CN109815560A - 一种基于bim的设计算量施工全生命周期应用的方法 - Google Patents

一种基于bim的设计算量施工全生命周期应用的方法 Download PDF

Info

Publication number
CN109815560A
CN109815560A CN201910010185.7A CN201910010185A CN109815560A CN 109815560 A CN109815560 A CN 109815560A CN 201910010185 A CN201910010185 A CN 201910010185A CN 109815560 A CN109815560 A CN 109815560A
Authority
CN
China
Prior art keywords
calculation amount
model
bim
construction
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910010185.7A
Other languages
English (en)
Inventor
王楠
李美衡
尹越
郭晓岩
张盈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Northeast Architectural Design and Research Institute Co Ltd
Original Assignee
China Northeast Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Northeast Architectural Design and Research Institute Co Ltd filed Critical China Northeast Architectural Design and Research Institute Co Ltd
Priority to CN201910010185.7A priority Critical patent/CN109815560A/zh
Publication of CN109815560A publication Critical patent/CN109815560A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种基于BIM的设计算量施工全生命周期应用的方法,包括以下步骤:应用BIM软件revit进行三维设计;施工图模型完成后,直接应用设计模型进行BIM算量;应用BIM算量软件进行工程设置、楼层设置、映射设置、工程特征设置;将Revit模型进行三维模型映射,并进行映射结果的确定和修改;在计算规则中按相应定额规则设置工程量输出形式、扣减规则及工程量优先输出顺序等;模型绘制不完全的部分可进行二次智能布置;进行汇总计算;将三维算量结果导出算量明细表和算量汇总表;将Revit模型上传到施工管理平台,在平台上可进行基础模型预览。本发明运用Revit模型进行工程量统计,算量结果符合实际施工要求,节省人员成本和时间成本,能够实现快速、准确的出量。

Description

一种基于BIM的设计算量施工全生命周期应用的方法
技术领域
本发明涉及建筑施工领域,具体为一种基于BIM的设计算量施工全生命周期应用的方法。
背景技术
随着工程项目日益复杂化以及建筑构件及安装设备形式、数量的剧增,绝大多数建筑BIM模型已满足不了市场对BIM模型数据传递的要求,满足不了BIM模型的全生命周期应用。现有的BIM设计方式普遍纯在模型构建属性信息不全,构件命名不规则,未按照施工技术要求对模型进行分割等问题,在不规范的BIM模型基础上进行的BIM算量的准确性便大大降低,甚至于设计阶段的BIM模型并不能传递给施工直接应用,造成了大量的BIM模型搭建的重复性工作。
发明内容
本发明的目的在于提供一种基于BIM的设计算量施工全生命周期应用的方法,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:一种基于BIM的设计算量施工全生命周期应用的方法,包括以下步骤:
S1:应用BIM软件revit进行三维设计,按造价及施工人员提出的需求,按设备及构件实现三维算量对模型深度的要求进行建模,同时不同施工段分段建模;
S2:设计施工图完成后,应用施工图模型进行三维算量;
S3:应用BIM算量软件进行工程设置、楼层设置、映射设置、工程特征设置;
S4:将Revit模型进行三维模型映射,并进行映射结果的确定和修改,将未映射部分手动进行映射,同时可在映射规则库中进行一类映射的添加和修改;
S5:在计算规则中按相应定额规则设置工程量输出形式、扣减规则及工程量优先输出顺序等;
S6:模型绘制不完全的部分可进行二次智能布置,如构造柱、过梁等;
S7:进行汇总计算,可分专业、分系统、分楼层进行分别计算;
S8:将三维算量结果导出算量明细表和算量汇总表;
S9:将Revit模型上传到施工管理平台,在平台上可进行基础模型预览、三维审批;
S10:经施工方认可的模型在平台上进行施工模拟、进度跟踪及成本管理。
优选的,S1中具体操作步骤为:S11、在revit中进行建筑、结构、设备专业的设计,首先建立中心文件,并将中心文件保存到服务器;S12、各专业设计人员在revit软件中将用户名修改为“专业-姓名”,通过服务器打开中心文件,并建立本地文件,按专业划分工作集,并分配权限;S13、各专业设计人员在本地文件中进行各自的设计工作,并注意及时进行与中心文件的同步和最新工作集的载入;S14、设计阶段按照设备及构件实现三维算量对模型深度的要求进行构件命名、属性设置并不同施工段分段建模。
优选的,S11中的中心文件包括建筑、结构与设备。
优选的,S2中BIM算量包括土建算量与机电算量。
优选的,S14中分段建模包括分层,分段,分区域建立模型。
与现有技术相比,本发明的有益效果是:本发明直接运用Revit模型进行工程量统计,在主要构件上得到的计算结果与传统二维算量的计算结果误差控制在1%以内,且算量结果更符合实际施工要求,同时节省30%-50%的人员成本和时间成本,能够实现快速、准确的出量。可应用于办公楼、商场、住宅等项目,同时在建筑行业具有极大的应用优势和广泛的应用范围。
附图说明
图1为本发明的原理框图示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1,本发明提供一种技术方案:一种基于BIM的设计算量施工全生命周期应用的方法,包括以下步骤:
S1:应用BIM软件revit进行三维设计,按照设备及构件实现三维算量对模型深度的要求,以及进行土建专业和安装专业的精度命名要求进行建模,同时不同施工段分段建模;
S2:设计施工图完成后,应用施工图模型进行三维算量;
S3:应用BIM算量软件进行工程设置、楼层设置、映射设置、工程特征设置;
S4:将Revit模型进行三维模型映射,并进行映射结果的确定和修改,将未映射部分手动进行映射,同时可在映射规则库中进行一类映射的添加和修改;
S5:在计算规则中按相应定额规则设置工程量输出形式、扣减规则及工程量优先输出顺序等;
S6:模型绘制不完全的部分可进行二次智能布置,如构造柱、过梁等;
S7:进行汇总计算,可分专业、分系统、分楼层进行分别计算;
S8:将三维算量结果导出算量明细表和算量汇总表;
S9:将Revit模型上传到施工管理平台,在平台上可进行基础模型预览、三维审批;
S10:经施工方认可的模型在平台上进行施工模拟、进度跟踪及成本管理。
S1中具体操作步骤为:
S11、在revit中进行建筑、结构、设备专业的设计,首先建立中心文件,并将中心文件保存到服务器;
S12、各专业设计人员在revit软件中将用户名修改为“专业-姓名”,通过服务器打开中心文件,并建立本地文件,按专业划分工作集,并分配权限;
S13、各专业设计人员在本地文件中进行各自的设计工作,并注意及时进行与中心文件的同步和最新工作集的载入;
S14、设计阶段按照设备及构件实现三维算量对模型深度的要求进行构件命名、属性设置并不同施工段分段建模。
S11中的中心文件包括建筑、结构与设备。
S2中BIM算量包括土建算量与机电算量。
S14中分段建模包括分层,分段,分区域建立模型。
下表为设备及构件实现三维算量对模型深度的要求表:
参见上表,在应用BIM软件revit进行三维设计时,按造价及施工人员提出的需求,按设备及构件实现三维算量对模型深度的要求进行建模。上表属性包括构件类型、命名规则、命名样例、Revit中需添加的类型属性与Revit中需添加的实例属性。
例1:在构件类型为配管与线缆时,即命名规则为管线名称-材质,命名样例为带配件的线管-SC,Revit中需添加的类型属性为安装高度,在Revit中需添加的实例属性包括:线缆规格:WDZB-BYJ-3X2.5、专业类型:强电、系统类型:照明、回路编号:WL18、子系统类型(箱编号)。
工作原理:
本发明设计阶段应用BIM软件revit进行三维设计,按造价及施工人员提出的需求,按照表(设备及构件实现三维算量对模型深度的要求)的进行土建专业和安装专业的精度和命名要求进行建模,同时不同施工段分段建模。
算量阶段直接应用设计人员提供的BIM模型进行计算,按照命名及属性要求进行模型映射,按定额单位要求调整好出量规则,提取工程量。
施工阶段直接应用设计阶段模型,设计人员通过与施工人员进行充分沟通交流后,按照施工的要求,分层,分段,分区域建立模型,直接进行施工模拟,知道施工,同时可在施工管理平台上进行项目进度、成本管理等。
本发明直接运用Revit模型进行工程量统计,在主要构件上得到的计算结果与传统二维算量的计算结果误差控制在1%以内,且算量结果更符合实际施工要求,同时节省30%-50%的人员成本和时间成本,能够实现快速、准确的出量。可应用于办公楼、商场、住宅等项目,同时在建筑行业具有极大的应用优势和广泛的应用范围。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。

Claims (5)

1.一种基于BIM的设计算量施工全生命周期应用的方法,其特征在于,包括以下步骤:
S1:应用BIM软件revit进行三维设计,按造价及施工人员提出的需求,按设备及构件实现三维算量对模型深度的要求进行建模,同时不同施工段分段建模;
S2:设计施工图完成后,应用施工图模型进行三维算量;
S3:应用BIM算量软件进行工程设置、楼层设置、映射设置、工程特征设置;
S4:将Revit模型进行三维模型映射,并进行映射结果的确定和修改,将未映射部分手动进行映射,同时可在映射规则库中进行一类映射的添加和修改;
S5:在计算规则中按相应定额规则设置工程量输出形式、扣减规则及工程量优先输出顺序等;
S6:模型绘制不完全的部分可进行二次智能布置,如构造柱、过梁等;
S7:进行汇总计算,可分专业、分系统、分楼层进行分别计算;
S8:将三维算量结果导出算量明细表和算量汇总表;
S9:将Revit模型上传到施工管理平台,在平台上可进行基础模型预览、三维审批;
S10:经施工方认可的模型在平台上进行施工模拟、进度跟踪及成本管理。
2.根据权利要求1所述的一种基于BIM的设计算量施工全生命周期应用的方法,其特征在于:所述S1中具体操作步骤为:S11、在revit中进行建筑、结构、设备专业的设计,首先建立中心文件,并将中心文件保存到服务器;S12、各专业设计人员在revit软件中将用户名修改为“专业-姓名”,通过服务器打开中心文件,并建立本地文件,按专业划分工作集,并分配权限;S13、各专业设计人员在本地文件中进行各自的设计工作,并注意及时进行与中心文件的同步和最新工作集的载入;S14、设计阶段按照设备及构件实现三维算量对模型深度的要求进行构件命名、属性设置并不同施工段分段建模。
3.根据权利要求2所述的一种基于BIM的设计算量施工全生命周期应用的方法,其特征在于:所述S11中的中心文件包括建筑、结构与设备。
4.根据权利要求1所述的一种基于BIM的设计算量施工全生命周期应用的方法,其特征在于:所述S2中BIM算量包括土建算量与机电算量。
5.根据权利要求2所述的一种基于BIM的设计算量施工全生命周期应用的方法,其特征在于:所述S14中分段建模包括分层,分段,分区域建立模型。
CN201910010185.7A 2019-01-04 2019-01-04 一种基于bim的设计算量施工全生命周期应用的方法 Pending CN109815560A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910010185.7A CN109815560A (zh) 2019-01-04 2019-01-04 一种基于bim的设计算量施工全生命周期应用的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910010185.7A CN109815560A (zh) 2019-01-04 2019-01-04 一种基于bim的设计算量施工全生命周期应用的方法

Publications (1)

Publication Number Publication Date
CN109815560A true CN109815560A (zh) 2019-05-28

Family

ID=66603929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910010185.7A Pending CN109815560A (zh) 2019-01-04 2019-01-04 一种基于bim的设计算量施工全生命周期应用的方法

Country Status (1)

Country Link
CN (1) CN109815560A (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110727983A (zh) * 2019-09-27 2020-01-24 贵州百胜工程建设咨询有限公司 一种关于公共医疗建筑的bim建模方法
CN111506957A (zh) * 2020-06-17 2020-08-07 南京长江都市建筑设计股份有限公司 建筑结构设计控制方法、装置、设备和介质
CN111709081A (zh) * 2020-06-22 2020-09-25 苏州柝创智慧建筑科技有限公司 一种基于bim技术的施工成本控制系统
CN111783202A (zh) * 2020-06-23 2020-10-16 中民筑友建设科技集团有限公司 基于bim的预制楼板外轮廓体生成方法、装置、设备及介质
CN111831260A (zh) * 2020-07-13 2020-10-27 重庆大学 一种基于web建模的数据同步方法、系统及相关装置
CN112001022A (zh) * 2020-08-27 2020-11-27 四川公路桥梁建设集团有限公司 一种基于bim模型快速拆分方法及系统
CN112035913A (zh) * 2020-07-16 2020-12-04 中国二十冶集团有限公司 承压设备基础电算建模方法
CN112836256A (zh) * 2020-12-21 2021-05-25 中建安装集团有限公司 一种基于bim机电模型的算量方法
CN112861240A (zh) * 2021-03-05 2021-05-28 广联达科技股份有限公司 二次构件的算量方法、装置、计算机设备及可读存储介质
CN113065783A (zh) * 2021-04-13 2021-07-02 中国天楹股份有限公司 一种基于bim技术的垃圾焚烧发电厂bim工程量应用方法
CN117235876A (zh) * 2023-11-14 2023-12-15 中国建筑西南设计研究院有限公司 一种基于Rhinoceros统计工程量的方法和系统
CN117974073A (zh) * 2024-03-29 2024-05-03 深圳华建电力工程技术有限公司 基于Revit软件的电力工程数字化模型算量统计方法及系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105868440A (zh) * 2016-03-21 2016-08-17 扬州大学 一种基于bim技术的建设工程数据建模方法
CN107704703A (zh) * 2017-10-19 2018-02-16 广州中建亿信科技有限公司 一种土建bim工程量模型的构建方法
CN108509220A (zh) * 2018-04-02 2018-09-07 厦门海迈科技股份有限公司 Revit工程计算量并行处理方法、装置、终端及介质
CN108846639A (zh) * 2018-06-12 2018-11-20 湖南建工集团有限公司 一种基于bim技术设计施工计价管理系统及方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105868440A (zh) * 2016-03-21 2016-08-17 扬州大学 一种基于bim技术的建设工程数据建模方法
CN107704703A (zh) * 2017-10-19 2018-02-16 广州中建亿信科技有限公司 一种土建bim工程量模型的构建方法
CN108509220A (zh) * 2018-04-02 2018-09-07 厦门海迈科技股份有限公司 Revit工程计算量并行处理方法、装置、终端及介质
CN108846639A (zh) * 2018-06-12 2018-11-20 湖南建工集团有限公司 一种基于bim技术设计施工计价管理系统及方法

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
师卫锋: "《土木工程施工与项目管理分析》", 30 June 2018 *
张大镇等: "三维数字化技术在建筑设计全过程质量管控中的应用", 《福建建设科技》 *
李欣等: "BIM技术在天津周大福智能化项目中的应用", 《智能建筑》 *
柯忱: "BIM技术在南京某地铁车站给排水及消防设计中的应用", 《建材与装饰》 *
钟炜等: "海南酒店项目BIM-5D精细化管理研究", 《土木建筑工程信息技术》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110727983A (zh) * 2019-09-27 2020-01-24 贵州百胜工程建设咨询有限公司 一种关于公共医疗建筑的bim建模方法
CN111506957A (zh) * 2020-06-17 2020-08-07 南京长江都市建筑设计股份有限公司 建筑结构设计控制方法、装置、设备和介质
CN111506957B (zh) * 2020-06-17 2020-09-29 南京长江都市建筑设计股份有限公司 建筑结构设计控制方法、装置、设备和介质
CN111709081A (zh) * 2020-06-22 2020-09-25 苏州柝创智慧建筑科技有限公司 一种基于bim技术的施工成本控制系统
CN111783202A (zh) * 2020-06-23 2020-10-16 中民筑友建设科技集团有限公司 基于bim的预制楼板外轮廓体生成方法、装置、设备及介质
CN111831260B (zh) * 2020-07-13 2022-08-02 重庆云图软件科技有限公司 一种基于web建模的数据同步方法、系统及相关装置
CN111831260A (zh) * 2020-07-13 2020-10-27 重庆大学 一种基于web建模的数据同步方法、系统及相关装置
CN112035913B (zh) * 2020-07-16 2023-04-07 中国二十冶集团有限公司 承压设备基础电算建模方法
CN112035913A (zh) * 2020-07-16 2020-12-04 中国二十冶集团有限公司 承压设备基础电算建模方法
CN112001022A (zh) * 2020-08-27 2020-11-27 四川公路桥梁建设集团有限公司 一种基于bim模型快速拆分方法及系统
CN112836256A (zh) * 2020-12-21 2021-05-25 中建安装集团有限公司 一种基于bim机电模型的算量方法
CN112861240A (zh) * 2021-03-05 2021-05-28 广联达科技股份有限公司 二次构件的算量方法、装置、计算机设备及可读存储介质
CN113065783A (zh) * 2021-04-13 2021-07-02 中国天楹股份有限公司 一种基于bim技术的垃圾焚烧发电厂bim工程量应用方法
CN117235876A (zh) * 2023-11-14 2023-12-15 中国建筑西南设计研究院有限公司 一种基于Rhinoceros统计工程量的方法和系统
CN117235876B (zh) * 2023-11-14 2024-01-30 中国建筑西南设计研究院有限公司 一种基于Rhinoceros统计工程量的方法和系统
CN117974073A (zh) * 2024-03-29 2024-05-03 深圳华建电力工程技术有限公司 基于Revit软件的电力工程数字化模型算量统计方法及系统

Similar Documents

Publication Publication Date Title
CN109815560A (zh) 一种基于bim的设计算量施工全生命周期应用的方法
WO2022048156A1 (zh) 抽水蓄能电站综合管理方法、平台、系统、设备和介质
US20210294299A1 (en) Method and system for building framing and manufacturing system
CN109146089A (zh) 一种基于bim的设备全生命周期管理方法
CN106407540A (zh) 一种基于三维gis技术的地下管线辅助规划审核方法
CN105844380A (zh) 基于bim的bim工程项目要素的管理方法及系统
CN104866952A (zh) 水电站工程项目三维数字化管理实施方法
CN101689122A (zh) 数字化设计生态系统
CN102360535A (zh) 三维可视化仿真培训系统及其方法
CN102117367A (zh) 飞机装配现场可视化仿真系统
CN107391842A (zh) 基于建筑信息模型的隐蔽工程设计系统及其设计方法
CN110990927A (zh) 基于bim的全过程咨询方法
CN110443499A (zh) 一种清单工程量自动生成方法及系统
CN110276555A (zh) 基于互联网和bim的住宅建筑实体全生命周期分析方法
CN103093007A (zh) 输电铁塔三维虚拟装配方法
CN108228997A (zh) 一种施工管理平台系统
CN110990914A (zh) 基于bim技术的大型锅炉安装方法
CN111651818A (zh) 一种bim模型快速变更方法
CN107679332B (zh) 基于Tekla平台的输电铁塔BIM模型构建方法
CN106408255A (zh) 基于建筑信息模型bim的多维编码分析方法及其系统
CN113987659A (zh) 一种基于bim技术的建筑设计方法
CN109887092A (zh) 利用虚拟现实技术搭建的复杂地形下光伏电站的设计平台
CN108776837A (zh) 基于建筑信息模型和虚拟现实技术的建筑运维管理系统和方法
CN111428310A (zh) 一种基于bim和gis的地下管廊模型构建方法
CN113420359B (zh) 一种基于revit的电力工程总图自动传参布井的方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190528