CN107679275A - A kind of fire-fighting life-saving evacuation analogy method based on BIM technology - Google Patents

A kind of fire-fighting life-saving evacuation analogy method based on BIM technology Download PDF

Info

Publication number
CN107679275A
CN107679275A CN201710769576.8A CN201710769576A CN107679275A CN 107679275 A CN107679275 A CN 107679275A CN 201710769576 A CN201710769576 A CN 201710769576A CN 107679275 A CN107679275 A CN 107679275A
Authority
CN
China
Prior art keywords
evacuation
emergency exit
space
threedimensional model
pathfinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710769576.8A
Other languages
Chinese (zh)
Inventor
蔡庆军
蒋经纬
覃瑞
宫红亮
刘海球
李承珂
黄彬
辛炯业
江春强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201710769576.8A priority Critical patent/CN107679275A/en
Publication of CN107679275A publication Critical patent/CN107679275A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computer Graphics (AREA)
  • Software Systems (AREA)
  • Emergency Lowering Means (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of fire-fighting life-saving based on BIM technology to evacuate analogy method, and it includes step:Threedimensional model is established using Autodesk Revit softwares;The threedimensional model of foundation is exported to Pathfinder and evacuated in software;Extract the evacuation space in threedimensional model;Labeled as emergency exit;The evacuation personnel of setting and personnel's movement velocity;Evacuation operation emulation is carried out, obtains generating evacuation space number change curve and emergency exit number change curve;Whether observation is reasonable the time required to judging evacuation;Observation judges whether the emergency exit stream of people is reasonable;For irrational, re-flag emergency exit and re-start evacuation operation emulation, until rationally;The emergency exit data marked in output evacuation space, update building structure threedimensional model.The present invention combines BIM technology and Pathfinder evacuations analogue technique can carry out dispersal plan analog demenstration in advance and scheme progress specific aim is optimized and revised, and formulates optimal escape route.

Description

A kind of fire-fighting life-saving evacuation analogy method based on BIM technology
Technical field
The present invention relates to fire-fighting life-saving to evacuate analogue technique, more particularly to a kind of fire-fighting life-saving evacuation based on BIM technology Analogy method.
Background technology
With expanding economy, all kinds of large public buildings are also more and more in city, filled used by its inside fitting Repair and contain a large amount of combustibles in material, it is built or in use, fire once occurs, personnel escape's evacuation in building is exactly to build Lifeline, do not allow the least bit to neglect.Assemble space, or museum, car in special populations such as skyscraper, kindergarten, schools The public space such as stand, it appears particularly important.In the past accident imagine by two-dimentional drawing or drilled on the spot, two dimension Epoch often can not intuitively show various relations with a kind of limitation.
The content of the invention
To solve above-mentioned the problems of the prior art, the invention provides a kind of fire-fighting life-saving evacuation based on BIM technology Analogy method, dispersal plan analog demenstration can be carried out and how specific aim adjustment, which optimizes, is carried out to scheme, formulate optimal escape Route.
To achieve the above object, the technical solution adopted by the present invention is:A kind of fire-fighting life-saving evacuation mould based on BIM technology Plan method, it includes step:
Building structure threedimensional model is established using Autodesk Revit softwares;
The building structure threedimensional model of foundation is exported to Pathfinder from the Autodesk Revit softwares and evacuated In software;
The evacuation space in the building structure threedimensional model is extracted using Pathfinder evacuation softwares;
It is emergency exit by the door body in the evacuation space and stair position mark, keeps coherent inside evacuation space;
A number of evacuation personnel are set in evacuation space, the movement velocity of evacuation personnel, simulated accident hair are set The true personnel at raw scene;
Evacuation operation emulation is carried out using Pathfinder evacuation softwares, obtains the people of evacuation space and emergency exit Number changes with time, and generates evacuation space number change curve and emergency exit number change curve;
It is whether reasonable the time required to evacuation is judged from from the evacuation space number change curve;
Judge whether the emergency exit stream of people is reasonable from from the emergency exit number change curve;
The time required to for evacuation and/or the emergency exit stream of people is irrational, re-flags emergency exit and re-starts Evacuation operation emulation, until obtained evacuation required time and the emergency exit stream of people are reasonable;And
The emergency exit data marked in the evacuation space are exported, update the building structure threedimensional model.
Fire-fighting life-saving evacuation analogy method of the present invention based on BIM technology, which is further improved, to be, the Autodesk The building structure threedimensional model that Revit softwares are established is exported to the Pathfinder with dxf files and evacuated in software.
Fire-fighting life-saving evacuation analogy method of the present invention based on BIM technology, which is further improved, to be, described in the utilization The step of Pathfinder evacuation softwares extract the evacuation space in the building structure threedimensional model, including:Using described Pathfinder evacuation softwares extract the floor and stair that evacuation floor is treated in the building structure threedimensional model, and generation evacuation is empty Between.
Fire-fighting life-saving evacuation analogy method of the present invention based on BIM technology, which is further improved, to be, described in the utilization Pathfinder evacuation softwares, which carry out the step of evacuation operation emulates, to be included:
The closeness that evacuation personnel are carried out to the evacuation space is set;
Presence based on barrier, infeasible region is set in evacuation space, carries out removal of obstacle;And
Setting based on emergency exit, dry run is carried out using Pathfinder evacuation softwares.
Fire-fighting life-saving evacuation analogy method of the present invention based on BIM technology, which is further improved, to be, the evacuation space Number change curve is the linear relationship chart that the number in the evacuation space changes over time;
And wherein, it is described from the evacuation space number change curve from judge evacuation the time required to whether close The step of reason, includes:
Corresponding time value when number is null value from from evacuation space number change curve, and with the time value The time required to evacuation;
By the evacuation required time of acquisition compared with actually available evacuation time;
It is more than actually available evacuation time the time required to for evacuation, is evaluated as unreasonable;
It is less than or equal to available safe evacuation time the time required to for evacuation, is evaluated as rationally.
Fire-fighting life-saving evacuation analogy method of the present invention based on BIM technology, which is further improved, to be, described actually available Evacuation time is according to building structure situation and accident a situation arises evacuation time threshold value set in advance.
Fire-fighting life-saving evacuation analogy method of the present invention based on BIM technology, which is further improved, to be, the emergency exit Number change curve is the linear relationship chart that the number at emergency exit changes over time;
And wherein, it is described from the emergency exit number change curve from judge whether the emergency exit stream of people closes The step of reason, includes:
Preset the number threshold value of passing through at emergency exit;
Number exceedes the situation for the number threshold value that can pass through from from emergency exit number change curve;
In the presence of in the case of the number that gets exceedes and can pass through number threshold value, it is evaluated as unreasonable;
For do not get number exceed can pass through number threshold value in the case of in the presence of, be evaluated as rationally.
Fire-fighting life-saving evacuation analogy method of the present invention based on BIM technology, which is further improved, to be, described in the utilization Pathfinder evacuation softwares carry out the step of evacuation operation emulates and also obtain evacuation route;
And wherein, described the step of re-flagging emergency exit, includes:
Observation judges the evacuation route, extracts evacuation route process or close crowded in the evacuation space Position, and it is labeled as emergency exit.
Fire-fighting life-saving evacuation analogy method of the present invention based on BIM technology, which is further improved, to be, described in the output The emergency exit data marked in evacuation space, the step of updating the building structure threedimensional model, include:According to dredging for output Outlet data is dissipated, utilizes building structure threedimensional model described in the Autodesk Revit software upgradings.
Due to using above technical scheme, what is made it have has the beneficial effect that the present invention:It is soft using Autodesk Revit Part establishes threedimensional model, exports dxf formatted files and imports in Pathfinder evacuation softwares, Revit threedimensional model is turned Change evacuation model, with reference to BIM technology visualization property, optimization property, can simulation the characteristics of, in advance carry out dispersal plan simulation drills Show and specific aim is carried out to scheme and optimize and revise, formulate optimal escape route.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, make required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing.
Fig. 1 is a kind of flow chart of fire-fighting life-saving evacuation analogy method based on BIM technology in embodiments of the invention.
Fig. 2 is the evacuation personnel positions distribution map in embodiments of the invention.
Fig. 3 is the evacuation space number change curve in embodiments of the invention.
Fig. 4 is the emergency exit number change curve in embodiments of the invention.
Embodiment
Illustrate embodiments of the present invention below by way of specific instantiation, those skilled in the art can be by this specification Disclosed content understands other advantages and effect of the present invention easily.The present invention can also pass through specific realities different in addition The mode of applying is embodied or practiced, the various details in this specification can also be based on different viewpoints with application, without departing from Various modifications or alterations are carried out under the spirit of the present invention.
The invention provides a kind of fire-fighting life-saving based on BIM technology to evacuate simulation application method.In daily life, accident Often occur, personnel evacuation simulation preferably can be expressed more intuitively evacuation process, shifted to an earlier date by the simulation of evacuation The relation of prediction evacuation time used, people and space, so as to obtain more preferable solution.With BIM technology development and Using with escaping, simulation softward (Pathfinder) carries out personnel evacuation simulation to BIM models, sets best-effort path and dredges The number of dissipating simultaneously studies parameter setting, obtains evacuating path, emergency exit number curve map and region number change curve, There is great importance to formulating a set of rational fire-fighting evacuation prediction scheme and actual person evacuation.And the present invention describes profit Threedimensional model is established with Autodesk Revit softwares, dxf formatted files is exported and imports evacuation simulation softward Pathfinder In, Revit threedimensional model is changed into evacuation model, with reference to BIM technology visualization property, optimization property, can simulation the characteristics of, Dispersal plan analog demenstration is carried out in advance and specific aim is carried out to scheme optimizing and revising, formulate optimal escape route.
BIM (Building Information Modeling, abbreviation BIM) can be true, complete, rigorous Expression building and architectural environment in Virtual Space, it is emergent thin based on BIM models couplings evacuation simulation softward (Pathfinder) Prediction scheme simulation softward is dissipated, can not only generate the emergency evacuation prediction scheme simulation animation for possessing 3D effect of visualization true to nature, it is most important It is reasonable utilization fire escape, formulates emergency evacuation prediction scheme that is many-sided, considering more.Therefore, using BIM models virtual empty Between middle simulation evacuation, optimal emergency evacuation scheme can be drawn closest to true.
Below in conjunction with the accompanying drawings and embodiment the present invention is further detailed explanation.
As shown in fig.1, a kind of fire-fighting life-saving evacuation simulation side based on BIM technology is provided in embodiments of the invention Method, it is mainly included the following steps that:
StepRapid 101:Building structure threedimensional model is established using Autodesk Revit softwares;
Specifically, building structure threedimensional model can be built using Autodesk Revit softwares according to two-dimentional drawing.
Wherein, Autodesk Revit softwares towards BIM (Building Information Model, letter Claim BIM) and build, support Sustainable Design, collision detection, Construction Specifications and construction, at the same help with engineer, contractor and Owner preferably links up cooperation.Having altered in design process can all be realized more in relevant design with being automatically updated in document Add harmonious flow, obtain relatively reliable design documentation.
Step 102:The building structure threedimensional model of foundation is exported to Pathfinder from Autodesk Revit softwares Evacuate in software;
Wherein, the building structure threedimensional model that Autodesk Revit softwares are established is exported with dxf files, then is imported into In Pathfinder evacuation softwares.
Pathfinder evacuation softwares are an emergency exit simulators, are integrated with user interface and three-dimensional animation effect; Can evacuation model, and produce graphical effect more real than other simulators more quickly.It is strong that Pathfinder combines function Big simulation engine, neatly population controlling and behavior, to provide more preferable result.Therefore, can be evacuated in Pathfinder Software carries out evacuating personnel operation method emulation.
Step 103:Utilize the evacuation space in Pathfinder evacuation software extraction building structure threedimensional models;
Specifically, after building structure threedimensional model imports, the floor of personnel activity, landing are extracted (if model is in Closed state, can first hidden parts wall, then extraction setting is carried out to floor;It is may also set up to the floor set to cut open Face height, is hidden to part floor), evacuation space is generated, the evacuation space is that the building of pending evacuation simulation is empty Between, can be multilayer floor.
Step 104:It is emergency exit by the door body in evacuation space and stair position mark, keeps connecting inside evacuation space Pass through;
Specifically, outlet setting is carried out to stair, door body, it is ensured that the continuity between space and space, ensure follow-up Personnel in evacuation operation emulation are provided with complete best-effort path.
Step 105:A number of evacuation personnel are set in evacuation space, the movement velocity of evacuation personnel, mould are set The true personnel at scene occur for plan accident;
Specifically, as shown in Fig. 2 carrying out the setting of personnel amount and personnel's movement velocity to the evacuation space of extraction, So that evacuation personnel can preferably simulate situation when a fault occurs during evacuation.
Step 106:UtilizePathfinder evacuates softwareEvacuation operation emulation is carried out, obtains evacuation space and emergency exit Number change with time, generate evacuation space number change curve and emergency exit number change curve;
Coordinate shown in Fig. 3, evacuation space number change curve changes over time linear for the number in evacuation space Graph of a relation;Again as shown in figure 4, emergency exit number change curve is the linear pass that the number at emergency exit changes over time System's figure.
If barrier be present, barrier threedimensional model is created using BIM threedimensional models, with building structure threedimensional model phase Imported with step in existing evacuation model, by the position of infeasible region during mobile control evacuation, and assign it one Individual separate space;
In the self-defined setting extra exit of evacuation model spatial edge, and it is set to extra exit terminal;
Evacuation operation emulation is carried out using Pathfinder evacuation softwares, after above step is provided with, passes through software Run The operation emulation of Simulation functions, operation result automatically generate the total time after evacuation animation and statistician's safe escape, The number for obtaining evacuation space and emergency exit changes with time, and generates evacuation space number change curve and emergency exit Number change curve.
Wherein, the step of carrying out evacuation operation emulation using Pathfinder evacuation softwares, may particularly include:
1) closeness that evacuation personnel are carried out to the evacuation space based on BIM threedimensional models is set, can be by according to floor Total number of persons random distribution or definition evacuation densely populated place degree two ways are set;
2) presence based on barrier, infeasible region is set in evacuation space, carries out removal of obstacle;
3) setting of escape way;Enter the setting of row of channels up and down to floor, the width degree of passage can be led to by model Road space size is defined, it is ensured that is penetrated between passage and space;
4) setting of extra exit;Evacuation space border sets extra exit, the size of emergency exit, can be gone out according to model Mouthful width is set.
5) by above-mentioned setting, meet evacuation space necessary to the animation simulation of evacuation, evacuate personnel, fire escape with And the integrality of extra exit, dry run is carried out using software, operation result is automatically generated, can be directly viewable.Step 107: It is whether reasonable the time required to evacuation is judged from from evacuation space number change curve;
Coordinate shown in Fig. 3, the step specifically may include:
Corresponding time value when number is null value from from evacuation space number change curve, and with the time value The time required to evacuation;
By the evacuation required time of acquisition compared with actually available evacuation time;
It is more than actually available evacuation time the time required to for evacuation, is evaluated as unreasonable;And
It is less than or equal to available safe evacuation time the time required to for evacuation, is evaluated as rationally.
And wherein, actually available evacuation time be according to building structure situation and accident a situation arises it is set in advance dredge Dissipate time threshold or some specific value.
Step 108:Judge whether the emergency exit stream of people is reasonable from from emergency exit number change curve;
Coordinate shown in Fig. 4, show that the stream of people at multiple emergency exits changes with time in figure, wherein some occurred Peak value represents current time stream of people maximum, most by the number of the emergency exit.The step 108 specifically may include:
Pass through number threshold value or a certain particular value at emergency exit are preset, can be according to the physics spy of emergency exit Sign is set, and such as when emergency exit is door body, calculate it by the length and width dimensions of emergency exit allows to pass through in synchronization Maximum number;When emergency exit is stair, by the numbers of steps of stair, step width, stair length and turn feature etc., Calculate its maximum number for allowing to pass through in synchronization;
Number exceedes the situation for the number threshold value that can pass through from from emergency exit number change curve;
In the presence of in the case of the number that gets exceedes and can pass through number threshold value, it is evaluated as unreasonable;And
For do not get number exceed can pass through number threshold value in the case of in the presence of, be evaluated as rationally.
Step 109:For evacuation the time required to and/or the emergency exit stream of people it is irrational, re-flag emergency exit and Evacuation operation emulation is re-started, until obtained evacuation required time and the emergency exit stream of people are reasonable;
Wherein, above-mentioned steps 106 using Pathfinder evacuation software carry out evacuation operation emulation the step of also obtain Evacuation route;
Also, in step 109 is the step of re-flagging emergency exit, it may include:
Observation judges the evacuation route, extracts evacuation route process or close crowded in the evacuation space Position, and it is labeled as emergency exit.
Step 110:The emergency exit data marked in the evacuation space are exported, update the building structure three-dimensional mould Type.
Specifically, Autodesk Revit software upgradings building structure three can be utilized according to the emergency exit data of output Dimension module, reach optimization Autodesk Revit modelings.
The present invention obtains evacuation time, route, the space amount of evacuating an endless flow of people, the stream of people is on evacuation road by evacuating operation emulation The data such as the degree of crowding in footpath carry out escape route layout data, meanwhile, it also can intuitively be evacuated and flowed by every floor layer personage Cardon is intuitively observed, and evacuation crowd required time, route, movement of population density degree is analyzed, to appearance not Rationally, it is unsatisfactory for situation to modify processing, exports new evacuation data again, obtains and more reasonably solve method, so as to Obtain optimal escape route.
The present invention establishes threedimensional model using Autodesk Revit softwares, exports dxf formatted files and imports evacuation mould Intend in software Pathfinder, Revit threedimensional model is changed into evacuation model, with reference to BIM technology visualization property, can optimize Property, can simulation the characteristics of, carry out dispersal plan analog demenstration in advance and specific aim carried out to scheme to optimize and revise, formulate optimal Escape route.
The beneficial effect of the present invention compared with prior art is:
(1) BIM evacuation models (Revit models are imported into Pathfinder) are based on, pass through animation simulation personnel Evacuation route, it is determined that most preferably evacuating path.
(2) BIM evacuation models are based on, it is clear intuitively to find area people present position, there is provided fire-fighting and rescue scheme.
(3) BIM evacuation models are based on, analogue simulation personnel are true to nature, directly perceived, and evacuation process is intended to reality, expression effect It is more direct.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only coordinating Content disclosed in bright book, so that those skilled in the art understands and reads, it is not limited to the enforceable limit of the present invention Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not Influence under the effect of present invention can be generated and the purpose that can reach, all should still fall and be obtained in disclosed technology contents In the range of covering.It is meanwhile cited such as " on ", " under ", "left", "right", " centre " and " one " etc. in this specification Term, understanding for narration is merely convenient to, and is not used to limit the enforceable scope of the present invention, the change of its relativeness or tune It is whole, in the case where changing technology contents without essence, when being also considered as the enforceable category of the present invention.
Described above is only presently preferred embodiments of the present invention, not does any formal limitation to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, in the range of technical solution of the present invention is not departed from, when the technology contents using the disclosure above make a little change or repair The equivalent embodiment for equivalent variations is adornd, as long as being the content without departing from technical solution of the present invention, the technology according to the present invention is real Any simple modification, equivalent change and modification that confrontation above example is made, still fall within the scope of technical solution of the present invention It is interior.

Claims (9)

1. a kind of fire-fighting life-saving evacuation analogy method based on BIM technology, it is characterised in that including step:
Building structure threedimensional model is established using Autodesk Revit softwares;
The building structure threedimensional model of foundation is exported to Pathfinder from the Autodesk Revit softwares and evacuates software In;
The evacuation space in the building structure threedimensional model is extracted using Pathfinder evacuation softwares;
It is emergency exit by the door body in the evacuation space and stair position mark, keeps coherent inside evacuation space;
A number of evacuation personnel are set in evacuation space, the movement velocity of evacuation personnel is set, simulated accident occurs existing The true personnel of field;
Carry out evacuation operation emulation using Pathfinder evacuation softwares, obtain the number of evacuation space and emergency exit with The change of time, generate evacuation space number change curve and emergency exit number change curve;
It is whether reasonable the time required to evacuation is judged from from the evacuation space number change curve;
Judge whether the emergency exit stream of people is reasonable from from the emergency exit number change curve;
The time required to for evacuation and/or the emergency exit stream of people is irrational, re-flags emergency exit and re-starts evacuation Operation emulation, until reasonable with the emergency exit stream of people the time required to obtained evacuation;And
The emergency exit data marked in the evacuation space are exported, update the building structure threedimensional model.
2. the fire-fighting life-saving evacuation analogy method based on BIM technology as claimed in claim 1, it is characterised in that:It is described The building structure threedimensional model that Autodesk Revit softwares are established is exported to the Pathfinder with dxf files and evacuated In software.
3. the fire-fighting life-saving evacuation analogy method based on BIM technology as claimed in claim 1, it is characterised in that the utilization The step of Pathfinder evacuations software extracts the evacuation space in the building structure threedimensional model, including:Using institute State Pathfinder evacuation softwares and extract the floor and stair that evacuation floor is treated in the building structure threedimensional model, generation evacuation Space.
4. the fire-fighting life-saving evacuation analogy method based on BIM technology as claimed in claim 1, it is characterised in that the utilization The Pathfinder evacuations software, which carries out the step of evacuation operation emulates, to be included:
The closeness that evacuation personnel are carried out to the evacuation space is set;
Presence based on barrier, infeasible region is set in evacuation space, carries out removal of obstacle;And
Setting based on emergency exit, dry run is carried out using Pathfinder evacuation softwares.
5. the fire-fighting life-saving evacuation analogy method based on BIM technology as claimed in claim 1, it is characterised in that the evacuation Space number change curve is the linear relationship chart that the number in the evacuation space changes over time;
And wherein, it is described from the evacuation space number change curve from judge evacuation the time required to it is whether rational Step includes:
Corresponding time value when number is null value from from evacuation space number change curve, and using the time value as The time required to evacuation;
By the evacuation required time of acquisition compared with actually available evacuation time;
It is more than actually available evacuation time the time required to for evacuation, is evaluated as unreasonable;
It is less than or equal to available safe evacuation time the time required to for evacuation, is evaluated as rationally.
6. the fire-fighting life-saving evacuation analogy method based on BIM technology as claimed in claim 5, it is characterised in that the reality Available safe evacuation time is according to building structure situation and accident a situation arises evacuation time threshold value set in advance.
7. the fire-fighting life-saving evacuation analogy method based on BIM technology as claimed in claim 1, it is characterised in that the evacuation Outlet number change curve is the linear relationship chart that the number at emergency exit changes over time;
And wherein, it is described from the emergency exit number change curve from judge whether the emergency exit stream of people rational Step includes:
Preset the number threshold value of passing through at emergency exit;
Number exceedes the situation for the number threshold value that can pass through from from emergency exit number change curve;
In the presence of in the case of the number that gets exceedes and can pass through number threshold value, it is evaluated as unreasonable;
For do not get number exceed can pass through number threshold value in the case of in the presence of, be evaluated as rationally.
8. the fire-fighting life-saving evacuation analogy method based on BIM technology as claimed in claim 1, it is characterised in that the utilization The Pathfinder evacuations software carries out the step of evacuation operation emulates and also obtains evacuation route;
And wherein, described the step of re-flagging emergency exit, includes:
Observation judges the evacuation route, extracts evacuation route process crowded in the evacuation space or close position Put, and be labeled as emergency exit.
9. the fire-fighting life-saving evacuation analogy method based on BIM technology as claimed in claim 1, it is characterised in that the output The emergency exit data marked in the evacuation space, the step of updating the building structure threedimensional model, include:According to output Emergency exit data, utilize building structure threedimensional model described in the Autodesk Revit software upgradings.
CN201710769576.8A 2017-08-31 2017-08-31 A kind of fire-fighting life-saving evacuation analogy method based on BIM technology Pending CN107679275A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710769576.8A CN107679275A (en) 2017-08-31 2017-08-31 A kind of fire-fighting life-saving evacuation analogy method based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710769576.8A CN107679275A (en) 2017-08-31 2017-08-31 A kind of fire-fighting life-saving evacuation analogy method based on BIM technology

Publications (1)

Publication Number Publication Date
CN107679275A true CN107679275A (en) 2018-02-09

Family

ID=61135582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710769576.8A Pending CN107679275A (en) 2017-08-31 2017-08-31 A kind of fire-fighting life-saving evacuation analogy method based on BIM technology

Country Status (1)

Country Link
CN (1) CN107679275A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108919766A (en) * 2018-07-30 2018-11-30 浙江中博信息工程有限公司 A kind of safety in production integrated manager platform based on BIM technology
CN109063282A (en) * 2018-07-16 2018-12-21 中国地质大学(武汉) A kind of foundation pit layout method constrained based on largest passages and density of personnel
CN109883421A (en) * 2019-01-25 2019-06-14 交通运输部科学研究院 A kind of intelligent carriage navigation methods and systems merging Building Information Model
CN109992876A (en) * 2019-03-28 2019-07-09 同济大学建筑设计研究院(集团)有限公司 Fire-fighting evacuation path processing method, device and the computer equipment of building
CN109992901A (en) * 2019-04-08 2019-07-09 同济大学建筑设计研究院(集团)有限公司 Stair data processing method, device and the computer equipment of building
CN110377996A (en) * 2019-07-10 2019-10-25 河北省建筑科学研究院有限公司 Urban architecture fire spalling degree Prediction System and application based on Internet of Things and BIM
CN110929378A (en) * 2019-10-25 2020-03-27 中国科学院深圳先进技术研究院 High-rise building emergency evacuation method and system based on digital twins and electronic equipment
CN111027232A (en) * 2019-12-30 2020-04-17 成都工业学院 BIM-based underground space personnel safety evacuation simulation method and system
CN112116775A (en) * 2020-10-14 2020-12-22 珠海格力电器股份有限公司 Fire detection method of multi-split air-conditioning equipment and multi-split air-conditioning system
CN112200487A (en) * 2020-10-27 2021-01-08 中铁第五勘察设计院集团有限公司 Passenger flow simulation method for urban rail transit transfer station
CN112215430A (en) * 2020-10-21 2021-01-12 中铁第四勘察设计院集团有限公司 Graphical rail transit structured emergency plan compiling system and method
CN112836878A (en) * 2021-02-04 2021-05-25 厦门市建筑科学研究院有限公司 BIM technology-based emergency evacuation method and device
CN112991544A (en) * 2021-04-20 2021-06-18 山东新一代信息产业技术研究院有限公司 Group evacuation behavior simulation method based on panoramic image modeling
CN113947014A (en) * 2021-09-15 2022-01-18 江苏中云筑智慧运维研究院有限公司 BIM-based tunnel fire emergency rescue method, terminal and storage medium
CN113963089A (en) * 2021-12-23 2022-01-21 朗坤智慧科技股份有限公司 Three-dimensional space evacuation simulation method based on A-x algorithm
CN114818360A (en) * 2022-05-10 2022-07-29 煤炭科学研究总院有限公司 Evacuation exit setting method and device in crowd emergency evacuation scene
CN117952810A (en) * 2024-03-26 2024-04-30 山东科技大学 Personnel evacuation path planning method and related device based on subway station fire
US12116771B2 (en) 2020-12-31 2024-10-15 Mitek Holdings, Inc. Rapid assembly construction modules and methods for use

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103394171A (en) * 2013-08-02 2013-11-20 重庆大学 Large high-rise building indoor fire urgent evacuation indication escape method and system
CN104966154A (en) * 2015-06-09 2015-10-07 广州市水电设备安装有限公司 BIM technology-based temporary water and temporary electricity management method and system
CN104978696A (en) * 2015-06-09 2015-10-14 广州市水电设备安装有限公司 Electronic acceptance and handover method based on BIM technology
US20160004795A1 (en) * 2014-07-01 2016-01-07 Scanifly, LLC Device, method, apparatus, and computer-readable medium for solar site assessment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103394171A (en) * 2013-08-02 2013-11-20 重庆大学 Large high-rise building indoor fire urgent evacuation indication escape method and system
CN103394171B (en) * 2013-08-02 2015-07-15 重庆大学 Large high-rise building indoor fire urgent evacuation indication escape method and system
US20160004795A1 (en) * 2014-07-01 2016-01-07 Scanifly, LLC Device, method, apparatus, and computer-readable medium for solar site assessment
CN104966154A (en) * 2015-06-09 2015-10-07 广州市水电设备安装有限公司 BIM technology-based temporary water and temporary electricity management method and system
CN104978696A (en) * 2015-06-09 2015-10-14 广州市水电设备安装有限公司 Electronic acceptance and handover method based on BIM technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴水根: "基于BIM与Pathfinder的高层住宅应急疏散模拟研究", 《结构工程师》 *
张月梦萦: "BIM技术在楼宇自动化管理中的研究与应用", 《中国优秀硕士学位论文全文数据库(工程科技Ⅱ辑)》 *

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109063282A (en) * 2018-07-16 2018-12-21 中国地质大学(武汉) A kind of foundation pit layout method constrained based on largest passages and density of personnel
CN109063282B (en) * 2018-07-16 2022-11-18 中国地质大学(武汉) Foundation pit layout method based on maximum channel and personnel density constraint
CN108919766A (en) * 2018-07-30 2018-11-30 浙江中博信息工程有限公司 A kind of safety in production integrated manager platform based on BIM technology
CN109883421A (en) * 2019-01-25 2019-06-14 交通运输部科学研究院 A kind of intelligent carriage navigation methods and systems merging Building Information Model
CN109883421B (en) * 2019-01-25 2021-08-03 交通运输部科学研究院 Intelligent trolley navigation method and system fusing building information model
CN109992876A (en) * 2019-03-28 2019-07-09 同济大学建筑设计研究院(集团)有限公司 Fire-fighting evacuation path processing method, device and the computer equipment of building
CN109992876B (en) * 2019-03-28 2023-07-11 同济大学建筑设计研究院(集团)有限公司 Method and device for processing fire evacuation path of building and computer equipment
CN109992901B (en) * 2019-04-08 2023-07-11 同济大学建筑设计研究院(集团)有限公司 Stair data processing method and device for building and computer equipment
CN109992901A (en) * 2019-04-08 2019-07-09 同济大学建筑设计研究院(集团)有限公司 Stair data processing method, device and the computer equipment of building
CN110377996A (en) * 2019-07-10 2019-10-25 河北省建筑科学研究院有限公司 Urban architecture fire spalling degree Prediction System and application based on Internet of Things and BIM
CN110377996B (en) * 2019-07-10 2023-03-03 河北省建筑科学研究院有限公司 Urban building fire burst degree estimation system based on Internet of things and BIM and application
CN110929378A (en) * 2019-10-25 2020-03-27 中国科学院深圳先进技术研究院 High-rise building emergency evacuation method and system based on digital twins and electronic equipment
CN110929378B (en) * 2019-10-25 2024-03-19 中国科学院深圳先进技术研究院 High-rise building emergency evacuation method, system and electronic equipment based on digital twinning
CN111027232A (en) * 2019-12-30 2020-04-17 成都工业学院 BIM-based underground space personnel safety evacuation simulation method and system
CN112116775A (en) * 2020-10-14 2020-12-22 珠海格力电器股份有限公司 Fire detection method of multi-split air-conditioning equipment and multi-split air-conditioning system
CN112215430B (en) * 2020-10-21 2023-06-30 中铁第四勘察设计院集团有限公司 Graphical rail transit structured emergency plan compiling system and method
CN112215430A (en) * 2020-10-21 2021-01-12 中铁第四勘察设计院集团有限公司 Graphical rail transit structured emergency plan compiling system and method
CN112200487B (en) * 2020-10-27 2024-05-28 中铁第五勘察设计院集团有限公司 Passenger flow simulation method for urban rail transit transfer station
CN112200487A (en) * 2020-10-27 2021-01-08 中铁第五勘察设计院集团有限公司 Passenger flow simulation method for urban rail transit transfer station
US12116771B2 (en) 2020-12-31 2024-10-15 Mitek Holdings, Inc. Rapid assembly construction modules and methods for use
CN112836878A (en) * 2021-02-04 2021-05-25 厦门市建筑科学研究院有限公司 BIM technology-based emergency evacuation method and device
CN112991544A (en) * 2021-04-20 2021-06-18 山东新一代信息产业技术研究院有限公司 Group evacuation behavior simulation method based on panoramic image modeling
CN113947014A (en) * 2021-09-15 2022-01-18 江苏中云筑智慧运维研究院有限公司 BIM-based tunnel fire emergency rescue method, terminal and storage medium
CN113963089B (en) * 2021-12-23 2022-05-03 朗坤智慧科技股份有限公司 Three-dimensional space evacuation simulation method based on A-x algorithm
CN113963089A (en) * 2021-12-23 2022-01-21 朗坤智慧科技股份有限公司 Three-dimensional space evacuation simulation method based on A-x algorithm
US11893325B2 (en) 2022-05-10 2024-02-06 Ccteg Chinese Institute Of Coal Science Method and apparatus for setting evacuation exit under crowd emergency evacuation scenario
CN114818360B (en) * 2022-05-10 2022-11-01 煤炭科学研究总院有限公司 Evacuation exit setting method and device in crowd emergency evacuation scene
CN114818360A (en) * 2022-05-10 2022-07-29 煤炭科学研究总院有限公司 Evacuation exit setting method and device in crowd emergency evacuation scene
CN117952810A (en) * 2024-03-26 2024-04-30 山东科技大学 Personnel evacuation path planning method and related device based on subway station fire

Similar Documents

Publication Publication Date Title
CN107679275A (en) A kind of fire-fighting life-saving evacuation analogy method based on BIM technology
Génevaux et al. Terrain generation using procedural models based on hydrology
Sarmady et al. Modeling groups of pedestrians in least effort crowd movements using cellular automata
Beier Web-based virtual reality in design and manufacturing applications
CN108733876A (en) Fire develops emulation mode and the fire evacuation comprehensive simulating method including it
Dang et al. A chain navigation grid based on cellular automata for large-scale crowd evacuation in virtual reality
Larive et al. Wall grammar for building generation
Rüppel et al. BIM-based immersive indoor graph networks for emergency situations in buildings
CN106355640A (en) Ground-underground three-dimensional integrated space processing method and system
Kurmann Sculptor-A tool for intuitive architectural design
CN112257258B (en) Crowd motion simulation method based on Boids cluster motion model
Kurmann et al. Real-time modeling with architectural space
Campos et al. Integrated modeling of road environments for driving simulation
Montana et al. Sketching for real-time control of crowd simulations
Zhu et al. Design and realization of virtual classroom
Wang et al. Behavior-based simulation of real-time crowd evacuation
Qi et al. Study on realization technology of virtual reality for coal mining face
Applegate et al. A sketch-based system for highway design
Dukkardt et al. Informational system to support the design process of complex equipment based on the mechanism of manipulation and management for three-dimensional objects models
Rodriguez et al. Utilizing roadmaps in evacuation planning
Bidarra et al. Integrating semantics and procedural generation: key enabling factors for declarative modeling of virtual worlds
Zhu Using BIM technology to optimize the traditional interior design work Mode
CN104392061A (en) Personnel evacuation model based on geometric intelligent agents
Milena et al. Application of generative algorithms in architectural design
Selberherr et al. The Viennese TCAD System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209

RJ01 Rejection of invention patent application after publication