CN108868063A - A kind of method for constructing terrace - Google Patents

A kind of method for constructing terrace Download PDF

Info

Publication number
CN108868063A
CN108868063A CN201810580051.4A CN201810580051A CN108868063A CN 108868063 A CN108868063 A CN 108868063A CN 201810580051 A CN201810580051 A CN 201810580051A CN 108868063 A CN108868063 A CN 108868063A
Authority
CN
China
Prior art keywords
concrete
terrace
water draining
setting
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810580051.4A
Other languages
Chinese (zh)
Inventor
江华
龚锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201810580051.4A priority Critical patent/CN108868063A/en
Publication of CN108868063A publication Critical patent/CN108868063A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
    • E04F15/14Construction of joints, e.g. dividing strips

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention discloses a kind of method for constructing terrace, include the following steps, first clear up ground layer, and multiple water draining plates that tile on ground layer after the cleaning;Then terrace template is installed, ash cake is placed on water draining plate;According still further to jump storehouse method in casting area casting concrete;It is laid with reinforced mesh in the upper surface of concrete, and reinforced mesh is made to be settled down to setting position;It polished concrete, conserved again later, demoulding and the operation of cutting expansion joint, finally concrete being conserved again, until concrete setting intensity reaches design requirement.Method for constructing terrace of the invention can effectively prevent terrace crack and decortication occur;Terrace toughness and mechanical strength are preferable;Later maintenance cost can be effectively reduced, guarantees the service life of terrace;It is easy for construction, improve construction efficiency.

Description

A kind of method for constructing terrace
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of method for constructing terrace.
Background technique
Concrete floor is common building facility, is widely used in the occasions such as industrial premises, warehouse, parking lot, but existing Some terraces are also easy to produce crack and decortication, and terrace toughness is poor, and later maintenance cost is higher, and service life is shorter, Wu Faman Sufficient use demand.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of method for constructing terrace, can effectively prevent terrace occur crack and Decortication improves terrace toughness and mechanical strength, reduces later maintenance cost, guarantees the service life of terrace.
In order to solve the above technical problem, the present invention provides technical solution it is as follows:
A kind of method for constructing terrace, includes the following steps:
1)Ground layer is cleared up, and is laid with multiple water draining plates on ground layer after the cleaning;The water draining plate includes Multiple boss place the boss when being laid with water draining plate downward, and contiguous hydrophobic plate overlapping is laid with;
2)Ground layer is divided into multiple independent casting area, and installs terrace template on each casting area, and Terrace template surface coats release agent;
3)Ash cake is placed on water draining plate;
4)According to jump storehouse method in casting area casting concrete;
5) after concreting, it is laid with reinforced mesh in the upper surface of concrete, and reinforced mesh is made to be settled down to setting position It sets;
6)After concrete setting to setting time, sanding operation is carried out to concrete using finisher, until concrete surface Flatness reach design requirement;
7)Concrete is conserved, and in concrete setting to the first setting intensity, removes terrace template;
8)After concrete setting to the second setting intensity, multiple expansion joints are cut on concrete, and fill in expansion joint Sealant;
9)Concrete is conserved again, until concrete setting intensity reaches design requirement.
The step 6)In, the method that finisher carries out sanding operation to concrete is:Disk is first installed on finisher, Then it is gradually inwardly received using finisher from periphery and smears polishing concrete.
Setting is fluted in the convex block of the water draining plate.
Deflector is respectively connected on the inner wall of the groove and the outer wall of boss.
The water draining plate uses polyvinyls material.
The step 5)In, concrete surface is also detected after concreting with the presence or absence of collapsing, if concrete Surface, which exists, to be collapsed, then fills up the place of collapsing with pea gravel concreten and smooth out, until there is no mixing again after collapsing for concrete surface The upper surface for coagulating soil is laid with reinforced mesh.
The step 9)In, concrete curing method is:A thickness plastic film or geotextiles are covered in concrete surface, And sprinkling maintenance, curing time are no less than 14 days.
The step 8)In, the depth of cut at expansion joint is the one third of concrete thickness, and the slit width at expansion joint is little In 5mm.
The step 8)In, the spacing of adjacent expansion seam is not more than 4.5m.
The step 4)The clay content of middle concrete is not more than 3%, and the slump of concrete is 100mm~120mm, coagulation The ratio of mud of soil is not more than 0.5.
The invention has the advantages that:Method for constructing terrace of the invention, can effectively prevent terrace occur crack and Decortication;Terrace toughness and mechanical strength are preferable;Terrace surface is smooth;Later maintenance cost can be effectively reduced, guarantees terrace Service life;It is easy for construction, improve construction efficiency.
Detailed description of the invention
Fig. 1 is the schematic diagram of floor structure of the invention;
Fig. 2 is the structural schematic diagram of water draining plate in Fig. 1;
Fig. 3 is the schematic cross-sectional view in the direction A-A in Fig. 2;
In figure:1, ground layer, 2, concrete, 3, water draining plate, 31, plate body, 32, convex block, 321, groove, 33, deflector, 4, ash Cake.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples, so that those skilled in the art can be with It more fully understands the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
As Figure 1-Figure 2, a kind of method for constructing terrace, includes the following steps:
1)Ground layer 1 is cleared up, and multiple water draining plates 3 that tile on ground layer 1 after the cleaning;
Water draining plate 3 includes plate body 31, and multiple boss 32 are provided on plate body 31, when being laid with water draining plate 3, by boss 32 towards decentralization It sets, 3 edge of contiguous hydrophobic plate is superimposed, and specific laying method is:Water draining plate 3 is according to same continuous area from one side to another side Overlapping is laid with, and after the completion of laying, is fixed on water draining plate 3 on ground layer 1 by the spacing of 1m × 1m by nail, then pipeline Pipeline is arranged on 3 face of water draining plate, to carry out pre-buried preparation.
Further, as shown in figure 3, setting fluted 321 in the convex block 32 of water draining plate 3, on the inner wall of groove 321 and convex It is respectively connected with deflector 33 on the outer wall of block 32, preferably to dredge infiltration, infiltration be discharged can in time.
Further, water draining plate 3 uses plastic plate, and plastic plate is made of polyvinyls material.
The groove 321 of water draining plate 3 designs, and can make in subsequent concreting, have part concrete to fall into this recessed In slot 321, to better ensure that the compression strength of bottom plate surface layer.
Carrying out cleaning to ground layer 1 includes:Understand the sundries on ground layer 1 and cuts the position being locally higher by Projection on ground layer.
2)Ground layer 1 is divided into multiple independent casting area, and installs terrace template on each casting area, And release agent is coated in terrace template surface;It should keep straight after the completion of installing, between angle steel template, and every 9m straightness deviation No more than 10mm, to guarantee the construction joint between casting area point-blank;Guarantee simultaneously the absolute altitude of upper corners steel form with It is consistent to set absolute altitude.
Wherein, terrace template uses angle steel template, after installing, if the width in the gap between angle steel template and casting area Not less than 10mm, then sealing is tamped with cement mortar in the gap.
It is bolted between angle steel template, bolt uses full thread structure, convenient for adjusting angle iron position;Preferably, Angle steel template model L50*32*3, diameter of bolt 12mm.
Continuous pressing device for stereo-pattern paper at adjacent angle steel formwork edge joint, to accomplish tight not spillage.
If terrace is arranged around ditch and well, installation 50 × 6 angle steel bound edge of ∠ is needed in angle steel template.
3)Ash cake 4 is placed on water draining plate 3, ash cake 4 is arranged by 1.5m × 1.5m square;
4)According to jumping storehouse method in casting area sequentially casting concrete 2;The clay content of concrete 2 used by the process is not more than 3%, the slump is 100mm~120mm, and the ratio of mud is not more than 0.5, and the coarse aggregate size contained in concrete 2 is 5mm~10mm.
The process carries out concrete casting using jump storehouse method in the prior art, and jumping storehouse method is to take full advantage of concrete to exist It thoroughly is easy the principle for coming out internal stresses release before solidification, it is according to " partition programming, spacer block construction, placement layer by layer, entirety Molding " principle construction, i.e., be first poured a casting area, then behind a casting area, next pours Infuse the casting in region.
Pouring mode and can effectively avoid overlength knot in construction period short distance release temperature stress for storehouse is jumped using piecemeal The generation of the harmful cracks of structure concrete improves construction quality.
5) after concrete 2 pours, it is laid with reinforced mesh in the upper surface of concrete 2, and be settled down to reinforced mesh Setting position, to improve the cracking resistance of concrete structure.
Since reinforced mesh is softer, if putting before concreting, on the one hand it is not easy to fix, another party Face, casting concrete are easy reinforced mesh overwhelming bottom in the process, keep reinforced mesh due from playing the role of, therefore steel Muscle mesh sheet levelling forward swing after concreting is put into concrete upper surface, makes reinforcing bar in the levelling process of ground concrete Mesh sheet settles in place, and reinforced mesh is not susceptible to be displaced at this time, the uniform load of receiving good with the bond-anchorage of concrete Diffusion profile can preferably improve the cracking resistance of concrete structure.
Further, concrete surface is also detected after concreting with the presence or absence of collapsing, if concrete surface In the presence of collapsing, then the place of collapsing is filled up with pea gravel concreten and smoothed out, again in concrete after concrete surface is not present and collapses Upper surface be laid with reinforced mesh.
Further, the bar diameter of reinforced mesh is 4mm, and length and width is 200mm.
6)After concrete 2 was solidified to 3~4 hours, sanding operation is carried out to concrete 2 using finisher, until coagulation The flatness on native 2 surfaces reaches design requirement;Flatness deviation is no more than 3mm.
Finisher to concrete 2 carry out sanding operation method be:Disk is first installed on finisher, then whole polishing Concrete 2 and from periphery gradually inwardly receive smear, to play the role of smooth and warehouse.The process can be repeated several times progress, until mixed The flatness on 2 surfaces of solidifying soil reaches design requirement.
After finisher polishing, if the surface layer of concrete 2, which has, smears the line also reusable orderly artificial pressure in the same direction of steel trowel progress Light.
7)Concrete 2 is conserved, and in the solidification of concrete 2 to the first setting intensity, is generally poured in concrete 2 After the completion in 24 hours, i.e., dismountable terrace template;Remove terrace template when, should by the concrete of terrace template surface residual, slag, rubbish It cleans out, again brush release agent;Guarantee not damage template surface and corner angle when demoulding.
The uneven place in concrete edge can be trimmed with cutting machine after removing terrace template.
8)To the solidification of concrete 2 to the second setting intensity, namely when concrete 2 has poured 48h~72h, in concrete 2 The upper multiple expansion joints of cutting, and pointing is filled in expansion joint, then at the top of sealant sealing expansion joint;
Further, the spacing of adjacent expansion seam is not more than 4.5m, is generated with being better protected from concrete due to temperature change Crack or destruction.
Further, the depth of cut at expansion joint is the one third of concrete thickness, and the slit width at expansion joint is not more than 5mm, it is flexible with better conform to that concrete generates by temperature change.
9)Concrete 2 is conserved again, until 2 set strength of concrete reaches design requirement.
The maintenance process of concrete 2 is:A thickness plastic film or geotextiles are covered on 2 surface of concrete, and using spray Day with fog wet curing, curing time are no less than 14 days.
In step 1)It also needs to determine terrace absolute altitude and terrace template position by line setting before.
If can be repaired in addition, terrace has breakage, method for repairing and mending is:First as needed setting-out sawing, chisel out surface layer and Part substrate concrete, then wetting is cleared up, sweep plain-water slurry, disturbing concrete, curing agent surface layer of finally constructing.
The present embodiment has been laid with water draining plate 3 during floor construction, is designed using the convex-concave structure of water draining plate 3, can shape At hydrophobic layer, so that any infiltration is timely and effectively imported gutter, then sump is imported through gutter, finally by immersible pump Extraction, it is ensured that terrace is dry and comfortable, to guarantee the mechanical property of terrace.
The terrace that method for constructing terrace through the foregoing embodiment is constructed, is not likely to produce crack, and terrace toughness and machinery are strong Degree is preferable;Terrace surface is smooth, is not easy to peel;Fatigue resistance is good, reduces the maintenance cost in later period, guarantees terrace Service life;It is easy for construction, it is conducive to improve construction efficiency.
Embodiment described above is only to absolutely prove preferred embodiment that is of the invention and being lifted, protection model of the invention It encloses without being limited thereto.Those skilled in the art's made equivalent substitute or transformation on the basis of the present invention, in the present invention Protection scope within.Protection scope of the present invention is subject to claims.

Claims (10)

1. a kind of method for constructing terrace, characterized in that include the following steps:
1)Ground layer is cleared up, and multiple water draining plates that tile on ground layer after the cleaning;The water draining plate includes Multiple boss are placed the boss, the edge of contiguous hydrophobic plate is superimposed downward when being laid with water draining plate;
2)Ground layer is divided into multiple independent casting area, and installs terrace template on each casting area, and Terrace template surface coats release agent;
3)Ash cake is placed on water draining plate;
4)According to jump storehouse method in casting area casting concrete;
5) after concreting, it is laid with reinforced mesh in the upper surface of concrete, and reinforced mesh is made to be settled down to setting position It sets;
6)After concrete setting to setting time, sanding operation is carried out to concrete using finisher, until concrete surface Flatness reach design requirement;
7)Concrete is conserved, and in concrete setting to the first setting intensity, removes terrace template;
8)After concrete setting to the second setting intensity, multiple expansion joints are cut on concrete, and fill in expansion joint Sealant;
9)Concrete is conserved again, until concrete setting intensity reaches design requirement.
2. method for constructing terrace as described in claim 1, characterized in that the step 6)In, finisher carries out concrete The method of sanding operation is:First disk is installed on finisher, then gradually inwardly receives to smear to polish from periphery using finisher and mix Solidifying soil.
3. method for constructing terrace as described in claim 1, characterized in that setting is fluted in the convex block of the water draining plate.
4. method for constructing terrace as claimed in claim 3, characterized in that connect on the inner wall of the groove and the outer wall of boss It is connected to deflector.
5. method for constructing terrace as described in claim 1, characterized in that the water draining plate uses polyvinyls material.
6. method for constructing terrace as described in claim 1, characterized in that the step 5)In, after concreting also Concrete surface is detected with the presence or absence of collapsing, is collapsed if concrete surface exists, fills up the place of collapsing simultaneously with pea gravel concreten It smoothes out, is laid with reinforced mesh in the upper surface of concrete again after concrete surface is not present and collapses.
7. method for constructing terrace as described in claim 1, characterized in that the step 9)In, concrete curing method is:? Concrete surface covers a thickness plastic film or geotextiles, and sprinkling maintenance, curing time are no less than 14 days.
8. method for constructing terrace as described in claim 1, characterized in that the step 8)In, the depth of cut at expansion joint is The slit width of the one third of concrete thickness, expansion joint is not more than 5mm.
9. method for constructing terrace as described in claim 1, characterized in that the step 8)In, the spacing of adjacent expansion seam is not Greater than 4.5m.
10. method for constructing terrace as described in claim 1, characterized in that the step 4)The clay content of middle concrete is little In 3%, the slump of concrete is 100mm~120mm, and the ratio of mud of concrete is not more than 0.5.
CN201810580051.4A 2018-06-07 2018-06-07 A kind of method for constructing terrace Pending CN108868063A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810580051.4A CN108868063A (en) 2018-06-07 2018-06-07 A kind of method for constructing terrace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810580051.4A CN108868063A (en) 2018-06-07 2018-06-07 A kind of method for constructing terrace

Publications (1)

Publication Number Publication Date
CN108868063A true CN108868063A (en) 2018-11-23

Family

ID=64337188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810580051.4A Pending CN108868063A (en) 2018-06-07 2018-06-07 A kind of method for constructing terrace

Country Status (1)

Country Link
CN (1) CN108868063A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610779A (en) * 2019-01-24 2019-04-12 铜陵有色金属集团铜冠建筑安装股份有限公司 A kind of waterproof and anticorrosion epoxy floor structure
CN110593523A (en) * 2019-08-27 2019-12-20 江苏南通三建集团股份有限公司 Construction method of anti-cracking and moisture-proof gold steel grit terrace
CN110685424A (en) * 2019-09-05 2020-01-14 东莞市鲁班装饰工程有限公司 Building floor leveling anti-cracking construction method and building floor leveling anti-cracking structure
CN110725505A (en) * 2019-10-29 2020-01-24 江卫强 Fair-faced concrete floor product and construction method thereof
CN110735513A (en) * 2019-10-24 2020-01-31 安徽四建控股集团有限公司 Construction method of prestressed terraces
CN111851939A (en) * 2020-07-21 2020-10-30 天津华星智慧科技有限公司 Oil-seepage-preventing ground structure and construction method thereof
CN112031374A (en) * 2020-08-31 2020-12-04 上海宝冶集团有限公司 Construction method of basement large-area terrace
CN112049365A (en) * 2020-09-01 2020-12-08 上海家树建筑工程有限公司 Indoor terrace construction method and indoor terrace structure applied to same
CN112761230A (en) * 2019-10-21 2021-05-07 玛纳斯县久宇棉业有限公司 Concrete cast-in-place terrace drainage ditch mold and concrete cast-in-place terrace construction method
CN112878624A (en) * 2021-01-12 2021-06-01 王斌 Waterproof anticorrosive epoxy terrace structure
CN113202259A (en) * 2021-05-10 2021-08-03 四川省建筑科学研究院有限公司 Anti-cracking overhead terrace construction method and structure thereof
CN114961164A (en) * 2022-06-02 2022-08-30 北京三佳筑品建材有限公司 Hydrophobic special-shaped floor for building construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3969851A (en) * 1975-07-11 1976-07-20 Structural Stoneware Incorporated Architectural paving system with individual control joint paving
CN102535488A (en) * 2012-03-13 2012-07-04 广东中城建设集团有限公司 Waterproof construction method and system for bottom plate of high-water-level basement
CN102691401A (en) * 2012-06-15 2012-09-26 北京城建建设工程有限公司 Construction method for large-area concrete weighbridge
CN202450558U (en) * 2011-11-21 2012-09-26 深圳市博艺建筑工程设计有限公司 Basement waterproof structure based on application of dewatering board
CN203782724U (en) * 2014-03-14 2014-08-20 福州皇家地坪有限公司 Basement draining structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3969851A (en) * 1975-07-11 1976-07-20 Structural Stoneware Incorporated Architectural paving system with individual control joint paving
CN202450558U (en) * 2011-11-21 2012-09-26 深圳市博艺建筑工程设计有限公司 Basement waterproof structure based on application of dewatering board
CN102535488A (en) * 2012-03-13 2012-07-04 广东中城建设集团有限公司 Waterproof construction method and system for bottom plate of high-water-level basement
CN102691401A (en) * 2012-06-15 2012-09-26 北京城建建设工程有限公司 Construction method for large-area concrete weighbridge
CN203782724U (en) * 2014-03-14 2014-08-20 福州皇家地坪有限公司 Basement draining structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
上海建工集团股份有限公司: "《混凝土工程施工技术与创新》", 31 January 2012, 上海科学技术出版社 *
建设部工程质量安全监督与行业发展司、中国建筑业协会: "《土木建筑国家级工法汇编 2003-2004年度》", 31 January 2007, 中国计划出版社 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610779A (en) * 2019-01-24 2019-04-12 铜陵有色金属集团铜冠建筑安装股份有限公司 A kind of waterproof and anticorrosion epoxy floor structure
CN110593523A (en) * 2019-08-27 2019-12-20 江苏南通三建集团股份有限公司 Construction method of anti-cracking and moisture-proof gold steel grit terrace
CN110685424A (en) * 2019-09-05 2020-01-14 东莞市鲁班装饰工程有限公司 Building floor leveling anti-cracking construction method and building floor leveling anti-cracking structure
CN112761230A (en) * 2019-10-21 2021-05-07 玛纳斯县久宇棉业有限公司 Concrete cast-in-place terrace drainage ditch mold and concrete cast-in-place terrace construction method
CN110735513A (en) * 2019-10-24 2020-01-31 安徽四建控股集团有限公司 Construction method of prestressed terraces
CN110725505A (en) * 2019-10-29 2020-01-24 江卫强 Fair-faced concrete floor product and construction method thereof
CN111851939A (en) * 2020-07-21 2020-10-30 天津华星智慧科技有限公司 Oil-seepage-preventing ground structure and construction method thereof
CN112031374A (en) * 2020-08-31 2020-12-04 上海宝冶集团有限公司 Construction method of basement large-area terrace
CN112049365A (en) * 2020-09-01 2020-12-08 上海家树建筑工程有限公司 Indoor terrace construction method and indoor terrace structure applied to same
CN112878624A (en) * 2021-01-12 2021-06-01 王斌 Waterproof anticorrosive epoxy terrace structure
CN113202259A (en) * 2021-05-10 2021-08-03 四川省建筑科学研究院有限公司 Anti-cracking overhead terrace construction method and structure thereof
CN113202259B (en) * 2021-05-10 2021-11-12 四川省建筑科学研究院有限公司 Anti-cracking overhead terrace construction method and structure thereof
CN114961164A (en) * 2022-06-02 2022-08-30 北京三佳筑品建材有限公司 Hydrophobic special-shaped floor for building construction
CN114961164B (en) * 2022-06-02 2023-09-01 北京三佳筑品建材有限公司 Hydrophobic special-shaped floor for building construction

Similar Documents

Publication Publication Date Title
CN108868063A (en) A kind of method for constructing terrace
CN102937027B (en) A kind of construction method of edge top arch and bottom arch of concrete pouring tunnel
CN102535296B (en) Construction method of superheavy-load reinforcement-free large-area seamless epoxy self-leveling terrace
CN106759126B (en) Construction method of side slope support drainage channel
CN106401144A (en) Construction technology for addition type wear resisting concrete ground
US2729093A (en) Swimming pool and method of construction
CN107143111A (en) A kind of construction method of abrasion-proof terrace
CN108374566B (en) Repairing process for leakage water on back water surface
CN104929365B (en) Refuse of refuse burning generating plant discharging platform combined type surface construction technology
CN110607894A (en) Construction method for floor of constructional engineering
CN102505709A (en) Concrete-formwork-precast foundation construction method
CN109457571B (en) Construction method for repairing ground deformation joint
CN103276858A (en) Drainage structure for inverted roof and construction method of drainage structure
CN110424226A (en) Kerbstone precast assembly side form and its construction technology
CN102116092A (en) Method for constructing reinforcing band for compensating contraction of concrete and preventing cracks
CN112282294A (en) Construction method of steel fiber wear-resistant terrace
CN112458907A (en) Construction method for laying super-high performance concrete layer in super-large area of steel structure
CN115538708A (en) Construction method for reinforced soil-fixing grid of large-gradient planting inclined roof
CN115341476A (en) Bridge deck pavement construction process
CN110409600A (en) Unit-combination type cesspool construction method
CN104594633A (en) Construction method and template structure for umbrella-shaped spatial curved-surface bare concrete
CN110593321A (en) Construction method of basement outer wall post-cast strip advanced sealing prefabricated clamping groove formwork-free system
CN212129250U (en) Construction structure for additionally arranging collecting groove on post-cast strip of high-water-level foundation
CN110735493B (en) Anti-leakage composite waterproof method for flat roof
CN108867822A (en) A kind of constructing device and its construction method of anti-water Double-layer floor drain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123