technology

Effective date of registration: 20230828

Granted publication date: 20200609

Pledgee: Bank of Ningbo Co.,Ltd. Shaoxing Branch

Pledgor: ZHEJIANG ZHONGBO INFORMATION ENGINEERING Co.,Ltd.

Registration number: Y2023980053903

PE01 Entry into force of the registration of the contract for pledge of patent right