CN106759462A - A kind of prefabricated piping lane and its construction method suitable for narrow construction site - Google Patents

A kind of prefabricated piping lane and its construction method suitable for narrow construction site Download PDF

Info

Publication number
CN106759462A
CN106759462A CN201611129002.6A CN201611129002A CN106759462A CN 106759462 A CN106759462 A CN 106759462A CN 201611129002 A CN201611129002 A CN 201611129002A CN 106759462 A CN106759462 A CN 106759462A
Authority
CN
China
Prior art keywords
side wall
piping lane
prefabricated
prefabricated side
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611129002.6A
Other languages
Chinese (zh)
Other versions
CN106759462B (en
Inventor
刘宇晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Original Assignee
Guangzhou City Engineering Design Studies Total Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou City Engineering Design Studies Total Institute filed Critical Guangzhou City Engineering Design Studies Total Institute
Priority to CN201611129002.6A priority Critical patent/CN106759462B/en
Publication of CN106759462A publication Critical patent/CN106759462A/en
Application granted granted Critical
Publication of CN106759462B publication Critical patent/CN106759462B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of prefabricated piping lane and its construction method suitable for narrow construction site, the prefabricated piping lane includes the end to end piping lane unit of more piece, wet seam is poured into a mould between adjacent piping lane unit to be attached, piping lane unit includes prefabricated side wall, base plate and top board, prefabricated side wall is configured to the building enclosure of excavation of foundation pit with interim barricade, as soil mass of foundation pit is excavated, prefabricated side wall sinks and sets up temporary support between prefabricated side wall, after prefabricated side wall sinks in place, cast in situs base plate and top board form Pipe rack, due to supporting construction when prefabricated side wall is as excavation of foundation pit, save the cost of pattern foundation pit supporting structure, reduce the occupancy in place, the piping lane for being particularly suited for narrow construction site builds construction;Additionally, prefabricated side wall uses prefabrication, base plate and top board use cast in situs, both can guarantee that construction quality, and work on the spot amount can be reduced again, so as to save the duration.

Description

A kind of prefabricated piping lane and its construction method suitable for narrow construction site
Technical field
The present invention relates to civilian infrastructure technical field, more particularly to a kind of prefabricated pipe suitable for narrow construction site Corridor and its construction method.
Background technology
At present, existing Pipe rack is generally all that cast in situs underground pipe gallery adds, it is necessary to carry out reinforcing bar at the construction field (site) The operations such as work colligation, formwork, concrete cast, maintenance, form removal, not only working procedure is complicated, long construction period;Additionally, construction During consider formwork space requirement, foundation ditch bottom width generally it is bigger than the width of Pipe rack more than 1 meter, add supporting construction and account for With space, the place for needing of constructing is bigger, therefore, when run into piping lane build locational space it is narrow when, conventional technique scheme is led to Often it is difficult to because place limits.
The content of the invention
It is wide, short construction period suitable for narrow construction that the technical problems to be solved by the invention are to provide a kind of applicability The prefabricated piping lane and its construction method in place.
To solve the technical scheme that above-mentioned one of technical problem is used:It is a kind of suitable for the pre- of narrow construction site Tubulation corridor construction method, comprises the following steps:
(1), according to piping lane design attitude, prefabricated side wall is assembled into rectangle building enclosure with interim barricade, gone along with sb. to guard him in the rectangle Excavation of foundation pit is carried out in structure;
(2), with soil mass of foundation pit excavate, prefabricated side wall conduct oneself with dignity or apply pressure under sink, be provided with branch on prefabricated side wall top Guard, temporary support is set up between prefabricated side wall, between branch guard respectively;
(3), after prefabricated side wall sinks in place, cast in situs base plate;
(4), after base plate strength satisfaction, remove the temporary support between the prefabricated side wall, and cast in situs top board;
(5), after strength of roof satisfaction, remove the temporary support and branch guard between the branch guard, and carry out top Backfill completes first segment piping lane;
(6), repeating the above steps(1)~(5)To apply next sections piping lane, wet seam is poured into a mould between adjacent segment piping lane.
Further, the prefabricated side wall bottom forms cutting shoe.
Further, the prefabricated side wall bottom interior wall has groove, during cast in situs base plate, the insertion of base plate both sides of the edge To the groove of prefabricated side wall.
Further, the prefabricated side wall top inner wall has notch, during cast in situs top board, top board both sides of the edge overlap joint In the notch of prefabricated side wall.
Further, during cast in situs base plate, waterstop is provided between base plate and prefabricated side wall;During cast in situs top board, Waterstop is provided between top board and prefabricated side wall.
Further, needs are designed according to piping lane, in step(3)With step(4)Between, scene is poured between prefabricated side wall Build middle wall.
To solve the technical scheme that above-mentioned another technical problem is used:It is a kind of suitable for the pre- of narrow construction site Tubulation corridor, including the end to end piping lane unit of more piece, pour into a mould wet seam and are attached between the adjacent piping lane unit, described Piping lane unit includes two prefabricated side walls, base plate and top board, and the prefabricated side wall bottom forms cutting shoe, in the prefabricated side wall bottom Wall has the groove for the insertion of base plate both sides of the edge, and the prefabricated side wall top inner wall has the groove for top board both sides of the edge overlap joint Mouthful.
Further, the base plate is provided with waterstop, the top board and prefabricated side wall joint with prefabricated side wall joint It is provided with waterstop.
Further, the waterstop be rubber waterproof belt with expansion when in water or in buried galvanized steel plain sheet waterstop.
Further, buried galvanized steel plain sheet sealing during the prefabricated side wall joint in the wet seam and piping lane unit is provided with Band, the waterproof steel plate that two ends are overlapped on prefabricated side wall respectively is provided with the wet seam outer wall.
Beneficial effect:This prefabricated piping lane and its construction method suitable for narrow construction site, prefabricated side wall is used as base The part supporting construction excavated is cheated, after prefabricated side wall sinks in place, cast in situs top board and base plate form Pipe rack, due to pre- Supporting construction when side wall processed is as excavation of foundation pit, saves the cost of pattern foundation pit supporting structure, reduces the occupancy in place, especially suitable Piping lane in narrow construction site builds construction;Additionally, prefabricated side wall uses prefabrication, base plate and top board are poured using scene Build, both can guarantee that construction quality, work on the spot amount can be reduced again, so as to save the duration.
Brief description of the drawings
The present invention is described further with reference to the accompanying drawings and examples;
Fig. 1 is the sequence of construction schematic diagram of prefabricated piping lane construction method embodiment of the invention;
Fig. 2 is the profile of prefabricated piping lane embodiment of the invention;
Fig. 3 is the elevation of prefabricated piping lane embodiment of the invention;
Fig. 4 is the plan of prefabricated piping lane embodiment of the invention;
Fig. 5 is enlarged diagram at A in Fig. 4.
Specific embodiment
Referring to figs. 1 to Fig. 5, a kind of prefabricated piping lane suitable for narrow construction site of the invention, including more piece is end to end Piping lane unit 10, pour into a mould wet seam 20 between adjacent piping lane unit 10 and be attached, piping lane unit 10 include two prefabricated side walls 11st, base plate 12 and top board 13, the bottom of prefabricated side wall 11 form cutting shoe 14, and the bottom interior wall of prefabricated side wall 11 has for the both sides of base plate 12 The groove 15 of edge insertion, the top inner wall of prefabricated side wall 11 has the notch 16 for the both sides of the edge of top board 13 overlap joint.
Wherein, prefabricated side wall 11 is prefabricated components, and base plate 12 and top board 13 are cast in situs composition, prefabricated side wall The cutting shoe 14 of 11 bottoms easily prefabricated side wall 11 can sink in place, when cast in situs base plate 12 and top board in soil mass of foundation pit When 13, waterstop 17 is provided with base plate 12 and the joint of prefabricated side wall 11, top board 13 is provided with sealing with the joint of prefabricated side wall 11 Band 17, the waterstop 17 be preferably rubber waterproof belt with expansion when in water or in buried galvanized steel plain sheet waterstop, in addition;Two adjacent sections After the completion of piping lane unit 10 is applied, when wet seam 20 is poured, wet seam 20 and the prefabricated side wall in adjacent piping lane unit 10 11 joints buried galvanized steel plain sheet waterstop in being provided with, on the outer wall of wet seam 20 be provided with two ends is overlapped on prefabricated side wall 11 respectively On waterproof steel plate 18.
The construction method step of above-mentioned prefabricated piping lane is as follows:
(1), according to piping lane design attitude, prefabricated side wall 11 is assembled into rectangle building enclosure with interim barricade 31, in the rectangle Excavation of foundation pit is carried out in building enclosure;
(2), with soil mass of foundation pit excavate, prefabricated side wall 11 conduct oneself with dignity or apply pressure under sink, set on the top of prefabricated side wall 11 There is branch guard 32, between prefabricated side wall 11, set up temporary support 33 between branch guard 32 respectively;
(3), after prefabricated side wall 11 sinks in place, cast in situs base plate 12, the both sides of the edge of base plate 12 are embedded in prefabricated side wall 11 In groove 15, and waterstop 17 is set between base plate 12 and prefabricated side wall 11;
(4), after the intensity of base plate 12 satisfaction, remove the temporary support 33 between the prefabricated side wall 11, and cast in situs top board 13, the both sides of the edge of top board 13 are overlapped in the notch 16 of prefabricated side wall 11, and are set between top board 13 and prefabricated side wall 11 Waterstop 17;
(5), after the intensity of top board 13 satisfaction, remove the temporary support 33 and branch guard 32 between the branch guard 32, and Carry out top backfill and complete first segment piping lane;
(6), repeating the above steps(1)~(5)To apply next sections piping lane, wet seam is poured into a mould between adjacent segment piping lane 20。
Wherein, needs are designed according to piping lane, can be in step(3)With step(4)Between, wall in cast in situs, in intensity Support replacement is carried out after satisfaction, then to pour top board 13.
Embodiments of the present invention are explained in detail above in conjunction with accompanying drawing, but the invention is not restricted to above-mentioned embodiment party Formula, in the ken that the technical field those of ordinary skill possesses, can also be before present inventive concept not be departed from Put that various changes can be made.

Claims (10)

1. a kind of prefabricated piping lane construction method suitable for narrow construction site, it is characterised in that comprise the following steps:
(1), according to piping lane design attitude, prefabricated side wall is assembled into rectangle building enclosure with interim barricade, gone along with sb. to guard him in the rectangle Excavation of foundation pit is carried out in structure;
(2), with soil mass of foundation pit excavate, prefabricated side wall conduct oneself with dignity or apply pressure under sink, be provided with branch on prefabricated side wall top Guard, temporary support is set up between prefabricated side wall, between branch guard respectively;
(3), after prefabricated side wall sinks in place, cast in situs base plate;
(4), after base plate strength satisfaction, remove the temporary support between the prefabricated side wall, and cast in situs top board;
(5), after strength of roof satisfaction, remove the temporary support and branch guard between the branch guard, and carry out top Backfill completes first segment piping lane;
(6), repeating the above steps(1)~(5)To apply next sections piping lane, wet seam is poured into a mould between adjacent segment piping lane.
2. the prefabricated piping lane construction method suitable for narrow construction site according to claim 1, it is characterised in that:It is described Prefabricated side wall bottom forms cutting shoe.
3. the prefabricated piping lane construction method suitable for narrow construction site according to claim 1, it is characterised in that:It is described Prefabricated side wall bottom interior wall has groove, and during cast in situs base plate, base plate both sides of the edge are embedded in the groove of prefabricated side wall.
4. the prefabricated piping lane construction method suitable for narrow construction site according to claim 1, it is characterised in that:It is described Prefabricated side wall top inner wall has notch, and during cast in situs top board, top board both sides of the edge are overlapped in the notch of prefabricated side wall.
5. the prefabricated piping lane construction method suitable for narrow construction site according to claim 1, it is characterised in that:Scene When pouring base plate, waterstop is provided between base plate and prefabricated side wall;During cast in situs top board, it is provided between top board and prefabricated side wall Waterstop.
6. the prefabricated piping lane construction method suitable for narrow construction site according to claim 1, it is characterised in that:According to Piping lane design needs, in step(3)With step(4)Between, the wall in cast in situs between prefabricated side wall.
7. a kind of prefabricated piping lane suitable for narrow construction site, it is characterised in that:Including the piping lane unit that more piece is end to end, Wet seam is poured into a mould between the adjacent piping lane unit to be attached, the piping lane unit includes two prefabricated side walls, base plate and top board, The prefabricated side wall bottom forms cutting shoe, and the prefabricated side wall bottom interior wall has the groove for the insertion of base plate both sides of the edge, institute Stating prefabricated side wall top inner wall has the notch overlapped for top board both sides of the edge.
8. the prefabricated piping lane suitable for narrow construction site according to claim 7, it is characterised in that:The base plate with it is pre- Side wall joint processed is provided with waterstop, and the top board is provided with waterstop with prefabricated side wall joint.
9. the prefabricated piping lane suitable for narrow construction site according to claim 8, it is characterised in that:The waterstop is Rubber waterproof belt with expansion when in water or in buried galvanized steel plain sheet waterstop.
10. the prefabricated piping lane suitable for narrow construction site according to claim 7, it is characterised in that:The wet seam Buried galvanized steel plain sheet waterstop in being provided with the prefabricated side wall joint in piping lane unit, two are provided with the wet seam outer wall End is overlapped on the waterproof steel plate on prefabricated side wall respectively.
CN201611129002.6A 2016-12-09 2016-12-09 A kind of prefabricated piping lane and its construction method suitable for narrow construction site Active CN106759462B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611129002.6A CN106759462B (en) 2016-12-09 2016-12-09 A kind of prefabricated piping lane and its construction method suitable for narrow construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611129002.6A CN106759462B (en) 2016-12-09 2016-12-09 A kind of prefabricated piping lane and its construction method suitable for narrow construction site

Publications (2)

Publication Number Publication Date
CN106759462A true CN106759462A (en) 2017-05-31
CN106759462B CN106759462B (en) 2019-02-15

Family

ID=58875703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611129002.6A Active CN106759462B (en) 2016-12-09 2016-12-09 A kind of prefabricated piping lane and its construction method suitable for narrow construction site

Country Status (1)

Country Link
CN (1) CN106759462B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108005119A (en) * 2018-01-15 2018-05-08 山东大学 The integrated concrete pipe gallery in braced wall corridor and its installation method
CN108071122A (en) * 2017-11-09 2018-05-25 神翼航空器科技(天津)有限公司 Assembled underground pipe gallery and its construction method
CN109137970A (en) * 2018-08-24 2019-01-04 中国华冶科工集团有限公司 Arterial highway underground pipe gallery construction method
CN109183837A (en) * 2017-07-14 2019-01-11 吴健 The construction method and stress stake of piping lane, prestressing combination supporting and piping lane
CN109778865A (en) * 2018-12-19 2019-05-21 上海建工集团股份有限公司 A kind of piping lane subregion excavation method guaranteeing that existing road half range is current
CN109898556A (en) * 2019-03-27 2019-06-18 济南市市政工程设计研究院(集团)有限责任公司 A kind of underground pipe gallery structure and sunk type construction method
CN109914475A (en) * 2019-03-27 2019-06-21 中国一冶集团有限公司 Excavate the prefabricated piping lane construction method of self supporting
CN110306595A (en) * 2019-07-12 2019-10-08 长江勘测规划设计研究有限责任公司 A kind of build together structure and its construction method of electric power piping lane and anti-flood wall
WO2021088279A1 (en) * 2019-11-08 2021-05-14 南京联众工程技术有限公司 Underground pipeline having two-in-one support pile and pipeline wall and construction method
CN112814025A (en) * 2020-12-29 2021-05-18 济南市市政工程设计研究院(集团)有限责任公司 Assembled underground structure and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11107297A (en) * 1997-10-07 1999-04-20 Kyoei Unyu Kiko Kk Construction method for multi-stage underground parking pit and concrete retaining block used for building thereof
CN105951880A (en) * 2016-05-09 2016-09-21 江苏鸿基节能新技术股份有限公司 Assembled underground structure of precast concrete planks and construction method thereof
CN105971007A (en) * 2016-03-30 2016-09-28 阜阳金谷快宜居住工科技有限公司 Split type non-formwork pouring underground comprehensive pipe gallery
CN106013228A (en) * 2016-06-24 2016-10-12 中国建筑股份有限公司 Overlapping integral type prefabricated assembly structure for comprehensive pipe gallery and construction method thereof
CN106049536A (en) * 2016-08-01 2016-10-26 安徽三建工程有限公司 Splitting method for assembled integral type waterproof comprehensive pipe rack
CN106088147A (en) * 2016-08-01 2016-11-09 中建五局第三建设有限公司 Hollow wallboard mixed prefabricated assembly type comprehensive pipe gallery and construction method thereof
CN206328777U (en) * 2016-12-09 2017-07-14 广州市市政工程设计研究总院 A kind of prefabricated piping lane suitable for narrow construction site

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11107297A (en) * 1997-10-07 1999-04-20 Kyoei Unyu Kiko Kk Construction method for multi-stage underground parking pit and concrete retaining block used for building thereof
CN105971007A (en) * 2016-03-30 2016-09-28 阜阳金谷快宜居住工科技有限公司 Split type non-formwork pouring underground comprehensive pipe gallery
CN105951880A (en) * 2016-05-09 2016-09-21 江苏鸿基节能新技术股份有限公司 Assembled underground structure of precast concrete planks and construction method thereof
CN106013228A (en) * 2016-06-24 2016-10-12 中国建筑股份有限公司 Overlapping integral type prefabricated assembly structure for comprehensive pipe gallery and construction method thereof
CN106049536A (en) * 2016-08-01 2016-10-26 安徽三建工程有限公司 Splitting method for assembled integral type waterproof comprehensive pipe rack
CN106088147A (en) * 2016-08-01 2016-11-09 中建五局第三建设有限公司 Hollow wallboard mixed prefabricated assembly type comprehensive pipe gallery and construction method thereof
CN206328777U (en) * 2016-12-09 2017-07-14 广州市市政工程设计研究总院 A kind of prefabricated piping lane suitable for narrow construction site

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183837A (en) * 2017-07-14 2019-01-11 吴健 The construction method and stress stake of piping lane, prestressing combination supporting and piping lane
CN108071122A (en) * 2017-11-09 2018-05-25 神翼航空器科技(天津)有限公司 Assembled underground pipe gallery and its construction method
CN108005119A (en) * 2018-01-15 2018-05-08 山东大学 The integrated concrete pipe gallery in braced wall corridor and its installation method
CN108005119B (en) * 2018-01-15 2023-09-05 山东大学 Concrete pipe gallery with integrated supporting wall gallery and installation method thereof
CN109137970A (en) * 2018-08-24 2019-01-04 中国华冶科工集团有限公司 Arterial highway underground pipe gallery construction method
CN109778865A (en) * 2018-12-19 2019-05-21 上海建工集团股份有限公司 A kind of piping lane subregion excavation method guaranteeing that existing road half range is current
CN109898556A (en) * 2019-03-27 2019-06-18 济南市市政工程设计研究院(集团)有限责任公司 A kind of underground pipe gallery structure and sunk type construction method
CN109914475A (en) * 2019-03-27 2019-06-21 中国一冶集团有限公司 Excavate the prefabricated piping lane construction method of self supporting
CN110306595A (en) * 2019-07-12 2019-10-08 长江勘测规划设计研究有限责任公司 A kind of build together structure and its construction method of electric power piping lane and anti-flood wall
CN110306595B (en) * 2019-07-12 2024-01-05 长江勘测规划设计研究有限责任公司 Co-building structure of electric power pipe gallery and flood control wall and construction method thereof
WO2021088279A1 (en) * 2019-11-08 2021-05-14 南京联众工程技术有限公司 Underground pipeline having two-in-one support pile and pipeline wall and construction method
CN112814025A (en) * 2020-12-29 2021-05-18 济南市市政工程设计研究院(集团)有限责任公司 Assembled underground structure and construction method

Also Published As

Publication number Publication date
CN106759462B (en) 2019-02-15

Similar Documents

Publication Publication Date Title
CN106759462A (en) A kind of prefabricated piping lane and its construction method suitable for narrow construction site
CN110747899B (en) Basement waterproof construction method
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN104818696B (en) The manufacture method of the vertical water sealing structure of hydraulic engineering
CN204343339U (en) A kind of temporary support columns waterproof base plate
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN201943086U (en) Underground building wall body
JP2017008568A (en) Tunnel joint structure and tunnel construction method
CN103590841A (en) Supporting method for primary support of underground excavated chamber
US4459063A (en) Building construction
CN206328777U (en) A kind of prefabricated piping lane suitable for narrow construction site
CN107476340A (en) A kind of subway tunnel and the new Joining Structure and its construction method at enlarging station
CN107268675A (en) Laying method and structure of combined multi-bin underground comprehensive pipe gallery
CN106436721B (en) The construction method of diaphram wall built-in type steel purlin plug system
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN104314104B (en) Deformation joint setting method for oblique crossing with underground box culvert
CN207727733U (en) The spliced gutter that can be had enough to meet the need
CN210288282U (en) Prefabricated ditch
CN105484201B (en) A kind of manufacture method of concrete works swaging die skeleton
CN209798679U (en) Double-layer lining channel
CN108729475A (en) Underground structure multi-layer combined type expansion joint waterproof construction method
CN208501735U (en) Prefabricated piping lane
CN206015720U (en) A kind of prefabricated ground-connecting-wall with limiting card groove plate joint
CN109667278A (en) Tower crane anti-cracking and seepage control construction method is set under underground garage isolated footing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong

Patentee after: Guangzhou municipal engineering design and Research Institute Co., Ltd.

Address before: 510060, No. 348, East Ring Road, Yuexiu District, Guangdong, Guangzhou

Patentee before: Guangzhou City Engineering Design studies total institute