CN101603338A CNA2008100647001A CN200810064700A CN101603338A CN 101603338 A CN101603338 A CN 101603338A CN A2008100647001 A CNA2008100647001 A CN A2008100647001A CN 200810064700 A CN200810064700 A CN 200810064700A CN 101603338 A CN101603338 A CN 101603338A
Authority
CN
China
Prior art keywords
shear wall
precast concrete
limb
assembly integrated
short
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100647001A
Other languages
Chinese (zh)
Other versions
CN101603338B (en
Inventor
刘文清
姜洪斌
耿永常
阎红缨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Yuhui New Building Materials Co Ltd
Original Assignee
Heilongjiang Yuhui New Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Yuhui New Building Materials Co Ltd filed Critical Heilongjiang Yuhui New Building Materials Co Ltd
Priority to CN200810064700A priority Critical patent/CN101603338B/en
Publication of CN101603338A publication Critical patent/CN101603338A/en
Application granted granted Critical
Publication of CN101603338B publication Critical patent/CN101603338B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

Assembly integrated precast concrete shear wall and job practices, shear wall cross section in the prior art, volume and weight are bigger, and difficulty is bigger in prefabricated, transportation, lifting installation process, is not suitable for the fabricated construction worker method of housing industrialization.Assembly integrated precast concrete shear wall and job practices, its composition comprises: one group precast concrete short-limb shear wall provided (1), described precast concrete short-limb shear wall provided by connector (2) connection.The present invention is used for the assembly integrated precast concrete shear wall structural system of housing industrialization.

Description

Assembly integrated precast concrete shear wall and job practices
Technical field:
The present invention relates to precast concrete design and construction field, particularly a kind of assembly integrated precast concrete shear wall structural system that is suitable for housing industrialization.
Background technology:
Concrete shear wall with short piers is meant that the wall limb depth of section and the ratio of thickness are 5~8 seismic structural wall, earthquake resistant walls, according to the current Chinese code of practice requirement, wall section thickness is not less than 200mm, and the stress performance of concrete shear wall with short piers structure is between hetermorphiscal column and general shear wall structure.Because this structural system has good performance in many-sides such as building, structure, construction cost, energy-conserving and environment-protective, has now become the form of structure that is suitable for dwelling construction most.The original form of construction work of an on-the-spot template, assembling reinforcement, cast-in-place concrete is also adopted in the construction of concrete shear wall with short piers structure at present, after main structure construction finishes, also to carry out loaded down with trivial details work such as a large amount of interior and exterior finishes, equipment installation installation, make that construction cost is big, site operation program and complex management, and the final structure construction quality also is difficult to obtain assurance.The comprehensive energy consumption of original in addition form of construction work building structure is higher, and construction mode is unfavorable for environment and energy-conservation, and the construction place is not easy to clean, construction noise seriously disturbs residents.Therefore in housing industrialization, adopt precast concrete short-limb shear wall provided structure Design method and construction, can remove all disadvantages of original form of construction work, make the advantage of short-shear wall structure to give full play to.
But according to China's code requirement, can not all adopt shear wall with short piers by all bodies of wall in the short-shear wall structure, must be furnished with the general shear wall of some, be wall limb depth of section with the ratio of thickness greater than 8 seismic structural wall, earthquake resistant wall, because the cross section of such body of wall, volume and weight are bigger, difficulty is bigger in prefabricated, transportation, lifting installation process, just is not suitable for the fabricated construction worker method of housing industrialization.
Summary of the invention:
The purpose of this invention is to provide a kind of assembly integrated precast concrete shear wall and job practices, structural performance is reliable, helps environmental protection and energy saving.
Above-mentioned purpose realizes by following technical scheme:
Assembly integrated precast concrete shear wall, its composition comprises: one group precast concrete short-limb shear wall provided, described precast concrete short-limb shear wall providedly connect by connector.
Described assembly integrated precast concrete shear wall, described precast concrete short-limb shear wall provided wall limb depth of section is 5-8 with the ratio of thickness, wall limb cross sectional shape is in-line or T font or L shaped or cross.
Described assembly integrated precast concrete shear wall, described connector are that interface shearing-resistance connector or the reserved steel bar that passes through described precast concrete short-limb shear wall provided both sides adopt the vertical ater-casting of reserving to connect.
Described assembly integrated precast concrete shear wall, described interface shearing-resistance connector welds mutually with the shear reinforcement of precast concrete short-limb shear wall provided inside.
Described assembly integrated precast concrete shear wall is describedly reserved gingival cyst of mucous gland in the newborn stubble slit between precast concrete short-limb shear wall provided, and irritate having grouting to expect in described gingival cyst of mucous gland in the newborn stubble the slit in.
The job practices of assembly integrated precast concrete shear wall, described precast concrete short-limb shear wall provided prefabricated in factory in advance, maintenance is finished after be transported to the job site by haulage device, the site assembly formula construction that adopts lifting machine to lift during construction.
Beneficial effect of the present invention:
1. the invention provides a kind of assembly integrated precast concrete shear wall structural system that is suitable for housing industrialization, this structural system has that the building course switching performance is reliable, construction is advanced, construction quality is easy to guarantee, structure tension performance satisfies the characteristics of existing national regulation requirement fully, the present invention is on-the-spot basic for doing operation, has fully avoided all disadvantages of original form of construction work.Help environmental protection and energy saving, be suitable for extensive construction, help reducing construction cost, save construction fund.
The present invention's ratio that cross section, general shear wall that volume and weight is bigger are divided into wall limb depth of section and thickness be 5~8 precast concrete short-limb shear wall provided, assembling at the construction field (site) is prefabricated in the factory, each is precast concrete short-limb shear wall provided to adopt interface shearing-resistance connector to connect each other, so just can carry out prefabricated, transportation and lifting construction according to the fabricated construction worker method that is suitable for housing industrialization.Owing to complicated procedures of forming such as a template of having cancelled original form of construction work, assembling reinforcement, fluid concretes, therefore make site operation environment and condition improve greatly, speed of application is accelerated greatly, and prefabricate structural portion product specification unanimity, quality are unified, and the construction quality of building structure can access sufficient assurance.
Description of drawings:
Accompanying drawing 1 is the structural representation of this product.
Accompanying drawing 2 is plan structure schematic diagrames of accompanying drawing 1.
Accompanying drawing 3 is that A-A cuts at the place node generalized section open in accompanying drawing 1.
Accompanying drawing 4 is that B-B cuts at the place node generalized section open in accompanying drawing 2.
Accompanying drawing 5 is the vertical structural representation of reserving the ater-casting for this product adopts.
Accompanying drawing 6 is plan structure schematic diagrames of accompanying drawing 5.
Accompanying drawing 7 C-C in accompanying drawing 5 cuts at the place node generalized section open.
Accompanying drawing 8 D-D in accompanying drawing 6 cuts at the place node generalized section open.
The specific embodiment:
Embodiment 1:
Assembly integrated precast concrete shear wall, its composition comprises: one group precast concrete short-limb shear wall provided 1, described precast concrete short-limb shear wall providedly connect by connector 2, has holistic resistant behavior.
Embodiment 2:
Above-mentioned assembly integrated precast concrete shear wall, described precast concrete short-limb shear wall provided wall limb cross sectional shape is in-line or T font or L shaped or cross.Wall limb depth of section is 5-8 with the ratio of thickness.
Embodiment 3:
Above-mentioned assembly integrated precast concrete shear wall, described connector are that interface shearing-resistance connector 3 or the reserved steel bar that passes through described precast concrete short-limb shear wall provided both sides 4 adopt the vertical ater-casting 5 of reserving to connect.
Embodiment 4:
Above-mentioned assembly integrated precast concrete shear wall, described interface shearing-resistance connector welds mutually with the shear reinforcement 6 of precast concrete short-limb shear wall provided inside.
In accompanying drawing 1, accompanying drawing 2, accompanying drawing 3, accompanying drawing 4,11 is L shaped shear wall, and 12 is the in-line shear wall, and neighboring walls connects by interface shearing-resistance connector 3.The interface shearing-resistance connector by the shear connector steel plate 31 that is embedded in body of wall in advance and after be welded in 31 outsides shear connector steel plate 32 forms, its light plate 31 with precast concrete short-limb shear wall provided 11 and the shear reinforcement 6 of 12 inside weld, make shearing transmitted.The quantity of shear connector 3 and the thickness of steel plate and size design according to interface shear stress.In order to increase the interface shearing-resistance concatenation ability, slit 7 pre-retained gingival cyst of mucous gland in the newborn stubble shapes adopt the cement-based grout material to irritate real in the slit.
Embodiment 5:
Assembly integrated precast concrete shear wall, its composition comprises: one group precast concrete short-limb shear wall provided 1, described precast concrete short-limb shear wall providedly connect by connector 2, has holistic resistant behavior.Described assembly integrated precast concrete shear wall, described precast concrete short-limb shear wall provided wall limb cross sectional shape is in-line or T font or L shaped or cross.Wall limb depth of section is 5~8 with the ratio of thickness.
Described assembly integrated precast concrete shear wall, described connector are that interface shearing-resistance connector 3 or the reserved steel bar that passes through described precast concrete short-limb shear wall provided both sides 4 adopt the vertical ater-casting 5 of reserving to connect.
Described assembly integrated precast concrete shear wall is describedly reserved gingival cyst of mucous gland in the newborn stubble slit 7 between precast concrete short-limb shear wall provided, and irritate having grouting to expect in described gingival cyst of mucous gland in the newborn stubble the slit in.
The ratio of the desired wall limb of China's standard depth of section and thickness is greater than 8 general shear wall, the ratio that is divided into wall limb depth of section and thickness be 5~8 precast concrete short-limb shear wall provided, the precast concrete short-limb shear wall provided wall limb cross sectional shape of forming general shear wall can be " one " font, " T " font, " L " shape or " ten " font.The pre-buried corresponding mutually one by one interface shearing-resistance connector in precast concrete short-limb shear wall provided both sides, the shear reinforcement welding of this connector and precast concrete short-limb shear wall provided inside.Forming the precast concrete short-limb shear wall provided of precast concrete shear wall structure can also adopt the vertical ater-casting of reserving to connect by the both sides reserved steel bar.Each precast concrete short-limb shear wall provided both sides of forming precast concrete shear wall is prefabricated into gingival cyst of mucous gland in the newborn stubble seam, when assembling is constructed at the scene, by weld interface shear connector and perfusion gingival cyst of mucous gland in the newborn stubble shape slit, with the precast concrete short-limb shear wall provided assembly integrated precast concrete shear wall that is connected to become with general shear wall stress performance.
In accompanying drawing 5, accompanying drawing 6, accompanying drawing 7, accompanying drawing 8, connect by reserving ater-casting 5 between precast concrete short-limb shear wall provided.The both walls limb is reserved horizontal reinforcement 41, and the certain angle of level bending, is welded into the horizontal reinforcement welding point of axle center centering after the two butt joint, and longitudinal reinforcement 42 inserts in 41 enclosure spaces that form.It is template that external-wall exterior insulation layer and architectural surface are directly adopted in the outside, or behind the formwork plate of the interior outside, is connected to become integral body behind the fluid concrete.In order to increase the interface shearing-resistance concatenation ability, reserve the pre-retained gingival cyst of mucous gland in the newborn stubble shape in ater-casting.
Embodiment 6:
The job practices of assembly integrated precast concrete shear wall, described precast concrete short-limb shear wall provided prefabricated in factory in advance, maintenance is finished after be transported to the job site by haulage device, the site assembly formula construction that adopts lifting machine to lift during construction.

Claims (7)

1. assembly integrated precast concrete shear wall, its composition comprises: one group precast concrete short-limb shear wall provided, it is characterized in that: described precast concrete short-limb shear wall providedly connect by connector.
2. assembly integrated precast concrete shear wall according to claim 1, it is characterized in that: described precast concrete short-limb shear wall provided wall limb depth of section is 5-8 with the ratio of thickness, and wall limb cross sectional shape is in-line or T font or L shaped or cross.
3. assembly integrated precast concrete shear wall according to claim 1 and 2 is characterized in that: described connector is that interface shearing-resistance connector or the reserved steel bar that passes through described precast concrete short-limb shear wall provided both sides adopt the vertical ater-casting of reserving to connect.
4. assembly integrated precast concrete shear wall according to claim 3 is characterized in that: described interface shearing-resistance connector welds mutually with the shear reinforcement of precast concrete short-limb shear wall provided inside.
5. assembly integrated precast concrete shear wall according to claim 1 and 2 is characterized in that: describedly reserve gingival cyst of mucous gland in the newborn stubble slit between precast concrete short-limb shear wall provided, irritate having grouting to expect in described gingival cyst of mucous gland in the newborn stubble the slit in.
6. assembly integrated precast concrete shear wall according to claim 4 is characterized in that: describedly reserve gingival cyst of mucous gland in the newborn stubble slit between precast concrete short-limb shear wall provided, irritate having grouting to expect in described gingival cyst of mucous gland in the newborn stubble the slit in.
7. the job practices of an assembly integrated precast concrete shear wall, it is characterized in that: described precast concrete short-limb shear wall provided prefabricated in factory in advance, maintenance is finished after be transported to the job site by haulage device, the site assembly formula construction that adopts lifting machine to lift during construction.
CN200810064700A 2008-06-12 2008-06-12 Assembly integrated precast concrete shear wall and construction method thereof Expired - Fee Related CN101603338B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810064700A CN101603338B (en) 2008-06-12 2008-06-12 Assembly integrated precast concrete shear wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810064700A CN101603338B (en) 2008-06-12 2008-06-12 Assembly integrated precast concrete shear wall and construction method thereof

Publications (2)

Publication Number Publication Date
CN101603338A true CN101603338A (en) 2009-12-16
CN101603338B CN101603338B (en) 2012-10-03

Family

ID=41469233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810064700A Expired - Fee Related CN101603338B (en) 2008-06-12 2008-06-12 Assembly integrated precast concrete shear wall and construction method thereof

Country Status (1)

Country Link
CN (1) CN101603338B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101851964A (en) * 2010-03-08 2010-10-06 南通建筑工程总承包有限公司 L-shaped wall horizontal connecting node
CN102733506A (en) * 2012-06-28 2012-10-17 东南大学 Assembly type seismic insulation house structure
CN103643741A (en) * 2013-09-23 2014-03-19 初明进 Method for connecting prefabricated concrete members
CN104032859A (en) * 2014-05-15 2014-09-10 中国建筑股份有限公司 Assembly-type L-shaped mixed coupled wall and construction method thereof
CN104695589A (en) * 2015-03-10 2015-06-10 东南大学 Connecting structure and method for prefabricated assembled concrete shearing wall splicing joint
CN105421615A (en) * 2015-12-01 2016-03-23 沈阳建筑大学 Prefabricated type shear wall horizontal bolt connecting structure
CN105421614A (en) * 2014-06-17 2016-03-23 东南大学 Construction method of prefabricated shear wall dry type vertical connection joint
CN105464244A (en) * 2015-10-30 2016-04-06 江苏中南建筑产业集团有限责任公司 Prefabricated integrated shear wall construction method
CN106677381A (en) * 2017-01-18 2017-05-17 天津城建大学 Metal connector for improving integrity of rammed-earth wall structure and rammed-earth wall structure
CN106906900A (en) * 2017-05-02 2017-06-30 付东根 Assembled manomelia wall column steel-concrete building tectonic system
CN108360901A (en) * 2018-03-06 2018-08-03 四川大学 Novel low layer assembled wallboard structure energy dissipating bolt joint
CN108374493A (en) * 2018-03-06 2018-08-07 四川大学 Novel low layer assembled wallboard structure energy dissipating steel plate welding node
CN109898860A (en) * 2017-12-07 2019-06-18 浙江新盛建设集团有限公司 A kind of fabricated assembly overall shear wall formwork bracket reducing fracture width

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2247687Y (en) * 1996-01-16 1997-02-19 韩鑫森 Antiseismic prefabricated slab for building
CN1274035A (en) * 1999-05-17 2000-11-22 王维汉 Light slab structure of short-limb shear wall for large-bay residence
CN1185395C (en) * 2002-01-24 2005-01-19 张毓英 Residence system with great space and flexible partitions
CN1408970A (en) * 2002-09-28 2003-04-09 朱维高 Prefabricated concrete shear wall building structure and its construction method
CN201217861Y (en) * 2008-06-12 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Assembly integral precast concrete shear wall

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101851964A (en) * 2010-03-08 2010-10-06 南通建筑工程总承包有限公司 L-shaped wall horizontal connecting node
CN102733506A (en) * 2012-06-28 2012-10-17 东南大学 Assembly type seismic insulation house structure
CN103643741A (en) * 2013-09-23 2014-03-19 初明进 Method for connecting prefabricated concrete members
CN104032859A (en) * 2014-05-15 2014-09-10 中国建筑股份有限公司 Assembly-type L-shaped mixed coupled wall and construction method thereof
CN105421614A (en) * 2014-06-17 2016-03-23 东南大学 Construction method of prefabricated shear wall dry type vertical connection joint
CN105421614B (en) * 2014-06-17 2017-09-19 东南大学 The construction method of precast shear wall dry type vertical connection nodes
CN104695589A (en) * 2015-03-10 2015-06-10 东南大学 Connecting structure and method for prefabricated assembled concrete shearing wall splicing joint
CN105464244A (en) * 2015-10-30 2016-04-06 江苏中南建筑产业集团有限责任公司 Prefabricated integrated shear wall construction method
CN105421615A (en) * 2015-12-01 2016-03-23 沈阳建筑大学 Prefabricated type shear wall horizontal bolt connecting structure
CN106677381A (en) * 2017-01-18 2017-05-17 天津城建大学 Metal connector for improving integrity of rammed-earth wall structure and rammed-earth wall structure
CN106906900A (en) * 2017-05-02 2017-06-30 付东根 Assembled manomelia wall column steel-concrete building tectonic system
CN109898860A (en) * 2017-12-07 2019-06-18 浙江新盛建设集团有限公司 A kind of fabricated assembly overall shear wall formwork bracket reducing fracture width
CN109898860B (en) * 2017-12-07 2021-05-11 浙江新盛建设集团有限公司 Reduce integral shear wall template support of prefabricated assembly of crack width
CN108360901A (en) * 2018-03-06 2018-08-03 四川大学 Novel low layer assembled wallboard structure energy dissipating bolt joint
CN108374493A (en) * 2018-03-06 2018-08-07 四川大学 Novel low layer assembled wallboard structure energy dissipating steel plate welding node

Also Published As

Publication number Publication date
CN101603338B (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN201217861Y (en) Assembly integral precast concrete shear wall
CN101603338B (en) Assembly integrated precast concrete shear wall and construction method thereof
CN101603336B (en) Precast concrete short-pier shear wall with infilling wall panel and connecting method thereof
CN101608480B (en) Manufacturing method of precast concrete short-limb shear wall provided with door windows
CN103924710B (en) Low layer assembled combined wall house Plate Welding node structure
CN103993679B (en) Low layer assembling combined wall house bolt connection node structure
CN105089178B (en) A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls
CN204826308U (en) Structure assembly type structure is pieced together in advance to prefabricated shaped steel concrete shear force wall
CN110965639B (en) Prefabricated assembly dry type connecting frame structure system and construction method thereof
CN108824818A (en) The method of construction of assembly concrete-filled steel tube frame shear wall structure system
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN107816126B (en) Assembled concrete embedded prefabricated column and prefabricated balcony
CN216740195U (en) Shear wall mixed structure system connected by grouting sleeve
CN103255834B (en) Prefabricated heat preservation balcony suitable for industrial production and construction method of prefabricated heat preservation balcony
CN205776898U (en) Overall assembled reinforced concrete shear wall structure system
CN201217862Y (en) Precast concrete short-pier shear wall with filling type wall board
CN209816911U (en) Assembled concrete utility tunnel structure
CN106638956A (en) Concrete wallboard and ribbed slab dry type connection node
CN103541435B (en) With the cross node of full assembling of steel plate concrete Cantilever Beams
CN106088398A (en) A kind of combined wall board
CN206408743U (en) A kind of assembly concrete node
CN206034685U (en) Integrated system is gone along with sb. to guard him to structure of wide post husked kaoliang of dry -type link pack formula concrete
CN203049833U (en) Rural immature soil house with reinforced outer wall body
CN106284739B (en) Assembly concrete is whole without heat bridge gusset
CN112095850A (en) Connecting joint of H-shaped steel column and steel frame light wall panel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Assembly integrated precast concrete shear wall and construction method thereof

Effective date of registration: 20150216

Granted publication date: 20121003

Pledgee: The Bank of Jinzhou Limited by Share Ltd. Harbin Qunli branch

Pledgor: Heilongjiang Yuhui New Building Material Co.,Ltd.

Registration number: 2015230000003

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20160905

Granted publication date: 20121003

Pledgee: The Bank of Jinzhou Limited by Share Ltd. Harbin Qunli branch

Pledgor: Heilongjiang Yuhui New Building Material Co.,Ltd.

Registration number: 2015230000003

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

CF01 Termination of patent right due to non-payment of annual fee