CN105421614B - The construction method of precast shear wall dry type vertical connection nodes - Google Patents
The construction method of precast shear wall dry type vertical connection nodes Download PDFInfo
- Publication number
- CN105421614B CN105421614B CN201510754026.XA CN201510754026A CN105421614B CN 105421614 B CN105421614 B CN 105421614B CN 201510754026 A CN201510754026 A CN 201510754026A CN 105421614 B CN105421614 B CN 105421614B
- Authority
- CN
- China
- Prior art keywords
- shear wall
- precast shear
- groove
- tongue
- dowel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Abstract
The steps such as mortar are installed and fill the invention discloses the docking of hair fastener type connector, bolt at a kind of construction method of precast shear wall dry type vertical connection nodes, including precast shear wall manufacture, tongue and groove.Invention substantially achieves the connection method of dry type, bonding strength is high, high capacity, meets building industrialization, the requirement of housing industrialization.The present invention has added central colleges and universities' basic scientific research operating cost special fund and subsidized and ordinary higher learning school of Jiangsu Province postgraduate scientific research and innovation programme support project, bullets KYLX_0151;And Jiangsu Universities advantage subjects construction project Funded Projects, bullets CE02 17.
Description
Technical field
The present invention is 2014102681426 divisional application, is related to a kind of precast shear wall dry type vertical connection nodes shape
The construction method of formula, belongs to building structure technology field;The present invention has added central colleges and universities' basic scientific research operating cost special fund
Subsidize and ordinary higher learning school of Jiangsu Province postgraduate scientific research and innovation programme support project, bullets KYLX_0151;And Jiangsu Universities
Advantage subjects construction project Funded Projects, bullets CE02-1-7.
Background technology
Shear wall structure can bear the structure of vertical and horizontal loading by what shear wall was constituted, with other structures form
Compare, shear wall anti-seismic performance is higher, comfort level more preferably, is widely used in multilayer structure.In recent years, with building
Industrialization, the quickening of Process of Housing Industrialization, precast shear wall structure application are more and more extensive, and what is brought therewith is shear wall
Connectivity problem.Existing type of attachment is largely full wet type connection, and small part is dry-wet Hybrid connections, Chinese patent literature
CN101503896A discloses a kind of Linear shear wall vertical connection node, including the first precast shear wall and second prefabricated is cut
Power wall, has a prefabricated panel seam between the first precast shear wall and the second precast shear wall, first prefabricated cuts at node
The same side of power wall and the second precast shear wall respectively has a depression, and two parts depression constitutes a groove, in the first prefabricated shearing
The first additional muscle is provided with the walls and in groove, and the second additional muscle, first are provided with the second precast shear wall and in groove
The wall horizontal reinforcement of precast shear wall and the second precast shear wall in groove side is extended forwardly into close to groove in groove
Internal opposite side, and bend inwards, it is for cement mortar in groove in cast-in-place concrete, prefabricated panel seam.Above-mentioned connection
Wet type connection is fallen within, is come into operation there is presently no dry type connection.
Under the background that China greatly develops building industrialization, the requirement to construction quality, production efficiency and site environment
More and more higher, the dry type connection of precast shear wall becomes particularly important.
The content of the invention
Goal of the invention:In order to overcome the deficiencies in the prior art, the present invention provides a kind of precast shear wall dry type and hung down
The construction method of straight connecting node, comprises the following steps:
1)Precast shear wall is manufactured, includes tongue and groove, hair fastener type connector and the groove of end face, tongue and groove is carried out at dabbing
Reason, using modular mode in factory's manufacturer's standard precast shear wall module;
2)Standard precast shear wall module is hoisted to installation site, the tongue and groove of contiguous prefabricated shear wall connects, and hair fastener
Formula connector is mutually corresponded to;
3)Bolt is penetrated in the bolt hole of relative hair fastener type connector by the groove of both sides;
4)Bolt is tightened by the operating space of groove;
5)Groove is filled and led up using cement mortar.
Specifically, the linkage interface of the precast shear wall is provided with tongue and groove, and the tongue and groove is handled by dabbing, and its is close
The position of alien invasion is embedded with hair fastener type connector in precast shear wall;The hair fastener type connector includes the anchor being welded to each other
Expose the end face of tongue and groove on the outside of plate and dowel, the anchor slab, the dowel is anchored in the precast shear wall on the inside of anchor slab, institute
The center for stating anchor slab is provided with the precast shear wall on the inside of bolt hole, the bolt hole and is provided with groove;The linkage interface both sides
Hair fastener type connector symmetrically, and bolt is installed in a pair of bolts hole, the two ends of the bolt are located in groove.
Preferably, in order that dowel uniform stressed, improves the stability of anchoring, the dowel is symmetrically set along bolt hole
Four put, the angle of the dowel and anchor slab is 45 °.
Preferably, in order that the shear resistance of node is balanced with tensile capacity, the free end of the dowel is away from described
Bolt hole.The two ends of dowel are respectively to be welded in the fixing end of anchor slab and the free end away from anchor slab.
The thickness of the anchor slab is preferably 10mm.
In order to facilitate the arrangement of hair fastener type fixture, the diameter of the dowel and prefabricated shearing when the prefabricated shearing of manufacture is strong
The diameter of distribution bar is identical within the walls.
Beneficial effect:The present invention realizes the connection method of dry type, ring few with situ wet operation substantially at node
Border pollution is small, using factory prefabricated component, with easy construction, production efficiency height, short construction period, use of labor less,
The advantages of quality is easily controlled, meets building industrialization, the requirement of housing industrialization.Moreover, bolt connection hair fastener type connector
The globality of junction can effectively be strengthened, with higher bearing capacity.Due to whole hair fastener type connector be embedded in it is prefabricated
In shear wall, even if exposed anchor slab is also concordant with tongue and groove end face, in transport with special guarantor need not be to it in installing
Shield, and move up and down the alignment for realizing bolt hole after tongue and groove can be close in installation process, compared to existing exposed or
Breech-loading connector has the advantages that to be hardly damaged and is easily installed.The type of attachment can also be used for the level of precast shear wall
Connection.
Brief description of the drawings
Fig. 1 is the structural representation of connecting node in the embodiment of the present invention 1;
Fig. 2 is this Fig. 1 A-A views;
Fig. 3 is the structural representation of hair fastener type connector in the embodiment of the present invention 2;
Fig. 4 is Fig. 3 B-B views;
Mark represented structure entitled in accompanying drawing:
1. the dowel of the first precast shear wall 2. first
3. the anchor slab of the first anchor slab 4. second
5. the precast shear wall of the second dowel 6. second
7. the bolt of tongue and groove 8.
9. the anchor slab of groove 10.
11. the bolt hole of dowel 12..
Embodiment
Embodiment 1:As depicted in figs. 1 and 2, the precast shear wall dry type vertical connection nodes of the present embodiment are pre- including first
The precast shear wall 6 of shear wall 1 and second processed, the first precast shear wall 1 and the second precast shear wall 6 are connected with tongue and groove 7, to tongue and groove
7 carry out dabbing processing, and the position of facade is provided with the first hair fastener type in inside and outside on the first precast shear wall 1 at tongue and groove 7
The second hair fastener type connector is provided with the second precast shear wall 6 at connector, tongue and groove 7;First hair fastener type connector includes
The first anchor slab 3 and the first dowel 2 being welded to each other, the first anchor slab 3 are embedded on the linkage interface of tongue and groove, and the first dowel 2 is anchored at
In first precast shear wall 1;Second hair fastener type connector includes the second anchor slab 4 and the second dowel 5, and the second dowel 5 is welded on the
On two anchor slabs 4 and it is anchored in the second precast shear wall 6, the angle of the above-mentioned dowel 2 of first anchor slab 3 and first is 45 °, the second anchor
The dowel 5 of plate 4 and second also angle at 45 °.
The centre of first anchor slab 3 and the anchor slab of the second anchor slab 4 is provided with bolt hole, and in every side first dowel at node
2 and second the position of the bolt hole of alignment between dowel 5 groove 9 is set, bolt 8 is sent out in groove 9 through bolt hole connection first
Clamping type connector and the second hair fastener type connector.
In use, above-mentioned precast shear wall dry type vertical connection nodes construction method comprises the following steps:
1. setting tongue and groove 7 respectively in the same side of the first precast shear wall 1 and the second precast shear wall 6, tongue and groove 7 is entered
The processing of row dabbing.
2. hair fastener type connector is anchored into the ipsilateral penumbra to the first precast shear wall 1 and the second precast shear wall 6 respectively
Place.
3. groove 9 is set per the position of alignment bolt hole between the dowel of side four at node.
4. bolt 8 is anchored into the groove 9 that node both sides have been held successfully and is tightened.
5. groove 9 is filled and led up with cement mortar.
Embodiment 2:The present embodiment is the improvement on the basis of embodiment 1, the first hair fastener type connector and the second hair fastener type
Connector uses identical structure, i.e., hair fastener type connector is set to the standard component of batch micro operations.As shown in Figure 3 and Figure 4, hair fastener
The anchor slab 10 of formula connector including rectangle and welding thereon and with four dowels 11 of the angle at 45 ° of anchor slab 10, dowel 11 has
There is the free end of the fixing end for being welded in anchor slab 10 and remote anchor slab 10.And it is symmetrical along the bolt hole 12 being opened in the middle part of anchor slab
Set, its free end is away from bolt hole 12.
Using the above-mentioned desirable embodiment according to the present invention as enlightenment, by above-mentioned description, relevant staff is complete
Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention
Property scope is not limited to the content on specification, it is necessary to its technical scope is determined according to right.
Claims (5)
1. a kind of construction method of precast shear wall dry type vertical connection nodes, comprises the following steps:
1)Precast shear wall is manufactured, includes tongue and groove, hair fastener type connector and the groove of end face, dabbing processing is carried out to tongue and groove, adopted
With modular mode in factory's manufacturer's standard precast shear wall module;
2)Standard precast shear wall module is hoisted to installation site, the tongue and groove of contiguous prefabricated shear wall connects, and hair fastener type connects
Fitting is mutually corresponded to;
3)Bolt is penetrated in the bolt hole of relative hair fastener type connector by the groove of both sides;
4)Bolt is tightened by the operating space of groove;
5)Groove is filled and led up using cement mortar;
It is characterized in that:The linkage interface of the precast shear wall is provided with tongue and groove, and the tongue and groove is handled by dabbing, and its is close
The position of alien invasion is embedded with hair fastener type connector in precast shear wall;The hair fastener type connector includes the anchor being welded to each other
Expose the end face of tongue and groove on the outside of plate and dowel, the anchor slab, the dowel is anchored in the precast shear wall on the inside of anchor slab, institute
The center for stating anchor slab is provided with the precast shear wall on the inside of bolt hole, the bolt hole and is provided with groove;The linkage interface both sides
Hair fastener type connector symmetrically, and bolt is installed in a pair of bolts hole, the two ends of the bolt are located in groove.
2. the construction method of precast shear wall dry type vertical connection nodes according to claim 1, it is characterised in that:It is described
Dowel is that, symmetrically arranged four along bolt hole, the angle of the dowel and anchor slab is 45 °.
3. the construction method of precast shear wall dry type vertical connection nodes according to claim 2, it is characterised in that:It is described
The free end of dowel is away from the bolt hole.
4. the construction method of precast shear wall dry type vertical connection nodes according to claim 3, it is characterised in that:It is described
The thickness of anchor slab is 10mm.
5. the construction method of precast shear wall dry type vertical connection nodes according to claim 4, it is characterised in that:It is described
The diameter of dowel is identical with the diameter of distribution bar in precast shear wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510754026.XA CN105421614B (en) | 2014-06-17 | 2014-06-17 | The construction method of precast shear wall dry type vertical connection nodes |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410268142.6A CN104032850B (en) | 2014-06-17 | 2014-06-17 | Precast shear wall dry type vertical connection nodes and construction method |
CN201510754026.XA CN105421614B (en) | 2014-06-17 | 2014-06-17 | The construction method of precast shear wall dry type vertical connection nodes |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410268142.6A Division CN104032850B (en) | 2014-06-17 | 2014-06-17 | Precast shear wall dry type vertical connection nodes and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105421614A CN105421614A (en) | 2016-03-23 |
CN105421614B true CN105421614B (en) | 2017-09-19 |
Family
ID=51463822
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410268142.6A Active CN104032850B (en) | 2014-06-17 | 2014-06-17 | Precast shear wall dry type vertical connection nodes and construction method |
CN201510754026.XA Active CN105421614B (en) | 2014-06-17 | 2014-06-17 | The construction method of precast shear wall dry type vertical connection nodes |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410268142.6A Active CN104032850B (en) | 2014-06-17 | 2014-06-17 | Precast shear wall dry type vertical connection nodes and construction method |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN104032850B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544744B (en) * | 2016-01-29 | 2017-12-29 | 浙江电联通信机房工程技术有限公司 | A kind of structure that is connected of precast slab |
CN107700676B (en) * | 2017-09-20 | 2023-11-10 | 中国建筑股份有限公司 | Dry-method connection plate type structural system and construction method thereof |
CN109440969A (en) * | 2018-12-21 | 2019-03-08 | 刘祥锦 | Assembly shear wall vertically stitches connection structure and its accessory, application, calculating and construction |
CN109440970A (en) * | 2018-12-21 | 2019-03-08 | 刘祥锦 | Assemble shear wall structure linked system and its design method and vertical seam connection structure |
CN111206699B (en) * | 2020-04-23 | 2020-07-10 | 中国船舶重工集团国际工程有限公司 | Transverse connection structure of assembled stiff concrete shear wall, shear wall and construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101603338A (en) * | 2008-06-12 | 2009-12-16 | 黑龙江宇辉新型建筑材料有限公司 | Assembly integrated precast concrete shear wall and job practices |
CN101761160A (en) * | 2009-12-18 | 2010-06-30 | 东南大学 | Totally-prefabricated assembling type reinforced concrete floor system |
CN201574492U (en) * | 2009-12-18 | 2010-09-08 | 东南大学 | Welded precast concrete floor slab joint connection node |
CN202466893U (en) * | 2011-12-26 | 2012-10-03 | 森特士兴集团股份有限公司 | Composite corner board |
CN103741842A (en) * | 2014-01-22 | 2014-04-23 | 天津大学建筑设计研究院 | Lightweight fabricated shear wall structure |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
HUP0102262A3 (en) * | 1998-05-11 | 2003-11-28 | Interlock Holdings Pty Ltd Ner | Improvements in or relating to building elements and methods in relation to same |
DE10027502B4 (en) * | 2000-06-02 | 2005-02-17 | Möding Keramikfassaden GmbH | Curtain ventilated facade construction |
US7437858B2 (en) * | 2003-02-04 | 2008-10-21 | Reward Wall System, Inc. | Welded wire reinforcement for modular concrete forms |
CN201217861Y (en) * | 2008-06-12 | 2009-04-08 | 黑龙江宇辉新型建筑材料有限公司 | Assembly integral precast concrete shear wall |
CN201433480Y (en) * | 2009-02-04 | 2010-03-31 | 南通建筑工程总承包有限公司 | Linear shear wall vertical connection node |
CN203034638U (en) * | 2012-12-19 | 2013-07-03 | 清华大学建筑设计研究院有限公司 | Heat-insulation-type structure connector |
CN203129369U (en) * | 2013-01-14 | 2013-08-14 | 上海核工程研究设计院 | Connection node of steel plate-concrete combination shear wall and concrete shear wall |
CN203049832U (en) * | 2013-01-22 | 2013-07-10 | 天津大学建筑设计研究院 | Assembling type shear wall structure |
-
2014
- 2014-06-17 CN CN201410268142.6A patent/CN104032850B/en active Active
- 2014-06-17 CN CN201510754026.XA patent/CN105421614B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101603338A (en) * | 2008-06-12 | 2009-12-16 | 黑龙江宇辉新型建筑材料有限公司 | Assembly integrated precast concrete shear wall and job practices |
CN101761160A (en) * | 2009-12-18 | 2010-06-30 | 东南大学 | Totally-prefabricated assembling type reinforced concrete floor system |
CN201574492U (en) * | 2009-12-18 | 2010-09-08 | 东南大学 | Welded precast concrete floor slab joint connection node |
CN202466893U (en) * | 2011-12-26 | 2012-10-03 | 森特士兴集团股份有限公司 | Composite corner board |
CN103741842A (en) * | 2014-01-22 | 2014-04-23 | 天津大学建筑设计研究院 | Lightweight fabricated shear wall structure |
Also Published As
Publication number | Publication date |
---|---|
CN105421614A (en) | 2016-03-23 |
CN104032850A (en) | 2014-09-10 |
CN104032850B (en) | 2016-01-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105421614B (en) | The construction method of precast shear wall dry type vertical connection nodes | |
CN103243838B (en) | Connection structure of integrally assembled concrete frame and shear wall | |
CN107299683B (en) | Compound concrete-filled tubular column assembled docks node and connection method | |
CN106013517A (en) | Fabricated reinforced concrete shear wall and manufacturing method thereof | |
CN207194006U (en) | A kind of prefabricated concrete retaining wall | |
CN103741811B (en) | Sleeper formula precast reinforced concrete structure node | |
CN103883025B (en) | Assembling type combination steel plate shear wall | |
CN108678220B (en) | Concrete shear wall with integrally installed reinforcing steel bar templates | |
CN208363404U (en) | A kind of prefabricated panel and its connection structure | |
TW200427904A (en) | A construct for buildings and a method for manufacturing the same | |
CN105821989A (en) | Assembly type steel pipe bundle concrete shear wall structure system and construction method thereof | |
CN106760038A (en) | A kind of T-shaped precast concrete shear wall and its dry construction connection method | |
CN103967133A (en) | Stud welding mixed connection node of rectangular concrete filled steel tubular column and H-shaped steel girder | |
CN107905385A (en) | The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure | |
CN208072706U (en) | A kind of connection structure of the prefabricated steel shear wall horizontal joint of slip installation | |
CN207812741U (en) | Pre-manufactured steel structure overlapped shear wall | |
CN106284644B (en) | A kind of residential architecture structural system and its method of construction suitable for industrialized production | |
CN105220792A (en) | A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof | |
CN105937280A (en) | Novel prefabricated building connecting joint | |
CN205917875U (en) | One -way rigid connection ductility assembled column base node | |
RU128636U1 (en) | BASE ASSEMBLY JOINT REINFORCED CONCRETE COLUMN WITH FOUNDATION | |
CN103397720A (en) | Steel tube shear wall for building | |
CN209760525U (en) | Assembled construction is with interior wall of being convenient for to pile up | |
CN107201782A (en) | A kind of wall of assembled architecture, floor connecting node and method | |
CN207646886U (en) | The assembled arthitecutral structure that steel construction is combined with concrete structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |