CN108756892B - Work platform, continuous operation system and continuous operation method for tunnel construction - Google Patents

Work platform, continuous operation system and continuous operation method for tunnel construction Download PDF

Info

Publication number
CN108756892B
CN108756892B CN201810289134.8A CN201810289134A CN108756892B CN 108756892 B CN108756892 B CN 108756892B CN 201810289134 A CN201810289134 A CN 201810289134A CN 108756892 B CN108756892 B CN 108756892B
Authority
CN
China
Prior art keywords
arch
tunnel
construction
support
arch support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810289134.8A
Other languages
Chinese (zh)
Other versions
CN108756892A (en
Inventor
伍毅敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201810289134.8A priority Critical patent/CN108756892B/en
Publication of CN108756892A publication Critical patent/CN108756892A/en
Application granted granted Critical
Publication of CN108756892B publication Critical patent/CN108756892B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses an operation platform, a continuous operation system and an operation method for tunnel construction, wherein the operation platform comprises an arch support similar to the transverse shape of the arch inner wall of a tunnel and a traveling system for the arch support to move along the longitudinal direction of the tunnel; the walking system comprises a main walking mechanism and an auxiliary walking mechanism; the arch support is connected to the suspension track in a hanging manner through the main travelling mechanism, and the arch support is connected to the support track in a supporting manner through the auxiliary travelling mechanism, and the annular travelling mechanism for carrying the construction equipment head is arranged on the arch support along the circular arch direction of the arch support. The continuous operation system for tunnel construction provided by the operation platform provides a brand-new tunnel drilling and blasting method construction mode, effectively solves the technical problems of irregular construction sites, multiple excavation construction methods and poor equipment universality existing in the drilling and blasting method construction process, and lays foundation conditions for realizing comprehensive mechanization and unmanned construction of the drilling and blasting method tunnel.

Description

Work platform, continuous operation system and continuous operation method for tunnel construction
Technical Field
The invention belongs to the tunnel construction technology, and particularly relates to an operation platform, a continuous operation system for tunnel construction and an operation method thereof.
Background
In the intelligent building era, comprehensive mechanization and unmanned construction are the necessary trend of tunnel engineering technology development. The drilling and blasting method and the shield method are two main methods for tunnel construction. At present, a complete large-scale shield machine is adopted for constructing a tunnel by a shield method, so that full-process mechanized construction such as tunneling, slag discharge, duct piece assembly, back grouting and the like can be realized, and unmanned construction can be achieved theoretically. The tunnel is built by the drilling and blasting method, which comprises a plurality of working procedures such as excavation, support, waterproof layer laying and hanging, lining pouring, lining health maintenance and the like, and each working procedure is provided with special mechanical equipment or a working bench, so that the realization of comprehensive mechanical unmanned construction faces great difficulty. However, the drilling and blasting method has the irreplaceable advantages and adaptability of the shield method in the aspects of tunnel scale, channel condition, construction site, prefabrication condition and the like, and is still the most important method for tunnel construction in a quite long time in the future.
When the drilling and blasting method is adopted for construction, different types of trolleys and tools exist in each construction step of excavation (rock drilling, charging, blasting and slag discharging), support (anchoring, stand and concrete spraying), construction monitoring, waterproof layer paving and hanging, lining (including binding reinforcing steel bars), maintenance and the like, and the trolleys and tools are supported and arranged on the ground of a tunnel for walking construction, and have great differences in various aspects of geometric structures, sizes, travelling mechanisms, operation control and the like. Meanwhile, the tunnel constructed by adopting the drilling and blasting method is blasted and broken by adopting explosive, the bottom of the tunnel actually excavated is rugged, and the construction site is extremely irregular by adding groundwater for soaking and rolling by vehicles. In addition, when the drilling and blasting method is adopted for construction, according to different stratum conditions, multiple excavation methods such as a full-face method, an up-down step method, a three-step method and a pilot tunnel method can be adopted for excavation, the number, the shape and the size of section blocks of different excavation methods are different, the bottom edge of a tunnel in each excavation stage cannot meet the requirement of comprehensive mechanization, and special construction machines are required to be designed corresponding to special construction conditions. The above factors cause great difficulty in realizing comprehensive mechanical unmanned construction of the tunnel by the drilling and blasting method.
For example, chinese patent application No. 201520901763.3 discloses a multifunctional arch frame for tunnel construction, wherein a working platform is arranged on a chassis provided with moving wheels through a supporting frame, and is supported and moved on the construction ground of a tunnel through the moving wheels. The work platform of the arch frame is only generally suitable for laying and installing the circuit in the later period of the tunnel, and the ground of the tunnel is leveled at the moment, so that the movable wheels can roll conveniently. However, the arch frame cannot be applied to the construction of a tunnel by a drilling and blasting method.
Disclosure of Invention
The invention solves the technical problems that: aiming at the construction difficulty caused by irregular construction sites in the construction process of the conventional tunnel drilling and blasting method, the novel operation platform, the continuous operation system and the operation method for tunnel construction are provided, and the standardized and systematic construction of the tunnel drilling and blasting method can be realized through the operation platform and the continuous operation system.
The invention is realized by adopting the following technical scheme:
the working platform comprises an arch support 1 similar to the transverse shape of the arch inner wall of the tunnel and a traveling system for moving the arch support along the longitudinal direction of the tunnel;
the walking system comprises a main walking mechanism 2 and an auxiliary walking mechanism 3;
the main travelling mechanism 2 comprises a hanging rail 21 and a main travelling wheel 22, wherein the hanging rail 21 is longitudinally paved along the top of the arched inner wall of the tunnel, the rail surface is upward, and the main travelling wheel 22 is assembled on the central top of the arched bracket 1 and is in rolling fit with the hanging rail 21 to hang and connect the arched bracket 1 on the hanging rail 21;
the auxiliary travelling mechanism 3 comprises a supporting rail 31 and auxiliary travelling wheels 32, the supporting rail 31 is longitudinally paved on the arched inner walls of the tunnels at the two sides of the hanging rail 21 along the tunnel, the rail surface faces upwards, and the auxiliary travelling wheels 32 are assembled at the two sides of the arched bracket 1 and are in rolling fit with the supporting rail 31 to support and connect the arched bracket 1 on the supporting rail;
the main travelling mechanism 2 and/or the auxiliary travelling mechanism 3 are/is provided with driving equipment for driving travelling wheels.
Further, the arch support 1 is provided with a circumferential travelling mechanism 4 along the arch direction.
Further, the annular travelling mechanism 4 comprises transmission teeth 41 continuously arranged along the arch direction of the arch support 1 and a moving operation support 42 arranged on the arch support in a guiding manner, wherein the moving operation support 42 is arranged along the arch direction of the arch support 1 in a guiding manner, and is driven to move along the arch direction of the arch support through a driving gear 43 meshed with the transmission teeth.
Further, the auxiliary support system 5 is further included, and the auxiliary support system 5 comprises a lateral support structure 51 located between two sides of the arch support and the arch inner wall of the tunnel, and a vertical support structure 52 located between two ends of the arch support and the ground of the tunnel.
Further, the lateral support structure 51 is a telescopic lateral support shoe laterally disposed on an arch support.
Further, the vertical support structure 52 is a telescopic leg vertically disposed at an end of the arch-shaped bracket.
Further, the arch support 1 is a spliced arch truss structure.
The invention also discloses a continuous operation system for tunnel construction, which comprises a plurality of groups of operation platforms;
the operation platforms are respectively distributed at each construction section of tunnel construction, and construction equipment heads used for corresponding construction sections are arranged on arch supports of different construction sections.
Specifically, the construction equipment head comprises at least one of a scanning head, a concrete spraying head, a water spraying head, a rock drilling head and a waterproof board rolling shaft.
The invention also discloses a continuous operation method for tunnel construction, which adopts the continuous operation system to carry out drilling and blasting method tunnel construction, and uses a plurality of groups of working platforms to sequentially carry out drilling, blasting, supporting, waterproof and lining construction on each construction section.
According to the invention, by utilizing the characteristic that the arched inner wall of the tunnel is more uniform and regular than the ground in the tunnel construction process, two groups of travelling mechanisms are arranged on the arch crown of the tunnel, and the arch support similar to the arched inner wall of the tunnel is hung and arranged through the main travelling mechanism, so that the limitation of the tunnel ground is eliminated in the mobile construction process, and the problem of extremely irregular construction site is solved.
Meanwhile, working procedure operation tools for tunnel construction can be carried on the standardized arch support, and all operation platforms of all longitudinal construction sections of the tunnel can walk on the same track system, so that systemization and standardization of each working procedure are realized.
The arched bracket is assembled by adopting modularized trusses at the same time, so that the expansion or folding adjustment of the operation platform is realized, the construction and the assembly of different construction sizes are facilitated, the operation requirements of different excavation construction methods are met, and the problem of diversity of the excavation construction methods is solved.
By the technical scheme, a brand new tunnel drilling and blasting method construction mode is provided, the technical problems of irregular construction sites, multiple excavation construction methods and poor equipment universality in the drilling and blasting method construction process are effectively solved, and foundation conditions are laid for realizing comprehensive mechanization and unmanned construction of the drilling and blasting method tunnel.
The invention is further described below with reference to the drawings and detailed description.
Drawings
Fig. 1 is a schematic structural diagram of a working platform according to a first embodiment.
Fig. 2 is a schematic cross-sectional distribution diagram of a working platform in a tunnel step excavation process in accordance with the first embodiment.
Fig. 3 is a schematic structural view of the working platform in a step-up arrangement in the first embodiment.
Fig. 4 is a schematic structural view of the working platform in a low-level arrangement of steps in the first embodiment.
Fig. 5 is a schematic structural diagram of a working platform with a circumferential traveling mechanism in the first embodiment.
Fig. 6 is a schematic structural diagram of a working platform in the second embodiment.
Fig. 7 is a schematic cross-sectional distribution diagram of the continuous operation system in the third embodiment during the drilling and blasting process.
Fig. 8 is a schematic structural diagram of one set of working platforms in the continuous operation system in the third embodiment, where the working platforms are mainly used for primary support and support lining maintenance of the tunnel.
Fig. 9 is a schematic structural view of another set of working platform in the continuous operation system in the third embodiment, and the working platform is mainly used for rolling and paving the waterproof board.
Reference numerals:
a 1-arch bracket,
2-a main travelling mechanism, 21-a suspension rail, 22-a main travelling wheel, 23-a wheel carrier, 24-a guide rail bracket,
3-auxiliary travelling mechanism, 31-supporting rail, 32-auxiliary travelling wheel,
4-annular travelling mechanism, 41-transmission gear, 42-movable operation bracket and 43-driving gear
5-auxiliary support system, 51-lateral support structure, 52-vertical support structure,
101-rock drilling machine head, 102-concrete spraying machine head, 103-water spraying machine head and 104-waterproof plate roller
61-Arch inner wall of tunnel, 62-Tunnel floor
Detailed Description
Example 1
In order to solve the problem that operation equipment such as a trolley is not easy to erect and move due to irregular construction sites in the tunnel drilling and blasting method construction process, a novel operation platform scheme is provided, and the operation platform mainly comprises an arch support 1, a main travelling mechanism 2 and an auxiliary travelling mechanism 3 as shown in an attached figure 1.
Specifically, the arched bracket 1 is an arc truss member, and the shape of the arc of the outer side of the arched bracket is similar to that of the arched inner wall 61 of the tunnel, so that the arched bracket 1 can be guaranteed to be parallel to the cross section of the arched inner wall of the tunnel when being clung to the arched inner wall of the tunnel, and the whole operation platform can avoid collision with the arched inner wall of the tunnel when moving.
In combination with the illustration of fig. 2, the construction ground heights are different between different sections in different construction sections in the tunnel, so that the lengths of the arched inner walls of the tunnel are different, therefore, the arched bracket 1 of the embodiment adopts a truss with a splicing structure, the arched brackets with corresponding lengths can be assembled and spliced according to the actual conditions of different construction sections, and aluminum alloy materials are adopted, so that the self weight of the working platform is reduced as much as possible while the strength is ensured.
The arch support 1 is connected to the arch inner wall 61 of the tunnel through the main traveling mechanism 2 and the auxiliary traveling mechanism 3, so that the whole arch support 1 is suspended relative to the tunnel ground in the moving process, is not in contact with the tunnel ground, the influence of irregular ground of tunnel construction on a working platform is avoided, and the main traveling mechanism 2 and the auxiliary traveling mechanism 3 in the embodiment not only realize the guiding traveling of the arch support 1, but also serve as a suspension support piece for the arch support 1 to be suspended on the arch inner wall.
As shown in fig. 1, 3 and 4, the main travelling mechanism 2 comprises a suspension rail 21, a main travelling wheel 22, a wheel frame 23 and a guide rail bracket 24, wherein the suspension rail 21 is longitudinally paved along the top of the arched inner wall of the tunnel, a plurality of L-shaped guide rail brackets 24 are anchored and fixed to the inner wall of the tunnel along the track of the suspension rail 21, the suspension rail 21 is fixedly paved on the guide rail brackets 24, and the track surface of the suspension rail 21 is kept upwards. The main travelling wheel 22 is assembled at the center top of the arch support 1 through the wheel frame 23, the main travelling wheel 22 is assembled on the hanging rail 21 in a rolling way, the arch support 1 is guided to move along the hanging rail 21 through the structure, and meanwhile the arch support 1 is hung on the arch inner wall 61 of the tunnel in a hanging way through the main travelling wheel 22.
In order to ensure the stability and strength of the main travelling mechanism 2, the suspension rails 21 are arranged in parallel in two groups, and correspondingly, the arch-shaped bracket is reliably suspended on the suspension rails 21 through the cooperation of the two groups of symmetrical main travelling wheels 22.
The auxiliary travelling mechanism 3 comprises a supporting rail 31 and auxiliary travelling wheels 32, wherein the supporting rail 31 is longitudinally paved on the arched inner walls of the tunnels at two sides of the hanging rail 21 along the tunnel, a plurality of horizontal supports are anchored and fixed to the inner walls of the tunnels along the track of the supporting rail 31, the supporting rail 31 is directly paved on the horizontal supports, the track surface of the supporting rail 31 is kept upwards, and the hanging rails 21 at two sides can be symmetrically arranged. The auxiliary travelling wheels 32 are assembled on two sides of the arch support 1, meanwhile, the auxiliary travelling wheels 32 are assembled on the supporting rails 31 in a rolling mode, the auxiliary supporting function is achieved on the arch support 1 through the auxiliary supporting rails, and the fact that all stress of the arch support 1 is concentrated on the main travelling mechanism is avoided.
The number of the auxiliary travelling mechanisms 3 can be designed according to the overall length of the arch support 1, for example, in fig. 3, two groups of auxiliary travelling mechanisms are respectively arranged between two sides of the longer arch support 1 and the arch inner wall 61 of the tunnel, and in fig. 4, one group of auxiliary travelling mechanisms are respectively arranged between two sides of the shorter arch support 1 and the arch inner wall 61 of the tunnel.
At least one of the main running gear 2 and the auxiliary running gear 3 is provided with a drive device, such as a drive motor, for driving the running wheels to run along the track.
As shown in fig. 5, in order to enable the working platform to realize automatic construction control, the circular traveling mechanism 4 is arranged on the arch support 1 along the circular arch direction of the working platform, the machine head of the construction equipment can be used for moving and constructing along the arch support 1 by the circular traveling mechanism 4 to cling to the inner wall of the tunnel, and the working platform is combined with the active traveling mechanism 2 and the auxiliary traveling mechanism 3 to realize full-face coverage construction of the inner wall of the tunnel.
Specifically, the annular travelling mechanism 4 comprises a transmission gear 41 continuously arranged along the circular arch direction of the arch support 1 and a movable operation support 42 arranged on the arch support in a guiding manner, wherein the movable operation support 42 is arranged along the circular arch direction of the arch support 1 in a guiding manner, and the movable operation support 42 and the arch support 1 can be driven to move along the circular arch direction of the arch support through a driving gear 43 meshed with the transmission gear in a guiding manner through guide wheels and guide rails. Meanwhile, the annular travelling mechanism 4 is arranged to avoid the main travelling mechanism and the auxiliary travelling mechanism of the arch support, so that the travelling mechanisms in different directions are prevented from interfering with each other.
The driving gear 43 is driven by a motor capable of self-locking, and the driving mode of the driving gear 43 and the transmission gear 41 is adopted to drive the construction equipment machine head to climb along the arch support 1, and meanwhile, the machine head can be positioned at any position of the arch support by utilizing the characteristic of meshing transmission.
The operation platform in the embodiment can be used for scanning construction of tunnel surrounding rock and structural conditions.
Example two
The first embodiment belongs to a light working platform, and can be used for the construction procedures of scanning the inner wall of a tunnel and the like without bearing a great load. In order to further improve the construction procedures which are required to bear larger loads, the embodiment provides another working platform scheme on the basis of the first embodiment.
As shown in fig. 6, the arch support 1 is suspended and connected to the arch inner wall 61 of the tunnel through the main travelling mechanism 2 and the auxiliary travelling mechanism 3, and in order to realize the construction process that the arch support 1 can bear larger load, an auxiliary supporting system 5 is further arranged on the arch support 1, and after the arch support 1 is moved and positioned to a fixed position, the arch support 1, the arch inner wall 61 of the tunnel and the tunnel ground 62 are supported and fixed, so that an auxiliary support of a working platform in the construction process is provided.
Specifically, the support system 5 includes a lateral support structure 51 and a vertical support structure 52, where the lateral support structure 51 is fixedly disposed on two sides of the arch support 1, and a telescopic lateral support boot that is deployed towards two sides is adopted, and extends outwards through the telescopic lateral support boot, so that the support system can be transversely supported on the arch inner wall 61 of the tunnel; the vertical supporting structure 52 is fixedly arranged at two ends of the arch support 1, adopts vertical downward telescopic supporting legs, is in contact with the tunnel ground 62 downwards through the telescopic supporting legs, and provides vertical support for the arch support 1, and the vertical supporting structure only needs to level two side positions of the tunnel ground and does not need large-area occupied tunnel ground space.
After the arch support 1 moves to a specified construction position, the telescopic lateral support shoes and the telescopic support legs extend out, reliable supports are respectively formed between the arch support 1 and the arch inner wall 61 of the tunnel and between the arch support 1 and the ground 62 of the tunnel, all loads in the construction process are prevented from being concentrated on the travelling mechanism, and the construction reliability of the working platform is improved.
In practical application, the arched bracket 1 can be assembled and adjusted in length according to an actual excavation construction method. Taking the construction of the up-down step method as an example, as shown in fig. 3 and 4 of the first embodiment, when the tunnel is excavated to go up the step, the height of the arch support 1 is lower, the overall length is shorter, and only one group of auxiliary travelling mechanisms 3 and one group of lateral support structures 51 are required to be arranged on two sides. After the tunnel is excavated down the step, the height of the arch support 1 is increased, the whole length is longer, the weight of the support is increased, two or more groups of auxiliary travelling mechanisms 3 and a group of lateral support structures 51 can be arranged on two sides, and therefore the working platform has more reliable stability and strength in the construction process.
In this embodiment, the arched bracket 1 is also provided with the annular travelling mechanism 4, and the specific structure is the same as that of the first embodiment, and care needs to be taken to avoid the auxiliary supporting system when the annular travelling mechanism is provided. The working platform of the embodiment is a medium or heavy working platform and can be used for carrying construction such as rock drilling, supporting, lining or waterproof paving.
Example III
The embodiment provides a continuous operation system for tunnel construction based on the first embodiment and the second embodiment, specifically as shown in fig. 7, 8 and 9, the continuous operation system comprises a plurality of groups of working platforms on up-down steps along the tunnel, corresponding construction equipment heads are mounted on the working platforms of different construction sections, the inner wall of the tunnel of the corresponding construction section is constructed, and after one construction section is completed, the working platform of the following construction section can be moved forwards through a travelling mechanism, so that continuous construction operation in the tunnel is realized.
The following is a detailed description with reference to fig. 8 and 9.
As shown in fig. 8, three groups of annular travelling mechanisms 4 are arranged on an arch support 1 of a working platform in the drawing, each group of annular travelling mechanisms 4 share transmission teeth, a rock drilling machine head 101, a concrete spraying machine head 102 and a water spraying machine head 103 are respectively carried and arranged on a moving working platform of the three groups of annular travelling mechanisms, the rock drilling machine head 101 is driven by a motor of the annular travelling mechanisms 4 to move along the arch support 1 in the annular direction, so that radial rock drilling can be carried out, anchor rods can be installed, blastholes can be drilled forward, and the front end of a tunnel can be blasted; the concrete spraying machine head 102 moves along the circular direction of the arch support 1 under the drive of the motor of the circular direction travelling mechanism 4, and performs the concrete spraying operation of the primary support of the arch inner wall 61 of the tunnel; the water sprayer 103 moves along the circular direction of the arch support 1 under the drive of the motor of the circular direction travelling mechanism 4, so that the concrete curing of the primary support can be performed.
The construction equipment heads can be carried on the same working platform for continuous synchronous construction, and the construction equipment heads can be carried on the working platforms for continuous construction.
As shown in fig. 9, it can be seen from fig. 7 that, in the drawing, since the length of the waterproof board roller 104 for waterproof board laying is long, in this embodiment, three sets of arch brackets 1 close to each other are used to jointly mount the waterproof board roller 104, the waterproof board roller 104 and the waterproof board wound around it are driven by the endless travelling mechanism 4 to roll from the middle to both sides of the arch brackets 1, and the rolled waterproof board is laid on the primary support of the arch inner wall of the tunnel by the rotation of the waterproof board roller 104.
The continuous operation system of this embodiment can be used for the construction of drilling and blasting method tunnel, the continuous construction process of drilling in the tunnel has been realized, the support, waterproof and lining, specific drilling and blasting method construction technological process is unchangeable, through the unsettled work platform who walks in midair relative tunnel ground, the irregular ground of tunnel excavation is reduced to the influence of construction, and work platform's arch support 1 can freely assemble, can carry on conventional construction equipment aircraft nose, need not in addition to the construction of special design platform truck to the construction environment, the commonality of equipment has been improved, construction cost has been reduced, and construction efficiency has been improved.
Although embodiments of the invention have been disclosed above, they are not limited to the use listed in the specification and embodiments. It can be applied to various fields suitable for the present invention. Modifications to the other structural designs of the present patent may be readily made by those skilled in the art. Therefore, the present invention is not to be limited to the specific details and illustrations presented herein, without departing from the general concepts defined by the claims and the equivalents thereof.

Claims (10)

1. The operation platform, its characterized in that: comprises an arch support (1) similar to the transverse shape of the arch inner wall of the tunnel and a traveling system for moving the arch support along the longitudinal direction of the tunnel;
the walking system comprises a main walking mechanism (2) and an auxiliary walking mechanism (3);
the main travelling mechanism (2) comprises a hanging rail (21) and a main travelling wheel (22), wherein the hanging rail (21) is longitudinally paved along the top of the arched inner wall of the tunnel, the rail surface is upward, and the main travelling wheel (22) is assembled at the central top of the arched bracket (1) and is in rolling fit with the hanging rail (21) to hang and connect the arched bracket (1) on the hanging rail (21);
the auxiliary travelling mechanism (3) comprises a supporting rail (31) and auxiliary travelling wheels (32), the supporting rail (31) is longitudinally paved on the arch inner walls of the tunnel at the two sides of the hanging rail (21) along the tunnel, the track surface faces upwards, and the auxiliary travelling wheels (32) are assembled at the two sides of the arch-shaped bracket (1) and are in rolling fit with the supporting rail (31) to support and connect the arch-shaped bracket (1) on the supporting rail;
the main travelling mechanism (2) or/and the auxiliary travelling mechanism (3) is provided with driving equipment for driving travelling wheels.
2. Work platform according to claim 1, wherein the arched bracket (1) is provided with a circumferential travelling mechanism (4) along the arch direction thereof.
3. The working platform according to claim 2, wherein the annular travelling mechanism (4) comprises transmission teeth (41) which are continuously arranged along the arch direction of the arch support (1) and a moving working support (42) which is arranged on the arch support in a guiding way, and the moving working support (42) is arranged along the arch direction of the arch support (1) in a guiding way and is driven to move along the arch direction of the arch support through a driving gear (43) meshed with the transmission teeth.
4. The work platform of claim 2, further comprising an auxiliary support system (5), the auxiliary support system (5) comprising lateral support structures (51) between the sides of the arch support and the tunnel arch inner wall, and vertical support structures (52) between the ends of the arch support and the tunnel floor.
5. The work platform of claim 4, said lateral support structure (51) being a telescopic lateral support shoe laterally arranged on an arched bracket.
6. The work platform of claim 4, said vertical support structure (52) being a telescoping leg vertically disposed at an end of an arch support.
7. A work platform according to any one of claims 1-6, the arch support (1) being a spliced arch truss structure.
8. A continuous operation system for tunnel construction, characterized in that: comprising a number of work platforms according to any of claims 1-7;
the operation platforms are respectively distributed at each construction section of tunnel construction, and construction equipment heads used for corresponding construction sections are arranged on arch supports of different construction sections.
9. A continuous operation system for tunnel construction according to claim 8, wherein the construction equipment head comprises at least one of a scanning head, a concrete spraying head, a water spraying head, a rock drilling head, and a waterproof board roller.
10. A continuous operation method for tunnel construction is characterized in that: the continuous operation system of claim 9 is used for carrying out tunnel construction by drilling and blasting, and each construction section is sequentially subjected to drilling, blasting, supporting, waterproofing and lining construction by utilizing a plurality of groups of working platforms.
CN201810289134.8A 2018-04-03 2018-04-03 Work platform, continuous operation system and continuous operation method for tunnel construction Active CN108756892B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810289134.8A CN108756892B (en) 2018-04-03 2018-04-03 Work platform, continuous operation system and continuous operation method for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810289134.8A CN108756892B (en) 2018-04-03 2018-04-03 Work platform, continuous operation system and continuous operation method for tunnel construction

Publications (2)

Publication Number Publication Date
CN108756892A CN108756892A (en) 2018-11-06
CN108756892B true CN108756892B (en) 2023-08-18

Family

ID=63980830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810289134.8A Active CN108756892B (en) 2018-04-03 2018-04-03 Work platform, continuous operation system and continuous operation method for tunnel construction

Country Status (1)

Country Link
CN (1) CN108756892B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110030012B (en) * 2019-05-08 2020-09-25 长沙泽和智能科技有限公司 Foldable arch frame type tunnel milling and excavating machine
CN110365944B (en) * 2019-07-19 2020-12-15 精英数智科技股份有限公司 Monitoring method, device, equipment and storage medium for empty top operation
CN113123804A (en) * 2020-01-13 2021-07-16 中国建筑第四工程局有限公司 Tunnel inner wall repairing method and device
CN111271094B (en) * 2020-03-03 2021-02-26 中铁工程服务有限公司 Mountain tunnel secondary lining reinforcing bar mechanized operation complete sets
CN112302674B (en) * 2020-10-30 2022-08-30 国家电网有限公司 Tunnel construction device with rail clamping, sliding and positioning functions

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB850201A (en) * 1957-03-28 1960-10-05 Saarlandische Gesselschaft Fur Improvements in or relating to platforms for use in mine galleries or tunnels
DE2216643A1 (en) * 1972-04-07 1973-10-11 Bergbaustahl Gmbh & Co METHOD AND DEVICE FOR ASSEMBLING LINE STRUCTURES, IN PARTICULAR FOR MACHINE LINE FORWARD DRIVING WITH SECTION CUTTING MACHINES IN MINING
JPH05106399A (en) * 1991-10-15 1993-04-27 Tone Chika Gijutsu Kk Erecting device for tunnel timbering
JPH05280287A (en) * 1992-04-01 1993-10-26 Okumura Corp Construction device for tunnel wall
JPH06117198A (en) * 1992-10-05 1994-04-26 Mitsubishi Heavy Ind Ltd Additionally tightening apparatus for segment of shield tunnel
JPH09250296A (en) * 1996-03-15 1997-09-22 Konoike Constr Ltd Suspension type form tunnel lining device
JP2005083014A (en) * 2003-09-05 2005-03-31 Ishikawajima Constr Materials Co Ltd Pre-cast tunnel method and member conveyor used therefor
CN101403305A (en) * 2008-09-08 2009-04-08 中铁隧道集团有限公司 Construction method for tunnel continuous mucking, lining and excavation synchronization
KR20110032457A (en) * 2009-09-23 2011-03-30 코오롱건설주식회사 Work platform for tunnel
CN102226402A (en) * 2011-04-08 2011-10-26 中铁三局集团有限公司 Auxiliary device and method used for laying tunnel waterproofing plates
KR20120134441A (en) * 2011-06-02 2012-12-12 김하늘 Construction method of waterproof in tunnel
CN203248171U (en) * 2013-04-28 2013-10-23 湖南五新重型装备有限公司 Full fracture surface needle beam trolley without beam frame
CN204436416U (en) * 2014-11-19 2015-07-01 上海东方雨虹防水工程有限公司 Lay chassis
WO2015154698A1 (en) * 2014-04-09 2015-10-15 邓卫东 Installation platform and installation method for tunnel waterproof sheet having wide width
CN205578009U (en) * 2016-04-27 2016-09-14 中铁四局集团第一工程有限公司 Two lined steel bones RACK in tunnel equipment of being under construction
CN107144490A (en) * 2017-07-03 2017-09-08 中南大学 Tunnel Second Lining pours monitoring system and monitoring method
CN206562935U (en) * 2017-03-16 2017-10-17 中铁工程装备集团有限公司 TBM steel arch-shelfs are kept in and transshipment acitivity
CN208010349U (en) * 2018-04-03 2018-10-26 中南大学 A kind of job platform and its system of working continuously for constructing tunnel

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB850201A (en) * 1957-03-28 1960-10-05 Saarlandische Gesselschaft Fur Improvements in or relating to platforms for use in mine galleries or tunnels
DE2216643A1 (en) * 1972-04-07 1973-10-11 Bergbaustahl Gmbh & Co METHOD AND DEVICE FOR ASSEMBLING LINE STRUCTURES, IN PARTICULAR FOR MACHINE LINE FORWARD DRIVING WITH SECTION CUTTING MACHINES IN MINING
JPH05106399A (en) * 1991-10-15 1993-04-27 Tone Chika Gijutsu Kk Erecting device for tunnel timbering
JPH05280287A (en) * 1992-04-01 1993-10-26 Okumura Corp Construction device for tunnel wall
JPH06117198A (en) * 1992-10-05 1994-04-26 Mitsubishi Heavy Ind Ltd Additionally tightening apparatus for segment of shield tunnel
JPH09250296A (en) * 1996-03-15 1997-09-22 Konoike Constr Ltd Suspension type form tunnel lining device
JP2005083014A (en) * 2003-09-05 2005-03-31 Ishikawajima Constr Materials Co Ltd Pre-cast tunnel method and member conveyor used therefor
CN101403305A (en) * 2008-09-08 2009-04-08 中铁隧道集团有限公司 Construction method for tunnel continuous mucking, lining and excavation synchronization
KR20110032457A (en) * 2009-09-23 2011-03-30 코오롱건설주식회사 Work platform for tunnel
CN102226402A (en) * 2011-04-08 2011-10-26 中铁三局集团有限公司 Auxiliary device and method used for laying tunnel waterproofing plates
KR20120134441A (en) * 2011-06-02 2012-12-12 김하늘 Construction method of waterproof in tunnel
CN203248171U (en) * 2013-04-28 2013-10-23 湖南五新重型装备有限公司 Full fracture surface needle beam trolley without beam frame
WO2015154698A1 (en) * 2014-04-09 2015-10-15 邓卫东 Installation platform and installation method for tunnel waterproof sheet having wide width
CN204436416U (en) * 2014-11-19 2015-07-01 上海东方雨虹防水工程有限公司 Lay chassis
CN205578009U (en) * 2016-04-27 2016-09-14 中铁四局集团第一工程有限公司 Two lined steel bones RACK in tunnel equipment of being under construction
CN206562935U (en) * 2017-03-16 2017-10-17 中铁工程装备集团有限公司 TBM steel arch-shelfs are kept in and transshipment acitivity
CN107144490A (en) * 2017-07-03 2017-09-08 中南大学 Tunnel Second Lining pours monitoring system and monitoring method
CN208010349U (en) * 2018-04-03 2018-10-26 中南大学 A kind of job platform and its system of working continuously for constructing tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
公路隧道隧底结构水害机理研究;刘敏捷;伍毅敏;高劲松;;地下空间与工程学报(S1);319-326 *

Also Published As

Publication number Publication date
CN108756892A (en) 2018-11-06

Similar Documents

Publication Publication Date Title
CN108756892B (en) Work platform, continuous operation system and continuous operation method for tunnel construction
CN109208478B (en) Integrated rapid construction method for prefabricated bridge
KR101014779B1 (en) Construction method by concrete lining in parallel with excavation, working platform for reinforcement and waterproofing work and lining form for pouring lining concrete
CN104747199B (en) A kind of open type TBM with section of jurisdiction installation function
CN102042021A (en) Automatically walking stepped mobile trestle
CN207998785U (en) A kind of driving postposition trestle
CN107725078B (en) Mining face crossheading circulation self-moving advanced support system and track self-moving system
CN109723445A (en) Parallel three steps full section of tunnel entirety driving method
CN102061926A (en) TBM tunneling and secondary lining synchronous construction method at mucking of continuous belt conveyor and trolley
CN102337905A (en) Open type TBM (Tunnel Boring Machine) fullface synchronous lining trolley for hydraulictunnel
CN105755964A (en) Low-level bridge erection machine for erecting high-speed railway bridge
CN106869948A (en) A kind of construction that technique on shield machine's station-crossing is realized using the delivery vehicle that misses the stop
CN109236331A (en) A kind of steel arch rack trolley suitable for the micro- bench cut method in tunnel
CN207498754U (en) A kind of novel track-laying machine of city track traffic engineering
CN107246268B (en) A kind of shaft sinking gib equipment
CN108049303A (en) A kind of driving postposition trestle and installation, method of adjustment
CN203809016U (en) Inverted arch lining trolley and synchronous tunnel operating system
RU2692518C1 (en) Method for constructing a three-span subway station of an open method of performing works with a lateral arrangement of passenger platforms and a double-track still tunnel
CN113530553B (en) Three-step construction process based on tunnel excavation and support integrated trolley
CN109630146B (en) Shield assembly method and assembly chamber
CN117027824A (en) Deep and long frozen inclined shaft digging and building parallel operation construction method
CN110080791A (en) Small-diameter tunnel boring machine
CN208010349U (en) A kind of job platform and its system of working continuously for constructing tunnel
CN113464157B (en) Tunnel excavation supporting trolley, construction method and operation method thereof
CN113530552B (en) Tunnel comprehensive excavation trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant