CN108729475A - Underground structure multi-layer combined type expansion joint waterproof construction method - Google Patents

Underground structure multi-layer combined type expansion joint waterproof construction method Download PDF

Info

Publication number
CN108729475A
CN108729475A CN201710279488.XA CN201710279488A CN108729475A CN 108729475 A CN108729475 A CN 108729475A CN 201710279488 A CN201710279488 A CN 201710279488A CN 108729475 A CN108729475 A CN 108729475A
Authority
CN
China
Prior art keywords
layer
expansion joint
french drain
waterproof
waterproof roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710279488.XA
Other languages
Chinese (zh)
Inventor
黄骥
王友涛
王立军
薛铖
李佰西
尹旭文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710279488.XA priority Critical patent/CN108729475A/en
Publication of CN108729475A publication Critical patent/CN108729475A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Abstract

The present invention relates to the arrangement of foundation structure seam or construction applications, specially a kind of underground structure multi-layer combined type expansion joint waterproof construction method.A kind of underground structure multi-layer combined type expansion joint waterproof construction method is included in underground structure (11) and is excavated to foundation trench face (12), it is characterized in that:Further include the steps that implementing successively as follows:A. french drain layer is excavated;B. plain concrete bed course is poured;C. first layer waterproof roll is completely spread;D., the copper coin that stretches is set;E., first of waterstop is set;F. setting steel is cut off;G., second waterstop is set;H. cystosepiment is completely spread;I. casting concrete;J. second layer waterproof roll is completely spread;K. making concrete leveling layer.Easy construction of the present invention, waterproof quality is high, is convenient for later maintenance, control cost input applied widely.

Description

Underground structure multi-layer combined type expansion joint waterproof construction method
Technical field
The present invention relates to the arrangement of foundation structure seam or construction applications, specially a kind of underground structure multi-layer combined type is stretched Contracting seam waterproof construction method.
Background technology
Currently, China is in urbanization high-speed development period, construction of underground structure increasingly scale, complication, city are used The development and utilization of the growing tension of ground resource, the underground space has become main trend.But during Underground Construction, such as What ensures that structurally waterproof quality is a great problem of puzzlement construction.By geological conditions variation, ground cumulative settling and level of ground water Influences, the underground structures such as variation just will appear infiltration, water leakage situation in the latter section of time limit that complete for use, especially stretched in structure Contracting seam position is particularly evident.A large amount of now with domestic underground structure build and come into operation, and day occurs for structural leakage phenomenon Become to increasing, the technological means of structure leak stopping is also more and more, but all palliative, can not be inherently eliminated leakage, and thing Leak stopping is of a high price afterwards.Therefore, social development need is a kind of controls, can be controlled structural leakage from source in advance Means.
Invention content
In order to overcome the deficiencies of existing technologies, provide a kind of easy construction, waterproof quality it is high, convenient for later maintenance, control Cost input, basic seam construction applied widely, it is anti-that the invention discloses a kind of underground structure multi-layer combined type expansion joints Water construction method.
The present invention reaches goal of the invention by following technical solution:
A kind of underground structure multi-layer combined type expansion joint waterproof construction method is included in underground structure and is excavated to foundation trench face, special Sign is:Further include the steps that implementing successively as follows:
A. french drain layer is excavated:French drain layer is excavated on foundation trench face, french drain is buried in french drain layer as gutter, french drain includes At least one lateral french drain and at least one longitudinal french drain, it is parallel to each other between lateral french drain, between longitudinal french drain Parallel to each other, lateral french drain and longitudinal french drain interpenetrate, and at least a french drain imports the water inlet of pump house;French drain Setting form there is no particular/special requirement, the quantity of setting, width that can be configured according to actual demand, only need to ensure finally to access Pump house, french drain play first layer waterproof action;
B. plain concrete bed course is poured:Whole plain concrete bed course is poured on french drain, completely cuts off foundation trench face and structure base slab;Plain concrete bed course Second layer waterproof action is played, while work surface is provided for subsequent Superstructure Construction;
C. first layer waterproof roll is completely spread:The waterproof roll of first layer is completely spread on plain concrete bed course;The waterproof roll of first layer rises Third layer waterproof action;
D., the copper coin that stretches is set:Position setting perforation expansion joint at expansion joint and telescopic copper coin, the both ends difference of copper coin It is placed in the outside of expansion joint both sides, is arched upward in expansion joint in the middle part of copper coin;Setting structure bottom plate on copper coin, adjacent structure There are gaps to form expansion joint between bottom plate;Copper coin plays the 4th layer of waterproof action, while is arched upward in the middle part of copper coin at expansion joint two The structure base slab of side can be stretched or be shunk in a certain range when counter motion occur or moving toward one another, and prevented copper coin to be squeezed and crushed It is bad, it can still play waterproof action;
E., first of waterstop is set:In the top of copper coin, the middle buried water stop at first of perforation expansion joint is set;First Middle buried water stop plays layer 5 waterproof action;
F. setting steel is cut off:The top setting steel of buried water stop is cut off in first, and steel is cut off including cylinder and sleeve, Cylinder is embedded in a block structure bottom plate, and sleeve is embedded in adjacent structure base slab, and cylinder is sleeved in sleeve between the two formation Gap coordinates and cylinder is slided along sleeve lining;When relative motion occurs for two adjacent block structure bottom plates, cylinder is along sleeve lining Sliding, plays the role of certain anti-differential settlement;
G. setting second waterstop penetrates through the middle buried water stop at expansion joint in the top that steel is cut off setting second;Second Buried water stop plays layer 6 waterproof action in road;
H. cystosepiment is completely spread:Certain vertical vertical interval must be ensured between each layer waterproof, it is ensured that concrete when pouring bottom plate Can be fully closely knit, completely spread cystosepiment in vertical vertical interval, that is, expansion joint between every layer of waterproof;Cystosepiment is adjacent for being isolated Two block structure bottom plates, avoid adjacent structure base slab from being in direct contact, while playing certain buffer protection function, prevent adjacent Structure base slab be crushed because being squeezed;
I. casting concrete:Each road sealing by said sequence installation it is firm after, the casting concrete on structure base slab, waterstop Position is reinforced vibrating, and ensures that each faying face is fully closely knit;
J. second layer waterproof roll is completely spread:The waterproof roll of the second layer is completely spread on the concrete that structure base slab pours;The second layer Waterproof roll rise layer 7 waterproof action;
K. making concrete leveling layer:The making concrete leveling layer on second layer waterproof roll;Concrete leveling layer plays the 8th Layer waterproof action.
The underground structure multi-layer combined type expansion joint waterproof construction method, it is characterized in that:
When step a, the depth of french drain layer is not less than 30cm;
When step b, the thickness of plain concrete bed course is not less than 10cm;
When step c and j, waterproof roll selects self-adhesive waterproof coiled material;
When step k, the thickness of concrete leveling layer is not less than 15cm.
The present invention reduces the possibility that leakage occurs from source, by horizontal drainage system and vertical combination water-proof system two Part forms, and by reinforcing construction quality early period, reduces engineering structure later stage infiltration risk.The present invention keeps the formation of french drain layer horizontal To drainage system, water body elicitation effect is played, reduces structure seepage pressure, the waterproof roll of first layer, copper coin bury in first Formula waterstop, steel cut off, the middle buried water stop of second, cystosepiment, the waterproof roll of the second layer and concrete leveling layer shape At vertical layered combination water-proof system, spatially multilayer flashing is realized, by horizontal and vertical three-dimensional combination waterproof technique, greatly The big hidden danger of quality for reducing underground structure expansion joint leakage.
Beneficial effects of the present invention are as follows:
1. carrying out the waterproof project design at underground structure expansion joint using horizontal drainage system and vertical layered combination water-proof system And construction, form multi layer waterproof, waterproof quality and with obvious effects;
2. the operations flow and construction technology that are related to are simple and clear, convenient for construction;
3. it is applied widely, it can be used for the waterproof construction of all types of construction of underground structures;
4. economy is strong, increased input by early period, avoids later stage pipe from supporting reprocessing during safeguarding, pass through the throwing of less cost Enter, avoids the mending-leakage expense of follow-up costliness;
5. social effect is good, the good quality assurance of underground structure is the publicity to brand names, while being also avoided that and repairing repeatedly The whole operation management difficulty brought increases.
Description of the drawings
Fig. 1 is that the schematic top plan view of french drain is arranged in foundation trench face in the present invention;
Fig. 2 is the schematic cross-section after the completion of the present invention.
Specific implementation mode
It is further illustrated the present invention below by way of specific embodiment.
Embodiment 1
A kind of underground structure multi-layer combined type expansion joint waterproof construction method, it is as depicted in figs. 1 and 2, real successively as follows It applies:
A. french drain layer is excavated:As shown in Figure 1:It is excavated to foundation trench face 12 in underground structure 11, cutting depth is not on foundation trench face 12 French drain layer 21 less than 30cm, it includes at least one lateral that french drain 22 is buried in french drain layer 21 and is used as gutter, french drain 22 French drain 22 and at least one longitudinal french drain 22, it is parallel to each other between lateral french drain 22, it is mutually equal between longitudinal french drain 22 Row, lateral french drain 22 and longitudinal french drain 22 interpenetrate, and at least a french drain 22 imports the water inlet of pump house 13;It is blind The setting form of ditch 22 does not have particular/special requirement, the quantity of setting, width that can be configured according to actual demand, need to only ensure final Pump house 13 is accessed, french drain 22 plays first layer waterproof action;
B. plain concrete bed course is poured:The plain concrete bed course 3 that whole thickness is not less than 10cm, isolation foundation trench face 12 are poured on french drain 2 With structure base slab 14;Plain concrete bed course 3 plays second layer waterproof action, while providing work surface for subsequent Superstructure Construction;
C. first layer waterproof roll is completely spread:The waterproof roll 4 of first layer is completely spread on plain concrete bed course 3, waterproof roll 4 is selected certainly Viscous formula waterproof roll;The waterproof roll 4 of first layer plays third layer waterproof action;
D., the copper coin that stretches is set:Position setting perforation expansion joint 15 at expansion joint 15 and telescopic copper coin 5, the two of copper coin 5 End is respectively placed in the outside of 15 both sides of expansion joint, and the middle part of copper coin 5 is arched upward in expansion joint 15;Setting structure bottom on copper coin 5 Plate 14, there are gaps to form expansion joint 15 between adjacent structure base slab 14;Copper coin 5 plays the 4th layer of waterproof action, while copper coin 5 The structure base slab 14 that arches upward in 15 both sides of expansion joint of middle part can draw in a certain range when counter motion occur or moving toward one another It stretches or shrinks, copper coin 5 is prevented to be extruded destruction, can still play waterproof action;
E., first of waterstop is set:In the top of copper coin 5, the middle buried water stop 6 at first of perforation expansion joint 15 is set;The Buried water stop 6 plays layer 5 waterproof action in together;
F. setting steel is cut off:The top setting steel of buried water stop 6 cuts off 7 in first, and it includes 71 He of cylinder that steel, which cuts off 7, Sleeve 72, cylinder 71 are embedded in a block structure bottom plate 14, and sleeve 15 is embedded in adjacent structure base slab 14, and cylinder 71 is sleeved on Clearance fit is formed both in sleeve 72 and cylinder 71 is slided along 72 inner wall of sleeve;When phase occurs for two adjacent block structure bottom plates 14 When to movement, cylinder 71 is slided along 72 inner wall of sleeve, plays the role of certain anti-differential settlement;
G. setting second waterstop cuts off the middle buried water stop 6 at 7 top setting second perforation expansion joint 15 in steel; Buried water stop 6 plays layer 6 waterproof action in second;
H. cystosepiment is completely spread:Certain vertical vertical interval must be ensured between each layer waterproof, it is ensured that concrete when pouring bottom plate Can be fully closely knit, completely spread cystosepiment 8 made of polyethylene in vertical vertical interval, that is, expansion joint 15 between every layer of waterproof;Foam Plate 8 avoids adjacent structure base slab 14 from being in direct contact, while playing certain delay for two adjacent block structure bottom plates 14 to be isolated Protective effect is rushed, adjacent structure base slab 14 is prevented to be crushed because being squeezed;
I. casting concrete:Each road sealing by said sequence installation it is firm after, the casting concrete on structure base slab 14, sealing Band position is reinforced vibrating, and ensures that each faying face is fully closely knit;
J. second layer waterproof roll is completely spread:The waterproof roll 4 of the second layer is completely spread on the concrete that structure base slab 14 pours;The Two layers of waterproof roll 4 plays layer 7 waterproof action;
K. making concrete leveling layer:Placement thickness is not less than the concrete leveling layer 9 of 15cm on second layer waterproof roll 4; Concrete leveling layer 9 plays the 8th layer of waterproof action.
Section after the completion of the present embodiment is as shown in Figure 2.
The present embodiment reduces the possibility that leakage occurs from source, by horizontal drainage system and vertical combination water-proof system Two parts form, and by reinforcing construction quality early period, reduce engineering structure later stage infiltration risk.The present invention makes the formation of french drain layer 21 Horizontal direction drainage system plays water body elicitation effect, reduces structure seepage pressure, waterproof roll 4, the copper coin 5, first of first layer Buried water stop 6, steel cut off the waterproof roll 4 and coagulation of the middle buried water stop 6 of 7, second, cystosepiment 8, the second layer in road Native leveling layer 9 forms vertical layered combination water-proof system, realizes spatially multilayer flashing, is combined by horizontal and vertical solid Waterproof technique greatly reduces the hidden danger of quality of underground structure expansion joint leakage.

Claims (2)

1. a kind of underground structure multi-layer combined type expansion joint waterproof construction method is included in underground structure (11) and is excavated to foundation trench face (12), it is characterized in that:Further include the steps that implementing successively as follows:
A. french drain layer is excavated:French drain layer (21) is excavated on foundation trench face (12), and french drain (22) conduct is buried in french drain layer (21) Gutter, french drain (22) include at least one lateral french drain (22) and at least one longitudinal french drain (22), lateral french drain (22) parallel to each other between, parallel to each other between longitudinal french drain (22), the french drain (22) of lateral french drain (22) and longitudinal direction is mutual It connects, at least a french drain (22) imports the water inlet of pump house (13);
B. plain concrete bed course is poured:Whole plain concrete bed course (3) is poured on french drain (2), completely cuts off foundation trench face (12) and structure base slab (14);
C. first layer waterproof roll is completely spread:The waterproof roll (4) of first layer is completely spread on plain concrete bed course (3);
D., the copper coin that stretches is set:In position setting perforation expansion joint (15) of expansion joint (15) and telescopic copper coin (5), copper The both ends of plate (5) are respectively placed in the outside of expansion joint (15) both sides, arch upward in the middle part of copper coin (5) in expansion joint (15);Copper Setting structure bottom plate (14) on plate (5), there are gaps to form expansion joint (15) between adjacent structure base slab (14);
E., first of waterstop is set:In the top of copper coin (5), the middle buried water stop of first of perforation expansion joint (15) is set (6);
F. setting steel is cut off:The top setting steel of buried water stop (6) is cut off (7) in first, and it includes column that steel, which cuts off (7), Body (71) and sleeve (72), cylinder (71) are embedded in a block structure bottom plate (14), and sleeve (15) is embedded in adjacent structure bottom In plate (14), cylinder (71) is sleeved on the two formation clearance fit in sleeve (72) and cylinder (71) is slided along sleeve (72) inner wall;
G., second waterstop is set:The top setting second that (7) are cut off in steel penetrates through buried sealing in expansion joint (15) Band (6);
H. cystosepiment is completely spread:Cystosepiment (8) is completely spread in expansion joint (15);
I. casting concrete:The casting concrete on structure base slab (14) ensures that each faying face is fully closely knit;
J. second layer waterproof roll is completely spread:The waterproof roll of the second layer is completely spread on the concrete that structure base slab (14) pours (4);
K. making concrete leveling layer:The making concrete leveling layer (9) on second layer waterproof roll (4).
2. underground structure multi-layer combined type as described in claim 1 expansion joint waterproof construction method, it is characterized in that:
When step a, the depth of french drain layer (21) is not less than 30cm;
When step b, the thickness of plain concrete bed course (3) is not less than 10cm;
When step c and j, waterproof roll (4) selects self-adhesive waterproof coiled material;
When step k, the thickness of concrete leveling layer (9) is not less than 15cm.
CN201710279488.XA 2017-04-25 2017-04-25 Underground structure multi-layer combined type expansion joint waterproof construction method Pending CN108729475A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710279488.XA CN108729475A (en) 2017-04-25 2017-04-25 Underground structure multi-layer combined type expansion joint waterproof construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710279488.XA CN108729475A (en) 2017-04-25 2017-04-25 Underground structure multi-layer combined type expansion joint waterproof construction method

Publications (1)

Publication Number Publication Date
CN108729475A true CN108729475A (en) 2018-11-02

Family

ID=63934580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710279488.XA Pending CN108729475A (en) 2017-04-25 2017-04-25 Underground structure multi-layer combined type expansion joint waterproof construction method

Country Status (1)

Country Link
CN (1) CN108729475A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029628A (en) * 2019-05-24 2019-07-19 郑州水务建筑工程股份有限公司 A kind of water conservancy project raft plate dilatation joint waterproof structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2809018Y (en) * 2005-08-05 2006-08-23 上海市隧道工程轨道交通设计研究院 Combination type mounting structure for water stop
CN202830739U (en) * 2012-10-16 2013-03-27 中铁十局集团有限公司 Frame bridge inducing joint structure
CN104420485A (en) * 2013-08-21 2015-03-18 中国二十冶集团有限公司 Underground space leaking type water stopping method for utility tunnel
CN204982640U (en) * 2015-07-07 2016-01-20 山西省交通科学研究院 Bridge expansion joint is with anti -shearing elasticity rubber support
CN106245688A (en) * 2016-09-26 2016-12-21 六合峰(天津)科技股份有限公司 A kind of prevention basement water leakage of floor constructing structure and construction technology thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2809018Y (en) * 2005-08-05 2006-08-23 上海市隧道工程轨道交通设计研究院 Combination type mounting structure for water stop
CN202830739U (en) * 2012-10-16 2013-03-27 中铁十局集团有限公司 Frame bridge inducing joint structure
CN104420485A (en) * 2013-08-21 2015-03-18 中国二十冶集团有限公司 Underground space leaking type water stopping method for utility tunnel
CN204982640U (en) * 2015-07-07 2016-01-20 山西省交通科学研究院 Bridge expansion joint is with anti -shearing elasticity rubber support
CN106245688A (en) * 2016-09-26 2016-12-21 六合峰(天津)科技股份有限公司 A kind of prevention basement water leakage of floor constructing structure and construction technology thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
广东省中等职业学校教材编写委员会组编: "《建筑施工技术与测量》", 30 September 2004, 广东高等教育出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029628A (en) * 2019-05-24 2019-07-19 郑州水务建筑工程股份有限公司 A kind of water conservancy project raft plate dilatation joint waterproof structure

Similar Documents

Publication Publication Date Title
CN103790182B (en) A kind of hydraulic engineering vertical water stopping structure and manufacture thereof and construction method
CN103410175B (en) A kind of water seepage control construction method for karst water-rich geological underground structure waterproof construction
CN104060631B (en) A kind of manhole mouth elevation Dynamic controlling structure
CN105421497B (en) The waterproof construction method of sole plate and ground wall connecting node in combined fender construction system
CN104878783A (en) Super-long basement concrete base plate deformation joint leakage prevention and leakage treatment method
CN106759462A (en) A kind of prefabricated piping lane and its construction method suitable for narrow construction site
CN106988440A (en) A kind of waterproof construction and its construction method at subway station main body and accessory interface
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN112459116A (en) Construction method for rebuilding basement bottom plate of existing building
CN106869169B (en) A kind of three-dimensional interval construction method of underground pipe gallery warehouse
CN108547260A (en) A kind of full library basin Anti-seeping technology structure of karst area and construction method
CN202706060U (en) Waterproof structure for base plate deformation joint with width of 50 mm
CN110306591A (en) A kind of base pit engineering exempts to set the construction method of the underground structure of temporary support
CN104846935B (en) Head-tank treating seepage remodeling method
CN108729475A (en) Underground structure multi-layer combined type expansion joint waterproof construction method
CN106638544A (en) Anti-seepage and anti-cracking construction method for ultra-large reinforced concrete bio-oxidation pond in cold area
CN107059878A (en) A kind of construction method for being applied to river course across Metro station excavation
CN113187487B (en) Construction method of double-layer full-section frozen underground excavation station structure of subway
CN110359495A (en) Comprehensive pipe gallery structure seam construction and its construction method
CN110747763A (en) Box culvert settlement joint waterproof structure and construction method thereof
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
CN206189430U (en) A escape canal for deep overburden ground
CN202440852U (en) Advance water-stop isolation structure of basement post-poured strip
CN106088758B (en) A kind of bilayer assembled underground granary

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181102