CN108824475A CN201810693726.6A CN201810693726A CN108824475A CN 108824475 A CN108824475 A CN 108824475A CN 201810693726 A CN201810693726 A CN 201810693726A CN 108824475 A CN108824475 A CN 108824475A
Authority
CN
China
Prior art keywords
cushion cap
tubular pole
equilateral triangle
piecemeal
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810693726.6A
Other languages
English (en)
Inventor
祝小彦
张新合
李占岭
王耀福
胡振鹏
张旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201810693726.6A priority Critical patent/CN108824475A/zh
Publication of CN108824475A publication Critical patent/CN108824475A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

一种输电线路等边三角形承台桩装配式基础,它涉及220kV输电线路技术领域,包括立柱,等边三角形承台,管桩,所述等边三角形承台有三块,其大小一样,承台下方是管桩,管桩有三根,管桩中预埋有机械套筒,双头螺柱一端连接管桩中预埋的机械套筒,另一端穿过承台预留孔后经螺母连接,承台分块拼装时,内部钢筋采用机械套筒连接,承台分块上下表面连接处采用钢板螺栓进行双面连接,立柱最下端埋有法兰盘,承台和立柱通过法兰盘进行连接。立柱、承台和管桩都是在工厂预制生产和现场拼装施工,克服了施工季节性的限制,不仅方便现场工人操作,保证产品质量,方便运输,而且还提升了输电线路杆塔基础机械化施工水平,大大提高了施工效率。

Description

一种输电线路等边三角形承台桩装配式基础
技术领域:
本发明涉及220kV输电线路技术领域,涉及到预制等边三角形承台的分块拼装连接以及等边三角形承台与管桩的连接。
背景技术:
现有输电线路领域所使用的装配式基础主要有型钢装配式基础和混凝板条+型钢装配式基础两种形式,缺乏对混凝土装配式基础的研究,装配式基础是各类输电线路杆塔基础中施工周期最短的基础,开展输电线路预制混凝土基础研究及应用工作,促进杆塔基础模块化、批量化加工生产,提高杆塔基础质量;同时装配式基础不需现场混凝土养护,能有效缩短输电线路杆塔基础施工周期,提升输电线路工程建设效率。
发明内容:
本发明的目的是提供一种基础的立柱、承台和管桩都是在工厂预制生产和现场拼装施工,克服了施工季节性的限制,不仅方便现场工人操作,减少人工作业量,保证产品质量,承台模块化方便运输,便于统一配料,减少材料消耗,而且还提升了输电线路杆塔基础机械化施工水平,特别是在山区、丘陵地段施工,大大提高了施工效率,同时装配式基础不需现场混凝土养护,提升了输电线路工程建设效率的混凝土构件拼装的装配式基础。
附图说明:
图1为本发明的承台分块顶面机械套筒连接完成前局部剖面图;
图2为本发明的承台分块顶面机械套筒连接完成后局部剖面图;
图3为本发明的承台分块底面机械套筒连接完成前局部剖面图;
图4为本发明的承台分块底面机械套筒连接完成后局部剖面图;
图5为本发明的承台分块侧面钢板螺栓连接示意图;
图6为本发明的立柱、承台和管桩连接成整体后的结构示意图;
图7为本发明的承台与管桩桩顶连接图。
具体实施方式:
一种输电线路承台桩装配式基础设计步骤如下:
参照图1-7,包括管桩1、承台2、立柱3,所述管桩有三根,承台有三块,预应力锚固筋4、预埋机械套筒5、双头螺柱6、螺栓7、钢板8、预埋法兰盘9、预埋钢筋10、预留凹槽11、管桩端板12、预留孔13、预埋锚栓14;
如图1,在承台2分块预埋钢筋10处预留凹槽11,在承台2分块拼装连接前,机械套筒5首先安装到预埋钢筋10的一端,然后将承台2分块进行拼装,拼装好之后将机械套筒5拧到承台2另一分块预埋钢筋上进行连接,如图2,机械套筒5连接预埋钢筋10完成,承台2分块的连接需要上下双面连接;
如图3和图4,承台2底面机械套筒5在承台2预制时首先预埋到里面,之后用钢板8通过螺栓7进行承台2分块之间的连接;
如图5,承台2侧面连接,也是通过在承台2中预埋机械套筒5,之后用钢板8通过螺栓7进行承台2分块之间的连接;
如图6,管桩1中预埋的预应力锚固筋4和预埋机械套筒5进行锚固连接,双头螺柱6与机械套筒5连接,且机械套筒5穿过承台2预留孔13后经螺母与承台2连接成一个整体;
如图7,是管桩1桩顶与承台2的连接详图;
如图1-4承台2顶面的连接是跟承台2底面连接方式一样,机械套筒5在承台2预制时首先预埋到里面,之后用钢板8通过螺栓7进行承台2分块之间的连接,立柱3最下端预埋有法兰盘9,拼装承台2与立柱3通过法兰盘9用预埋锚栓14连接,进而形成一个完整的装配式基础;
在完成第(5)步的时候,采用灌浆料或树脂等材料对预留孔、预留凹槽和承台分块间缝隙进行填充密封。

Claims (5)

1.一种输电线路等边三角形承台桩装配式基础,其特征在于,包括立柱,等边三角形承台,管桩,所述等边三角形承台有三块,其大小一样,承台下方是管桩,管桩有三根,管桩中预埋有机械套筒,双头螺柱一端连接管桩中预埋的机械套筒,另一端穿过承台预留孔后经螺母连接,承台分块拼装时,内部钢筋采用机械套筒连接,承台分块上下表面连接处采用钢板螺栓进行双面连接,立柱最下端埋有法兰盘,承台和立柱通过法兰盘进行连接。
2.根据1所述基础,其特征在于,所述预制等边三角形承台为均匀三块拼装结构。
3.根据1所述基础,其特征在于,承台分块横向拼装时,承台内部钢筋用机械套筒连接。
4.根据1所述基础,其特征在于,承台分块横向拼装时,承台分块上下表面连接处采用钢板螺栓双面连接。
5.根据1所述基础,其特征在于,在管桩中预埋机械套筒,并采用双头螺柱将等边三角形承台和管桩进行机械连接。
CN201810693726.6A 2018-06-29 2018-06-29 一种输电线路等边三角形承台桩装配式基础 Pending CN108824475A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810693726.6A CN108824475A (zh) 2018-06-29 2018-06-29 一种输电线路等边三角形承台桩装配式基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810693726.6A CN108824475A (zh) 2018-06-29 2018-06-29 一种输电线路等边三角形承台桩装配式基础

Publications (1)

Publication Number Publication Date
CN108824475A true CN108824475A (zh) 2018-11-16

Family

ID=64134175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810693726.6A Pending CN108824475A (zh) 2018-06-29 2018-06-29 一种输电线路等边三角形承台桩装配式基础

Country Status (1)

Country Link
CN (1) CN108824475A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680687A (zh) * 2019-01-17 2019-04-26 江西联保工程咨询有限公司 一种桩台一体成型的施工工艺
CN109989419A (zh) * 2019-03-25 2019-07-09 国网山东省电力公司德州供电公司 一种装配式“凹槽型”phc管桩基础
CN110644470A (zh) * 2019-10-18 2020-01-03 中国铁路设计集团有限公司 一种预制管桩与预制承台间预埋钢套筒接头结构
CN113668596A (zh) * 2021-09-05 2021-11-19 弓健 装配式预制铁塔基础

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005194792A (ja) * 2004-01-08 2005-07-21 Ishikawajima Harima Heavy Ind Co Ltd 洋上風力発電装置の基礎および洋上風力発電装置の据付方法
CN103590414A (zh) * 2013-11-19 2014-02-19 中铁第四勘察设计院集团有限公司 一种混凝土管桩与承台的连接结构
CN106836269A (zh) * 2017-04-07 2017-06-13 江苏国华管塔制造有限公司 装配式快装基础
CN107090841A (zh) * 2017-04-17 2017-08-25 广州电力设计院 预制承台基础、输电杆塔及其施工方法
CN206635791U (zh) * 2017-01-23 2017-11-14 沈阳建筑大学 一种装配式桥梁墩柱结构
CN207228148U (zh) * 2017-09-20 2018-04-13 天元瑞信通信技术股份有限公司 一种单管塔预制拼装式基础
CN107964979A (zh) * 2017-12-26 2018-04-27 国家电网公司 一种输电线路组合结构装配式承台锚杆基础

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005194792A (ja) * 2004-01-08 2005-07-21 Ishikawajima Harima Heavy Ind Co Ltd 洋上風力発電装置の基礎および洋上風力発電装置の据付方法
CN103590414A (zh) * 2013-11-19 2014-02-19 中铁第四勘察设计院集团有限公司 一种混凝土管桩与承台的连接结构
CN206635791U (zh) * 2017-01-23 2017-11-14 沈阳建筑大学 一种装配式桥梁墩柱结构
CN106836269A (zh) * 2017-04-07 2017-06-13 江苏国华管塔制造有限公司 装配式快装基础
CN107090841A (zh) * 2017-04-17 2017-08-25 广州电力设计院 预制承台基础、输电杆塔及其施工方法
CN207228148U (zh) * 2017-09-20 2018-04-13 天元瑞信通信技术股份有限公司 一种单管塔预制拼装式基础
CN107964979A (zh) * 2017-12-26 2018-04-27 国家电网公司 一种输电线路组合结构装配式承台锚杆基础

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680687A (zh) * 2019-01-17 2019-04-26 江西联保工程咨询有限公司 一种桩台一体成型的施工工艺
CN109680687B (zh) * 2019-01-17 2021-02-05 江西联保工程咨询有限公司 一种桩台一体成型的施工工艺
CN109989419A (zh) * 2019-03-25 2019-07-09 国网山东省电力公司德州供电公司 一种装配式“凹槽型”phc管桩基础
CN109989419B (zh) * 2019-03-25 2021-02-02 国网山东省电力公司德州供电公司 一种承台上端可以微调杆件高度的高度调节装置
CN110644470A (zh) * 2019-10-18 2020-01-03 中国铁路设计集团有限公司 一种预制管桩与预制承台间预埋钢套筒接头结构
CN113668596A (zh) * 2021-09-05 2021-11-19 弓健 装配式预制铁塔基础

Similar Documents

Publication Publication Date Title
CN108824475A (zh) 一种输电线路等边三角形承台桩装配式基础
CN107254884A (zh) 一种可拆卸预制装配式方钢管混凝土柱脚节点
CN106284655B (zh) 预制混凝土梁柱栓接连接节点及连接方法
CN106321367A (zh) 斜拉预应力钢与混凝土组合式风机塔架
CN203755778U (zh) 装配式体外预应力活性粉末混凝土风电塔架
CN107435338A (zh) 架空输电线路混凝土预制管桩承台连接装置
CN103225304A (zh) 一种海上基础支撑结构及其施工方法
JP2006299631A (ja) プレキャスト工法による変断面塔状構造物
CN207047885U (zh) 一种体外预应力混凝土风机塔架空心基础
CN103924679A (zh) 预应力与普通钢筋连接混凝土梁圆钢管混凝土柱组合节点
CN108755739B (zh) 一种风力发电机组基础环
CN208441126U (zh) 一种海上钢结构高桩承台风机基础
CN106400832B (zh) 一种环保型装配式后注浆钢筒桩基础的施工方法
CN207194001U (zh) 一种新型架空输电线路混凝土预制管桩承台基础
CN206815278U (zh) 一种软土地基上的装配整体式驳岸结构
CN206873663U (zh) 全装配式预应力低损伤板墙结构
CN206359881U (zh) 一种装配式空心钢管约束钢筋混凝土柱高墩
CN206204985U (zh) 一种环保型装配式后注浆钢筒桩基础
CN104153630A (zh) 混合式风电塔架的过渡连接方法
CN104895401B (zh) 组合式装配围墙及其施工方法
CN209603166U (zh) 一种杆塔用螺旋桩
CN209482822U (zh) 混凝土装配式围墙
CN103938731B (zh) 预应力与普通钢筋连接预制混凝土梁圆钢管混凝土柱组合节点
CN106836324A (zh) 一种增设斜向抗拉钢筋的风机基础加固方法
CN203531004U (zh) 一种电抗器基础

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181116