CN108894785A - A kind of layer and section combination recovery method of breaking ore body interlayer - Google Patents

A kind of layer and section combination recovery method of breaking ore body interlayer Download PDF

Info

Publication number
CN108894785A
CN108894785A CN201810601593.5A CN201810601593A CN108894785A CN 108894785 A CN108894785 A CN 108894785A CN 201810601593 A CN201810601593 A CN 201810601593A CN 108894785 A CN108894785 A CN 108894785A
Authority
CN
China
Prior art keywords
stope
ore body
breaking
interlayer
ore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810601593.5A
Other languages
Chinese (zh)
Other versions
CN108894785B (en
Inventor
万串串
陈国良
解联库
杨小聪
杨桦
于世波
金明学
王湖鑫
曹俊
唐细卓
杨晗
乔德元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIBET HUATAILONG MINING DEVELOPMENT Co Ltd
BGRIMM Technology Group Co Ltd
Original Assignee
TIBET HUATAILONG MINING DEVELOPMENT Co Ltd
BGRIMM Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIBET HUATAILONG MINING DEVELOPMENT Co Ltd, BGRIMM Technology Group Co Ltd filed Critical TIBET HUATAILONG MINING DEVELOPMENT Co Ltd
Priority to CN201810601593.5A priority Critical patent/CN108894785B/en
Publication of CN108894785A publication Critical patent/CN108894785A/en
Application granted granted Critical
Publication of CN108894785B publication Critical patent/CN108894785B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Abstract

The invention discloses a kind of layer and sections of breaking ore body interlayer to combine recovery method, panel, panel barrier are successively divided along breaking ore body interlayer trend, capwise successively divides a step mineral building stope, two step ore pillar stopes in each panel, wherein a step mineral building stope horizontal direction is made of two parallel routes, the route quantity of vertical direction is determined by height of lift, it has adopted and has filled, formed cemented fill and replace a column;In panel a step mineral building stope adopt charge finish after, switch to two step ore pillar stope minings, two step stope two sides are a step cemented fill, and two step ore pillar stopes use the lower efficient mining methods to parallel deep hole sublevel open stoping afterwards filling of long anchor cable pre-reinforcement.The combination mining methods mainly for breaking ore body interlayer back production, with the relatively firm ore body in interlayer two sides have it is fine be connected, to realize the purpose of the safe and efficient back production of breaking ore body interlayer.

Description

A kind of layer and section combination recovery method of breaking ore body interlayer
Technical field
The present invention relates to a kind of a kind of combinations of the layer and section of breaking ore body production technique more particularly to breaking ore body interlayer Recovery method.
Background technique
About breaking ore body mining conditions, mining methods, production practice and equipment, support pattern and parameter, economical rationality Property etc., domestic and international correlative study is more.For be crushed big thick ore body, common mining methods have sublevel caving method without sill pillar, Gravity block caving method, sublevel open stoping afterwards filling mining method, point pillar slicing and filling mining codes or access back-filling method etc.. The main support form of fragmented rock body has bolt-mesh-spurting supporting, curtain-grouting supporting, Shed-pipe Advanced Support+section-steel support, integral rigidity branch Shield, the supporting of U-shaped steel collapsible timbering, rigid protection add the supporting of beformable body bed course, combined supporting etc..
For breaking ore body interlayer, interlayer two sides are relatively firm normal exploitation ore body, and Mining technology condition compares Firm orebody mining wants far short of what is expected, developmental joint fissure, local argillization, and pick branch difficulty is big, easily generation inbreak, the two mining methods There are larger difference, how safety and high efficiency breaking ore body interlayer, combine the normal exploitation of the relatively firm ore body in two sides, phase Research achievement is closed but to be rarely reported.
Summary of the invention
The object of the present invention is to provide a kind of layer and sections of breaking ore body interlayer to combine recovery method.
The purpose of the present invention is what is be achieved through the following technical solutions:
The layer and section of breaking ore body interlayer of the invention combines recovery method, including step:
A, panel, panel barrier are successively divided along breaking ore body interlayer trend, capwise is successively drawn in each panel Point a step mineral building stope, two step ore pillar stopes, the step mineral building stope include breaking ore body interlayer back production, and described two Step ore pillar stope includes that breaking ore body interlayer two sides consolidate ore body back production;
B, the step mineral building stope horizontal direction is made of two parallel routes, and the route quantity of vertical direction is by dividing Duan Gaodu is determined, has been adopted and has been filled, and is formed obturation and is replaced a column;
C, the step mineral building stope adopt charge finish after, switch to the two steps ore pillar stope mining.
As seen from the above technical solution provided by the invention, point of breaking ore body interlayer provided in an embodiment of the present invention Layer piecewise combination recovery method, due to using under the parallel access back-filling method of a step mineral building stope and two step ore pillar stopes Combination to parallel deep hole sublevel open stoping afterwards filling mining method, a step mineral building stope consolidated fill are two step ore pillar stopes Create safer mining conditions;The combination of the relatively firm ore body back production of the back production of breaking ore body interlayer and two sides, realizes broken mine The purpose of interlayer body safety and high efficiency.The combination mining methods can be extended to interlayer two mainly for breaking ore body interlayer The exploitation of the relatively firm ore body in side, realizes the purpose of breaking ore body interlayer safety and high efficiency, while may be selected and interlayer two sides mine Body conjunction is adopted or is divided and adopts, and work arrangement is flexible, adaptable.
Detailed description of the invention
Fig. 1 is that the layer and section of breaking ore body interlayer provided in an embodiment of the present invention combines the vertical projection of exploitation of recovery method Schematic diagram;
Fig. 2 is that the layer and section of breaking ore body interlayer provided in an embodiment of the present invention combines the section signal of recovery method Figure;
Fig. 3 is that the layer and section of breaking ore body interlayer provided in an embodiment of the present invention combines the plane signal of recovery method Figure.
In figure:
1- level haulage lane;2- segmentation connection road;3- ore pass;4- slice drift;5- cuts top layer;6- is layered connection roadway;7- Arteries and veins is worn in segmentation;8- studding returnairshaft;Mono- step cemented fill of 9-;The non-glue obturation of bis- step of 10-;11- arteries and veins outslope road;The bottom 12- Column;13- stope point column;14- overall length grouting cable anchor;15- fills returnairshaft;The big panel barrier of 16-.
Specific embodiment
The embodiment of the present invention will be described in further detail below.What is be not described in detail in the embodiment of the present invention is interior Appearance belongs to the prior art well known to professional and technical personnel in the field.
The layer and section of breaking ore body interlayer of the invention combines recovery method, and preferable specific embodiment is:
The layer and section combination recovery method of breaking ore body interlayer includes step:
A, panel, panel barrier are successively divided along breaking ore body interlayer trend, capwise is successively drawn in each panel Point a step mineral building stope, two step ore pillar stopes, the step mineral building stope include breaking ore body interlayer back production, and described two Step ore pillar stope includes that breaking ore body interlayer two sides consolidate ore body back production;
B, the step mineral building stope horizontal direction is made of two parallel routes, and the route quantity of vertical direction is by dividing Duan Gaodu is determined, has been adopted and has been filled, and is formed obturation and is replaced a column;
C, the step mineral building stope adopt charge finish after, switch to the two steps ore pillar stope mining.
The one step mineral building stope uses the back production of route consolidated fill, and the two steps ore pillar stope two sides are a step Cemented fill, the two steps ore pillar stope are returned using the lower of long anchor cable pre-reinforcement to parallel deep hole sublevel open stoping afterwards filling It adopts.
The extent length of the breaking ore body interlayer is the integral multiple of interlayer two sides ore body Width of stope, the broken mine The panel barrier width of interlayer body is a Width of stope of interlayer two sides ore body, and the panel barrier later period uses to admission passage filling Mining codes are recycled.
The one step mineral building stope uses tailing cemented filling, and the two steps ore pillar stope cementing is filled using tailings is non- It fills out.
During the two steps ore pillar stope, stope height is improved to a height of lift, and rock drilling is arranged on stope top Chamber, Bottom of Stope construction undercuts chamber, while stope undercuts, using overall length grouting cable anchor to breaking ore body carry out entirely plus Gu drilling chamber uses pre- stationary point column, bolt-mesh-spurting supporting, drilling chamber top plate is supported jointly with long anchor cable, using lower to deep hole Progress kerve, side collapse, remote-controlled scraper ore removal, and barnyard is afterwards non-cementing tailing-filled.
The layer and section of breaking ore body interlayer of the invention combines recovery method, for the geology preservation of breaking ore body interlayer Feature and Mining technology condition, using a parallel route consolidated fill back production of step mineral building stope, the two long anchors of step ore pillar stope The lower combination mining methods to parallel deep hole sublevel open stoping afterwards filling back production of rope pre-reinforcement, a step mineral building stope is cementing to be filled It fills out and creates safer mining conditions for two step ore pillar stopes, realize the purpose of the safe and efficient back production of breaking ore body interlayer, The back production that can be extended to the relatively firm ore body in interlayer two sides simultaneously, solves breaking ore body interlayer and the group of the relatively firm ore body in two sides is run jointly Adopt problem.
Specific embodiment, as shown in Figure 1 to Figure 3:
(1) panel and panel divide such as Fig. 1, a step mineral building stope and two steps in breaking ore body interlayer of the present invention It is the exploitation of certain copper mine underground ore bodies that rapid ore pillar stope, which divides such as Fig. 3, this example, and centre is breaking ore body interlayer, joint fissure hair It educates, local argillization, two sides are relatively firm ore body.The relatively firm ore body mining methods in two sides are that medium-length hole sublevel open stoping afterwards filling is adopted Mine method, production efficiency are high;Breaking ore body interlayer is not suitable for using such mining methods.If breaking ore body interlayer all using compared with For common access back-filling method, have the shortcomings that operating location is more, production capacity is low, cost of winning is high, ventilation is of poor quality. One step mineral building stope of invention uses parallel route tailing cemented filling mining codes, and two step ore pillar stopes are pre- using long anchor cable That reinforces is lower to parallel deep hole sublevel open stoping afterwards filling mining method, is able to satisfy breaking ore body interlayer safety economy high winning technology It is required that;Arrangement adopts quasi- engineering in the relatively firm ore body ore pillar stope in two sides, is arranged by adopting quasi- engineering optimization, breaking ore body interlayer It is connected very well with the relatively firm orebody mining realization in two sides.
(2) the relatively firm ore body in this example two sides uses the afterwards filling mining method back production of medium-length hole sublevel open stoping, Width of stope For 15m, height of lift is 20m or 25m, and breaking ore body interlayer divides panel, extent length 45m, height of lift be 10m or 12.5m, panel barrier width are 15m;A step mineral building stope horizontal direction is made of 2 extracting drifts in panel, back production into The a length of 45m in road, width 4m;Two step ore pillar length of stope are 45m, width 8m.
When (3) two step ore pillar Bottom of Stope undercut, breaking ore body is reinforced entirely using overall length grouting cable anchor, anchor cable Between array pitch be 2.0m × 2.0m;Drilling chamber pre- stationary point column in stope top puts column specification as 2.0m × 2.0m, while chamber top plate Using bolt-mesh-spurting supporting.It is collapsed to deep hole kerve with side using lower, interstitial hole apertureHole pattern parameters 2.6m × 2.5m, column Shape continuous charging structure;Lateral opening apertureHole pattern parameters 2.0m × 1.6m is spaced decoupling charge structure.
(4) two step ore pillar stopes use remote-controlled scraper ore removal, barnyard afterwards non-cementing tailings filling body backfill.Through reality The Mining technology condition for showing that such breaking ore body sandwich combination mining technology meets breaking ore body is trampled, and more steady with two sides Gu the exploitation of ore body has fine linking, it can achieve the purpose that safety and high efficiency.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Within the technical scope of the present disclosure, any changes or substitutions that can be easily thought of by anyone skilled in the art, It should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of claims Subject to enclosing.

Claims (5)

1. a kind of layer and section of breaking ore body interlayer combines recovery method, which is characterized in that including step:
A, panel, panel barrier are successively divided along breaking ore body interlayer trend, capwise successively divides one in each panel Step mineral building stope, two step ore pillar stopes, the step mineral building stope include breaking ore body interlayer back production, two step Ore pillar stope includes that breaking ore body interlayer two sides consolidate ore body back production;
B, the step mineral building stope horizontal direction is made of two parallel routes, and the route quantity of vertical direction is high by segmentation Degree determines, has adopted and has filled, and forms obturation and replaces a column;
C, the step mineral building stope adopt charge finish after, switch to the two steps ore pillar stope mining.
2. breaking ore body interlayer layer and section according to claim 1 combines recovery method, which is characterized in that a step Rapid mineral building stope uses the back production of route consolidated fill, and the two steps ore pillar stope two sides are a step cemented fill, described Two step ore pillar stopes are lower to parallel deep hole sublevel open stoping afterwards filling back production using long anchor cable pre-reinforcement.
3. the layer and section of breaking ore body interlayer according to claim 2 combines recovery method, which is characterized in that described The extent length of breaking ore body interlayer is the integral multiple of interlayer two sides ore body Width of stope, between the panel of the breaking ore body interlayer Column width is a Width of stope of interlayer two sides ore body, and the panel barrier later period uses and returned to access back-filling method It receives.
4. the layer and section of breaking ore body interlayer according to claim 3 combines recovery method, which is characterized in that described one Step mineral building stope uses tailing cemented filling, and the two steps ore pillar stope uses tailings Non cemented filling.
5. the layer and section of breaking ore body interlayer according to claim 4 combines recovery method, which is characterized in that described two During step ore pillar stope, stope height is improved to a height of lift, and stope top arranges that drilling chamber, Bottom of Stope are applied The work chamber that undercuts reinforces breaking ore body using overall length grouting cable anchor while stope undercuts entirely, and drilling chamber uses Pre- stationary point column, bolt-mesh-spurting supporting, drilling chamber top plate is supported with long anchor cable jointly, distant using lower to deep hole carries out kerve, side collapses Scraper ore removal is controlled, barnyard is afterwards non-cementing tailing-filled.
CN201810601593.5A 2018-06-12 2018-06-12 A kind of layer and section combination recovery method of breaking ore body interlayer Active CN108894785B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810601593.5A CN108894785B (en) 2018-06-12 2018-06-12 A kind of layer and section combination recovery method of breaking ore body interlayer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810601593.5A CN108894785B (en) 2018-06-12 2018-06-12 A kind of layer and section combination recovery method of breaking ore body interlayer

Publications (2)

Publication Number Publication Date
CN108894785A true CN108894785A (en) 2018-11-27
CN108894785B CN108894785B (en) 2019-11-15

Family

ID=64344546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810601593.5A Active CN108894785B (en) 2018-06-12 2018-06-12 A kind of layer and section combination recovery method of breaking ore body interlayer

Country Status (1)

Country Link
CN (1) CN108894785B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821495A (en) * 2019-11-23 2020-02-21 南宁学院 Multi-layer gentle dip ore body ore-waste separation collaborative mining method
CN112196538A (en) * 2020-11-19 2021-01-08 长沙矿山研究院有限责任公司 Inclined upward mountain combined downward access cemented filling mining method
CN113446005A (en) * 2021-07-27 2021-09-28 中国矿业大学 Method for treating side slope geological disasters and recovering mineral resources
CN113605971A (en) * 2021-09-18 2021-11-05 中南大学 Filling structure for preventing filling body from being unstable and mining method applying filling structure
CN114165235A (en) * 2021-11-23 2022-03-11 湖南柿竹园有色金属有限责任公司 Large-diameter deep hole continuous charging lateral ore caving mining method
WO2023142303A1 (en) * 2022-01-27 2023-08-03 中钢集团马鞍山矿山研究总院股份有限公司 Combined mining method for underground mine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3904244A (en) * 1972-01-20 1975-09-09 John C Haspert Method and apparatus for mechanized seam mining
CN1067290A (en) * 1991-05-28 1992-12-23 枣庄市联营石膏矿 Room-and-pilar type caving for mine
CN101634227A (en) * 2008-07-22 2010-01-27 鞍钢集团矿业公司 Flat-bottomed trench shallow hole shrinkage method
CN101858217A (en) * 2010-05-18 2010-10-13 中南大学 House pillar changeable panel upward demix filling mining method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3904244A (en) * 1972-01-20 1975-09-09 John C Haspert Method and apparatus for mechanized seam mining
CN1067290A (en) * 1991-05-28 1992-12-23 枣庄市联营石膏矿 Room-and-pilar type caving for mine
CN101634227A (en) * 2008-07-22 2010-01-27 鞍钢集团矿业公司 Flat-bottomed trench shallow hole shrinkage method
CN101858217A (en) * 2010-05-18 2010-10-13 中南大学 House pillar changeable panel upward demix filling mining method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821495A (en) * 2019-11-23 2020-02-21 南宁学院 Multi-layer gentle dip ore body ore-waste separation collaborative mining method
CN112196538A (en) * 2020-11-19 2021-01-08 长沙矿山研究院有限责任公司 Inclined upward mountain combined downward access cemented filling mining method
CN112196538B (en) * 2020-11-19 2022-02-01 长沙矿山研究院有限责任公司 Inclined upward mountain combined downward access cemented filling mining method
CN113446005A (en) * 2021-07-27 2021-09-28 中国矿业大学 Method for treating side slope geological disasters and recovering mineral resources
CN113446005B (en) * 2021-07-27 2022-04-01 中国矿业大学 Method for treating side slope geological disasters and recovering mineral resources
CN113605971A (en) * 2021-09-18 2021-11-05 中南大学 Filling structure for preventing filling body from being unstable and mining method applying filling structure
CN114165235A (en) * 2021-11-23 2022-03-11 湖南柿竹园有色金属有限责任公司 Large-diameter deep hole continuous charging lateral ore caving mining method
WO2023142303A1 (en) * 2022-01-27 2023-08-03 中钢集团马鞍山矿山研究总院股份有限公司 Combined mining method for underground mine

Also Published As

Publication number Publication date
CN108894785B (en) 2019-11-15

Similar Documents

Publication Publication Date Title
CN108894785B (en) A kind of layer and section combination recovery method of breaking ore body interlayer
CN107339104B (en) Security personnel's curtain wall recovery method
CN103557002B (en) A kind of mechanized concentrates drop shaft filling-up method
CN101737052B (en) Sublevel fill-mining method
CN102606159B (en) Medium thick heavy-pitch crushed ore body frame type artificial top downward segmenting cemented filling method
CN106121643B (en) Reserved two step nesting of retaining wall mine combines the method for mining by the way of filling
CN101858217B (en) House pillar changeable panel upward demix filling mining method
CN102619513B (en) Room and pillar type medium-length hole filling mining method using bottom ore withdrawal structures simultaneously arranged in original rock
CN103527200B (en) Bottom-column-free sectional Rhombic room afterwards filling mining method
CN103628877B (en) A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method
CN102518438B (en) Roof regeneration medium-length hole ore blast backfill mining method
CN103147761B (en) Filling mining method of gently inclined thin mineral deposit with soft roof
CN103437769B (en) Combination is reproduced structure medium-length hole ore blast and is worked in coordination with cable bolting afterwards filling mining method
CN106761912B (en) It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods
CN106761756B (en) A kind of stope structure for Upward slicing all-tailing cemented filling method
CN104481536B (en) Cover rock crack and surface subsidence controlled digging, mining and filling parallel operation coal mining method
CN104453996B (en) A kind of packed method of mining by the way of filling of Upward slicing wall type
CN102953732A (en) Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method
CN110259451A (en) A kind of efficient mining methods of gently inclined medium thick orebody Pre-control roof
CN104018836A (en) Divided mining method for inclined medium-thick ore body with unstable false roof
CN102337892B (en) Upward access filling method
CN102251773A (en) Route type upward horizontal layered filling mining method suitable for extremely complex ore body mining
CN108798672B (en) A kind of mining methods for the area's ore high-efficiency mining that collapses greatly
CN103628878A (en) Crushed surrounding rock ore downward drift layered sublevel-free tunnel filling mining method
CN107130962A (en) Sublevel caving subsequent cemented filling mining method for thick and large ore body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant