CN108661651B - Rapid construction method for hard rock stratum pipe jacking working well - Google Patents
Rapid construction method for hard rock stratum pipe jacking working well Download PDFInfo
- Publication number
- CN108661651B CN108661651B CN201810474403.8A CN201810474403A CN108661651B CN 108661651 B CN108661651 B CN 108661651B CN 201810474403 A CN201810474403 A CN 201810474403A CN 108661651 B CN108661651 B CN 108661651B
- Authority
- CN
- China
- Prior art keywords
- jacking
- pipe
- construction
- operation space
- pile hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/03—Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
- E21D1/06—Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws with shaft-boring cutters
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/04—Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials
Abstract
The invention discloses a rapid construction method of a hard rock stratum top pipe working well, which comprises the steps of leveling a field, measuring lofting and positioning a pile hole; adopting a rotary drilling machine to perform drilling operation until the drilling reaches a specified elevation; transversely excavating and widening a hole wall at the bottom of the pile hole and on the opposite side of the pipe jacking construction position to form a pipe jacking operation space, wherein the pipe jacking operation space is provided with an opening for enabling a pipe to be constructed to enter the pipe jacking operation space; hardening the ground in the jacking operation space and the ground in the pile hole of the jacking pipe; a jacking device for jacking the jacking pipe is arranged in the jacking operation space of the jacking pipe; and transversely excavating the lower foundation layer at the bottom of the pile hole and at the position of the pipe jacking construction, and jacking the pipe jacking construction through a jacking device. The invention adopts a pile hole mode, reduces the construction range, correspondingly reduces the construction workload and difficulty, improves the construction efficiency, shortens the construction period and reduces the influence on the surrounding environment.
Description
Technical Field
The invention relates to the field of construction, in particular to a quick construction method for a hard rock stratum top pipe working well.
Background
The pipe-jacking construction is a non-excavation construction method, and is a pipeline burying construction technology without excavation or with few excavations. The technology thoroughly solves the problems of damage to urban buildings, road traffic blockage and the like in pipeline burying construction, and has obvious advantages in soil stabilization and environmental protection. This is very important for cities with heavy traffic, dense population, numerous ground structures and complex underground pipelines, which will create a clean, comfortable and beautiful environment for the cities. In a hard rock stratum geological construction environment, according to a conventional construction method, a foundation pit needs to be excavated firstly, so that the construction area of the foundation pit is usually large in order to facilitate hoisting of a jacking pipe, the corresponding area excavated to a rock stratum is also large, and certain influence can be caused on the surrounding environment. In addition, because the rock stratum hardness is higher, the excavation difficulty is higher, and the construction period can be correspondingly prolonged.
Disclosure of Invention
Aiming at the defects of the prior art, the technical problems to be solved by the invention are as follows: how to provide a method for quickly constructing a hard rock stratum top pipe working well, which reduces the construction difficulty, shortens the construction period and reduces the influence on the environment.
In order to solve the technical problems, the invention adopts the following technical scheme:
a quick construction method for a hard rock stratum top pipe working well comprises the following steps:
(1) leveling the field, and positioning the position of the pile hole by measuring lofting;
(2) adopting a rotary drilling machine to perform drilling operation until the drilling reaches a specified elevation;
(3) transversely excavating and widening the pile hole bottom and the hole wall on the opposite side of the pipe jacking construction position to form a pipe jacking operation space for horizontally placing the jacking pipe, wherein the pipe jacking operation space is provided with an opening for enabling the jacking pipe to be constructed to enter the pipe jacking operation space, the width of the opening is greater than the diameter of the jacking pipe, and the height of the opening is equal to the height of the openingWherein c is the length of the jacking pipe, and b is the inner diameter of the pile casing;
(4) hardening the ground in the jacking operation space and the ground in the pile hole of the jacking pipe;
(5) a jacking device for jacking the jacking pipe is arranged in the jacking operation space of the jacking pipe;
(6) and transversely excavating the lower foundation layer at the bottom of the pile hole and at the position of the pipe jacking construction, and jacking the pipe jacking construction through a jacking device.
In the invention, a rotary excavating machine drilling mode is adopted, and after the pile hole drilling construction is finished, because the rock stratum has higher hardness and is not easy to collapse, the corresponding pipe jacking construction can be directly carried out at the bottom of the rock stratum. And a jacking pipe jacking operation space is dug at the bottom of the pile hole, so that the jacking pipe can be horizontally placed conveniently and jacking operation of the jacking pipe is facilitated. The jacking pipe to be constructed is lifted downwards from a pile hole orifice, the inner diameter of the whole pile casing is not large, so that the jacking pipe can only be lowered in a vertical or inclined mode with a small angle, after the jacking pipe is lowered to the bottom of the hole, the jacking pipe needs to be horizontally placed, jacking construction operation is convenient to carry out, the jacking pipe enters a jacking operation space through an opening of the jacking operation space, the height of the opening is calculated through a stranding theorem according to the maximum inclined angle of the jacking pipe in the pile casing, the bottom end of the jacking pipe is placed at the bottom of the hole and close to one side of a jacking construction opening, the jacking pipe is horizontally placed with the opening as a base point, the jacking pipe can enter the jacking operation space through the opening, and finally, the jacking construction operation is completed by excavating a rock stratum on the jacking side of the jacking pipe. Just need not excavate before the construction like this and form great foundation ditch, only need dig soon the machine creep into the stake hole can, reduced the excavation area to hard rock stratum in addition, reduced the construction degree of difficulty, construction speed obtains accelerating simultaneously, has shortened the worker period, and the great foundation ditch of corresponding construction area in stake hole has reduced the influence that causes the environment.
Preferably, the jacking pipe jacking operation space is provided with an arched top wall which is convex outwards. The jacking pipe jacking operation space can be used as a danger avoiding space for constructors, and when the jacking pipe is hung downwards, the constructors can jack the jacking pipe into the operation space, so that falling objects at high altitude are prevented from being injured by smashing. The arched top wall is convenient to construct and is not easy to collapse due to the structure.
As an optimization, in the step (3), after the construction of the jacking pipe jacking operation space is completed, spraying concrete on the inner wall of the pile hole to form a plain-shotcrete layer. Because in the whole rock stratum geology, the construction difficulty of jacking and excavating of the jacking pipe is large, the construction distance of the jacking pipe is long, the construction period is long usually, the weathering phenomenon can correspondingly occur on the wall of the pile hole after the construction period is prolonged, and the plain-blown concrete layer can protect the wall of the pile hole, so that the construction safety is improved.
In conclusion, the beneficial effects of the invention are as follows: the invention adopts a pile hole mode, reduces the construction range, correspondingly reduces the construction workload and difficulty, improves the construction efficiency, shortens the construction period and reduces the influence on the surrounding environment.
Detailed Description
The present invention is described in further detail below.
The method for quickly constructing the hard rock layer pipe jacking working well in the specific embodiment comprises the following steps of:
(1) leveling the field, and positioning the position of the pile hole by measuring lofting;
(2) adopting a rotary drilling machine to perform drilling operation until the drilling reaches a specified elevation;
(3) transversely excavating and widening the pile hole bottom and the hole wall on the opposite side of the pipe jacking construction position to form a pipe jacking operation space for horizontally placing the jacking pipe, wherein the pipe jacking operation space is provided with an opening for enabling the jacking pipe to be constructed to enter the pipe jacking operation space, the width of the opening is greater than the diameter of the jacking pipe, and the height of the opening is equal to the height of the openingWherein c is the length of the jacking pipe, and b is the inner diameter of the pile casing;
(4) hardening the ground in the jacking operation space and the ground in the pile hole of the jacking pipe;
(5) a jacking device for jacking the jacking pipe is arranged in the jacking operation space of the jacking pipe;
(6) and transversely excavating the lower foundation layer at the bottom of the pile hole and at the position of the pipe jacking construction, and jacking the pipe jacking construction through a jacking device.
In this embodiment, the top pipe jacking operation space has an arched top wall protruding outward.
In this embodiment, in step (3), after the construction of the jacking pipe jacking operation space is completed, concrete is sprayed on the inner wall of the pile hole to form a plain-shotcrete layer.
In the specific implementation process, after the construction of the pipe jacking operation space in the step (3) is completed, the rock stratum is transversely excavated and widened at the bottom of the pile hole and at the position where the pipe jacking is constructed to form a pipe jacking construction space, and the pipe jacking construction space also has an outward-protruding arched top wall, so that a constructor can conveniently place corresponding construction equipment in the space, and the space is enough for construction.
Finally, it is noted that the above-mentioned embodiments illustrate rather than limit the invention, and that, while the invention has been described with reference to preferred embodiments thereof, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.
Claims (2)
1. A quick construction method for a hard rock stratum top pipe working well is characterized by comprising the following steps of: the method comprises the following steps:
(1) leveling the field, and positioning the position of the pile hole by measuring lofting;
(2) adopting a rotary drilling machine to perform drilling operation until the drilling reaches a specified elevation;
(3) transversely excavating and widening the pile hole bottom and the hole wall on the opposite side of the pipe jacking construction position to form a pipe jacking operation space for horizontally placing the jacking pipe, wherein the pipe jacking operation space is provided with an opening for enabling the jacking pipe to be constructed to enter the pipe jacking operation space, the width of the opening is greater than the diameter of the jacking pipe, and the height of the opening is equal to the height of the openingWherein c is the length of the jacking pipe, and b is the inner diameter of the pile casing;
(4) hardening the ground in the jacking operation space and the ground in the pile hole of the jacking pipe;
(5) a jacking device for jacking the jacking pipe is arranged in the jacking operation space of the jacking pipe;
(6) and transversely excavating the lower foundation layer at the bottom of the pile hole and at the position of the pipe jacking construction, and jacking the pipe jacking construction through a jacking device.
2. The rapid construction method of the hard rock stratum top pipe working well according to claim 1, characterized in that: and (3) after the construction of the jacking pipe jacking operation space is finished, spraying concrete on the inner wall of the pile hole to form a plain sprayed concrete layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810474403.8A CN108661651B (en) | 2018-05-17 | 2018-05-17 | Rapid construction method for hard rock stratum pipe jacking working well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810474403.8A CN108661651B (en) | 2018-05-17 | 2018-05-17 | Rapid construction method for hard rock stratum pipe jacking working well |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108661651A CN108661651A (en) | 2018-10-16 |
CN108661651B true CN108661651B (en) | 2020-09-01 |
Family
ID=63776217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810474403.8A Active CN108661651B (en) | 2018-05-17 | 2018-05-17 | Rapid construction method for hard rock stratum pipe jacking working well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108661651B (en) |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3103259B2 (en) * | 1994-02-10 | 2000-10-30 | 東京瓦斯株式会社 | Double pipe propulsion method |
KR100984883B1 (en) * | 2009-05-22 | 2010-10-01 | 위성배 | The construction method of shield tunneling |
CN201459756U (en) * | 2009-08-19 | 2010-05-12 | 郑州市市政工程总公司 | Hanging-type construction ceiling coil vertical shaft |
CN202731927U (en) * | 2012-07-24 | 2013-02-13 | 岑益南 | Tunnel construction device |
CN103061777B (en) * | 2013-01-18 | 2015-03-04 | 中铁隧道集团有限公司 | Method for building urban underground tunnel shield cutter repairing space with preset reinforcing pile groups |
CN203925507U (en) * | 2014-03-21 | 2014-11-05 | 中铁二十二局集团第一工程有限公司 | A kind of metro shield assembling and the system of going into the well |
CN105240019B (en) * | 2015-09-24 | 2018-11-02 | 中国石油天然气集团公司 | A kind of pipe jacking construction method |
CN105626088B (en) * | 2016-02-02 | 2018-02-06 | 中铁十九局集团轨道交通工程有限公司 | T-shaped bored tunnel shield machine is gone into the well shift method |
CN206738711U (en) * | 2017-05-23 | 2017-12-12 | 罗永强 | jacking construction structure |
CN107060795B (en) * | 2017-05-26 | 2018-06-15 | 安徽理工大学 | A kind of underground mine TBM assembly construction methods |
-
2018
- 2018-05-17 CN CN201810474403.8A patent/CN108661651B/en active Active
Non-Patent Citations (2)
Title |
---|
基于顶管工作坑钢筋混凝土护壁支护的施工工艺研究;吴骏涛;《中国科技信息》;20131231(第17期);第59页 * |
盾构机及后续设备下井组装技术;欧阳璋等;《西部探矿工程》;20061231(第126期);第178-180页 * |
Also Published As
Publication number | Publication date |
---|---|
CN108661651A (en) | 2018-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102635120B (en) | Circular deep foundation ditch is without Construction of Supporting structure and construction method | |
US20220098817A1 (en) | Method for constructing structure | |
CN102605772A (en) | Construction method for revolving digging cast-in-place pile | |
CN103410152B (en) | A kind of construction method for long and narrow deep foundation pit earthwork digging | |
CN105464074B (en) | A kind of artificial digging pile high polymer grouting safeguard structure and its construction method | |
CN202194148U (en) | Waterproof curtain | |
CN108547628B (en) | Quick construction method for pipe-jacking working well in upper-soft and lower-hard stratum | |
CN105714772A (en) | Re-drilling concrete wall protecting method for hole formation of rock-socketed pile in karst region | |
CN104141311A (en) | Mechanical holing method for protecting wall and structure formed with method | |
CN101793023A (en) | Foundation pit construction method | |
CN109183787A (en) | A kind of forming method of man-made digging pile mould-pipe | |
CN103670448A (en) | Underground pipeline protection device and support method applying underground pipeline protection device | |
CN113832958A (en) | Anti-slide pile construction method with mechanical cooperation with manual excavation | |
CN106988305A (en) | A kind of pile-column pier construction method of underground integrated molding | |
CN103334452A (en) | Underground engineering mixed construction method | |
CN203821414U (en) | Structure of protecting wall of hole-digging pile | |
CN101824825B (en) | Deep foundation pit open cutting construction method | |
CN107237332A (en) | A kind of foundation pit stope support containing drifting sand layer method of use composite soil-nailed retaining wall | |
CN204825923U (en) | Relay formula underground structure | |
CN108071110A (en) | Rotary drilling rig Pile method under complex geological condition | |
CN207176700U (en) | A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment | |
CN103132532A (en) | Foundation pit support method for row of piles | |
CN209760247U (en) | Adopt combination stagnant water support system of Larsen steel sheet pile and spray anchor bank protection | |
CN108661651B (en) | Rapid construction method for hard rock stratum pipe jacking working well | |
CN101597903B (en) | Construction method of cylindrical slurry core pile for retaining and protecting foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |