CN107144490A - Tunnel Second Lining pours monitoring system and monitoring method - Google Patents

Tunnel Second Lining pours monitoring system and monitoring method Download PDF

Info

Publication number
CN107144490A
CN107144490A CN201710534548.8A CN201710534548A CN107144490A CN 107144490 A CN107144490 A CN 107144490A CN 201710534548 A CN201710534548 A CN 201710534548A CN 107144490 A CN107144490 A CN 107144490A
Authority
CN
China
Prior art keywords
drainpipe
tunnel
lining
monitoring system
pours
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710534548.8A
Other languages
Chinese (zh)
Other versions
CN107144490B (en
Inventor
伍毅敏
刘性峰
郝广伟
张俊
马加存
王勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Platts Civil Engineering Technology Co Ltd
Central South University
Shandong Luqiao Group Co Ltd
Original Assignee
Changsha Platts Civil Engineering Technology Co Ltd
Central South University
Shandong Luqiao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Platts Civil Engineering Technology Co Ltd, Central South University, Shandong Luqiao Group Co Ltd filed Critical Changsha Platts Civil Engineering Technology Co Ltd
Priority to CN201710534548.8A priority Critical patent/CN107144490B/en
Publication of CN107144490A publication Critical patent/CN107144490A/en
Application granted granted Critical
Publication of CN107144490B publication Critical patent/CN107144490B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N5/00Analysing materials by weighing, e.g. weighing small particles separated from a gas or liquid
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/38Concrete; Lime; Mortar; Gypsum; Bricks; Ceramics; Glass
    • G01N33/383Concrete or cement
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Monitoring system and monitoring method are poured the invention discloses a kind of Tunnel Second Lining, monitoring system includes being arranged in some hydraulically full drainpipes on Tunnel surface, and the drainpipe extruding is arranged between the preliminary bracing after pouring and waterproof layer;Drainpipe one end closing, other end connection capillary drain, the drainpipe is drained to beyond lining cutting pouring area by capillary drain, and the capillary drain is connected with liquid weight or volume monitoring device.Utilize the extrusion drainage monitoring method of the monitoring system, secondary lining concrete can be monitored continuously, comprehensively, in real time pours progress and plumpness, constructional deficiency is eliminated in the process, and monitoring system need not consume the high accuracy such as pressure sensor, expensive sensor, drainpipe only need to be embedded to, consumables cost is low.

Description

Tunnel Second Lining pours monitoring system and monitoring method
Technical field
The invention belongs to tunneling and underground engineering field, and in particular to a kind of Tunnel Second Lining pours monitoring system And monitoring method.
Background technology
In Tunnel Second Lining concreting process, the problem of three below aspect often occur influences secondary lining The quality of block.
One is that secondary lining behind come to nothing or leakiness by presence.For the change of operative constraint Tunnel and country rock Shape, it is ensured that the thickness of secondary lining, secondary lining should be closely connected with preliminary bracing.But in practice of construction, due to concrete gravity Sink, Concrete in Natural shrinks, pumping pressure is not enough, splash guard paving is hung tension, preliminary bracing and risen and fallen the reason such as excessive, often hair Raw secondary lining exists behind to come to nothing or uncompacted phenomenon.
Two to be that secondary lining both sides pour progress difference excessive.In order to avoid secondary lining formwork jumbo deforms or moves Position and influence concrete quality, lining concrete answer both sides alternately pour, progress difference can not be excessive.But both sides are alternately poured Process is cumbersome, work efficiency is relatively low, if not being subject to strict management and control in practice of construction, both sides often occurs and pour progress differing greatly Phenomenon, cause lining trolley to deform or shift, when serious the concrete for being not reaching to strength of mould stripping can be caused to become Shape even ftractures, caved in.
Three be that the secondary lining concreting break period is long.In order to ensure the integrality of lining concrete and uniform Property, lining concrete should continuous placing as far as possible, the presetting period of concrete is not to be exceeded in the break period.But in practice of construction In, usually mix and stir, transport and pump due to concrete in the problem of, cause concreting to be interrupted.Once the break period is long, First pouring concrete may be solidified, isolates, be layered, and lining cutting globality is adversely affected, and easily cause seepage etc. Problem.
It is necessary that monitor closely is carried out to Tunnel Second Lining casting process in order to avoid above mentioned problem.Yet with The limitation of Tunnel Second Lining casting method and technique, concrete pours progress and compactness and can not directly observed, at present also Lack convenient, fast, economic, comprehensive monitoring means.The monitoring means used at present have by embedded two electrodes of vault, The method for connecting the method for electrode using concrete to monitor vault concrete density, as long as it is disadvantageous in that two electricity Pole position is contacted with concrete, and circuit will be connected, thus whether the concrete that can not reflect between two electrodes is closely knit.If Pressure sensor monitoring is buried behind in secondary lining, certainly will lay substantial amounts of sensor, after lining cutting is poured, these sensors Can not reclaim mostly, this economically again be difficult to receive.The methods such as other electromagnetic waves, ultrasound or optics are also due to formwork jumbo The limitation of steel form and be difficult to.In this context, a kind of economic, comprehensive and accurate monitoring tunnel how is provided secondary The method that lining cutting pours progress and compactness, is a major issue for ensureing Tunnel Second Lining quality urgent need to resolve.
The content of the invention
Present invention solves the technical problem that being:The monitoring problem of presence is poured for secondary lining in existing tunnel, is carried Monitoring system and monitoring method are poured for a kind of Tunnel Second Lining, economic, comprehensive and accurate monitoring Tunnel Second Lining is poured Progress and compactness.
The present invention adopts the following technical scheme that realization:
Tunnel Second Lining pours monitoring system, including is arranged in some hydraulically full rows on Tunnel surface Water pipe 5, the drainpipe 5 is set between preliminary bracing surface and waterproof layer 4;
The one end of drainpipe 5 closing, other end connection capillary drain 6, the drainpipe 5 passes through capillary drain 6 It is drained to beyond lining cutting pouring area, the capillary drain 6 is connected with liquid weight or volume monitoring device.
Further, the capillary drain 6 is provided with capillary passive valve 7.
As a preferred embodiment of the present invention, the drainpipe 5 on the surface of Tunnel in circumferentially distributed, The surface of Tunnel longitudinal direction diverse location sets some groups of drainpipes, and on Tunnel vault surface along vertical To one group of drainpipe of distribution.
Further, the circumferentially distributed drainpipe is symmetrically arranged to two sections with tunnel axis face, and the drainpipe connects The capillary drain connect is unified by the extraction of Tunnel vault surface.
As another preferred scheme of the present invention, if the drainpipe 5 on Tunnel surface along genesis analysis Dry group drainpipe.
Further, it is equally spaced between the adjacent drainpipe, the capillary drain of drainpipe connection is from institute There is same one end of drainpipe is unified to draw.
In the present invention, the drainpipe protrudes from the surface setting of Tunnel completely, and fixed by snap On Tunnel surface.
Monitoring method is poured the invention also discloses a kind of Tunnel Second Lining, it uses above-mentioned Tunnel Second Lining to pour Monitoring system is built, following steps are specifically included:
The first step, the drainpipe that will be filled with liquid is fixed in the way of circumferentially distributed, genesis analysis or both is combined On the surface of Tunnel, and write down the rated weight or volume of liquid filling body inside drainpipe;
Second step, the capillary drain of drainpipe is connected to outside lining cutting pouring area, is monitored with liquid weight or volume Device is connected;
3rd step, carries out two and serves as a contrast concreting, and two lining concrete after pouring extrude the liquid in drainpipe to liquid Body weight or volume monitoring device, the actual weight or volume of liquid are discharged by determining, with corresponding draining in every group of drainpipe The nominal fluid weight or volume of pipe is contrasted;If both data are identical, the corresponding two linings casting area of the drainpipe Lining quality is qualified, if the liquid actual weight or volume of discharge are less than rated weight or volume, this group of drainpipe correspondence Lining cutting region exist pour uncompacted problem.
Further, can also be according to the liquid weight discharged in drainpipe in two lining concreting processes of the 3rd step The height for speculating that lining cutting is poured is changed stepwise in amount or volume.
Present invention embedment between Tunnel and waterproof layer fills the drainpipe of liquid (preferably water), passes through monitoring Drainpipe is discharged the weight or volume of water by the concrete extrusion that two linings are poured, and calculate concrete pours height and closely knit journey Degree.Drainpipe is connected by capillary drain, capillary passive valve with liquid weight or volume monitoring device, can the row of grasp at any time The displacement of water pipe, so that grasping concrete at any time pours progress and compactness.Between Tunnel and waterproof layer Circumferentially disposed drainpipe, can monitor and record in real time the height that pours of secondary lining concrete, whether assay both sides symmetrical, Continuous placing.Drainpipe is longitudinally arranged between tunnel vault preliminary bracing and waterproof layer, whole two linings vault can be monitored in real time Whether concreting is full, closely knit.
The present invention's has the advantages that:
1) Tunnel Second Lining casting process can be monitored secondary continuously, comprehensively, in real time by extrusion drainage monitoring method Lining concrete pours progress and plumpness, and constructional deficiency is eliminated in the process.
2) the extrusion drainage monitoring system of Tunnel Second Lining casting process, it is not necessary to consume pressure sensor etc. high-precision Degree, expensive sensor, only need to be embedded to drainpipe, consumables cost is low.
From the above mentioned, Tunnel Second Lining of the invention pours monitoring system and monitoring method is a kind of economy, Quan Mianhe Accurate measurements Tunnel Second Lining pours the technical scheme of progress and compactness, and can be widely popularized during practice of construction should With.
Below in conjunction with the drawings and specific embodiments, the invention will be further described.
Brief description of the drawings
Fig. 1 is the schematic diagram that embodiment one is monitored in Tunnel Second Lining casting process by extrusion drainage.
Fig. 2 is the drainpipe connection diagram in embodiment one.
Fig. 3 is drainpipe status schematic diagram before two lining concretings in embodiment one.
Drainpipe status schematic diagram when Fig. 4 comes to nothing to exist after two lining concretings in embodiment one.
Fig. 5 is that the drainpipe in embodiment one uses the schematic diagram that ring and vault longitudinal combination are arranged.
Fig. 6 is that embodiment one monitors two schematic diagrames for serving as a contrast concreting height.
Fig. 7 is the drainpipe in embodiment two all using the schematic diagram being longitudinally arranged.
Label in figure:1- has poured into a mould two lining concrete, and 2- waits to pour two lining concrete, 3- preliminary bracings, 4- waterproof layers, 5- Drainpipe, 6- capillary drains, 7- capillary passive valves, 8- monitoring weight devices, 9- residual water cavities, 10- lining concrete top surfaces.
Embodiment
Embodiment one
Referring to Fig. 1 to Fig. 5, it is illustrated that in Tunnel Second Lining pour monitoring system for the present invention preferred scheme, specifically Capillary drain 6, capillary passive valve 7 and the monitoring weight device 8 connected including some groups of drainpipes 5 and drainpipe.
As shown in figure 1, before Tunnel Second Lining is poured, burying and filling between the preliminary bracing 3 in tunnel and waterproof layer 4 During the drainpipe 5 of liquid, practice of construction can the directly water filling in drainpipe, in the outside of waterproof layer 4, poured two lining coagulations Soil 1 will be extruded drainpipe 5, be extruded the water inside drainpipe;And also wait to pour the draining in the region of two lining concrete 2 Pipe 5 will not be crushed.
In order to which the water for the inside for ensureing drainpipe 5 can be completely exhausted out, drainpipe 5 should protrude from tunnel initial-stage branch completely The surface of shield 3 is set, and drainpipe is fixed on the surface of Tunnel by fixtures such as buckles.
Referring to Fig. 2, drainpipe 5 must be using the pipeline for possessing certain crushing strength, the two lining coagulations that can be poured Soil pressure is flat, while should be guaranteed that drainpipe will not be because occurring caliber change after water filling in pipeline, it is to avoid measurement data distortion.Draining One end closing of pipe 5, the other end is supervised by capillary drain 6 and capillary passive valve 7 with the liquid weight beyond lining cutting pouring area Survey device 8 to be connected, constitute displacement monitoring system.Due to the caliber very little of capillary drain 6, (caliber of usual capillary is less than 1mm), the control of capillary passive valve 7 is added, drainpipe 5 is not in the case where being squeezed, and its internal water will not be arranged automatically Go out, only when drainpipe 5 is by the two lining concrete extrusion poured, it is passive that the pressure that extruding is produced can force water to wash capillary open Valve 7, starts draining.In the side wall casting process of two linings, by the water outlet weight change for monitoring drainpipe 5, it is possible to grasp The progress of the height, i.e. secondary lining of two lining concrete 1 is poured, whether analysis tunnel both sides concrete symmetrically pours.In reality In, the volume for discharging water can be also monitored by volume monitoring device.On liquid weight or volume monitoring device and Capillary drain and capillary passive valve, are conventional on the market liquid measure equipment and fluid flow control unit, this area Technical staff can carry out selection purchase as needed, and the present embodiment is not repeated its structure herein.
Referring to Fig. 3 and Fig. 4, in casting process, when tunnel double-lining concreting is to arch crown part, along tunnel longitudinal direction Horizontal layout drainpipe 5.If the water of the drainpipe 5 of final vault is completely exhausted out, illustrate in keystone, Tunnel 3 and secondary lining it is completely closely connected, in the absence of cavity.If the water of the drainpipe 5 of final vault is not completely exhausted out, i.e. drainpipe It is interior to also have residual water cavity 9, then illustrate in keystone, Tunnel 3 and secondary lining can not be completely closely connected, there is sky Hole.Therefore can monitor tunnel vault whether pour it is closely knit.
Describe the monitoring method of the present embodiment in detail below in conjunction with Fig. 5 and Fig. 6.
First, some groups of drainpipes 5 are subjected to cloth in the way of the ring shown in Fig. 5 and vault longitudinal combination arrangement Put, specifically, drainpipe 5 is in circumferentially distributed on the surface of Tunnel, in the longitudinal diverse location of Tunnel Surface sets four groups of drainpipes, and on Tunnel vault surface along one group of drainpipe of genesis analysis.For the ease of ring To the construction and drainage of the drainpipe of distribution, every group of circumferentially distributed drainpipe is symmetrically arranged to two with tunnel axis face, always Totally eight circumferentially distributed drainpipes, circumferentially distributed drainpipe bottom lock, then by all circumferentially distributed drainpipes with And the unified surface by Tunnel vault of capillary drain 6 of the drainpipe connection of vault genesis analysis is drawn and weight Monitoring device 8 is connected.
Referring to Fig. 6, after two lining concretings are carried out, the actual weight of liquid is discharged in every group of drainpipe by determining Or volume, contrasted with the nominal fluid weight or volume of corresponding drainpipe;If both data are identical, the drainpipe pair The two lining casting area lining qualities answered are qualified, if the liquid actual weight or volume of discharge are less than rated weight or volume, Then the corresponding lining cutting region of this group of drainpipe, which exists, pours uncompacted problem.In addition, can be real-time by monitoring weight device 8 The residing height of lining concrete top surface 10 corresponding to the drainpipe 5 of eight rings is grasped, it is possible thereby to grasp tunnel two in real time The information such as progress, both sides difference in height that secondary lining cutting is poured., then can be by the row of vault when secondary lining is poured into tunnel vault It is closely knit whether the monitoring vault of water pipe 5 pours.
Embodiment two
Referring to Fig. 7, and unlike embodiment one, the drainpipe 5 in the present embodiment all lays drainpipe 5 using longitudinal direction Monitoring scheme, except ring vault longitudinally lay drainpipe 5, can also whole tunnel arch level longitudinally lay drainpipe 5, drainpipe 5 along genesis analysis, is equally spaced on Tunnel surface between adjacent row water pipe, what drainpipe 5 was connected Same one end of capillary drain from all drainpipes is unified to draw, and so can start draining according to the drainpipe 5 of different height To judge pouring highly for two lining concrete, while judging the height by the whether whole drainings of drainpipe 5 of different height Concrete whether pour completely it is closely knit.
Embodiment above describes the general principle and principal character and advantages of the present invention of the present invention, the technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The concrete operating principle of invention, without departing from the spirit and scope of the present invention, the present invention also have various change and changed Enter, these changes and improvements all fall within the protetion scope of the claimed invention, the claimed scope of the invention is by appended right Claim and its equivalent thereof.

Claims (9)

1. Tunnel Second Lining pours monitoring system, it is characterised in that:Filled including being arranged in some of Tunnel surface The drainpipe (5) of full liquid, the drainpipe (5) is arranged between preliminary bracing surface and waterproof layer;
Drainpipe (5) one end closing, other end connection capillary drain (6), the drainpipe (5) passes through capillary drain (6) it is drained to beyond lining cutting pouring area, the capillary drain (6) is connected with liquid weight or volume monitoring device.
2. Tunnel Second Lining according to claim 1 pours monitoring system, the capillary drain (6) is provided with capillary Passive valve (7).
3. Tunnel Second Lining according to claim 2 pours monitoring system, the drainpipe (5) is in Tunnel Surface in circumferentially distributed, some groups of drainpipes are set on the surface of the longitudinal diverse location of Tunnel, and in tunnel Preliminary bracing vault surface is along one group of drainpipe of genesis analysis.
4. Tunnel Second Lining according to claim 3 pours monitoring system, the circumferentially distributed drainpipe is with tunnel Axis face is symmetrically arranged to two sections, and the capillary drain of the drainpipe connection is unified to be drawn by Tunnel vault surface Go out.
5. Tunnel Second Lining according to claim 2 pours monitoring system, the drainpipe (5) is in Tunnel Surface is along some groups of drainpipes of genesis analysis.
6. Tunnel Second Lining according to claim 5 pours equidistant cloth between monitoring system, the adjacent drainpipe Put, same one end of capillary drain from all drainpipes of the drainpipe connection is unified to draw.
7. the Tunnel Second Lining according to any one of claim 3-6 pours monitoring system, the drainpipe is completely convex Surface for Tunnel is set, and fixed by snap on Tunnel surface.
8. Tunnel Second Lining pours monitoring method, it is characterised in that:Poured using the Tunnel Second Lining in claim 1-7 Monitoring system, is comprised the following steps that:
The first step, the drainpipe that will be filled with liquid is fixed on tunnel in the way of circumferentially distributed, genesis analysis or both is combined The surface of road preliminary bracing, and write down the rated weight or volume of liquid filling body inside drainpipe;
Second step, the capillary drain of drainpipe is connected to outside lining cutting pouring area, with liquid weight or volume monitoring device Connection;
3rd step, carries out two and serves as a contrast concreting, and two lining concrete after pouring extrude the liquid in drainpipe to liquid weight Amount or volume monitoring device, the actual weight or volume of liquid are discharged by determining, with corresponding drainpipe in every group of drainpipe Nominal fluid weight or volume is contrasted;If both data are identical, the corresponding two linings casting area lining cutting of the drainpipe It is up-to-standard, if the liquid actual weight or volume of discharge are less than rated weight or volume, the corresponding lining of this group of drainpipe Block region, which exists, pours uncompacted problem.
9. pouring monitoring method according to the Tunnel Second Lining that claim 8 is above-mentioned, two in the 3rd step serve as a contrast concreting Cheng Zhong, the height for speculating that lining cutting is poured is changed stepwise according to the liquid weight or volume discharged in drainpipe.
CN201710534548.8A 2017-07-03 2017-07-03 Tunnel secondary lining pouring monitoring system and monitoring method Active CN107144490B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710534548.8A CN107144490B (en) 2017-07-03 2017-07-03 Tunnel secondary lining pouring monitoring system and monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710534548.8A CN107144490B (en) 2017-07-03 2017-07-03 Tunnel secondary lining pouring monitoring system and monitoring method

Publications (2)

Publication Number Publication Date
CN107144490A true CN107144490A (en) 2017-09-08
CN107144490B CN107144490B (en) 2023-08-15

Family

ID=59784932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710534548.8A Active CN107144490B (en) 2017-07-03 2017-07-03 Tunnel secondary lining pouring monitoring system and monitoring method

Country Status (1)

Country Link
CN (1) CN107144490B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756892A (en) * 2018-04-03 2018-11-06 中南大学 Job platform and its work continuously system and operational method for constructing tunnel
CN111398406A (en) * 2020-04-22 2020-07-10 中国铁建重工集团股份有限公司 Filling compactness detection method based on magnetoresistive sensor

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1583710A1 (en) * 1987-01-21 1990-08-07 Специальное Конструкторско-Технологическое Бюро Главмосинжстроя При Мосгорисполкоме Method and apparatus for constructing a secondary lining in tunnel
JP2006200141A (en) * 2005-01-18 2006-08-03 Kajima Corp Method and structure for treatment of water inflow in tunnel
CN101832140A (en) * 2010-04-20 2010-09-15 北京交通大学 Testing method of water pressure distribution law of subsea tunnel lining
JP2012026222A (en) * 2010-07-27 2012-02-09 Takenaka Doboku Co Ltd Method of detecting presence/absence of filling defective part of tunnel secondary lining concrete using ri moisture meter and improvement method
CN102866070A (en) * 2012-08-16 2013-01-09 浙江交建路桥工程有限公司 Loading method for bearing strength test for secondary lining concrete structure of tunnel
CN202755980U (en) * 2012-08-08 2013-02-27 中交第一公路勘察设计研究院有限公司 Tunnel supporting structure suitable for warm permafrost region
CN204357485U (en) * 2014-12-11 2015-05-27 中铁十一局集团第五工程有限公司 The drainage system of anti-tunnel double-lining behind ponding crossfire
CN105136072A (en) * 2015-08-27 2015-12-09 长安大学 Tunnel lining crack depth measuring method and measuring device
CN105179009A (en) * 2015-08-27 2015-12-23 重庆大学 External water pressure testing device and method for water-rich karst tunnel lining
JP2016003470A (en) * 2014-06-16 2016-01-12 株式会社錢高組 Liquid discharge device on inner peripheral surface of tunnel and liquid discharge method
CN105484773A (en) * 2015-12-25 2016-04-13 武汉市政工程设计研究院有限责任公司 System plugging and draining structure for tunnel leakage treatment
JP2016145466A (en) * 2015-02-06 2016-08-12 青木あすなろ建設株式会社 Exhaust drainage/injection hose and tunnel crown construction method using the same
CN105953837A (en) * 2016-06-14 2016-09-21 中铁二院工程集团有限责任公司 Maintainable tunnel lining water pressure and displacement monitoring system

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1583710A1 (en) * 1987-01-21 1990-08-07 Специальное Конструкторско-Технологическое Бюро Главмосинжстроя При Мосгорисполкоме Method and apparatus for constructing a secondary lining in tunnel
JP2006200141A (en) * 2005-01-18 2006-08-03 Kajima Corp Method and structure for treatment of water inflow in tunnel
CN101832140A (en) * 2010-04-20 2010-09-15 北京交通大学 Testing method of water pressure distribution law of subsea tunnel lining
JP2012026222A (en) * 2010-07-27 2012-02-09 Takenaka Doboku Co Ltd Method of detecting presence/absence of filling defective part of tunnel secondary lining concrete using ri moisture meter and improvement method
CN202755980U (en) * 2012-08-08 2013-02-27 中交第一公路勘察设计研究院有限公司 Tunnel supporting structure suitable for warm permafrost region
CN102866070A (en) * 2012-08-16 2013-01-09 浙江交建路桥工程有限公司 Loading method for bearing strength test for secondary lining concrete structure of tunnel
JP2016003470A (en) * 2014-06-16 2016-01-12 株式会社錢高組 Liquid discharge device on inner peripheral surface of tunnel and liquid discharge method
CN204357485U (en) * 2014-12-11 2015-05-27 中铁十一局集团第五工程有限公司 The drainage system of anti-tunnel double-lining behind ponding crossfire
JP2016145466A (en) * 2015-02-06 2016-08-12 青木あすなろ建設株式会社 Exhaust drainage/injection hose and tunnel crown construction method using the same
CN105136072A (en) * 2015-08-27 2015-12-09 长安大学 Tunnel lining crack depth measuring method and measuring device
CN105179009A (en) * 2015-08-27 2015-12-23 重庆大学 External water pressure testing device and method for water-rich karst tunnel lining
CN105484773A (en) * 2015-12-25 2016-04-13 武汉市政工程设计研究院有限责任公司 System plugging and draining structure for tunnel leakage treatment
CN105953837A (en) * 2016-06-14 2016-09-21 中铁二院工程集团有限责任公司 Maintainable tunnel lining water pressure and displacement monitoring system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
GUOZHU ZHANG ET AL.,: "Effect of ventilation on the thermal performance of tunnel lining GHEs", APPLIED THERMAL ENGINEERING, no. 93, pages 416 - 424, XP029361263, DOI: 10.1016/j.applthermaleng.2015.10.008 *
PENGFEI LI ET AL.,: "Performance of a multi-face tunnel excavated in loess ground based on field monitoring and numerical modeling", ARAB J GEOSCI., no. 9, pages 1 - 10 *
王洪德等: "厚硬岩层盾构隧道施工对地下管线影响分析", 地下空间与工程学报, vol. 9, no. 2, pages 333 - 337 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756892A (en) * 2018-04-03 2018-11-06 中南大学 Job platform and its work continuously system and operational method for constructing tunnel
CN108756892B (en) * 2018-04-03 2023-08-18 中南大学 Work platform, continuous operation system and continuous operation method for tunnel construction
CN111398406A (en) * 2020-04-22 2020-07-10 中国铁建重工集团股份有限公司 Filling compactness detection method based on magnetoresistive sensor

Also Published As

Publication number Publication date
CN107144490B (en) 2023-08-15

Similar Documents

Publication Publication Date Title
CN104018673B (en) Ultra-large volume concrete one-time continuous pours into a mould multi cycle real-time temperature control construction technology
CN206530363U (en) One kind can the outer drainage system of maintenance type railway tunnel bottom structure
CN106759354A (en) A kind of stratified continuous pouring mode of ultra-long and ultra-thick volume of concrete foundation
CN206368379U (en) A kind of systems stabilisation of buried pond anti-floating
CN112663694B (en) Construction method for lifting and rectifying building on silt geology
CN107144490A (en) Tunnel Second Lining pours monitoring system and monitoring method
CN107816056A (en) Filled type concrete gravity retaining wall and its construction technology
CN105951678B (en) A kind of vertical sealing swaging die of concrete works movement joint with projection
CN206848105U (en) A kind of Tunnel Second Lining pours monitoring system
CN109944236A (en) Root pile actively follows track delamination pour slurry system and construction method
CN108104126A (en) The anti-seam temperature control casting method and structure of sole plate mass concrete
CN210829300U (en) Tunnel center drainage ditch template
CN106545070B (en) Diversion method for adding pipeline by adopting jacking pipe in existing inspection well
CN209891202U (en) Anti-floating anchor rod
CN107605488A (en) A kind of bored shaft and its filling reinforcement means that suspends
CN201588408U (en) Monitoring device for concrete pouring
CN209011169U (en) A kind of experimental rig for simulating underground engineering impervious blocking material
CN106759111B (en) Water-bag type concrete works deformation joint sealing swaging die with reinforcing fiber
CN207672572U (en) The anti-seam temperature control pouring structure of sole plate mass concrete
CN110258660A (en) The manufacture craft and shut-in well technique of the decompression drainage sump of basement anti-floating
CN211008658U (en) Construction structure for preventing two lining vault from being hollow at railway tunnel vault
CN204982920U (en) Be used for intraductal ponding pump drainage device of deviational survey
CN113982342A (en) Concrete waterproof structure for pool
CN211446944U (en) Lining structure of deep foundation pit underground structure
CN106013254B (en) A kind of construction method of the concrete works swaging die with skeleton

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wu Yimin

Inventor after: Liu Xingfeng

Inventor after: Hao Guangwei

Inventor after: Zhang Jun

Inventor after: Ma Jiacun

Inventor after: Wang Yong

Inventor before: Wu Yimin

Inventor before: Liu Xingfeng

Inventor before: Hao Guangwei

Inventor before: Zhang Jun

Inventor before: Ma Jiacun

Inventor before: Wang Yong

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant