CN108919766A - A kind of safety in production integrated manager platform based on BIM technology - Google Patents
A kind of safety in production integrated manager platform based on BIM technology Download PDFInfo
- Publication number
- CN108919766A CN108919766A CN201810853681.4A CN201810853681A CN108919766A CN 108919766 A CN108919766 A CN 108919766A CN 201810853681 A CN201810853681 A CN 201810853681A CN 108919766 A CN108919766 A CN 108919766A
- Authority
- CN
- China
- Prior art keywords
- fire
- safety
- sensor
- real
- factory
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41875—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by quality surveillance of production
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/34—Director, elements to supervisory
- G05B2219/34465—Safety, control of correct operation, abnormal states
Abstract
The invention discloses a kind of safety in production integrated manager platform based on BIM technology, including centring system, centring system passes through the sensor that connection is mounted in factory and the fire protection data and video information in camera reading factory or detection data and video information that former factory fire-fighting system is read by gateway;Centring system is connected with false alarm prevention detection system, and false alarm prevention detection system detection at least two class sensors receive fire signal alarm simultaneously;Centring system calculates dead boundary, evacuation boundary, evacuation route, rescue route and chain accident range according to the real-time headroom data, using chain value after the accident as final calculated value if having dangerous material within the scope of chain accident;Centring system is connected with HAZMAT vehicle path command system.This kind safety in production integrated manager platform carries out integration utilization to the fire-fighting system of existing enterprise, and can accurately calculate fire-fighting evacuation range, while can plan the optimum operation path of hazardous materials transportation vehicle.
Description
Technical field
The invention belongs to safety management system field, specifically a kind of safety in production integrated manager based on BIM technology is flat
Platform.
Background technique
For initial fire management system outside 119,110 alarm systems, others are all manually dispatch controls;Wherein
Including:After receiving a crime report, fire brigade's selection, fire-fighting vehicle scheduling, fire fighter's outfit, fire line selection, the understanding of fire-fighting target,
Floor layout is found fire hydrant etc., is manually carried out entirely.And manual dispatching be difficult to solve live fire cause and combustible substance and
Traffic conditions, so that rescue means can not be implemented accurately, rescue speed is slow, and fire damage is caused to expand.
In the prior art, the substitution manual dispatching of three-dimensional fire management system gradually solves a series of fire-fighting under battle conditions
The problems in.A kind of three-dimensional digital urban fire protection pre-control and management system as disclosed in Publication No. CN101763605A, by this
System can quickly analyze rescue path, quickly understand and prepare the relief goods needed, divide dangerous Evacuation area etc., and
Existing three-dimensional digital urban fire protection pre-control and management system is typically all the data of preparatory typing, and data accuracy is not high, to fire
The division of calamity situation and dangerous Evacuation area is inaccurate;Enterprise present simultaneously is generally all each to have a set of fire-fighting system by oneself, such as
Fruit carries out the unified installation of fire-fighting system again, and undoubtedly installation cost is huge, wastes original fire-fighting system;And existing three
Generally only for inside plants, there is a situation where fire for dimension word urban fire control pre-control and management system, and there is no to hazardous materials transportation
The transit route of vehicle provides planning, if hazardous materials transportation vehicle occurs near the biggish enterprise of dangerous material storage capacity passing by
Explosion will lead to enterprise and subsequent explosion occur, therefore carrying out planning to the transit route of hazardous materials transportation vehicle is also administration of the prevention and control
Prevent chain accident from occurring in system essential.
Summary of the invention
The present invention is in view of the shortcomings of the prior art, provide a kind of safety in production integrated manager platform based on BIM technology, this kind
Safety in production integrated manager platform carries out integration utilization to the fire-fighting system of existing enterprise, and can accurately calculate fire-fighting
Range is evacuated, while can plan the optimum operation path of hazardous materials transportation vehicle.
In order to solve the above-mentioned technical problem, the present invention is addressed by following technical proposals:It is a kind of based on BIM technology
It keeps the safety in production integrated manager platform, including centring system, the centring system is received a crime report with 119 terminal, command scheduling terminal respectively
It is connected with GPS terminal, the GPS terminal includes GPS GPS, GSM/GPRS Cellular Networks communication systems, GIS
Manage information system and computer network communications system;The centring system includes the threedimensional model established with region actual scene,
Factory's title, factory location information, dangerous goods warehouse location information, factory are had according to actual scene typing in the threedimensional model
Facility information, dangerous material type and corresponding fire-extinguishing apparatus, fire-extinguishing apparatus location information and dangerous goods workshop information;Institute
Centring system is stated by connecting fire protection data and video in the sensor being mounted in factory and camera reading factory
Information or the detection data and video information that former factory fire-fighting system is read by gateway;The sensor includes temperature sensing
Device, humidity sensor, pressure sensor and smoke sensor device;The centring system is connected with false alarm prevention detection system, described
False alarm prevention detection system detection at least two class sensors receive fire signal alarm simultaneously;In shop equipment, dangerous goods
It is provided with the allowance detector for real-time detection surplus in warehouse, fire-extinguishing apparatus warehouse and is connect with the centring system,
The centring system extracted when receiving alarm signal alarm signal for the previous period in shop equipment in, dangerous goods
The real-time headroom data to tend towards stability in warehouse, fire-extinguishing apparatus warehouse calculates dead boundary according to the real-time headroom data, dredges
Boundary, evacuation route, rescue route and chain accident range are dissipated, with chain thing if there are dangerous material within the scope of chain accident
Therefore the value after occurring is as final calculated value;The centring system is connected with HAZMAT vehicle path command system, and record is dangerous
The hazardous classification of product vehicle transport, on HAZMAT vehicle installation for real-time detection surplus allowance detector and
GPS positioning device calculates the coverage of HAZMAT vehicle, is advised according to the real-time dangerous material location information and surplus of threedimensional model
Path is drawn with product dangerous goods warehouse and the dangerous material workshop of averting danger, record vehicle GPS location information in real time and passes through geography
Generalized information system is imported after the conversion of coordinate and signal filtering, and shows the motion profile of HAZMAT vehicle on threedimensional model, is being transported
Dynamic rail mark issues alarm signal when deviateing planning path.This kind keeps the safety in production integrated manager platform can be in real time in viewing area
It factory's title, factory location information, dangerous goods warehouse location information, shop equipment information, dangerous material type and corresponding goes out
Fiery equipment, fire-extinguishing apparatus location information and dangerous goods workshop information can simultaneously be observed in shop equipment and dangerous in real time
The dangerous material surplus and the fire-extinguishing apparatus surplus in fire-extinguishing apparatus warehouse in article warehouse, and can indicate HAZMAT vehicle
Best transportation route, and alarm signal is issued in HAZMAT vehicle off-target transportation route, prevent hazardous materials transportation process
It is middle that chain accident occurs;Instruction rescue aid, dead boundary, evacuation can be calculated according to real-time headroom data when fire occurs
Boundary, evacuation route, rescue route and chain accident range achieve the effect that calculate more accurate.
In above-mentioned technical proposal, it is preferred that the centring system is connected with query statistic system, is lost according to National Fire
Statistics method, based on statistical analysis strategy, operation is carried out by the way of icon, by the typing of fire damage master data,
Editor, modification and delete operation, establish common fire loss statistics mathematical model, realize corresponding statistical calculation, generate number
According to.The safety in production integrated manager platform can easily carry out query statistic, be conducive to increase the understanding to fire, so as to
It is enough rule of thumb to carry out optimization algorithm.
In above-mentioned technical proposal, it is preferred that the allowance detector is gravity sensor or pressure sensor.Using weight
Force snesor or pressure sensor are at low cost, and accuracy in detection is high.
In above-mentioned technical proposal, it is preferred that the threedimensional model is by BIM technology and type of business classification garden enterprise
Full garden mark is carried out by safety, mark embodies enterprise security grade by shade, thinner by clicking mark entrance
The description of level enterprise to carry out comprehensive roaming and management to garden.It being capable of more convenient clearly full garden by classifying and marking
Company information in area is roamed and is managed.
In above-mentioned technical proposal, it is preferred that read the detection data and video information of former factory fire-fighting system by gateway
Method be:The access of enterprise's end sensor and detector is carried out using things-internet gateway, gateway is by reserving different agreement
Sensor, camera and the fire fighting detector of multiple one-touch various brands of access of interface.By independent development things-internet gateway,
The access of enterprise's end sensor and detector is carried out, after system carries out specific aim exploitation to gateway, each enterprise's different brands are passed
The equipment such as sensor, camera, fire fighting detector only need access things-internet gateway, multiple interfaces that gateway passes through reserved different agreement
It one-touch can access, realize low-cost system transformation and increased convenience.
In above-mentioned technical proposal, it is preferred that be associated with shop equipment with sensor physics and logic is embodied in threedimensional model
In, and the dynamic data acquired to each equipment essential information and sensor is embodied in model in real time.To realize production vehicle
Between equipment management visualization, facilitate management.
In above-mentioned technical proposal, it is preferred that the supervising platform is equipped with demo system, and demo system passes through to real-time danger
The analysis of the data of product location information and surplus visually demonstrates explosion or fire in the three-dimensional model, and using different colours to not
It is distinguished with the extent of injury, while enumerating the nearest enterprise warehouse harmful influence storage condition of explosive range.Convenient in emergency episode
Specific aim rescue is carried out when generation, improves rescue efficiency, reduces secondary hazards.
Compared with prior art, the present invention having the advantages that:This kind keeps the safety in production integrated manager platform can be real
When viewing area in factory's title, factory location information, dangerous goods warehouse location information, shop equipment information, dangerous material
Type and corresponding fire-extinguishing apparatus, fire-extinguishing apparatus location information and dangerous goods workshop information simultaneously can observe work in real time
The interior dangerous material surplus with dangerous goods warehouse of plant and the fire-extinguishing apparatus surplus in fire-extinguishing apparatus warehouse, and can refer to
Show the best transportation route of HAZMAT vehicle, and issue alarm signal in HAZMAT vehicle off-target transportation route, prevents
Chain accident occurs during hazardous materials transportation;Instruction rescue can be calculated according to real-time headroom data when fire occurs to set
Standby, dead boundary, evacuation boundary, evacuation route, rescue route and chain accident range, reach and calculate more accurate effect
Fruit.
Detailed description of the invention
Fig. 1 is the attachment structure schematic diagram of the embodiment of the present invention.
Specific embodiment
Present invention is further described in detail with specific embodiment with reference to the accompanying drawing:Referring to Fig. 1, one kind is based on
The safety in production integrated manager platform of BIM technology, including centring system, the centring system receive a crime report respectively with 119 terminal, commander
Dispatch terminal is connected with GPS terminal, and the GPS terminal includes GPS GPS, GSM/GPRS Cellular Networks communication system
System, GIS GIS-Geographic Information System and computer network communications system;The centring system includes three established with region actual scene
Dimension module has factory's title, factory location information, dangerous goods warehouse location to believe in the threedimensional model according to actual scene typing
Breath, shop equipment information, dangerous material type and corresponding fire-extinguishing apparatus, fire-extinguishing apparatus location information and dangerous goods workshop
Information;The sensor and camera that the centring system is mounted in factory by connection read the fire protection data in factory
The detection data and video information of former factory fire-fighting system are read with video information or by gateway;The sensor includes temperature
Sensor, humidity sensor, pressure sensor and smoke sensor device;The centring system is connected with false alarm prevention detection system,
The false alarm prevention detection system detection at least two class sensors receive fire signal alarm simultaneously;Shop equipment is interior, dangerous
It is provided with the allowance detector for real-time detection surplus in article warehouse, fire-extinguishing apparatus warehouse and connects with the centring system
Connect, the centring system extracted when receiving alarm signal alarm signal for the previous period in shop equipment in, it is dangerous
The real-time headroom data to tend towards stability in article warehouse, fire-extinguishing apparatus warehouse calculates dead side according to the real-time headroom data
Boundary, evacuation boundary, evacuation route, rescue route and chain accident range, if chain accident within the scope of with dangerous material if with
Chain value after the accident is as final calculated value;The centring system is connected with HAZMAT vehicle path command system, note
The hazardous classification for recording HAZMAT vehicle transport, installation is used for the allowance detector of real-time detection surplus on HAZMAT vehicle
And GPS positioning device, the coverage of HAZMAT vehicle is calculated, according to the real-time dangerous material location information of threedimensional model and remaining
Planning path is measured with product dangerous goods warehouse and the dangerous material workshop of averting danger, record vehicle GPS location information in real time and is passed through
Generalized information system is imported after the conversion of geographical coordinate and signal filtering, and shows the motion profile of HAZMAT vehicle on threedimensional model,
Alarm signal is issued when motion profile deviates planning path.This kind keeps the safety in production integrated manager platform being capable of real-time observation area
Yu Nei factory title, factory location information, dangerous goods warehouse location information, shop equipment information, dangerous material type and correspondence
Fire-extinguishing apparatus, fire-extinguishing apparatus location information and dangerous goods workshop information and can observe in real time in shop equipment and
The dangerous material surplus and the fire-extinguishing apparatus surplus in fire-extinguishing apparatus warehouse in dangerous goods warehouse, and can indicate dangerous material vehicle
Best transportation route, and issue alarm signal in HAZMAT vehicle off-target transportation route, prevent hazardous materials transportation
Chain accident occurs in the process;Can be calculated according to real-time headroom data when fire occurs instruction rescue aid, dead boundary,
Boundary, evacuation route, rescue route and chain accident range are evacuated, achievees the effect that calculate more accurate.
The centring system is connected with query statistic system, statistics method is lost according to National Fire, based on statistical analysis
Strategy carries out operation by the way of icon, by the typing of fire damage master data, editor, modification and delete operation, builds
Common fire loss statistics mathematical model is found, realizes corresponding statistical calculation, generates data.The safety in production integrated manager is flat
Platform can easily carry out query statistic, be conducive to increase the understanding to fire, so as to rule of thumb carry out optimization algorithm.
The allowance detector is gravity sensor or pressure sensor.Using gravity sensor or pressure sensor at
This is low, and accuracy in detection is high.
Garden enterprise is carried out full garden mark by safety by BIM technology and type of business classification by the threedimensional model
Note, mark embody enterprise security grade by shade, enter the description of more sub-layers time enterprise by clicking to mark come to garden
Carry out comprehensive roaming and management.By classify and mark can the company information in more convenient clearly full garden overflow
Trip and management.
It is by the detection data of the former factory's fire-fighting system of gateway reading and the method for video information:Using things-internet gateway
The access of enterprise's end sensor and detector is carried out, gateway passes through the one-touch various product of access of the multiple interfaces for reserving different agreement
Sensor, camera and the fire fighting detector of board.By independent development things-internet gateway, enterprise's end sensor and detector are carried out
Access, system to gateway carry out specific aim exploitation after, each enterprise's different brands sensor, camera, fire fighting detector etc.
Equipment only needs access things-internet gateway, and gateway one-touch can be accessed by reserving multiple interfaces of different agreement, realizes low cost
The system reform and increased convenience.
Shop equipment is associated with sensor physics and logic is embodied in threedimensional model, and to each equipment essential information
It is embodied in model in real time with the dynamic data of sensor acquisition.It is convenient to realize the visualization of workshop equipment management
Management.
The supervising platform is equipped with demo system, and demo system passes through the data to real-time dangerous material location information and surplus
Analysis is visually demonstrated explosion or fire in the three-dimensional model, and is distinguished using different colours to the different extents of injury, simultaneously
Enumerate the nearest enterprise warehouse harmful influence storage condition of explosive range.Convenient for carrying out specific aim rescue when emergency episode occurs, mention
High rescue efficiency reduces secondary hazards.
Claims (7)
1. a kind of safety in production integrated manager platform based on BIM technology, including centring system, the centring system respectively with
119 receive a crime report terminal, command scheduling terminals are connected with GPS terminal, and the GPS terminal includes GPS GPS, GSM/
GPRS Cellular Networks communication system, GIS GIS-Geographic Information System and computer network communications system;The centring system includes with region
The threedimensional model that actual scene is established has factory's title, factory location information, danger according to actual scene typing in the threedimensional model
Dangerous cartridges library location information, shop equipment information, dangerous material type and corresponding fire-extinguishing apparatus, fire-extinguishing apparatus location information and
Dangerous goods workshop information;It is characterized in that:The sensor and take the photograph that the centring system is mounted in factory by connection
The detection data of former factory fire-fighting system is read as the fire protection data and video information in head reading factory or by gateway
And video information;The sensor includes temperature sensor, humidity sensor, pressure sensor and smoke sensor device;It is described
Centring system is connected with false alarm prevention detection system, and the false alarm prevention detection system detection at least two class sensors receive fire simultaneously
Calamity signal alarm;It is provided in shop equipment, in dangerous goods warehouse and fire-extinguishing apparatus warehouse for real-time detection surplus
Allowance detector is simultaneously connect with the centring system, the centring system extracted when receiving alarm signal alarm signal it
The real-time headroom data to tend towards stability in shop equipment in for the previous period, in dangerous goods warehouse, fire-extinguishing apparatus warehouse,
Dead boundary, evacuation boundary, evacuation route, rescue route and chain accident range are calculated according to the real-time headroom data, if
Have dangerous material then using chain value after the accident as final calculated value within the scope of chain accident;The centring system connection
Dangerous product vehicle route command system, the hazardous classification of record HAZMAT vehicle transport, installs on HAZMAT vehicle and uses
In the allowance detector and GPS positioning device of real-time detection surplus, the coverage of HAZMAT vehicle is calculated, according to three-dimensional
The real-time dangerous material location information and surplus planning path of model are real with product dangerous goods warehouse and the dangerous material workshop of averting danger
Shi Jilu vehicle GPS location information and by importing generalized information system after the conversion of geographical coordinate and signal filtering, and in threedimensional model
The motion profile of upper display HAZMAT vehicle, issues alarm signal when motion profile deviates planning path.
2. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:It is described
Centring system is connected with query statistic system, loses statistics method according to National Fire, based on statistical analysis strategy, using icon
Mode carry out operation, by the typing of fire damage master data, editor, modification and delete operation, establish common fire
Statistical mathematics model is lost, realizes corresponding statistical calculation, generates data.
3. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:It is described
Allowance detector is gravity sensor or pressure sensor.
4. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:It is described
Garden enterprise is carried out full garden mark by safety by BIM technology and type of business classification by threedimensional model, and mark presses color
The depth embodies enterprise security grade, carries out comprehensive roaming to garden by clicking to mark into the description of more sub-layers time enterprise
And management.
5. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:Pass through
The detection data of the former factory's fire-fighting system of gateway reading and the method for video information are:Enterprises end biography is carried out using things-internet gateway
The access of sensor and detector, gateway by the sensors of the various brands of the one-touch access of the multiple interfaces for reserving different agreement,
Camera and fire fighting detector.
6. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:By work
Plant is associated with sensor physics and logic is embodied in threedimensional model, and is acquired to each equipment essential information and sensor
Dynamic data be embodied in model in real time.
7. a kind of safety in production integrated manager platform based on BIM technology as described in claim 1, it is characterised in that:It is described
Supervising platform is equipped with demo system, and demo system is analyzed by the data to real-time dangerous material location information and surplus, in three-dimensional
Explosion or fire are visually demonstrated in model, and the different extents of injury are distinguished using different colours, while enumerating explosion model
Enclose nearest enterprise warehouse harmful influence storage condition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810853681.4A CN108919766B (en) | 2018-07-30 | 2018-07-30 | BIM technology-based safety production integrated supervision platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810853681.4A CN108919766B (en) | 2018-07-30 | 2018-07-30 | BIM technology-based safety production integrated supervision platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108919766A true CN108919766A (en) | 2018-11-30 |
CN108919766B CN108919766B (en) | 2020-06-09 |
Family
ID=64416224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810853681.4A Active CN108919766B (en) | 2018-07-30 | 2018-07-30 | BIM technology-based safety production integrated supervision platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108919766B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109583149A (en) * | 2019-01-25 | 2019-04-05 | 中铁三局集团广东建设工程有限公司 | Super large lid rolling stock section in-depth modernization system and its construction method based on BIM management |
CN110750885A (en) * | 2019-10-08 | 2020-02-04 | 上海建工五建集团有限公司 | On-site fire safety monitoring method and system |
CN111126904A (en) * | 2019-12-16 | 2020-05-08 | 西南交通大学 | ArcGIS-based dangerous goods transportation management method |
CN111126506A (en) * | 2019-12-30 | 2020-05-08 | 武汉壹坤达未来智能科技有限公司 | Data fusion system and method for multi-brand fire detectors and intelligent fire-fighting acquisition terminal |
CN112365609A (en) * | 2021-01-12 | 2021-02-12 | 成都职业技术学院 | BIM technology-based hardware equipment operating software visual representation method |
CN113470346A (en) * | 2021-05-18 | 2021-10-01 | 中国电建集团西北勘测设计研究院有限公司 | BIM-based municipal engineering traffic accident emergency processing method and device |
CN113721564A (en) * | 2021-07-29 | 2021-11-30 | 太原重工股份有限公司 | Intelligent workshop safety management system |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1170616A (en) * | 1996-07-15 | 1998-01-21 | 中国科学技术大学 | Automatic directional fire-extinguishing composite detector |
CN101067744A (en) * | 2007-06-06 | 2007-11-07 | 中国安全生产科学研究院 | Dynamic monitoring system and method for fireworks and firecracks production storage and transportation process |
CN101763605A (en) * | 2010-01-28 | 2010-06-30 | 成都东哈科技有限公司 | Three-dimensional digital urban fire protection pre-control and management system |
CN202549037U (en) * | 2012-04-19 | 2012-11-21 | 上海第二工业大学 | Household wireless alarm device |
CN202748906U (en) * | 2012-08-12 | 2013-02-20 | 英森电气系统(上海)有限公司 | Single-ultraviolet double-infrared compound flame detector |
US20140207774A1 (en) * | 2013-01-24 | 2014-07-24 | Mark Walter | Virtual Building Browser Systems and Methods |
CN205015926U (en) * | 2015-09-16 | 2016-02-03 | 王金刚 | Multidimension BIM building fire system |
CN105373852A (en) * | 2015-11-11 | 2016-03-02 | 深圳市华阳国际工程设计股份有限公司 | BIM-based personnel evacuation prompting system and method |
CN105403681A (en) * | 2015-12-16 | 2016-03-16 | 成都峰占科技有限公司 | Water quality on-line monitoring instrument remote monitoring and control device and water quality on-line monitoring system |
CN105869341A (en) * | 2016-04-20 | 2016-08-17 | 中国石油化工股份有限公司 | Visual fire alarm integrated monitoring method |
CN105976551A (en) * | 2016-06-22 | 2016-09-28 | 中铁二局集团勘测设计院有限责任公司 | Fire alarm system based on BIM |
CN106295870A (en) * | 2016-08-04 | 2017-01-04 | 合肥景昇信息科技有限公司 | Fire-fighting command plateform system based on three-dimensional map |
US20170109981A1 (en) * | 2015-10-16 | 2017-04-20 | Honeywell International Inc. | System and method of using a fire spread forecast and bim to guide occupants using smart signs |
CN206489681U (en) * | 2016-12-08 | 2017-09-12 | 中国建筑东北设计研究院有限公司 | A kind of intelligent fire hazard monitoring warning system based on BIM |
CN107194564A (en) * | 2017-05-16 | 2017-09-22 | 武汉科技大学 | Intelligent and safe evacuating system based on BIM |
CN107563549A (en) * | 2017-08-22 | 2018-01-09 | 深圳市泰和安科技有限公司 | A kind of best-effort path generation method, device and equipment based on BIM models |
CN107679275A (en) * | 2017-08-31 | 2018-02-09 | 中国建筑第八工程局有限公司 | A kind of fire-fighting life-saving evacuation analogy method based on BIM technology |
-
2018
- 2018-07-30 CN CN201810853681.4A patent/CN108919766B/en active Active
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1170616A (en) * | 1996-07-15 | 1998-01-21 | 中国科学技术大学 | Automatic directional fire-extinguishing composite detector |
CN101067744A (en) * | 2007-06-06 | 2007-11-07 | 中国安全生产科学研究院 | Dynamic monitoring system and method for fireworks and firecracks production storage and transportation process |
CN101763605A (en) * | 2010-01-28 | 2010-06-30 | 成都东哈科技有限公司 | Three-dimensional digital urban fire protection pre-control and management system |
CN202549037U (en) * | 2012-04-19 | 2012-11-21 | 上海第二工业大学 | Household wireless alarm device |
CN202748906U (en) * | 2012-08-12 | 2013-02-20 | 英森电气系统(上海)有限公司 | Single-ultraviolet double-infrared compound flame detector |
US20140207774A1 (en) * | 2013-01-24 | 2014-07-24 | Mark Walter | Virtual Building Browser Systems and Methods |
CN205015926U (en) * | 2015-09-16 | 2016-02-03 | 王金刚 | Multidimension BIM building fire system |
US20170109981A1 (en) * | 2015-10-16 | 2017-04-20 | Honeywell International Inc. | System and method of using a fire spread forecast and bim to guide occupants using smart signs |
CN105373852A (en) * | 2015-11-11 | 2016-03-02 | 深圳市华阳国际工程设计股份有限公司 | BIM-based personnel evacuation prompting system and method |
CN105403681A (en) * | 2015-12-16 | 2016-03-16 | 成都峰占科技有限公司 | Water quality on-line monitoring instrument remote monitoring and control device and water quality on-line monitoring system |
CN105869341A (en) * | 2016-04-20 | 2016-08-17 | 中国石油化工股份有限公司 | Visual fire alarm integrated monitoring method |
CN105976551A (en) * | 2016-06-22 | 2016-09-28 | 中铁二局集团勘测设计院有限责任公司 | Fire alarm system based on BIM |
CN106295870A (en) * | 2016-08-04 | 2017-01-04 | 合肥景昇信息科技有限公司 | Fire-fighting command plateform system based on three-dimensional map |
CN206489681U (en) * | 2016-12-08 | 2017-09-12 | 中国建筑东北设计研究院有限公司 | A kind of intelligent fire hazard monitoring warning system based on BIM |
CN107194564A (en) * | 2017-05-16 | 2017-09-22 | 武汉科技大学 | Intelligent and safe evacuating system based on BIM |
CN107563549A (en) * | 2017-08-22 | 2018-01-09 | 深圳市泰和安科技有限公司 | A kind of best-effort path generation method, device and equipment based on BIM models |
CN107679275A (en) * | 2017-08-31 | 2018-02-09 | 中国建筑第八工程局有限公司 | A kind of fire-fighting life-saving evacuation analogy method based on BIM technology |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109583149A (en) * | 2019-01-25 | 2019-04-05 | 中铁三局集团广东建设工程有限公司 | Super large lid rolling stock section in-depth modernization system and its construction method based on BIM management |
CN110750885A (en) * | 2019-10-08 | 2020-02-04 | 上海建工五建集团有限公司 | On-site fire safety monitoring method and system |
CN111126904A (en) * | 2019-12-16 | 2020-05-08 | 西南交通大学 | ArcGIS-based dangerous goods transportation management method |
CN111126904B (en) * | 2019-12-16 | 2023-01-03 | 西南交通大学 | ArcGIS-based dangerous goods transportation management method |
CN111126506A (en) * | 2019-12-30 | 2020-05-08 | 武汉壹坤达未来智能科技有限公司 | Data fusion system and method for multi-brand fire detectors and intelligent fire-fighting acquisition terminal |
CN112365609A (en) * | 2021-01-12 | 2021-02-12 | 成都职业技术学院 | BIM technology-based hardware equipment operating software visual representation method |
CN113470346A (en) * | 2021-05-18 | 2021-10-01 | 中国电建集团西北勘测设计研究院有限公司 | BIM-based municipal engineering traffic accident emergency processing method and device |
CN113721564A (en) * | 2021-07-29 | 2021-11-30 | 太原重工股份有限公司 | Intelligent workshop safety management system |
Also Published As
Publication number | Publication date |
---|---|
CN108919766B (en) | 2020-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108919766A (en) | A kind of safety in production integrated manager platform based on BIM technology | |
CN107330579A (en) | A kind of HSE risk stratifications managing and control system | |
CN110543986A (en) | Intelligent monitoring system and monitoring method for external hidden danger of power transmission line | |
CN104729587B (en) | A kind of monitoring system and method for large-scale power Material Transportation | |
CN107274075A (en) | A kind of HSE risk datas stage division | |
CN101763605A (en) | Three-dimensional digital urban fire protection pre-control and management system | |
CN107194564A (en) | Intelligent and safe evacuating system based on BIM | |
CN103558827A (en) | Mine emergency command communication and management information system | |
CN110262355A (en) | Intelligent mine management system and method based on intelligent mine control platform | |
CN105099790B (en) | Ring peace management method and its interactive system based on mobile internet | |
CN109799799A (en) | Chemical industrial park big data analysis platform | |
CN114399265A (en) | Electric power engineering construction project overall process management and control system | |
Zhang et al. | A transport monitoring system for cultural relics protection based on blockchain and internet of things | |
CN207177958U (en) | Coal mine down-hole personnel injures early warning system | |
CN104748795A (en) | Large-scale power equipment transportation monitoring system and method | |
CN113554371A (en) | Hierarchical management-based hazardous chemical substance transportation comprehensive management method, device and system | |
CN117273466B (en) | Dangerous cargo container yard risk analysis system based on petri net | |
CN201732292U (en) | Safety monitoring system of dangerous goods logistics | |
CN106200532A (en) | A kind of hazardous materials transportation management system and method | |
Reis et al. | Network management by smartphones sensors thresholds in an integrated control system for hazardous materials transportation | |
CN107911655A (en) | Intelligence handling based on AR perform method and system | |
CN115424212B (en) | Electric power operation site violation identification system and application thereof | |
CN116502886A (en) | Burn power plant wisdom security protection system | |
CN107934864A (en) | Explosion proof forklift itself monitoring and managing method and control system | |
CN207249677U (en) | A kind of construction site safety monitoring system integrated based on RFID and BIM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Safety Production Integrated Supervision Platform Based on BIM Technology Effective date of registration: 20230828 Granted publication date: 20200609 Pledgee: Bank of Ningbo Co.,Ltd. Shaoxing Branch Pledgor: ZHEJIANG ZHONGBO INFORMATION ENGINEERING Co.,Ltd. Registration number: Y2023980053903 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |