CN108905961A - A kind of restorative procedure in cadmium zinc pollution river - Google Patents

A kind of restorative procedure in cadmium zinc pollution river Download PDF

Info

Publication number
CN108905961A
CN108905961A CN201810815038.2A CN201810815038A CN108905961A CN 108905961 A CN108905961 A CN 108905961A CN 201810815038 A CN201810815038 A CN 201810815038A CN 108905961 A CN108905961 A CN 108905961A
Authority
CN
China
Prior art keywords
river
bed mud
zeolite
absorption
curing agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810815038.2A
Other languages
Chinese (zh)
Other versions
CN108905961B (en
Inventor
张彦浩
王宇辰
张志斌
曹国勋
夏四清
林建伟
朱广伟
孙翠珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jianzhu University
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN201810815038.2A priority Critical patent/CN108905961B/en
Publication of CN108905961A publication Critical patent/CN108905961A/en
Application granted granted Critical
Publication of CN108905961B publication Critical patent/CN108905961B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J20/00Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof
    • B01J20/02Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material
    • B01J20/10Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material comprising silica or silicate
    • B01J20/16Alumino-silicates
    • B01J20/18Synthetic zeolitic molecular sieves
    • B01J20/186Chemical treatments in view of modifying the properties of the sieve, e.g. increasing the stability or the activity, also decreasing the activity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J20/00Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof
    • B01J20/02Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material
    • B01J20/0203Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material comprising compounds of metals not provided for in B01J20/04
    • B01J20/0211Compounds of Ti, Zr, Hf
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J20/00Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof
    • B01J20/02Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material
    • B01J20/0203Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material comprising compounds of metals not provided for in B01J20/04
    • B01J20/0274Solid sorbent compositions or filter aid compositions; Sorbents for chromatography; Processes for preparing, regenerating or reactivating thereof comprising inorganic material comprising compounds of metals not provided for in B01J20/04 characterised by the type of anion
    • B01J20/0288Halides of compounds other than those provided for in B01J20/046
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/28Treatment of water, waste water, or sewage by sorption
    • C02F1/288Treatment of water, waste water, or sewage by sorption using composite sorbents, e.g. coated, impregnated, multi-layered
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/008Sludge treatment by fixation or solidification
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/20Heavy metals or heavy metal compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/20Heavy metals or heavy metal compounds
    • C02F2101/22Chromium or chromium compounds, e.g. chromates
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/007Contaminated open waterways, rivers, lakes or ponds

Landscapes

  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Inorganic Chemistry (AREA)
  • Analytical Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Solid-Sorbent Or Filter-Aiding Compositions (AREA)

Abstract

A kind of restorative procedure in cadmium zinc pollution river, includes the following steps:(1)Prepare the absorption stabilizing and curing agent based on Zeolite modifying, 1. zeolite, 2. by particulate zeolites high-temperature process, is 3. placed in NaOH solution and handles by clinoptilolite is broken, grinding and screening, 4. zeolite is placed in zirconyl chloride solution processing, the absorption stabilizing and curing agent based on Zeolite modifying is 5. obtained;(2)Improvement reparation is carried out to Cd, Zn polluted river channel using the absorption stabilizing and curing agent based on Zeolite modifying, 1. the absorption of polluted river water is administered, dredging and curing process 2. are carried out to polluted river channel bed mud, pollution by dredging bed mud is 3. repaired by ecological slope protection.This method is high temperature modified to natural zeolite progress, NaOH is modified and the processing such as zirconium oxychloride is modified, prepare the absorption stabilizing and curing agent based on Zeolite modifying, comprehensive improvement is carried out together in combination with Channel slope regulation and River Landscape transformation, regulation effect is good, easy to operate, being compatible with the environment property is good, and removal is accurate.

Description

A kind of restorative procedure in cadmium zinc pollution river
Technical field
The present invention relates to a kind of restorative procedures for cadmium zinc pollution river, belong to Heavy Metal Pollution Control technical field.
Background technique
Traditional river Heavy Metal Pollution Control technology mainly first investigates Heavy Metal Pollution in Sediments situation, in cutting external source In the case that heavy metal inputs, bed mud heavy metal is repaired.Major technique type has peripheral doses, chemical remediation and biological prosthetic three Kind.Peripheral doses project amount is big, and Dredged bed mud still needs to one processing disposition of progress.Chemical remediation needs to put into a large amount of medicaments, cost Height, reaction condition are not easy to control, and the medicament being not efficiently used can cause secondary pollution to environment, and cannot fundamentally by Except heavy metal removing river arrives in river bottom mud.
The processing method in the river containing heavy metal disclosed in Chinese patent literature CN201710812098.4, bed mud is placed in super Concussion processing is carried out in sound wave shock instrument, makes its emulsification, in the practical harnessing project of river bottom mud, can not be implemented on a large scale. A kind of ecological treatment method in heavy metal pollution river, need to add flocculant and gold into river disclosed in 201711473810.9 Belong to the heavy metal ion in trapping agent removal river, secondary pollution is caused to river, heavy metal in river can not thoroughly be gone It removes.
Due to comprehensive, the complexity of heavy metal pollution river regulation, improvement is big, the period is long, and regulation effect is good, grasps Making restorative procedure simple, that being compatible with the environment property is good is always that people inquire into and urgent need to resolve.
Summary of the invention
The present invention provides a kind of simple process, practical for deficiency existing for existing waterway Heavy Metal Pollution Control technology The cadmium zinc pollution river (cadmium pollution river, zinc pollution river and or the common polluted river channel of cadmium zinc) that property is strong, regulation effect is good Restorative procedure.
The restorative procedure in cadmium zinc pollution of the present invention river, includes the following steps:
(1) the absorption stabilizing and curing agent based on Zeolite modifying is prepared:
1. clinoptilolite crosses 18-5 mesh after broken, screening and grinding, after being rinsed well with deionized water, obtain Partial size is the zeolite of 1.0-4.0mm;
2. the particulate zeolites for taking step 1. to obtain 450-550 DEG C of roasting in Muffle furnace, removes and deposits in its hole and hole Impurity and hydrone (active zeolite, make its internal surface area increase, improve the adsorption capacity of zeolite), roasting 2-4 hours after, It is cooled to room temperature;
3. the modified zeolite for taking step 2. to obtain in mass ratio 1:The ratio of 20-30 is placed in concentration 1.0-3.0mol/L's (increase the pore volume of zeolite, enhance the adsorption capacity to heavy metal cation) in NaOH solution, 90-105 DEG C of heating water bath 2.5-3.5 hours, 220-260 revs/min isothermal vibration 9-11 hours, be sufficiently mixed zeolite with NaOH solution, by supernatant It pours out, is cleaned with deionized water, 105 DEG C drying 2-4 hours in baking oven;
4. the modified zeolite for taking step 3. to obtain in mass ratio 1:The ratio of 5-15 is placed in the oxygen of concentration 0.1-0.2mol/L Zirconium chloride (ZrOCl2) twice-modified, (inner passage of dredging zeolite, improve the adsorption capacity of zeolite) is carried out in solution.It is placed in The magnetic agitation instrument that revolving speed is 1600-1800 revs/min stirs 3-5 hours, and modified zeolite is made to be in suspended state.
5. 4. mixed solution that step is obtained is adjusted to pH 9-11 (with concentration 2mol/L NaOH solution), then carry out After separation of solid and liquid, using deionized water cleaning solid to supernatant pH 6.5-7.5, then solid is placed in 105 DEG C of baking oven It dries to get the absorption stabilizing and curing agent of modified zeolite is arrived;
(2) improvement reparation is carried out to Cd and Zn polluted river channel using the absorption stabilizing and curing agent based on Zeolite modifying:
1. the absorption to polluted river water is administered:
Absorption stabilizing and curing agent is fitted into mesh bag, in the two sides approximately level setting gabion slope protection of polluted river channel, gabion Upper layer and lower layer filler is set, and lower layer is block stone (playing the role of slope protection), and upper layer is the mesh bag equipped with absorption stabilizing and curing agent, is used Heavy metal Cd and Zn pollutant in adsorbed water body;
The partial size of the absorption stabilizing and curing agent is 1.0-4.0mm, and mesh bag perforation size is 50-140 mesh.
The mesh bag is having a size of 10-50cm × 10-50cm × 10-50cm.
The gabion is mild steel wire outsourcing PVC material, and size of mesh opening is 3-10cm × 3-10cm.
The thickness proportion of upper layer filler and lower layer's filler is 1 in the gabion:1-3.
Net door is set at the top of the gabion, when zeolite adsorbed water body heavy metal ion especially Cd and Zn ion reaches saturation Afterwards, net door is opened, mesh bag is replaced.
2. carrying out dredging and curing process to polluted river channel bed mud:
Strand is utilized in the case where preventing polluted bed mud from suspending and diffusion for river heavy metal Cd and Zn polluted bed mud Absorbing dredge boat, which will twist polluted bed mud, to be inhaled and is pumped into the bed mud of river bank and temporarily solidify place, temporarily solidify place bottom and Surrounding carries out Anti-seeping technology, and after temporarily Dredged bed mud is carried out screening process by solidification place, the sandstone for removing 2-5mm or more is miscellaneous The lower bed mud of sieve in beta site desiccation to moisture content is 20-30% by object.
If Cd concentration is less than 10mg/kg in the bed mud under sieve, and Zn pollution concentration is less than 1000mg/kg, into bed mud The absorption stabilizing and curing agent based on Zeolite modifying is added by the weight ratio of 10-14%, and stirs and is sufficiently mixed, is solidified 7-10 days It is used for the planting soil of subsequent river channel ecology slope protection afterwards.If Cd concentration is polluted in 10mg/kg or more or Zn in the bed mud under sieve Concentration then carries out the leach toxicity test of heavy metal in 1000mg/kg or more to it, if exceeding leaching characteristic identification mark Quasi- value (foundation《Hazardous waste judging standard leaching characteristic identification》(GB 5085.3-2007)), it is carried out at processing by hazardous waste It sets;If adding the absorption based on Zeolite modifying without departing from the standard by the weight ratio of 15-20% into bed mud and stablizing admittedly Agent, and stir and be sufficiently mixed, the planting soil of subsequent river channel ecology slope protection is used for after solidifying 7-10 days;
The occurrence patterns of heavy metal Cd and Zn change in bed mud after curing process, turn from labile state to stable state Become, wherein the residual form ratio of Cd increases 43-48%, in bed mud the Cd of 32-36% with Acid extractable and can reduction-state exist It is converted into relatively stable residual form;The residual form ratio of Zn increases 16-20%, and the Zn of 18-22% is extractable with acid in bed mud State and can reduction-state exist be converted into relatively stable oxidable state and residual form, effectively reduce heavy metal Cd and Zn to environment Harm.As planting soil, the migration of interior heavy metal Cd and Zn die down curing process bed mud, can effectively prevent or reduce because Heavy metal imports the risk in river with precipitation again in slope protection soil, and this Cd and Zn pollution planting soil is suitable for taking water plant Further ecology enrichment is repaired, and solves the handling problems of polluted bed mud after current bed mud ecological, environmental protective dredging.
3. repairing pollution by dredging bed mud by ecological slope protection:
Under the premise of not influencing river water conservancy trade culture, Channel slope is rebuild, will temporarily be solidified at the solidification in place Bed mud is managed as river channel ecology slope protection planting soil, is meeting suitable season, the plant of plantation enrichment Cd and Zn, plant on slope protection By plant harvesting before withered, burning disposal is carried out after drying.
The curing process bed mud is 20-40m as the cladding thickness of planting soil.
The plant of the plantation enrichment Cd and Zn, is to sow penny cress in late March, type of seeding uses drilling, line-spacing 15-20cm is sowed, shallow ridges depth 1.5-2.5cm is opened, uniformly seed is sowed in ditch;Polygonum aubertii is being transplanted around Clear and Bright, is being chosen to Ripe branch, by distance between rows and hills 15cm × 5cm insertion slope protection planting soil.Penny cress and Polygonum aubertii are enterprising in the different plot of slope protection Row intersects plantation, and wheel is carried out on same plot and grows plantation (rotation in 1 year).
The root system of enriching plant can will solidify the heavy metal Cd in bed mud and Zn and gradually shift enrichment to groups such as plant stem-leafs In knitting.Before plant is withered, by heavy metal accumulation plant harvesting, dry after, carry out burning disposal, and carry out flying dust trapping and remaining Bottom ash disposing task, to be processed and disposition amount have greatly reduced compared to Dredged bed mud.According to weight in flying dust and remaining bottom ash The leach toxicity test of metal and《Hazardous waste judging standard leaching characteristic identification》(GB 5085.3-2007), such as beyond danger The judging standard value of waste carries out processing disposition by hazardous waste;To the flying dust that does not reach hazardous waste judging standard value and residual Remaining bottom ash, is pressed《General industry waste storage, disposal site contamination control standard》(GB18599-2001) it is handled and is disposed.
The present invention is used as substrate using extensive, the cheap zeolite of material source, by suitably modified, provides its absorption and surely The performance for determining heavy metal carries out comprehensive treatment to heavy metal Cd and Zn polluted river channel in conjunction with river channel ecology slope protection etc., and this method can Carry out comprehensive improvement together in conjunction with Channel slope regulation and River Landscape transformation, regulation effect is good, it is easy to operate, be compatible with the environment Property is good.
The present invention carries out that high temperature modified, NaOH is modified to natural zeolite and processing, the preparation such as rare earth modified zirconia are based on zeolite Modified absorption stabilizing and curing agent, the height for heavy metal Cd and Zn in the high-efficiency adsorbent and bed mud of heavy metal in water Cd and Zn Imitate stabilizing and curing agent.For the river that heavy metal Cd and Zn pollute, river water body pollution control, river bottom mud environmental dredging are taken Curing process, pollution by dredging bed mud ecological slope protection three kinds of methods of reparation reach to the comprehensive comprehensive of heavy metal Cd and Zn polluted river channel It closes and administers.
The invention has the characteristics that:
1. preparing modified particles zeolite as substrate using clinoptilolite adsorbs stabilizing and curing agent, raw material is easy to get, cheap.
2. repairing cadmium zinc pollution river using modified particles zeolite, river water quality can be purified and repair river bottom mud, Littoral landscape can also be improved, it is easy to operate, it is applied widely.
3. can be realized the accurate removal to cadmium zinc in polluted river channel.
Detailed description of the invention
Fig. 1 gives the suction of absorption stabilizing and curing agent adsorbed water body cadmium and zinc ion in embodiment 1 based on Zeolite modifying Attached isollaothermic chart, wherein (a) is cadmium sorption isollaothermic chart, it is (b) zinc ion adsorption isotherm map.
Fig. 2 gives the fractions distribution that Cd and Zn in bed mud under stabilizing and curing agent different administration ratio is adsorbed in embodiment 1 Variation diagram, wherein (a) is the fractions distribution variation diagram of Cd in bed mud under different administration ratio, it is (b) different administration ratio bottom The fractions distribution variation diagram of Zn in mud.
Fig. 3 gives the electron microscope in embodiment 2 before Zeolite modifying.
Fig. 4 gives in embodiment 2 (the absorption stabilizing and curing agent 2 based on Zeolite modifying after Zeolite modifying#) electron microscope.
Fig. 5 provides the figure of the FTIR in the present embodiment 2 before and after Zeolite modifying, wherein upper solid line is natural zeolite;Middle solid line:It is high The modified zeolite of temperature;Lower solid line:Zeolite (the absorption stabilizing and curing agent based on Zeolite modifying after high temperature, NaOH and modified zirconia 2#)
Specific embodiment
Embodiment 1
1. preparing the absorption stabilizing and curing agent 1 based on Zeolite modifying#
(1) clinoptilolite crosses 18 meshes after broken, screening and grinding, after being rinsed well with deionized water, obtains grain Diameter is the zeolite of 1.0mm.
(2) particulate zeolites for taking step (1) to obtain 450 DEG C of roastings in Muffle furnace, remove and exist in its hole and hole Impurity and hydrone, roasting 2 hours after, be cooled to room temperature.
(3) modified zeolite in mass ratio 1 for taking step (2) to obtain:The NaOH that 20 ratio is placed in concentration 1.0mol/L is molten In liquid, 90 DEG C heating water bath 2.5 hours, 220 revs/min isothermal vibration 9 hours, be sufficiently mixed zeolite with NaOH solution.It will Supernatant is poured out, and is cleaned with deionized water, is dried 2 hours for 105 DEG C in baking oven.
(4) modified zeolite in mass ratio 1 for taking step (3) to obtain:5 ratio is placed in the zirconium oxychloride of concentration 0.1mol/L (ZrOCl2) carry out in solution it is twice-modified.It is placed in the magnetic agitation instrument that revolving speed is 1600 revs/min to stir 3 hours, makes to be modified Zeolite is in suspended state.
(5) mixed solution that step (4) obtains is adjusted to pH 9 (with concentration 2mol/L NaOH solution), then carried out After separation of solid and liquid, using deionized water cleaning solid to supernatant pH 6.5, then solid is placed in 105 DEG C of baking oven and is dried It does to get the absorption stabilizing and curing agent 1 based on Zeolite modifying is arrived#
2. adsorbing stabilizing and curing agent 1#Improvement reparation to heavy metal Cd or Zn polluted river channel water body and bed mud
(1) to the improvement of polluted river channel water body
Choose the absorption stabilizing and curing agent 1 that diameter is 1.0mm#, in the nylon net bag of 50 mesh, mesh bag is having a size of 10cm ×10cm×10cm;The gabion slope protection of PVC material, gabion material are wrapped up in the two sides approximately level setting mild steel wire of polluted river channel For mild steel wire outsourcing PVC material, size of mesh opening is 3cm × 3cm;Two layers of filler point in gabion, bottom, that is, gabion bottom dress Enter block stone, plays the role of slope protection, upper layer, that is, block stone top is put into the nylon net bag equipped with zeolite adsorbents, for adsorbing water The thickness proportion of heavy metal Cd and Zn pollutant in body, upper layer and lower layer is 1:1;Steel wire at the top of gabion, which is provided with, can be taken off The chain link door of nylon net bag.It is openable after especially Cd and Zn ion reaches saturation to zeolite adsorbed water body heavy metal ion Chain link door is replaced into the nylon net bag equipped with fresh modified zeolite, is continued water pollution removal and is controlled until reaching water body Manage target.
Fig. 1 gives the absorption of absorption stabilizing and curing agent adsorbed water body cadmium, zinc ion in the present invention based on Zeolite modifying Isollaothermic chart, wherein (a) is cadmium sorption isollaothermic chart, it is (b) zinc ion adsorption isotherm map.
(2) river bottom mud environmental dredging and curing process
For river heavy metal polluted bed mud (predominantly Cd and Zn pollution), ecological, environmental protective dredging is carried out, is preventing from polluting Bed mud suspend and diffusion in the case where, using cutter suction dredger by by polluted bed mud twists suction and be pumped into river bank bed mud it is interim Solidify place.Temporarily solidify place bottom and surrounding using compound HDPE film progress Anti-seeping technology, HDPE film with a thickness of 0.75mm, two sides compound nonwoven cloth.From the bed mud of the training of channel after beta site desiccation to moisture content is 20%, Cd in bed mud Pollution concentration is that 0.3-0.6mg/kg or Zn pollution concentration is 250-750mg/kg, need to be added based on Cd and Zn polluted bed mud concentration Add the proportional relation of curing agent ratio, adding proportion is the absorption stabilizing and curing agent 1 of polluted bed mud weight 10%-12% mass#, Make to adsorb stabilizing and curing agent 1 using blender#It is sufficiently mixed with bed mud, the kind of subsequent river channel ecology slope protection is used for after solidifying 7 days Plant soil.
After solidification, the occurrence patterns of heavy metal Cd and Zn change in bed mud, change from labile state to stable state, In, the residual form ratio of Cd increases 43-44%, in bed mud the Cd of 32-34% with Acid extractable and can reduction-state there is conversion For relatively stable residual form;The residual form ratio of Zn increases 16-18%, in bed mud the Zn of 18-20% with Acid extractable and Can reduction-state exist be converted into relatively stable oxidable state and residual form, effectively reduce heavy metal Cd and Zn to the danger of environment Evil.
Fig. 2 gives the fractions distribution variation diagram of Cd and Zn in bed mud under absorption stabilizing and curing agent different administration ratio, In (a) be Cd in bed mud under different administration ratio fractions distribution variation diagram, (b) be Zn in bed mud under different administration ratio shape State changes in distribution figure.
(3) pollution by dredging bed mud is repaired by ecological slope protection
The cured bed mud of modified zeolite in place will temporarily be solidified as river channel ecology slope protection planting soil, in the planting soil Heavy metal Cd and the migration of Zn die down, can effectively prevent or reduce because slope protection soil in heavy metal with precipitation due to import river again Risk, and this Cd and Zn pollution planting soil be suitable for take water plant further ecology enrichment repair.Do not influencing urban river water Under the premise of sharp trade culture, Channel slope is rebuild, the cured bed mud of modified zeolite can be as the cladding thickness of planting soil 20cm.Suitable season can be met, the plant of super enrichment Cd and Zn are planted on slope protection.Such as penny cress, sowing are sowed in late March Method uses drilling, and line-spacing sows 15cm, opens shallow ridges depth 1.5cm, uniformly seed is sowed in ditch;Mountain buckwheat is transplanted before and after Clear and Bright Wheat selects mature branch, by distance between rows and hills 15cm × 5cm insertion slope protection planting soil.The root system of enriching plant can be by cured base Heavy metal Cd and Zn in mud gradually shift in enrichment to the tissues such as plant stem-leaf.Before plant is withered, by heavy metal accumulation plant After gathering in, drying, burning disposal is carried out, and carries out flying dust trapping and remaining bottom ash disposing task, to be processed and disposition amount are compared Greatly reduce in Dredged bed mud.According to the leach toxicity test of heavy metal in flying dust and remaining bottom ash and《Hazardous waste mirror Other standard leaching characteristic identification》(GB 5085.3-2007), reaches the standard of hazardous waste, carries out at processing by hazardous waste It sets;To the flying dust for not reaching hazardous waste standard and remaining bottom ash, press《General industry waste storage, disposal site contamination control mark It is quasi-》(GB18599-2001) it is handled and is disposed.
Embodiment 2
1. preparing the absorption stabilizing and curing agent 2 based on Zeolite modifying#
(1) clinoptilolite crosses 10 meshes after broken, screening and grinding, after being rinsed well with deionized water, obtains grain Diameter is the zeolite of 2.0mm.
(2) particulate zeolites for taking step (1) to obtain 500 DEG C of roastings in Muffle furnace, remove and exist in its hole and hole Impurity and hydrone, roasting 2-3 hours after, be cooled to room temperature.
(3) modified zeolite in mass ratio 1 for taking step (2) to obtain:The NaOH that 25 ratio is placed in concentration 2.0mol/L is molten In liquid, 100 DEG C heating water bath 3 hours, 240 revs/min isothermal vibration 10 hours, be sufficiently mixed zeolite with NaOH solution.It will Supernatant is poured out, and is cleaned with deionized water, is dried 3 hours for 105 DEG C in baking oven.
(4) modified zeolite in mass ratio 1 for taking step (3) to obtain:10 ratio is placed in the oxychlorination of concentration 0.15mol/L Zirconium (ZrOCl2) carry out in solution it is twice-modified.It is placed in the magnetic agitation instrument that revolving speed is 1700 revs/min to stir 3.5 hours, make Modified zeolite is in suspended state.
(5) mixed solution that step (4) obtains is adjusted to pH 10 (with concentration 2mol/L NaOH solution), then carried out After separation of solid and liquid, using deionized water cleaning solid to supernatant pH 7.0, then solid is placed in 105 DEG C of baking oven and is dried It does to get the absorption stabilizing and curing agent 2 based on Zeolite modifying is arrived#
Fig. 3 gives the electron microscope before the present embodiment Zeolite modifying.Fig. 4 (is based on after giving the present embodiment Zeolite modifying The absorption stabilizing and curing agent 2 of Zeolite modifying#) electron microscope.Fig. 5 gives the FTIR figure before and after the present embodiment Zeolite modifying, In upper solid line be natural zeolite;Middle solid line:Zeolite after high temperature modified;Lower solid line:The zeolite after high temperature, NaOH and modified zirconia (the absorption stabilizing and curing agent 2 based on Zeolite modifying#)
2. adsorbing stabilizing and curing agent 2#Improvement reparation to heavy metal Cd or Zn polluted river channel water body and bed mud
(1) to the improvement of polluted river channel water body
Choose the absorption stabilizing and curing agent 2 that diameter is 2.0mm#, in the nylon net bag of 80 mesh, mesh bag is having a size of 25cm ×25cm×25cm;The gabion slope protection of PVC material, gabion material are wrapped up in the two sides approximately level setting mild steel wire of polluted river channel For mild steel wire outsourcing PVC material, size of mesh opening is 6cm × 6cm;Two layers of filler point in gabion, bottom, that is, gabion bottom dress Enter block stone, plays the role of slope protection, upper layer, that is, block stone top is put into the nylon net bag equipped with zeolite adsorbents, for adsorbing water The thickness proportion of heavy metal Cd and Zn pollutant in body, upper layer and lower layer is 1:2;Steel wire at the top of gabion, which is provided with, can be taken off The chain link door of nylon net bag.It is openable after especially Cd and Zn ion reaches saturation to zeolite adsorbed water body heavy metal ion Chain link door is replaced into the nylon net bag equipped with fresh modified zeolite, is continued water pollution removal and is controlled until reaching water body Manage target.
(2) river bottom mud environmental dredging and curing process
For Cd or Zn polluted river channel heavy metal polluted bed mud, ecological, environmental protective dredging is carried out, is preventing polluted bed mud from suspending And in the case where diffusion, temporarily solidify field for polluted bed mud to be twisted to the bed mud for inhaling and being pumped into river bank using cutter suction dredger Ground.The bottom for temporarily solidifying place and surrounding are using compound HDPE film progress Anti-seeping technology, and HDPE film is with a thickness of 0.75mm, two sides Compound nonwoven cloth.From the bed mud of the training of channel after beta site desiccation to moisture content is 25%, Cd pollution concentration is in bed mud 0.6-1.0mg/kg or Zn pollution concentration is 750-1000mg/kg, need to add curing agent ratio based on Cd and Zn polluted bed mud concentration The proportional relation of example, adding proportion are the absorption stabilizing and curing agent 2 of polluted bed mud weight 12%-14% mass#, utilize blender Make to adsorb stabilizing and curing agent 2#It is sufficiently mixed with bed mud, the planting soil of subsequent river channel ecology slope protection is used for after solidifying 7 days.
After solidification, the occurrence patterns of heavy metal Cd and Zn change in bed mud, change from labile state to stable state, In, the residual form ratio of Cd increases 44-48%, in bed mud the Cd of 34-36% with Acid extractable and can reduction-state there is conversion For relatively stable residual form;The residual form ratio of Zn increases 18-20%, in bed mud the Zn of 20-22% with Acid extractable and Can reduction-state exist be converted into relatively stable oxidable state and residual form, effectively reduce heavy metal Cd and Zn to the danger of environment Evil.
(3) pollution by dredging bed mud is repaired by ecological slope protection
The cured bed mud of modified zeolite in place will temporarily be solidified as river channel ecology slope protection planting soil, in the planting soil Heavy metal Cd and the migration of Zn die down, can effectively prevent or reduce because slope protection soil in heavy metal with precipitation due to import river again Risk, and this Cd and Zn pollution planting soil be suitable for take water plant further ecology enrichment repair.Do not influencing urban river water Under the premise of sharp trade culture, Channel slope is rebuild, the cured bed mud of modified zeolite can be as the cladding thickness of planting soil 20cm.Suitable season can be met, the plant of super enrichment Cd and Zn are planted on slope protection.Such as penny cress, sowing are sowed in late March Method uses drilling, and line-spacing sows 180cm, opens shallow ridges depth 2.0cm, uniformly seed is sowed in ditch;Mountain is being transplanted around Clear and Bright Buckwheat selects mature branch, by distance between rows and hills 15cm × 5cm insertion slope protection planting soil.
It is consistent described in remaining process and embodiment 1.
Embodiment 3
1. preparing the absorption stabilizing and curing agent 3 based on Zeolite modifying#
(1) clinoptilolite crosses 5 meshes after broken, screening and grinding, after being rinsed well with deionized water, obtains grain Diameter is the zeolite of 4.0mm.
(2) particulate zeolites for taking step (1) to obtain 550 DEG C of roastings in Muffle furnace, remove and exist in its hole and hole Impurity and hydrone, roasting 4 hours after, be cooled to room temperature.
(3) modified zeolite in mass ratio 1 for taking step (2) to obtain:The NaOH that 30 ratio is placed in concentration 3.0mol/L is molten In liquid, 105 DEG C heating water bath 3.5 hours, 260 revs/min isothermal vibration 11 hours, be sufficiently mixed zeolite with NaOH solution. Supernatant is poured out, is cleaned with deionized water, is dried 4 hours for 105 DEG C in baking oven.
(4) modified zeolite in mass ratio 1 for taking step (3) to obtain:15 ratio is placed in the oxychlorination of concentration 0.2mol/L Zirconium (ZrOCl2) carry out in solution it is twice-modified.It is placed in the magnetic agitation instrument that revolving speed is 1800 revs/min to stir 5 hours, makes to change Property zeolite is in suspended state.
(5) mixed solution that step (4) obtains is adjusted to pH 11 (with concentration 2mol/L NaOH solution), then carried out After separation of solid and liquid, using deionized water cleaning solid to supernatant pH 7.5, then solid is placed in 105 DEG C of baking oven and is dried It does to get the absorption stabilizing and curing agent 3 based on Zeolite modifying is arrived#
2. adsorbing stabilizing and curing agent 3#Improvement reparation to heavy metal Cd or Zn polluted river channel water body and bed mud
(1) to the improvement of polluted river channel water body
Choose the absorption stabilizing and curing agent 1 that diameter is 4.0mm#, in the nylon net bag of 140 mesh, mesh bag having a size of 50cm×50cm×50cm;The gabion slope protection of PVC material, gabion are wrapped up in the two sides approximately level setting mild steel wire of polluted river channel Material is mild steel wire outsourcing PVC material, and size of mesh opening is 10cm × 10cm;Two layers of filler point, bottom, that is, gabion in gabion Bottom is packed into block stone, plays the role of slope protection, upper layer, that is, block stone top is put into the nylon net bag equipped with zeolite adsorbents, is used for The thickness proportion of heavy metal Cd and Zn pollutant in adsorbed water body, upper layer and lower layer is 1:3;Steel wire at the top of gabion is provided with It can be taken off the chain link door of nylon net bag.After especially Cd and Zn ion reaches saturation to zeolite adsorbed water body heavy metal ion, Openable chain link door is replaced into the nylon net bag equipped with fresh modified zeolite, continues water pollution removal until reaching Water body treating target.
(2) river bottom mud environmental dredging and curing process
Ecological, environmental protective dredging is carried out for river Cd and Zn polluted bed mud, the case where preventing polluted bed mud from suspending and diffusion Under, temporarily solidify place for polluted bed mud to be twisted to the bed mud for inhaling and being pumped into river bank using cutter suction dredger.Interim solidification field The bottom on ground and surrounding are using compound HDPE film progress Anti-seeping technology, and HDPE film is with a thickness of 0.75mm, two sides compound nonwoven cloth.From The bed mud of the training of channel is after beta site desiccation to moisture content is 30%, and Cd pollution concentration is 1.2mg/kg in bed mud, and Zn is dirty Dye concentration is 1200mg/kg.The leach toxicity test of heavy metal is carried out to it, the concentration of Zn is 12mg/l in leachate, is lower than The concentration limits value 100mg/l of its leachate Zn;The concentration 0.2mg/l of Cd in leachate, the concentration limit lower than its leachate Zn Value 1mg/l processed.The proportional relation of curing agent ratio need to be then added based on Cd or Zn polluted bed mud concentration, adding proportion is pollution bottom The absorption stabilizing and curing agent 3 of 16% mass of mud weight#, make to adsorb stabilizing and curing agent 3 using blender#It is sufficiently mixed with bed mud, Gu The planting soil of subsequent river channel ecology slope protection is used for after changing 7 days.
After solidification, the occurrence patterns of heavy metal Cd and Zn change in bed mud, change from labile state to stable state, In, the residual form ratio of Cd increases 43-47%, in bed mud the Cd of 32-35% with Acid extractable and can reduction-state there is conversion For relatively stable residual form;The residual form ratio of Zn increases 17-20%, in bed mud the Zn of 20-21% with Acid extractable and Can reduction-state exist be converted into relatively stable oxidable state and residual form, effectively reduce heavy metal Cd and Zn to the danger of environment Evil.
(3) pollution by dredging bed mud is repaired by ecological slope protection
The cured bed mud of modified zeolite in place will temporarily be solidified as river channel ecology slope protection planting soil, in the planting soil Heavy metal Cd and the migration of Zn die down, can effectively prevent or reduce because slope protection soil in heavy metal with precipitation due to import river again Risk, and this Cd and Zn pollution planting soil be suitable for take water plant further ecology enrichment repair.Do not influencing urban river water Under the premise of sharp trade culture, Channel slope is rebuild, the cured bed mud of modified zeolite can be as the cladding thickness of planting soil 20cm.Suitable season can be met, the plant of super enrichment Cd and Zn are planted on slope protection.Such as penny cress, sowing are sowed in late March Method uses drilling, and line-spacing sows 20cm, opens shallow ridges depth 2.5cm, uniformly seed is sowed in ditch;Mountain buckwheat is transplanted before and after Clear and Bright Wheat selects mature branch, by distance between rows and hills 15cm × 5cm insertion slope protection planting soil.
It is consistent described in remaining process and embodiment 1.

Claims (8)

1. a kind of restorative procedure in cadmium zinc pollution river, characterized in that include the following steps:
(1) the absorption stabilizing and curing agent based on Zeolite modifying is prepared:
1. clinoptilolite crosses 18-5 mesh after broken, screening and grinding, after being rinsed well with deionized water, partial size is obtained For the zeolite of 1.0-4.0mm;
2. the particulate zeolites for taking step 1. to obtain 450-550 DEG C of roasting in Muffle furnace, removes present in its hole and hole Impurity and hydrone are cooled to room temperature after roasting 2-4 hours;
3. the modified zeolite for taking step 2. to obtain in mass ratio 1:The NaOH that the ratio of 20-30 is placed in concentration 1.0-3.0mol/L is molten In liquid, 90-105 DEG C heating water bath 2.5-3.5 hours, 220-260 revs/min isothermal vibration 9-11 hours, make zeolite and NaOH Solution is sufficiently mixed, and supernatant is poured out, and is cleaned with deionized water, 105 DEG C drying 2-4 hours in baking oven;
4. the modified zeolite for taking step 3. to obtain in mass ratio 1:The ratio of 5-15 is placed in the oxychlorination of concentration 0.1-0.2mol/L Carried out in zirconium solution it is twice-modified, be placed in revolving speed be 1600-1800 revs/min magnetic agitation instrument stir 3-5 hours, make to be modified Zeolite is in suspended state;
5. 4. mixed solution that step is obtained is adjusted to pH 9-11, after being then separated by solid-liquid separation, cleaned using deionized water Then it is steady to get the absorption to modified zeolite to be placed in 105 DEG C of drying in oven to supernatant pH 6.5-7.5 by solid for solid Determine curing agent;
(2) improvement reparation is carried out to Cd and Zn polluted river channel using the absorption stabilizing and curing agent based on Zeolite modifying:
1. the absorption to polluted river water is administered:
Absorption stabilizing and curing agent is fitted into mesh bag, gabion slope protection, setting in gabion are set in the two sides approximately level of polluted river channel Upper layer and lower layer filler, lower layer are block stone, and upper layer is the mesh bag equipped with absorption stabilizing and curing agent, for heavy metal Cd in adsorbed water body With Zn pollutant;
2. carrying out dredging and curing process to polluted river channel bed mud:
For river heavy metal Cd and Zn polluted bed mud, in the case where preventing polluted bed mud from suspending and diffusion, dug using twisting to inhale Mud ship temporarily solidifies place for polluted bed mud to be twisted to the bed mud for inhaling and being pumped into river bank, temporarily solidifies bottom and the surrounding in place Anti-seeping technology is carried out, after temporarily Dredged bed mud is carried out screening process by solidification place, removes the sandstone sundries of 2-5mm or more, It in beta site desiccation to moisture content is 20-30% by the lower bed mud of sieve;
If Cd concentration is less than 10mg/kg in the bed mud under sieve, and Zn pollution concentration is less than 1000mg/kg, and 10- is pressed into bed mud 14% weight ratio adds the absorption stabilizing and curing agent based on Zeolite modifying, and stirs and be sufficiently mixed, and solidification is used after 7-10 days In the planting soil of subsequent river channel ecology slope protection;If Cd concentration is in 10mg/kg or more or Zn pollution concentration in the bed mud under sieve In 1000mg/kg or more, then the leach toxicity test of heavy metal is carried out to it, if exceeding leaching characteristic identification standard value, Processing disposition is carried out by hazardous waste;If be based on into bed mud by the weight ratio addition of 15-20% without departing from the standard The absorption stabilizing and curing agent of Zeolite modifying, and stir and be sufficiently mixed, the kind of subsequent river channel ecology slope protection is used for after solidifying 7-10 days Plant soil;
3. repairing pollution by dredging bed mud by ecological slope protection:
Under the premise of not influencing river water conservancy trade culture, Channel slope is rebuild, will temporarily solidify the curing process bottom in place Mud is meeting suitable season as river channel ecology slope protection planting soil, and the plant of plantation enrichment Cd and Zn, plant are withered on slope protection It is preceding by plant harvesting, carry out burning disposal after drying.
2. the restorative procedure in cadmium zinc pollution according to claim 1 river, characterized in that the absorption to polluted river water In improvement, the partial size of the absorption stabilizing and curing agent is 1.0-4.0mm, and mesh bag perforation size is 50-140 mesh.
3. the restorative procedure in cadmium zinc pollution according to claim 1 river, characterized in that the absorption to polluted river water In improvement, the mesh bag is having a size of 10-50cm × 10-50cm × 10-50cm.
4. the restorative procedure in cadmium zinc pollution according to claim 1 river, characterized in that the absorption to polluted river water In improvement, the gabion is mild steel wire outsourcing PVC material, and size of mesh opening is 3-10cm × 3-10cm.
5. the restorative procedure in cadmium zinc pollution according to claim 1 river, characterized in that the absorption to polluted river water In improvement, the thickness proportion of upper layer filler and lower layer's filler is 1 in the gabion:1-3.
6. the restorative procedure in cadmium zinc pollution according to claim 1 river, characterized in that the absorption to polluted river water In improvement, net door is set at the top of the gabion, after zeolite adsorbed water body Cd and Zn ion reaches saturation, opens net door, replacement Mesh bag.
7. the restorative procedure in cadmium zinc pollution according to claim 1 river, characterized in that dredged by ecological slope protection reparation In polluted bed mud, the curing process bed mud is 20-40m as the cladding thickness of planting soil.
8. the restorative procedure in cadmium zinc pollution according to claim 1 river, characterized in that dredged by ecological slope protection reparation In polluted bed mud, the plant of the plantation enrichment Cd and Zn is to sow penny cress in late March, and type of seeding uses drilling, row Away from sowing 15-20cm, shallow ridges depth 1.5-2.5cm is opened, uniformly seed is sowed in ditch;Polygonum aubertii is being transplanted around Clear and Bright, is being selected Mature branch, by distance between rows and hills 15cm × 5cm insertion slope protection planting soil.
CN201810815038.2A 2018-07-23 2018-07-23 Method for repairing cadmium-zinc polluted river channel Active CN108905961B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810815038.2A CN108905961B (en) 2018-07-23 2018-07-23 Method for repairing cadmium-zinc polluted river channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810815038.2A CN108905961B (en) 2018-07-23 2018-07-23 Method for repairing cadmium-zinc polluted river channel

Publications (2)

Publication Number Publication Date
CN108905961A true CN108905961A (en) 2018-11-30
CN108905961B CN108905961B (en) 2021-06-08

Family

ID=64414865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810815038.2A Active CN108905961B (en) 2018-07-23 2018-07-23 Method for repairing cadmium-zinc polluted river channel

Country Status (1)

Country Link
CN (1) CN108905961B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111362510A (en) * 2020-03-24 2020-07-03 浙江省海洋水产养殖研究所 Water body ecological balance restoration method
CN111448968A (en) * 2020-02-28 2020-07-28 南京工业大学 Method for preparing greening soil by improving tail mud of water works
CN113321351A (en) * 2021-08-02 2021-08-31 清大国华环境集团股份有限公司 Method for treating cadmium wastewater and solidifying cadmium slag
CN113371956A (en) * 2021-02-10 2021-09-10 中庆建设有限责任公司 Method for treating bottom mud of surface water body
WO2023187221A1 (en) 2022-04-01 2023-10-05 Idrabel Assembly and method for cleaning up an aquatic environment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6824690B1 (en) * 2002-10-11 2004-11-30 Sandia Corporation Zirconium-modified materials for selective adsorption and removal of aqueous arsenic
US20050247635A1 (en) * 2001-08-27 2005-11-10 Vo Toan P Adsorbents for removing heavy metal cations and methods for producing and using these adsorbents
CN102139942A (en) * 2010-02-02 2011-08-03 中国科学院生态环境研究中心 Method for high-efficiency flocculation of algal blooms by modified clay, soil or sand
CN102745872A (en) * 2012-07-26 2012-10-24 山东建筑大学 Treatment method and device for riverway and lake heavy metal pollution bottom sludge
CN103408209A (en) * 2013-08-28 2013-11-27 上海海洋大学 Method for in-situ phosphorus release control of bottom sludge by using modified zeolite
CN204491518U (en) * 2014-12-26 2015-07-22 北京东方园林股份有限公司 A kind of ecological revetment structure
CN106400095A (en) * 2016-11-04 2017-02-15 广州大学 Treatment method of electroplating wastewater
CN107445422A (en) * 2017-08-03 2017-12-08 山东建筑大学 A kind of pollution of river bed mud ecological restoring method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050247635A1 (en) * 2001-08-27 2005-11-10 Vo Toan P Adsorbents for removing heavy metal cations and methods for producing and using these adsorbents
US6824690B1 (en) * 2002-10-11 2004-11-30 Sandia Corporation Zirconium-modified materials for selective adsorption and removal of aqueous arsenic
CN102139942A (en) * 2010-02-02 2011-08-03 中国科学院生态环境研究中心 Method for high-efficiency flocculation of algal blooms by modified clay, soil or sand
CN102745872A (en) * 2012-07-26 2012-10-24 山东建筑大学 Treatment method and device for riverway and lake heavy metal pollution bottom sludge
CN103408209A (en) * 2013-08-28 2013-11-27 上海海洋大学 Method for in-situ phosphorus release control of bottom sludge by using modified zeolite
CN204491518U (en) * 2014-12-26 2015-07-22 北京东方园林股份有限公司 A kind of ecological revetment structure
CN106400095A (en) * 2016-11-04 2017-02-15 广州大学 Treatment method of electroplating wastewater
CN107445422A (en) * 2017-08-03 2017-12-08 山东建筑大学 A kind of pollution of river bed mud ecological restoring method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘继娟: ""锆改性凹土对水体与底泥中重金属的吸附与固定效果研究"", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 *
汪多仁: "《绿色净水处理剂》", 30 November 2006, 科学技术出版社 *
王培铭: "《绿色建材的研究与应用》", 31 October 2004, 中国建材工业出版社 *
郑顺安: "《耕地重金属污染防治管理理论与实践(上册)》", 31 July 2017, 中国环境出版社 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111448968A (en) * 2020-02-28 2020-07-28 南京工业大学 Method for preparing greening soil by improving tail mud of water works
CN111448968B (en) * 2020-02-28 2022-02-11 南京工业大学 Method for preparing greening soil by improving tail mud of water works
CN111362510A (en) * 2020-03-24 2020-07-03 浙江省海洋水产养殖研究所 Water body ecological balance restoration method
CN113371956A (en) * 2021-02-10 2021-09-10 中庆建设有限责任公司 Method for treating bottom mud of surface water body
CN113371956B (en) * 2021-02-10 2022-03-04 中庆建设有限责任公司 Method for treating bottom mud of surface water body
CN113321351A (en) * 2021-08-02 2021-08-31 清大国华环境集团股份有限公司 Method for treating cadmium wastewater and solidifying cadmium slag
CN113321351B (en) * 2021-08-02 2021-11-12 清大国华环境集团股份有限公司 Method for treating cadmium wastewater and solidifying cadmium slag
WO2023187221A1 (en) 2022-04-01 2023-10-05 Idrabel Assembly and method for cleaning up an aquatic environment

Also Published As

Publication number Publication date
CN108905961B (en) 2021-06-08

Similar Documents

Publication Publication Date Title
CN108905961A (en) A kind of restorative procedure in cadmium zinc pollution river
CN104259192B (en) A kind of Ecological waterscape repair system of heavy metal pollution agricultural land soil and method
CN108905960A (en) A method of Cu-W ore deposit river is repaired using modified particles zeolite
CN104206161B (en) A kind of method of submerged plant planting and basin model equipment
CN107572952A (en) A kind of plant-growing type eco-concrete and its preparation and application
CN103586270A (en) Method for restoring heavy metal contaminated soil
CN107524116A (en) A kind of method of river course rigidity revetment ecology
CN108144954A (en) A kind of ecological blanket of fixed heavy metal and its method for being combined removal heavy metal-polluted soil with phytoremediation
CN109663583A (en) A kind of material and preparation method thereof of adsorbing separation heavy metal ions in soil
CN108160685A (en) A kind of method that plant-microorganism joint repairs coal mining area soil
CN109266363B (en) Green soil remediation agent and preparation method and use method thereof
CN108658399A (en) A kind of solidification reagent of Dredged bed mud heavy metal and its application method and application
CN104303933A (en) Root promoting seedling culturing method for woody plants
CN109819866A (en) What a kind of organic wet garbage was prepared matches the raw-soil
CN106583433A (en) Remediation technology of arsenic-polluted soil
KR102273480B1 (en) Structure of transplanting seaweed for creation and recover marine forest
CN110373199A (en) A kind of composite soil renovation agent and preparation method thereof and restorative procedure
CN109834111A (en) A kind of modified calcium silicate material and its in restoring cadmium polluted application in farmland
CN104396968B (en) Bark renewal agent and application thereof
CN108746202A (en) The method of phoenix-tail mushroom and T.lobayense Heim renovation of heavy metal polluted soil with combined
CN1292364A (en) Bubble-contained porous sintered clay block, its production process and application
CN107651754A (en) A kind of complex ecosystem construction method and artificial reef for repairing eutrophic water body
CN109315261B (en) Double-layer soil fixation transplanting method for coarse sandy soil trees
CN108702886A (en) The method for being passivated rice field external source import heavy metal using manganese salt-biological breadcrust
JP7077852B2 (en) Soil preparation method for growing benthic organisms and method for growing benthic organisms

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Yanhao

Inventor after: Sun Cuizhen

Inventor after: Wang Yuchen

Inventor after: Li Peng

Inventor after: Zhang Xiaorui

Inventor after: Zhang Zhibin

Inventor after: Cao Guoxun

Inventor after: Xia Siqing

Inventor after: Lin Jianwei

Inventor after: Zhu Guangwei

Inventor before: Zhang Yanhao

Inventor before: Wang Yuchen

Inventor before: Zhang Zhibin

Inventor before: Cao Guoxun

Inventor before: Xia Siqing

Inventor before: Lin Jianwei

Inventor before: Zhu Guangwei

Inventor before: Sun Cuizhen

GR01 Patent grant
GR01 Patent grant