CN108846639A - 一种基于bim技术设计施工计价管理系统及方法 - Google Patents
一种基于bim技术设计施工计价管理系统及方法 Download PDFInfo
- Publication number
- CN108846639A CN108846639A CN201810600034.2A CN201810600034A CN108846639A CN 108846639 A CN108846639 A CN 108846639A CN 201810600034 A CN201810600034 A CN 201810600034A CN 108846639 A CN108846639 A CN 108846639A
- Authority
- CN
- China
- Prior art keywords
- model
- quota
- inventory
- project
- component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000013461 design Methods 0.000 title claims abstract description 41
- 238000010276 construction Methods 0.000 title claims abstract description 33
- 238000000034 method Methods 0.000 title claims abstract description 32
- 238000005516 engineering process Methods 0.000 title claims abstract description 21
- 238000004364 calculation method Methods 0.000 claims abstract description 17
- 238000007726 management method Methods 0.000 claims abstract description 14
- 230000006870 function Effects 0.000 claims abstract description 13
- 238000011156 evaluation Methods 0.000 claims description 13
- 238000013507 mapping Methods 0.000 claims description 12
- 238000005259 measurement Methods 0.000 claims description 10
- 238000003780 insertion Methods 0.000 claims description 6
- 230000037431 insertion Effects 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 3
- 241000208340 Araliaceae Species 0.000 claims 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 claims 1
- 235000003140 Panax quinquefolius Nutrition 0.000 claims 1
- 239000004744 fabric Substances 0.000 claims 1
- 235000008434 ginseng Nutrition 0.000 claims 1
- 230000008901 benefit Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 241000209094 Oryza Species 0.000 description 2
- 235000007164 Oryza sativa Nutrition 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 235000009566 rice Nutrition 0.000 description 2
- 239000004793 Polystyrene Substances 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000010426 asphalt Substances 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000004745 nonwoven fabric Substances 0.000 description 1
- 230000032696 parturition Effects 0.000 description 1
- 229920000728 polyester Polymers 0.000 description 1
- 229920002223 polystyrene Polymers 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明提供一种基于BIM技术设计施工计价管理系统及方法,包括基于BIM建模软件开发的Revit插件,所述Revit插件中内嵌有工艺做法族库功能模块、构件算量功能模块以及计价功能模块。本发明通过Revit插件构建的BIM模型集成构件信息库,通过读取模型中所有构件信息进行建设过程中的工程总造价统计,比其他利用第三方算量软件更加简单、方便,并且大大提高效率。
Description
技术领域
本发明涉及教育教学技术领域,尤其涉及一种基于BIM技术设计施工计价管理系统及方法。
背景技术
随着现代工程建设项目规模的扩大,施工技术的难度与要求不断提高,各专业部门之间信息量扩大、信息的交流与传递更频繁,但不能实现整个建设项目的信息共享,设计施工联合体双方要有充分的信息交流,建立信息网络,才能充分利用计价优势。建筑信息模型(Building Information Modeling,BIM)作为一种集成的全寿命周期管理的建筑信息化工具,可为实现设计施工计价提供良好的技术平台和解决思路。目前最大的问题是设计、施工两个阶段的工作不能真正的融合,集成优势不明显,综合效益难以体现。BIM改变了传统模式下信息共享路径,设计施工计价建设转换了传统模式下设计、施工的分离状态,将BIM应用到设计施工计价建设中,能更好的辅助项目,减少信息流失,两者相辅相成。
发明内容
本发明的目的在于提供一种基于BIM技术设计施工计价管理方法实现设计阶段的BIM正向设计过程,提高设计的效率、质量的同时,解决BIM模型无法传递给施工阶段使用的难题。
本发明提供一种基于BIM技术设计施工计价管理系统,包括基于BIM建模软件开发的Revit插件,所述Revit插件中内嵌有工艺做法族库功能模块、构件算量功能模块以及计价功能模块,所述工艺做法族库功能模块包括工艺做法增加子模块、工艺做法插入子模块。工艺做法增加子模块主要实现将工程工艺做法封装成Revit族文件,上传增加至工艺做法族库中;工艺做法插入子模块主要实现对工艺做法族文件的调用,插入项目中,调用拼装成项目模型。
所述算量模块包括清单定额设置子模块和构件出量子模块,并生成模型参数与构件之间的映射规则以及市场价格与构件之间的映射规则。清单定额设置子模块主要实现对内嵌的清单定额规范根据项目所在地进行选择调用;构件出量子模块主要实现根据项目构件属性定义映射清单定额规范,根据清单定额规则计算项目清单定额工程量。
所述计价功能模块包括计价子模块,计价子模块主要实现清单定额工程量的套价,基于算量模块得出的工程量加载内嵌信息发布价进行加载匹配,然后与全国各地计价规范中对应工程计价公式进行关联组价,输出模型清单综合单价。
本发明另外提供一种基于BIM技术设计施工计价管理方法,包括以下步骤:
S1、根据国家及地方建筑设计标准,结合Revit软件自身建模规则,制定BIM设计建模标准;
S2、根据BIM设计建模标准根据建筑工程分部分项,构建BIM模型构件库;
S3、通过调用BIM模型构件库中构件,根据建筑工程设计需求,通过设定模型构件参数属性,创建设计阶段BIM模型;
S4、通过C#编程语言将国标清单规范、全国各地定额工程量计算规则、全国各地定额人材机单位消耗用量、全国各地人材机市场信息价格库、全国各地计价规范内嵌至Revit插件中,并可实现数据识别调用;
S5、通过C#编程语言中BuiltInParameter算法读取模型构件的类型参数、清单编码参数、构造层,使用look up工具找到revit自带参数的BuiltInParameter值,读取出构件类型与国标清单中项目名称匹配映射、清单编码与国标清单中项目编码匹配、构造层与国标清单中构造做法匹配映射,基于清单规范对模型进行分块;
S6、通过C#编程语言中BuiltInParameter算法读取模型构件计量单位、构造层、工程量等参数,与国标清单规范、全国各地定额工程量计算规则中对应的计量单位、构造做法、工程量计算规则相匹配,对计量单位不统一或存在系数增扣的工程量,根据计量规范,设置计算值公式,数据库自动记忆存储;
S7、基于国标清单规范、全国各地定额工程量计算规则对匹配的模型参数进行映射,输出模型清单工程量和定额工程量;
S8、基于S7步骤中映射的模型定额工程量,与插件中新增的计价功能模块,内嵌全国各地定额人材机单位消耗用量,自动关联人材机代码,输出模型定额人材机消耗用量,自动汇总成模型清单工程量人材机消耗用量;
S9、基于S8步骤中关联的模型定额人材机消耗用量,与插件中新增的计价功能模块中全国各地人材机市场信息价格库,对应工程映射市场价格,取费计价,输出模型各地信息发布价;
S10、基于S9步骤中映射的模型各地信息发布价,与插件中内嵌的全国各地计价规范中对应工程计价公式进行关联,输出模型清单综合单价。
其中术语解释:
Revit:是专为建筑信息模型BIM构建的,可帮助建筑设计师设计、建造和维护质量更好、能效更好的建筑的一套系列软件。
算量:是指在编制工程造价预结算工作时对所建造的建筑物或工程以平方米、立方米、吨、米、个等计算单位计算工程实物量。包括土方开挖,模板,钢筋下料,混凝土量。涵盖建筑、装饰、安装、市政、园林、轨道交通、爆破专业。
构件(建筑构件):是指构成建筑物各个要素。如果把建筑物看成是一个产品,那建筑构件就是指这个产品当中的零件。建筑物当中的构件主要有:楼(屋)面、墙体、柱子、基础等。
“族”在Revit中是一个重要的概念,它是建筑或内装项目中各种图元构成的基础。Revit的可载入族分为三种类别:体量族、模型类别族、注释类别族,其中模型类别族用于生成项目的模型图元、详图构件等。
与相关技术相比,本发明提供的一种基于BIM技术设计施工计价管理系统及方法,通过Revit插件构建的BIM模型集成构件信息库,通过读取模型中所有构件信息进行建设过程中的工程总造价统计,比其他利用第三方算量软件更加简单、方便,并且大大提高效率。
附图说明
图1为本发明提供的基于BIM技术设计施工计价管理模块框图;
图2为本发明提供的基于BIM技术设计施工计价管理方法流程框图;
具体实施方式
以下将参考附图并结合具体实施方式来详细说明本发明。
请同时参阅图1和图2,其中,图1为本发明提供的基于BIM技术设计施工计价管理模块框图,图2为本发明提供的基于BIM技术设计施工计价管理方法流程框图。
本发明实施例提供的基于BIM技术设计施工计价管理系统,包括开发设计施工一体化的revit插件,包括工艺做法库功能模块、构件算量功能模块、计价功能模块三个模块,采用本发明的管理方法包括以下步骤:S1、根据国家及地方建筑设计标准,结合Revit软件自身建模规则,制定BIM设计建模标准;
S2、根据BIM设计建模标准根据建筑工程分部分项,构建BIM模型构件库(工艺做法族库),建筑工程分部分项包括桩基工程、墙面工程、柱面工程、门窗工程以及金属工程,各分项下再细分;
S3、通过调用BIM模型构件库中构件,根据建筑工程设计需求,通过设定模型构件参数属性,创建设计阶段BIM模型;
S4、通过C#编程语言将国标清单规范、全国各地定额工程量计算规则、全国各地定额人材机单位消耗用量、全国各地人材机市场信息价格库、全国各地计价规范内嵌至Revit插件中,并可实现数据识别调用,其中,国标清单规范包括统一项目编码、类别名称、计量单位、工程量计算规则,全国各地定额工程量计算规则包括统一类别名称、计量单位以及工程量计算规则;
S5、通过C#编程语言中BuiltInParameter算法读取模型构件的类型参数、清单编码参数、构造层,使用look up工具找到revit自带参数的BuiltInParameter值,读取出构件类型与国标清单中项目名称匹配映射、清单编码与国标清单中项目编码匹配、构造层与国标清单中构造做法匹配映射,基于清单规范对模型进行分块;
S6、通过C#编程语言中BuiltInParameter算法读取模型构件计量单位、构造层、工程量等参数,与国标清单规范、全国各地定额工程量计算规则中对应的计量单位、构造做法、工程量计算规则相匹配,对计量单位不统一或存在系数增扣的工程量,根据计量规范,设置计算值公式,数据库自动记忆存储;
S7、基于国标清单规范、全国各地定额工程量计算规则对匹配的模型参数进行映射,输出模型清单工程量和定额工程量,比如工艺做法库中保温隔热屋面对应的类型是保温隔热屋面类型、编码参数是011001001001,构造层为水泥砂浆面、聚酯无纺布一层面、改性沥青防水卷材面、细石混凝土找平面、难燃性挤塑聚苯板及轻骨混凝土找平2%坡抹平面,根据映射的模型参数输出保温隔热屋面的清单工程量和定额工程量;
S8、基于S7步骤中映射的模型定额工程量,与插件中新增的计价功能模块,内嵌全国各地定额人材机单位消耗用量,自动关联人材机代码,输出模型定额人材机消耗用量,自动汇总成模型清单工程量人材机消耗用量;
S9、基于S8步骤中关联的模型定额人材机消耗用量,与插件中新增的计价功能模块中全国各地人材机市场信息价格库,对应工程映射市场价格,取费计价,输出模型各地信息发布价;
S10、基于S9步骤中映射的模型各地信息发布价,与插件中内嵌的全国各地计价规范中对应工程计价公式进行关联,输出模型清单综合单价。
见图2,本实施例中以屋面为例本发明应用流程如下:
1、根据设计规范建立10种屋面做法族文件(构件),上传至工艺做法族库中;
2、项目设计阶段时,设计师在工艺做法库中选择一种做法屋面文件载入项目中,进行项目模型设计搭建;
3、项目施工阶段时,商务工程师在构件算量功能模块中选择相对应的清单定额规范(已经内嵌至构件算量功能模块中),屋面工程根据项目编码、构造做法、计算式自动提取计算出符合规范的屋面清单工程量、屋面定额消耗量;
4、屋面定额消耗量自动传递计价功能模块中,商务工程师根据项目所在地选择市场价格信息库中当地信息发布价进行加载(已经内嵌至计价功能模块中),取费组价,得到屋面工程的建安工程费,建安工程造价包含建筑工程费、安装工程费和建筑(公用)设备费用;
5、商务工程师在建安工程费基础上,选择当地计价规范(已经内嵌至计价功能模块中)加载,取费组价,得到屋面工程的工程总造价。
本发明实现了在Revit平台中进行算量处理,无需再由第三方算量软件进行处理计价,操作简便,提高了工程项目效率。
以上所述仅为本发明的实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其它相关的技术领域,均同理包括在本发明的专利保护范围内。
Claims (2)
1.一种基于BIM技术设计施工计价管理系统,其特征在于,包括基于BIM建模软件开发的Revit插件,所述Revit插件中内嵌有工艺做法族库功能模块、构件算量功能模块以及计价功能模块,所述算量模块包括清单定额设置子模块和构件出量子模块,并生成模型参数与构件之间的映射规则以及市场价格与构件之间的映射规则,清单定额设置子模块主要实现对内嵌的清单定额规范根据项目所在地进行选择调用;构件出量子模块主要实现根据项目构件属性定义映射清单定额规范,根据清单定额规则计算项目清单定额工程量;
所述工艺做法族库功能模块包括工艺做法增加子模块、工艺做法插入子模块,工艺做法增加子模块主要实现将工程工艺做法封装成Revit族文件,上传增加至工艺做法族库中;工艺做法插入子模块主要实现对工艺做法族文件的调用,插入项目中,调用拼装成项目模型;
所述计价功能模块包括计价子模块,计价子模块主要实现清单定额工程量的套价,基于算量模块得出的工程量加载内嵌信息发布价进行加载匹配,然后与全国各地计价规范中对应工程计价公式进行关联组价,输出模型清单综合单价。
2.根据权利要求1所述的基于BIM技术设计施工计价管理方法,其特征在于,包括以下步骤:
S1、根据国家及地方建筑设计标准,结合Revit软件自身建模规则,制定BIM设计建模标准;
S2、根据BIM设计建模标准根据建筑工程分部分项,构建BIM模型构件库;
S3、通过调用BIM模型构件库中构件,根据建筑工程设计需求,通过设定模型构件参数属性,创建设计阶段BIM模型;
S4、通过C#编程语言将国标清单规范、全国各地定额工程量计算规则、全国各地定额人材机单位消耗用量、全国各地人材机市场信息价格库、全国各地计价规范内嵌至Revit插件中,并可实现数据识别调用;
S5、通过C#编程语言中BuiltInParameter算法读取模型构件的类型参数、清单编码参数、构造层,使用look up工具找到revit自带参数的BuiltInParameter值,读取出构件类型与国标清单中项目名称匹配映射、清单编码与国标清单中项目编码匹配、构造层与国标清单中构造做法匹配映射,基于清单规范对模型进行分块;
S6、通过C#编程语言中BuiltInParameter算法读取模型构件计量单位、构造层、工程量等参数,与国标清单规范、全国各地定额工程量计算规则中对应的计量单位、构造做法、工程量计算规则相匹配,对计量单位不统一或存在系数增扣的工程量,根据计量规范,设置计算值公式,数据库自动记忆存储;
S7、基于国标清单规范、全国各地定额工程量计算规则对匹配的模型参数进行映射,通过所述构件算量功能模块输出模型清单工程量和定额工程量;
S8、基于S7步骤中映射的模型定额工程量,与插件中新增的计价功能模块,内嵌全国各地定额人材机单位消耗用量,自动关联人材机代码,输出模型定额人材机消耗用量,自动汇总成模型清单工程量人材机消耗用量;
S9、基于S8步骤中关联的模型定额人材机消耗用量,与插件中新增的计价功能模块中全国各地人材机市场信息价格库,对应工程映射市场价格,取费计价,输出模型各地信息发布价;
S10、基于S9步骤中映射的模型各地信息发布价,与插件中内嵌的全国各地计价规范中对应工程计价公式进行关联,输出模型清单综合单价。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810600034.2A CN108846639B (zh) | 2018-06-12 | 2018-06-12 | 一种基于bim技术设计施工计价管理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810600034.2A CN108846639B (zh) | 2018-06-12 | 2018-06-12 | 一种基于bim技术设计施工计价管理方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108846639A true CN108846639A (zh) | 2018-11-20 |
CN108846639B CN108846639B (zh) | 2022-04-15 |
Family
ID=64211731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810600034.2A Active CN108846639B (zh) | 2018-06-12 | 2018-06-12 | 一种基于bim技术设计施工计价管理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108846639B (zh) |
Cited By (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109753717A (zh) * | 2018-12-28 | 2019-05-14 | 国网浙江省电力有限公司经济技术研究院 | 一种配电网构件数字模型的构建方法及应用 |
CN109785018A (zh) * | 2019-03-21 | 2019-05-21 | 广州翔实工程咨询有限公司 | 基于bim的自动预结算方法及系统 |
CN109815560A (zh) * | 2019-01-04 | 2019-05-28 | 中国建筑东北设计研究院有限公司 | 一种基于bim的设计算量施工全生命周期应用的方法 |
CN109885953A (zh) * | 2019-03-01 | 2019-06-14 | 广联达科技股份有限公司 | 一种模型构件的映射方法和装置 |
CN110096814A (zh) * | 2019-05-05 | 2019-08-06 | 广西路桥工程集团有限公司 | 一种基于bim模型的数字化桥梁施工系统 |
CN110197007A (zh) * | 2019-05-09 | 2019-09-03 | 北新集团建材股份有限公司 | 一种自动生成轻钢龙骨石膏板墙体模型的方法 |
CN110288222A (zh) * | 2019-06-20 | 2019-09-27 | 江西博微新技术有限公司 | 基于三维建模的变电工程造价数据生成系统及方法 |
CN110378568A (zh) * | 2019-06-24 | 2019-10-25 | 中铁四局集团有限公司 | 基于bim技术的工程算量方法、系统、计算机设备及可读存储介质 |
CN110389998A (zh) * | 2019-07-18 | 2019-10-29 | 广联达科技股份有限公司 | 建筑计价程序中项目快速组价方法、系统和计算机可读存储介质 |
CN110443579A (zh) * | 2019-07-31 | 2019-11-12 | 广联达科技股份有限公司 | 数字建筑工程清单构件模块化管理的方法、系统和介质 |
CN110473067A (zh) * | 2019-08-14 | 2019-11-19 | 杭州品茗安控信息技术股份有限公司 | 构件的造价标准文件确定方法、装置、设备及存储介质 |
CN110705853A (zh) * | 2019-09-20 | 2020-01-17 | 国网上海市电力公司 | 一种基于bim模型的变电站成本动态管控系统及方法 |
CN110737932A (zh) * | 2019-08-29 | 2020-01-31 | 中建一局集团第二建筑有限公司 | 一种利用bim模型分析工程临时设施成本的方法 |
CN111210162A (zh) * | 2020-01-14 | 2020-05-29 | 中资锐诚工程项目管理有限公司 | 一种基于bim的全过程工程计价管理方法和基于bim的全过程工程管理系统 |
CN111339591A (zh) * | 2020-02-26 | 2020-06-26 | 久翔环保工程(上海)有限公司 | 一种基于bim和云数据库的工程项目智能化计算方法 |
CN111859522A (zh) * | 2020-08-11 | 2020-10-30 | 长沙垚森工程科技有限公司 | 一种基于bim的公路工程快速造价方法 |
CN111915169A (zh) * | 2020-07-20 | 2020-11-10 | 中南大学 | 一种基于区块链技术的公路工程智慧造价方法 |
CN111950063A (zh) * | 2020-08-17 | 2020-11-17 | 国网上海市电力公司 | 一种基于Revit的变电站三维算量和计价方法 |
CN112163908A (zh) * | 2020-10-30 | 2021-01-01 | 张强 | 一种基于Revit的算量与计价统一处理的方法 |
CN112329178A (zh) * | 2020-11-26 | 2021-02-05 | 国网河北省电力有限公司经济技术研究院 | 角钢塔三维造价模型建立方法、装置及终端设备 |
CN113076581A (zh) * | 2021-03-30 | 2021-07-06 | 贵州数智联云工程科技有限公司 | 一种用于工程管理的跨专业信息管理系统及方法 |
CN113537939A (zh) * | 2021-07-21 | 2021-10-22 | 四川路桥桥梁工程有限责任公司 | 一种基于bim和物联网技术的砼成本管控方法 |
CN114004005A (zh) * | 2022-01-04 | 2022-02-01 | 深圳小库科技有限公司 | 室内设计构件清单的生成方法、装置、计算机设备及介质 |
CN114329751A (zh) * | 2022-03-17 | 2022-04-12 | 中核华纬工程设计研究有限公司 | 一种基于bim技术的全专业算量与计价系统及方法 |
CN114445129A (zh) * | 2022-01-13 | 2022-05-06 | 湖北国际物流机场有限公司 | Bim编码系统 |
CN114647885A (zh) * | 2022-04-02 | 2022-06-21 | 北京梦诚科技有限公司 | 一种施工图设计内容展示和应用计算的方法和系统 |
CN115796972A (zh) * | 2022-11-24 | 2023-03-14 | 中核华纬工程设计研究有限公司 | 一种基于bim技术的量价融合实现方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080015823A1 (en) * | 2006-06-16 | 2008-01-17 | Tectonic Network, Inc. | Extensible building information model toolset |
CN105335905A (zh) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | 一种建筑工程算量和估价系统及方法 |
CN107944187A (zh) * | 2017-12-13 | 2018-04-20 | 厦门海迈科技股份有限公司 | 一种基于Revit的钢筋计算方法、装置、终端设备及介质 |
-
2018
- 2018-06-12 CN CN201810600034.2A patent/CN108846639B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080015823A1 (en) * | 2006-06-16 | 2008-01-17 | Tectonic Network, Inc. | Extensible building information model toolset |
CN105335905A (zh) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | 一种建筑工程算量和估价系统及方法 |
CN107944187A (zh) * | 2017-12-13 | 2018-04-20 | 厦门海迈科技股份有限公司 | 一种基于Revit的钢筋计算方法、装置、终端设备及介质 |
Non-Patent Citations (1)
Title |
---|
徐鹏宇: "基于BIM的总体设计阶段地铁暗挖车站工程造价实时计算方法研究", 《中国优秀博硕士学位论文全文数据库(硕士) 工程科技II辑》 * |
Cited By (35)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109753717A (zh) * | 2018-12-28 | 2019-05-14 | 国网浙江省电力有限公司经济技术研究院 | 一种配电网构件数字模型的构建方法及应用 |
CN109815560A (zh) * | 2019-01-04 | 2019-05-28 | 中国建筑东北设计研究院有限公司 | 一种基于bim的设计算量施工全生命周期应用的方法 |
CN109885953A (zh) * | 2019-03-01 | 2019-06-14 | 广联达科技股份有限公司 | 一种模型构件的映射方法和装置 |
CN109885953B (zh) * | 2019-03-01 | 2023-01-24 | 广联达科技股份有限公司 | 一种模型构件的映射方法和装置 |
CN109785018A (zh) * | 2019-03-21 | 2019-05-21 | 广州翔实工程咨询有限公司 | 基于bim的自动预结算方法及系统 |
CN110096814A (zh) * | 2019-05-05 | 2019-08-06 | 广西路桥工程集团有限公司 | 一种基于bim模型的数字化桥梁施工系统 |
CN110096814B (zh) * | 2019-05-05 | 2022-08-16 | 广西路桥工程集团有限公司 | 一种基于bim模型的数字化桥梁施工系统 |
CN110197007A (zh) * | 2019-05-09 | 2019-09-03 | 北新集团建材股份有限公司 | 一种自动生成轻钢龙骨石膏板墙体模型的方法 |
CN110288222A (zh) * | 2019-06-20 | 2019-09-27 | 江西博微新技术有限公司 | 基于三维建模的变电工程造价数据生成系统及方法 |
CN110378568A (zh) * | 2019-06-24 | 2019-10-25 | 中铁四局集团有限公司 | 基于bim技术的工程算量方法、系统、计算机设备及可读存储介质 |
CN110389998A (zh) * | 2019-07-18 | 2019-10-29 | 广联达科技股份有限公司 | 建筑计价程序中项目快速组价方法、系统和计算机可读存储介质 |
CN110443579A (zh) * | 2019-07-31 | 2019-11-12 | 广联达科技股份有限公司 | 数字建筑工程清单构件模块化管理的方法、系统和介质 |
CN110473067B (zh) * | 2019-08-14 | 2020-09-04 | 杭州品茗安控信息技术股份有限公司 | 构件的造价标准文件确定方法、装置、设备及存储介质 |
CN110473067A (zh) * | 2019-08-14 | 2019-11-19 | 杭州品茗安控信息技术股份有限公司 | 构件的造价标准文件确定方法、装置、设备及存储介质 |
CN110737932A (zh) * | 2019-08-29 | 2020-01-31 | 中建一局集团第二建筑有限公司 | 一种利用bim模型分析工程临时设施成本的方法 |
CN110705853A (zh) * | 2019-09-20 | 2020-01-17 | 国网上海市电力公司 | 一种基于bim模型的变电站成本动态管控系统及方法 |
CN111210162A (zh) * | 2020-01-14 | 2020-05-29 | 中资锐诚工程项目管理有限公司 | 一种基于bim的全过程工程计价管理方法和基于bim的全过程工程管理系统 |
CN111339591A (zh) * | 2020-02-26 | 2020-06-26 | 久翔环保工程(上海)有限公司 | 一种基于bim和云数据库的工程项目智能化计算方法 |
CN111915169A (zh) * | 2020-07-20 | 2020-11-10 | 中南大学 | 一种基于区块链技术的公路工程智慧造价方法 |
CN111859522A (zh) * | 2020-08-11 | 2020-10-30 | 长沙垚森工程科技有限公司 | 一种基于bim的公路工程快速造价方法 |
CN111950063A (zh) * | 2020-08-17 | 2020-11-17 | 国网上海市电力公司 | 一种基于Revit的变电站三维算量和计价方法 |
CN112163908A (zh) * | 2020-10-30 | 2021-01-01 | 张强 | 一种基于Revit的算量与计价统一处理的方法 |
CN112329178A (zh) * | 2020-11-26 | 2021-02-05 | 国网河北省电力有限公司经济技术研究院 | 角钢塔三维造价模型建立方法、装置及终端设备 |
CN113076581A (zh) * | 2021-03-30 | 2021-07-06 | 贵州数智联云工程科技有限公司 | 一种用于工程管理的跨专业信息管理系统及方法 |
CN113076581B (zh) * | 2021-03-30 | 2024-04-30 | 贵州数智联云工程科技有限公司 | 一种用于工程管理的跨专业信息管理系统及方法 |
CN113537939A (zh) * | 2021-07-21 | 2021-10-22 | 四川路桥桥梁工程有限责任公司 | 一种基于bim和物联网技术的砼成本管控方法 |
CN113537939B (zh) * | 2021-07-21 | 2024-03-22 | 四川路桥桥梁工程有限责任公司 | 一种基于bim和物联网技术的砼成本管控方法 |
CN114004005A (zh) * | 2022-01-04 | 2022-02-01 | 深圳小库科技有限公司 | 室内设计构件清单的生成方法、装置、计算机设备及介质 |
CN114445129B (zh) * | 2022-01-13 | 2024-03-19 | 湖北国际物流机场有限公司 | Bim编码系统 |
CN114445129A (zh) * | 2022-01-13 | 2022-05-06 | 湖北国际物流机场有限公司 | Bim编码系统 |
CN114329751A (zh) * | 2022-03-17 | 2022-04-12 | 中核华纬工程设计研究有限公司 | 一种基于bim技术的全专业算量与计价系统及方法 |
CN114647885A (zh) * | 2022-04-02 | 2022-06-21 | 北京梦诚科技有限公司 | 一种施工图设计内容展示和应用计算的方法和系统 |
CN114647885B (zh) * | 2022-04-02 | 2023-03-24 | 北京梦诚科技有限公司 | 一种施工图设计内容展示和应用计算的方法和系统 |
CN115796972A (zh) * | 2022-11-24 | 2023-03-14 | 中核华纬工程设计研究有限公司 | 一种基于bim技术的量价融合实现方法 |
CN115796972B (zh) * | 2022-11-24 | 2024-05-07 | 中核华纬工程设计研究有限公司 | 一种基于bim技术的量价融合实现方法 |
Also Published As
Publication number | Publication date |
---|---|
CN108846639B (zh) | 2022-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108846639A (zh) | 一种基于bim技术设计施工计价管理系统及方法 | |
Agugiaro et al. | The Energy Application Domain Extension for CityGML: enhancing interoperability for urban energy simulations | |
Ding et al. | A building information modeling-based carbon emission measurement system for prefabricated residential buildings during the materialization phase | |
Abanda et al. | Integrating BIM and new rules of measurement for embodied energy and CO2 assessment | |
CN110378568A (zh) | 基于bim技术的工程算量方法、系统、计算机设备及可读存储介质 | |
Pincetl et al. | Enabling future sustainability transitions: An urban metabolism approach to Los Angeles | |
US20110246155A1 (en) | Computer-Readable Medium And Systems For Applying Multiple Impact Factors | |
US20110246381A1 (en) | Systems and methods of modeling energy consumption of buildings | |
CN103150751A (zh) | 在数字地图中实现建筑物内外一体化的三维建模方法 | |
US20100138353A1 (en) | Computer implemented system and method for providing an optimized sustainable land use plan | |
CN111275297A (zh) | 一种基于bim技术的建筑工程epc造价和进度管理系统及管理方法 | |
CN109558412A (zh) | 装配式建筑建造平台的数据生长方法和装置 | |
CN115496540A (zh) | 智慧成本计算方法、系统、设备及存储介质 | |
CN113011832A (zh) | 基于bim的工程造价系统 | |
Abdelmohsen et al. | Automated cost analysis of concept design BIM models | |
Shen | Application of BIM and Internet of Things Technology in Material Management of Construction Projects | |
CN109344458A (zh) | 基于revit设计软件统计工程量的方法和装置 | |
CN113065783A (zh) | 一种基于bim技术的垃圾焚烧发电厂bim工程量应用方法 | |
Dabirian et al. | Structuring heterogeneous urban data: A framework to develop the data model for energy simulation of cities | |
CN111311206A (zh) | 建设工程三元空间关系构建方法、系统和介质 | |
CN109711059A (zh) | 基于装配式建筑的导水槽自动生成方法、装置及设备 | |
Anopriienko et al. | Modern development trend of normative monetary valuation of non-agricultural land plots in Ukraine | |
CN113095296B (zh) | 基于物联网的土木工程材料计算系统及方法 | |
CN117609868B (zh) | 基于分部分项逻辑的房建类bim数据分类方法、系统及介质 | |
Chen et al. | A Conceptual Framework for Estimating Building Embodied Carbon Based on Digital Twin Technology and Life Cycle Assessment. Sustainability 2021, 13, 13875 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220321 Address after: No. 788, Section 1, Furong South Road, Tianxin District, Changsha, Hunan 410000 Applicant after: HUNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd. Applicant after: Zhongxiang Intelligent Construction Co., Ltd Address before: No. 788, Section 1, Furong South Road, Tianxin District, Changsha, Hunan 410000 Applicant before: HUNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |