CN202830739U - Frame bridge inducing joint structure - Google Patents

Frame bridge inducing joint structure Download PDF

Info

Publication number
CN202830739U
CN202830739U CN 201220526755 CN201220526755U CN202830739U CN 202830739 U CN202830739 U CN 202830739U CN 201220526755 CN201220526755 CN 201220526755 CN 201220526755 U CN201220526755 U CN 201220526755U CN 202830739 U CN202830739 U CN 202830739U
Authority
CN
China
Prior art keywords
frame
inducing
seam
framework
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201220526755
Other languages
Chinese (zh)
Inventor
杨基好
踪高峰
吴强
马小伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN 201220526755 priority Critical patent/CN202830739U/en
Application granted granted Critical
Publication of CN202830739U publication Critical patent/CN202830739U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Building Environments (AREA)

Abstract

The utility model discloses a frame bridge inducing joint structure and provides an inducing joint structure that is positioned in the frame bridge. Problem of concrete crack due to the stress generated by a long box body jacking the frame, and water seepage from a frame seam can be solved. The utility model belongs to the technical field of jacking construction. The frame bridge inducing joint structure comprises an inducing joint positioned in the frame bridge. A joint plate (7) is arranged inside the inducing joint. A plurality of steel shear pins (5) which are arranged along length direction of the frame are alternately positioned on both sides of the wall of the frame of the inducing joint along the height direction of the frame. The steel shear pins (5) pass through the joint plate (7). Water proof layers are arranged on the outside of the top tray of the inducing joint frame, on outside of two lateral walls, and inside the frame respectively. The frame bridge inducing joint structure is simple in structure, and the phenomenon that a plurality of cracks appear in the frame structure under the effect of concrete stress is effectively improved. Accumulated jacking deviation caused by a plurality of frames jacking by several times is greatly reduced, project quality is greatly improved, time limit for a project is greatly shortened, and construction cost is reduced.

Description

A kind of frame bridge is induced crack structure
Technical field
The utility model relates to a kind of frame bridge and induces crack structure, and specifically a kind of crack structure of inducing that improves long box-body jacking frame concrete stress crack and framework joint seam crossing infiltration phenomenon in the frame bridge that is arranged on belongs to the Construction Technology of With standing Operation field.
Background technology
During the framework jacking construction, if the jacking lengths of frame is long, normally minute more piece is taked the jacking of relay well method after prefabricated, needs the long construction period like this, and the jacking number of times increase after then the jacking Accumulated deviation increase; Perhaps adopt framework whole elongated prefabricated, though can shorten the construction period like this, frame construction can occur than multiple cracking because of the concrete stress impact, and quality can not guarantee.Be to establish settlement joint together every about 5~10m on framework, though can improve structural cracks like this, it is bad that framework saves the seam crossing stagnant water effect, can't thoroughly solve seepy question in the past, of long duration the phenomenon that seeps water will occur.
Summary of the invention
For the defects that exists in the prior art, the utility model provides a kind of frame bridge to induce crack structure, and effectively solution framework divides that the multistage prefabricated construction is long in time limit, repeatedly jacking causes the jacking Accumulated deviation to increase, problem than multiple cracking, framework joint joint seal weak effect can occur because of the concrete stress impact.
The utility model is achieved by the following technical solution: a kind of frame bridge is induced crack structure, it comprises the seam of inducing that is arranged in the frame bridge, described inducing is provided with joint filling board in the seam, being interval with some steel along the setting of lengths of frame direction along the frame height direction within the walls at described framework dual-side of inducing the seam place cuts off, described steel cuts off and passes described joint filling board, is respectively equipped with waterproofing course in the described inboard of the top board outside, the both sides abutment wall outside and the framework of the framework at seam place of inducing.
In the utility model, be located at steel in the seam and cut off and can guarantee that framework induces the stability of crack structure in jacking, and the vertical shear strain of controlled framework bridge, the design of waterproofing course can effectively guarantee to induce seam water-tight.Frame bridge can effectively prevent the crack that occurs because of the concrete stress impact by the above-mentioned crack structure of inducing is set.
In order to improve the stagnant water effect of inducing the seam place, the described outside of inducing seam to be in the framework reinforcing bar also is embedded with along inducing the seam place to form the steel limit waterstop of closed loop, is embedded with in the frame concrete at described seam guide place along inducing the seam place to form the rubber fastening band of closed loop.
Further scheme is, described steel limit waterstop is GSE5 section steel edge waterstop, and described rubber fastening band is GRE7 type rubber fastening band.
In order to improve waterproof effect, described waterproofing course is included in the top board outside of framework and polyurethane water-proof paint layer and the Chlorinated polyethylene plastic sheets for waterproofing layer that the abutment wall outside in both sides sets gradually from the inside to the outside, and the M1500 waterproof agent layer of brushing in the inboard of framework.
It is that the ferule of 30mm and round steel that diameter is φ 28mm consist of that described steel cuts off by internal diameter, and described round steel is inserted in the described ferule, is filled with the pitch ointment in the described ferule.
Described joint filling board is to be fixedly installed on the hard wood particle board of inducing seam middle.
The setting space that described steel cuts off is 20cm.
The beneficial effects of the utility model are: the utility model is simple in structure, simple to operate, it is arranged in the framework, effectively improved frame construction because being subjected to concrete stress to affect the more cracky phenomenon of appearance, greatly reduced the accumulative total jacking deviation that multi-section frame gradation jacking produces, improved workmanship, and reduction of erection time greatly, reducing construction cost.
Description of drawings
Fig. 1 is the structural representation among the utility model embodiment 1;
Fig. 2 is the A-A schematic diagram among Fig. 1;
Fig. 3 is the C section enlarged diagram among Fig. 1;
Fig. 4 is the structural representation among the utility model embodiment 2;
Fig. 5 is the D-D schematic diagram among Fig. 4;
Fig. 6 is the B section enlarged diagram among Fig. 4;
Among the figure: 1, Chlorinated polyethylene plastic sheets for waterproofing layer, 2, the polyurethane water-proof paint layer, 3, steel limit waterstop, 4, rubber fastening band, 5, steel cuts off, 6, the waterproof agent layer, 7, joint filling board, 8, ferule, 9, the pitch ointment, 10, round steel, 11, the framework body.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described:
Embodiment 1
Shown in accompanying drawing 1-3, a kind of frame bridge is induced crack structure, induce seam to be arranged in the framework, described inducing is provided with joint filling board 7 in the seam, be interval with some steel along the setting of lengths of frame direction along the frame height direction within the walls at described framework dual-side of inducing the seam place and cut off 5, it is that the ferule 8 of 30mm and round steel 10 that diameter is φ 28mm consist of by internal diameter that steel cuts off 5, round steel 10 passes joint filling board 7 and is inserted in the ferule 8, the other end of ferule 8 is blind end, be filled with pitch ointment 9 in it, the non-blind end of ferule 8 is surperficial concordant with joint filling board 7.The described outside of inducing seam to be in the framework reinforcing bar also is embedded with along inducing the seam place to form the steel limit waterstop 3 of closed loop, is embedded with in the frame concrete at described seam guide place along inducing the seam place to form the rubber fastening band 4 of closed loop.Steel limit waterstop 3 in the present embodiment is GSE5 section steel edge waterstop, and rubber fastening band 4 is GRE7 type rubber fastening band.The top board outside and the both sides abutment wall outside at framework are disposed with polyurethane water-proof paint layer 2 and Chlorinated polyethylene plastic sheets for waterproofing layer 1 from the inside to the outside, are coated with in the inboard of framework and are brushed with M1500 waterproof agent layer 6.
In the present embodiment, it is 20cm that steel cuts off 5 setting space, and joint filling board 7 is the hard wood particle board, and the thickness of joint filling board 7 is 2cm.
The crack structure of inducing of the present embodiment is applicable to not be with the framework of settlement joint, is mainly used in arranging in the jacking framework.
In the prefabricated process of framework, during colligation chassis base reinforcing bar, bury GSE5 section steel edge waterstop 3 and GRE7 type rubber fastening band 4 and joint filling board 7 underground, build underplate concrete, then at colligation framework abutment wall, bury first successively GRE7 type rubber fastening band 4 in the top board reinforcing bar process underground, install joint filling board 7, all fix with indented bars for two kinds, burying ferule 8 and round steel 10 underground forms steel and cuts off 5 again, steel cuts off 5 and passes joint filling board 7, treat the framework abutment wall, the top board reinforcing bar binding is complete, be welded and fixed GSE5 section steel edge waterstop 3 at the framework steel mesh reinforcement, concreting, rear at the framework abutment wall until frame concrete curing time end at last, the outer concrete surface of top board is brushed first two-layer polyurethane water-proof paint, re-lay Chlorinated polyethylene plastic sheets for waterproofing, and in framework, induce seam place concrete surface brushing M1500 waterproof agent.
GSE5 section steel edge waterstop and GRE7 type rubber fastening band are arranged on around the framework, with reinforcing bar laterally, vertical fixing, make it when concreting, affect the sealing effect after unlikely displacement or the distortion; Steel cuts off and is arranged on abutment wall place, framework both sides, and spot welding is fixed on the framework reinforcing bar; Before joint filling board uses as required size be sawn into two boards, cut off the position at steel and get the hole, spelling uses, and needs be fixed on the framework reinforcing bar with reinforcing bar, guarantees that when concreting it is not shifted.
The utility model has improved the lower crack that produces of inside configuration concrete stress impact by establishing " seam ", cuts off and has guaranteed that framework induces the stability of crack structure in jacking by establishing waterstop, steel in " seam ", can guarantee again to save seam crossing at framework water-tight.
Other parts in the present embodiment adopt prior art, do not repeat them here.
Embodiment 2
Shown in accompanying drawing 4-6, the present embodiment is substantially the same manner as Example 1, and difference is not establish steel limit waterstop and rubber fastening band in the present embodiment.It comprises the seam of inducing that is arranged in the frame bridge, and described inducing is provided with joint filling board 7 in the seam.Be interval with some steel along the setting of lengths of frame direction along the frame height direction within the walls at described framework dual-side of inducing the seam place and cut off 5, it is that the ferule 8 of 30mm and round steel 10 that diameter is φ 28mm consist of by internal diameter that steel cuts off 5, round steel 10 passes joint filling board 7 and is inserted in the ferule 8, the other end of ferule 8 is blind end, be filled with pitch ointment 9 in it, the non-blind end of ferule 8 is surperficial concordant with joint filling board 7.The top board outside and the both sides abutment wall outside at framework are disposed with polyurethane water-proof paint layer 2 and Chlorinated polyethylene plastic sheets for waterproofing layer 1 from the inside to the outside, are coated with in the inboard of framework and are brushed with M1500 waterproof agent layer 6.
In the present embodiment, joint filling board 7 is the hard wood particle board, and the thickness of joint filling board 7 is 2cm.
Other parts in the present embodiment adopt prior art, do not repeat them here.
The crack structure of inducing of the present embodiment is applicable to framework with settlement joint, mainly be in place for the jacking framework after and the seam crossing between cast-in-place framework.

Claims (7)

1. a frame bridge is induced crack structure, it is characterized in that: comprise the seam of inducing that is arranged in the frame bridge, described inducing is provided with joint filling board (7) in the seam, be interval with some steel along the setting of lengths of frame direction along the frame height direction within the walls at described framework dual-side of inducing the seam place and cut off (5), described steel cuts off (5) and passes described joint filling board (7), is respectively equipped with waterproofing course in the described inboard of the top board outside, the both sides abutment wall outside and the framework of the framework at seam place of inducing.
2. frame bridge according to claim 1 is induced crack structure, it is characterized in that: the described outside of inducing seam to be in the framework reinforcing bar also is embedded with along inducing the seam place to form the steel limit waterstop (3) of closed loop, is embedded with in the frame concrete at described seam guide place along inducing the seam place to form the rubber fastening band (4) of closed loop.
3. frame bridge according to claim 2 is induced crack structure, it is characterized in that: described steel limit waterstop (3) is GSE5 section steel edge waterstop, and described rubber fastening band (4) is GRE7 type rubber fastening band.
According to claim 1 and 2 or 3 described frame bridges induce crack structure, it is characterized in that: described waterproofing course is included in the top board outside of framework and polyurethane water-proof paint layer (2) and the Chlorinated polyethylene plastic sheets for waterproofing layer (1) that the abutment wall outside in both sides sets gradually from the inside to the outside, and the M1500 waterproof agent layer (6) of brushing in the inboard of framework.
According to claim 1 and 2 or 3 described frame bridges induce crack structure, it is characterized in that: it is that the ferule (8) of 30mm and round steel (10) that diameter is φ 28mm consist of by internal diameter that described steel cuts off (5), described round steel (10) is inserted in the described ferule (8), and described ferule is filled with the pitch ointment in (8).
According to claim 1 and 2 or 3 described frame bridges induce crack structure, it is characterized in that: described joint filling board (7) for be fixedly installed on induce the seam in the middle of the hard wood particle board.
According to claim 1 and 2 or 3 described frame bridges induce crack structure, it is characterized in that: the setting space that described steel cuts off (5) is 20cm.
CN 201220526755 2012-10-16 2012-10-16 Frame bridge inducing joint structure Withdrawn - After Issue CN202830739U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220526755 CN202830739U (en) 2012-10-16 2012-10-16 Frame bridge inducing joint structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220526755 CN202830739U (en) 2012-10-16 2012-10-16 Frame bridge inducing joint structure

Publications (1)

Publication Number Publication Date
CN202830739U true CN202830739U (en) 2013-03-27

Family

ID=47942485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220526755 Withdrawn - After Issue CN202830739U (en) 2012-10-16 2012-10-16 Frame bridge inducing joint structure

Country Status (1)

Country Link
CN (1) CN202830739U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102912720A (en) * 2012-10-16 2013-02-06 中铁十局集团有限公司 Induced crack structure of frame bridge
CN108661074A (en) * 2017-03-31 2018-10-16 中国二十冶集团有限公司 Underground engineering expansion joint multi-layer combined type antipriming and its manufacturing method
CN108729475A (en) * 2017-04-25 2018-11-02 中国二十冶集团有限公司 Underground structure multi-layer combined type expansion joint waterproof construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102912720A (en) * 2012-10-16 2013-02-06 中铁十局集团有限公司 Induced crack structure of frame bridge
CN102912720B (en) * 2012-10-16 2015-08-26 中铁十局集团有限公司 A kind of frame bridge attractive joint structure
CN108661074A (en) * 2017-03-31 2018-10-16 中国二十冶集团有限公司 Underground engineering expansion joint multi-layer combined type antipriming and its manufacturing method
CN108661074B (en) * 2017-03-31 2021-12-07 中国二十冶集团有限公司 Underground engineering expansion joint multi-layer combined water stopping device and manufacturing method thereof
CN108729475A (en) * 2017-04-25 2018-11-02 中国二十冶集团有限公司 Underground structure multi-layer combined type expansion joint waterproof construction method

Similar Documents

Publication Publication Date Title
CN107326940B (en) basement advanced water stop post-cast strip structure and construction method thereof
CN105569224A (en) Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof
CN101603336A (en) Band filling type wallboard precast concrete short-limb shear wall provided and attaching method thereof
CN101608480A (en) Precast concrete short-limb shear wall provided and the preparation method of band door and window
CN101603338A (en) Assembly integrated precast concrete shear wall and job practices
CN104532953A (en) 3D printing based assembly type special-shaped column framework structure and construction method thereof
CN102912720B (en) A kind of frame bridge attractive joint structure
CN108385871A (en) The precast wall body of fabricated structure
CN104763085A (en) Assembled integral type pre-stress double-T floor framework structure and construction method thereof
CN202830739U (en) Frame bridge inducing joint structure
CN205712204U (en) A kind of multiple waterstop and waterproof construction thereof
CN104074285A (en) ultra-long concrete wall body structure and method for controlling structural cracks by constructing wall body
CN111980063A (en) Subway open cut interval prefabricated box culvert laminated structure and construction method thereof
CN106481347B (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN203200745U (en) Strengthening support of underground diaphragm wall in inverse construction method
CN204782044U (en) Reinforced structure of existing structure roof beam
CN104314105B (en) The connection vertical piece structure of the basement wall and cast-in-place buttress and construction method
CN206706844U (en) A kind of alter-pouring strips mould plate installs construction
CN105821908A (en) Multiple water stop belt, waterproof structure and construction method of waterproof structure
KR101673287B1 (en) Methods of increasing the sectional resisting force for negative moment acting at the end part of beam in case of repair or remodeling
CN106812359B (en) A kind of assembled underground garage and its method of construction
CN206752892U (en) A kind of prefabricated shock insulation staircase structure
KR100815174B1 (en) Pipe Roof Tunnel and Constructing Method thereof
CN204151835U (en) The vertical piece structure of connection of the basement wall and cast-in-place buttress

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130327

Effective date of abandoning: 20150826

RGAV Abandon patent right to avoid regrant