CN109183787A - A kind of forming method of man-made digging pile mould-pipe - Google Patents

A kind of forming method of man-made digging pile mould-pipe Download PDF

Info

Publication number
CN109183787A
CN109183787A CN201811037467.8A CN201811037467A CN109183787A CN 109183787 A CN109183787 A CN 109183787A CN 201811037467 A CN201811037467 A CN 201811037467A CN 109183787 A CN109183787 A CN 109183787A
Authority
CN
China
Prior art keywords
retaining wall
bending section
man
steel reinforcement
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811037467.8A
Other languages
Chinese (zh)
Inventor
李幻涛
梁海涛
钱志峰
张宪苏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201811037467.8A priority Critical patent/CN109183787A/en
Publication of CN109183787A publication Critical patent/CN109183787A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

The present invention relates to civil construction project technical fields, disclose a kind of forming method of man-made digging pile mould-pipe.Method includes the following steps: A, earth and stone digging to projected depth, install the first dado template;B, the first retaining wall steel reinforcement cage lower end extension is bent into the first bending section, transfers the first retaining wall steel reinforcement cage, and the first bending section is embedded to and is buried in the earthwork;C, the casting concrete into the first dado template removes the first dado template after concrete coagulation molding;D, earth and stone digging installs the second dado template to projected depth;E, the second retaining wall steel reinforcement cage is transferred, the first bending section straightening of the first retaining wall steel reinforcement cage is overlapped with the upper end of the second retaining wall steel reinforcement cage;F, the second retaining wall of pouring molding.First bending section is embedded to and buries in the earthwork by the way that the first retaining wall steel reinforcement cage lower end extension is bent to the first bending section by the present invention, can be while again easily operated to avoid scratching staff.

Description

A kind of forming method of man-made digging pile mould-pipe
Technical field
The present invention relates to civil construction project technical field more particularly to a kind of forming methods of man-made digging pile mould-pipe.
Background technique
When implementing pile foundation engineering under the environment of mountain area, limited by mountain area geology condition, using pile foundation mechanical tapping to machine The loss of tool itself is big, and construction efficiency is low, and the operation of large-scale construction equipment is also easy to cause traffic jam to mountain area place. And artificial digging pile has plant simple, and constructing operation is convenient, and occupancy construction site is small, and it is small to surrounding constructure influence, The advantages that reliable construction quality, can be in full swing construction, shorten the construction period, low cost, so artificial digging pile becomes pile foundation engineering One of pore-forming mode being commonly used in alpine terrain, suitable for viscous in the less clay of no underground water or underground water, silty Soil, or containing a small amount of sand, sandy gravel, gravel clay layer.
Artificial digging pile is using the hand digging cubic metre of earth and stone, and merogenesis excavates, the mode of merogenesis supporting, first forms pile body section by section Then retaining wall places steel reinforcement cage, a kind of construction technology of casting concrete and pile.Before pouring upper section breast wall concrete, Need to stretch out the lower end of upper section retaining wall vertical reinforcement a part, the prepared upper end with lower section retaining wall vertical reinforcement overlaps.If Any processing is not done to the reinforcing bar of above-mentioned stretching, it is allowed to be directly exposed in artificial digging pile excavated surface, just there is scratch to exist The danger of the staff of operation in bottom hole.
Summary of the invention
Based on the above, the purpose of the present invention is to provide a kind of forming methods of man-made digging pile mould-pipe, to solve Retaining wall vertical reinforcement extension deals with the problem of scratching worker improperly.
In order to achieve the above object, the invention adopts the following technical scheme:
A kind of forming method of man-made digging pile mould-pipe, comprising the following steps:
A, the first retaining wall cubic metre of earth and stone: earth and stone digging to projected depth is excavated, and installs the first dado template;
B, the first retaining wall early-stage preparations: bending to the first bending section for the lower end extension of the first retaining wall steel reinforcement cage, under The first retaining wall steel reinforcement cage is put, and first bending section is embedded to and is buried in the earthwork;
C, the first retaining wall of pouring molding: the casting concrete into first dado template, after concrete coagulation molding Remove first dado template;
D, the second retaining wall cubic metre of earth and stone: earth and stone digging to projected depth is excavated, and installs the second dado template;
E, the second retaining wall early-stage preparations: the second retaining wall steel reinforcement cage of decentralization, by the first bending of the first retaining wall steel reinforcement cage Portion's straightening, and overlapped with the upper end of the second retaining wall steel reinforcement cage;
F, the second retaining wall of pouring molding.
A kind of preferred embodiment of forming method as man-made digging pile mould-pipe, the first retaining wall steel reinforcement cage includes multiple A segment length is stretched out in first circumferential stirrup and multiple first vertical reinforcements, first vertical reinforcement lower end, is used to form described First bending section.
A kind of preferred embodiment of forming method as man-made digging pile mould-pipe, first vertical reinforcement are uniformly overlapped on The outside of described first circumferential stirrup, the described first circumferential stirrup is along first vertical reinforcement longitudinal direction spaced set.
The preferred embodiment of forming method as a kind of man-made digging pile mould-pipe, between adjacent first vertical reinforcement Circumferential distance is 100-150mm, and the longitudinal pitch between adjacent described first circumferential stirrup is 100-150mm.
A kind of preferred embodiment of forming method as man-made digging pile mould-pipe, first vertical reinforcement and described first Circumferential stirrup is bound by iron wire.
The upper end of a kind of preferred embodiment of forming method as man-made digging pile mould-pipe, first vertical reinforcement is also set There is the second bending section, first bending section and second bending section are in U-shape, and first bending section is perpendicular to described One vertical reinforcement, second bending section are parallel to first vertical reinforcement.
A kind of preferred embodiment of forming method as man-made digging pile mould-pipe, first bending section are biased to described On the inside or outside of one circumferential stirrup, and first bending section deviates clockwise or counterclockwise and deviation angle It is all the same.
A kind of preferred embodiment of forming method as man-made digging pile mould-pipe, first bending section and institute after straightening The upper end for stating the second retaining wall steel reinforcement cage is bound by iron wire.
A kind of preferred embodiment of forming method as man-made digging pile mould-pipe, the length after the straightening of first bending section No less than 200mm.
A kind of preferred embodiment of forming method as man-made digging pile mould-pipe, the man-made digging pile mould-pipe include multiple Sequentially connected retaining wall, wherein the retaining wall steel reinforcement cage bottom for being located at a upper section is equipped with first bending section, it is curved by described first It is connected after pars convoluta straightening with the retaining wall steel reinforcement cage of next section.
The invention has the benefit that
The present invention is by bending to the first bending section for the lower end extension of the first retaining wall steel reinforcement cage, and by described first Bending section, which is embedded to, buries in the earthwork, can guarantee personnel's life security, together to avoid the staff for scratching the operation in bottom hole When again it is easily operated.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, institute in being described below to the embodiment of the present invention Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also implement according to the present invention The content of example and these attached drawings obtain other attached drawings.
Fig. 1 is the flow chart of the forming method for the man-made digging pile mould-pipe that embodiment of the present invention provides;
Fig. 2 is the cross-sectional view for the first retaining wall that embodiment of the present invention provides;
Fig. 3 is the top cross-sectional view for the first retaining wall that embodiment of the present invention provides;
Fig. 4 is the cross-sectional view that the first retaining wall that embodiment of the present invention provides connects the second retaining wall.
In figure:
The first dado template of 11-;The second dado template of 12-;21- the first retaining wall steel reinforcement cage;The circumferential stirrup of 211- first; The first vertical reinforcement of 212-;22- the second retaining wall steel reinforcement cage;The circumferential stirrup of 221- second;The second vertical reinforcement of 222-;31- first Bending section;The second bending section 32-;The first retaining wall of 41-;The second retaining wall of 42-;5- buries the earthwork.
Specific embodiment
To keep the technical problems solved, the adopted technical scheme and the technical effect achieved by the invention clearer, below It will the technical scheme of the embodiment of the invention will be described in further detail in conjunction with attached drawing, it is clear that described embodiment is only It is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those skilled in the art exist Every other embodiment obtained under the premise of creative work is not made, shall fall within the protection scope of the present invention.
As shown in Figs 1-4, the present embodiment proposes a kind of forming method of man-made digging pile mould-pipe, is suitable in no underground water Or the less clay of underground water, silty clay, or containing a small amount of sand, sandy gravel, gravel clay layer geological conditions under, using people In the technique of work borehole forming pile retaining wall.Method includes the following steps:
1) excavate the first retaining wall cubic metre of earth and stone: artificial digging pile is excavated using merogenesis, the mode of merogenesis supporting.By staff It holds underground boring tool and excavates the cubic metre of earth and stone to projected depth, the cubic metre of earth and stone dug out is promoted to ground by bottom hole by lifting means.Borehole There is water burst in Shi Ruguo bottom hole, can first be drained the water in hole with water pump.When borehole to certain depth, setting in also Ying Kong Air hose, lighting apparatus guarantee that bottom hole ventilation is smooth, allow staff's operation under conditions of bright.First segment artificial digging pile After the completion of earthwork evacuation, the first dado template 11 is installed, which can choose steel plate, and firm supporting is indeformable, template bottom Portion and hole subsoil rock layers are in close contact.
Specifically, for the excavation of soil layer, the underground boring tools such as spade, pick can be used;For the excavation of hard soil layer, can adopt With underground boring tools such as hammer, pricker or pneumatic picks;For hard rock stratum, drilling machine excavation can be used.
Further, before step 1) further include:
True fixed pile: laying Control Survey Triangulation Network for Construction, fixed pile three-dimensional space position is surveyed according to design drawing, determining Stake holes center is marked with marker on spatial position, which can be timber, crooked chisel or other articles.Three-dimensional space position It is determined by plane coordinates in SURVEYING CONTROL NETWORK and elevation.
Further, to prevent around stake holes native stone to roll into hole, staff's life security is threatened, also for preventing ground Table water flows into stake holes, protective device need to be arranged in aperture before borehole, such as baffle or casting concrete are arranged around aperture Wall.
2) the lower end extension of the first retaining wall steel reinforcement cage 21 the first retaining wall early-stage preparations: is bent into the first bending section 31, the first retaining wall steel reinforcement cage 21 is transferred, then the first bending section 31 is embedded to and is buried in the earthwork 5, which is one layer Soil, the earthwork is with a thickness of can hide the first bending section 31.
Preferably, the first retaining wall steel reinforcement cage 21 includes the multiple first circumferential stirrups 211 and multiple first vertical reinforcements 212, preferably, the first vertical reinforcement 212 is uniformly overlapped on the outside of the first circumferential stirrup 211, the first 211 edge of circumferential stirrup The longitudinal spaced set of first vertical reinforcement 212, and the first vertical reinforcement 212 and the first circumferential stirrup 211 are bound by iron wire.
It should be noted that the first retaining wall steel reinforcement cage 21 is wanted in surface facility according to design drawing before transferring bottom hole It asks and completes in advance, selected bar gauge model also must satisfy the requirement of engineering construction.
Preferably, the circumferential distance between adjacent first vertical reinforcement 212 is 100-150mm, the adjacent first circumferential stirrup Longitudinal pitch between 211 is 100-150mm.
Further, by the upper-end bent of the first vertical reinforcement 212, the second bending section 32,32 He of the second bending section are formed First bending section 31 is in U-shape, and the first bending section 31 is parallel to first perpendicular to the first vertical reinforcement 212, the second bending section 32 Vertical reinforcement 212.Other than bending section is arranged to U-shaped, other shapes, such as V-arrangement can also be arranged to, it is rectangular, it is trapezoidal etc., The bending section of vertical reinforcement can catch on circumferential stirrup, securely fix vertical reinforcement with circumferential stirrup.
Further, the first bending section 31 can be biased to the first circumferential 211 inner or outer side of stirrup, along clockwise direction Or counter clockwise direction deviates and deviation angle is all the same.In the present embodiment preferably, the first circumferential direction is biased in the first bending section 31 The inside of stirrup 211, and deviate in the counterclockwise direction, as shown in Figure 2.
Further, the length after 31 straightening of the first bending section is no less than 200mm, and in the present embodiment preferably, first is curved Length after 31 straightening of pars convoluta is 300mm.
3) the first retaining wall of pouring molding: the casting concrete into the first dado template 11 is torn open after concrete coagulation molding Except the template.
4) it excavates the second retaining wall cubic metre of earth and stone: continuing downward earth and stone digging to projected depth, and install the second dado template 12。
5) the second retaining wall early-stage preparations: the second retaining wall steel reinforcement cage 22 of decentralization, by the first bending of the first retaining wall steel reinforcement cage 21 31 straightening of portion, and overlapped with the upper end of the second retaining wall steel reinforcement cage 22, then the first bending section 31 of the second retaining wall steel reinforcement cage 22 is buried Enter into the burial earthwork 5 of lower layer.
Further, the second retaining wall steel reinforcement cage 22 is identical as 21 structure of the first retaining wall steel reinforcement cage, equally includes multiple circumferential directions Stirrup and multiple vertical reinforcements, vertical reinforcement are uniformly overlapped on the outside of ring-shaped stirrup, and vertically reinforcing bar is longitudinal etc. for ring-shaped stirrup Spacing setting, and vertical reinforcement and ring-shaped stirrup are bound by iron wire.
Further, the first bending section 31 after straightening and the second retaining wall steel reinforcement cage 22 are bound by iron wire.
6) the second retaining wall of pouring molding 42.
Man-made digging pile mould-pipe can also include more piece retaining wall, and such as the second retaining wall 42 can be positioned below third retaining wall, the Three retaining walls can be positioned below the 4th retaining wall, and so on;The set-up mode of above-mentioned each retaining wall is the retaining wall reinforcing bar of a upper section Cage bottom portion is equipped with the first bending section 31, according to the method described above by after 31 straightening of the first bending section of upper section retaining wall with lower section retaining wall Steel reinforcement cage connection, then saves retaining wall, each retaining wall is in turn connected to form man-made digging pile mould-pipe under pouring molding.
Note that the above is only a better embodiment of the present invention and the applied technical principle.It will be appreciated by those skilled in the art that The invention is not limited to the specific embodiments described herein, be able to carry out for a person skilled in the art it is various it is apparent variation, It readjusts and substitutes without departing from protection scope of the present invention.Therefore, although being carried out by above embodiments to the present invention It is described in further detail, but the present invention is not limited to the above embodiments only, without departing from the inventive concept, also It may include more other equivalent embodiments, and the scope of the invention is determined by the scope of the appended claims.

Claims (10)

1. a kind of forming method of man-made digging pile mould-pipe, which comprises the following steps:
A, the first retaining wall cubic metre of earth and stone: earth and stone digging to projected depth is excavated, and installs the first dado template (11);
B, the lower end extension of the first retaining wall steel reinforcement cage (21) the first retaining wall early-stage preparations: is bent into the first bending section (31), the first retaining wall steel reinforcement cage (21) is transferred, and first bending section (31) is embedded to and is buried in the earthwork (5);
C, the first retaining wall of pouring molding: to the interior casting concrete of first dado template (11), after concrete coagulation molding Remove first dado template (11);
D, the second retaining wall cubic metre of earth and stone: earth and stone digging to projected depth is excavated, and installs the second dado template (12);
E, the second retaining wall early-stage preparations: the second retaining wall steel reinforcement cage (22) of decentralization, by the first of the first retaining wall steel reinforcement cage (21) Bending section (31) straightening, and overlapped with the upper end of the second retaining wall steel reinforcement cage (22);
F, the second retaining wall of pouring molding (42).
2. the forming method of man-made digging pile mould-pipe according to claim 1, which is characterized in that the first retaining wall reinforcing bar Cage (21) includes the multiple first circumferential stirrups (211) and multiple first vertical reinforcements (212), first vertical reinforcement (212) A segment length is stretched out in lower end, is used to form first bending section (31).
3. the forming method of man-made digging pile mould-pipe according to claim 2, which is characterized in that first vertical reinforcement (212) it is uniformly overlapped on the outside of the described first circumferential stirrup (211), the described first circumferential stirrup (211) is perpendicular along described first To the longitudinal spaced set of reinforcing bar (212).
4. the forming method of man-made digging pile mould-pipe according to claim 3, which is characterized in that adjacent described first is vertical Circumferential distance between reinforcing bar (212) is 100-150mm, and the longitudinal pitch between adjacent described first circumferential stirrup (211) is 100-150mm。
5. according to the forming method of man-made digging pile mould-pipe described in claim 2-4 any claim, which is characterized in that institute It states the first vertical reinforcement (212) and the first circumferential stirrup (211) is bound by iron wire.
6. the forming method of man-made digging pile mould-pipe according to claim 2, which is characterized in that first vertical reinforcement (212) upper end is additionally provided with the second bending section (32), and first bending section (31) and second bending section (32) are in U Shape, perpendicular to first vertical reinforcement (212), second bending section (32) is parallel to described first bending section (31) First vertical reinforcement (212).
7. the forming method of man-made digging pile mould-pipe according to claim 2, which is characterized in that first bending section (31) it is biased on the inside or outside of the described first circumferential stirrup (211), and first bending section (31) is along clockwise direction Or counter clockwise direction deviates and deviation angle is all the same.
8. the forming method of man-made digging pile mould-pipe according to claim 1, which is characterized in that described first after straightening Bending section (31) and the upper end of the second retaining wall steel reinforcement cage (22) are bound by iron wire.
9. the forming method of man-made digging pile mould-pipe according to claim 1, which is characterized in that first bending section (31) length after straightening is no less than 200mm.
10. the forming method of man-made digging pile mould-pipe according to claim 1, which is characterized in that the artificial digging pile Retaining wall includes multiple sequentially connected retaining walls, wherein the retaining wall steel reinforcement cage bottom for being located at a upper section is equipped with first bending section (31), will be connected after the first bending section (31) straightening with the retaining wall steel reinforcement cage of next section.
CN201811037467.8A 2018-09-06 2018-09-06 A kind of forming method of man-made digging pile mould-pipe Pending CN109183787A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811037467.8A CN109183787A (en) 2018-09-06 2018-09-06 A kind of forming method of man-made digging pile mould-pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811037467.8A CN109183787A (en) 2018-09-06 2018-09-06 A kind of forming method of man-made digging pile mould-pipe

Publications (1)

Publication Number Publication Date
CN109183787A true CN109183787A (en) 2019-01-11

Family

ID=64915063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811037467.8A Pending CN109183787A (en) 2018-09-06 2018-09-06 A kind of forming method of man-made digging pile mould-pipe

Country Status (1)

Country Link
CN (1) CN109183787A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106867A (en) * 2019-05-10 2019-08-09 中铁六局集团有限公司 Manual digging pile construction method between railcar station track
CN110258538A (en) * 2019-06-21 2019-09-20 中国十七冶集团有限公司 A kind of soil nailing reinforces buffer-type artificial digging pile and its construction method
CN112176992A (en) * 2020-10-12 2021-01-05 西南交通大学 Construction method of manual hole digging pile and manual hole digging pile
CN114622550A (en) * 2022-03-04 2022-06-14 中铁二局第四工程有限公司 Assembled steel retaining wall for manual hole digging pile and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572764A (en) * 2013-10-15 2014-02-12 中国建筑第二工程局有限公司 Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN106400799A (en) * 2016-11-10 2017-02-15 中国电建集团华东勘测设计研究院有限公司 Cast-in-situ dado structure for manually excavated pile and construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572764A (en) * 2013-10-15 2014-02-12 中国建筑第二工程局有限公司 Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN106400799A (en) * 2016-11-10 2017-02-15 中国电建集团华东勘测设计研究院有限公司 Cast-in-situ dado structure for manually excavated pile and construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
卓维松: "《建筑施工技术》", 30 June 2013, 厦门大学出版社 *
李国生: "《室内设计制图》", 31 January 2017, 华南理工大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106867A (en) * 2019-05-10 2019-08-09 中铁六局集团有限公司 Manual digging pile construction method between railcar station track
CN110258538A (en) * 2019-06-21 2019-09-20 中国十七冶集团有限公司 A kind of soil nailing reinforces buffer-type artificial digging pile and its construction method
CN110258538B (en) * 2019-06-21 2021-04-13 中国十七冶集团有限公司 Soil nail reinforced buffer type manual hole digging pile and construction method thereof
CN112176992A (en) * 2020-10-12 2021-01-05 西南交通大学 Construction method of manual hole digging pile and manual hole digging pile
CN114622550A (en) * 2022-03-04 2022-06-14 中铁二局第四工程有限公司 Assembled steel retaining wall for manual hole digging pile and construction method thereof

Similar Documents

Publication Publication Date Title
CN109183787A (en) A kind of forming method of man-made digging pile mould-pipe
CN104846829B (en) Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN108867814A (en) It is newly-built to cut dirty branch pipe and existing sewage network is plugged into engineering method
CN109723443B (en) Tunnel construction method
CN113832958B (en) Anti-slide pile construction method with mechanical cooperation with manual excavation
CN105951747B (en) A kind of construction method of the pre-buried lattice column of contrary sequence method
CN106812150A (en) A kind of mountain area steep slope region Road Bridge Pile Foundation construction method
CN110593753A (en) Mechanical rapid hole forming construction method for rectangular slide-resistant pile
CN105569051A (en) Foundation pit support system of sandy pebble boulder geological stratification and construction method
CN108560536A (en) The continuous piling wall construction method of Soil-cement
CN110259490A (en) A kind of Underground Subway Station construction method
CN104480929B (en) A kind of pile wall interaction construction method that interlocking pile is applied to permanent outer wall of basement
CN115539048A (en) Construction method for shallow-buried bias tunnel portal
CN108316283A (en) The devices and methods therefor of influence of foundation excavation is controlled using hole rising pouring slurry ground-connecting-wall
CN108547628B (en) Quick construction method for pipe-jacking working well in upper-soft and lower-hard stratum
CN107288665A (en) The construction method of Station
CN109208594A (en) Processing method, steel pile casting structure and the drilled pile of sinking steel protecting canister chance boulder
CN104863183A (en) Isolation damping pile structure used for construction of large cross-section tunnel closed-spaced building and construction method of isolation damping pile structure
CN109356193A (en) A kind of prefabricated piping lane push constructing device
US10081925B2 (en) Method for constructing building through gravity and weight of the building structure
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
CN206693258U (en) Hold type rigid pile composite foundation structure in a kind of end
CN110080238A (en) Deep one meat or fish dyadic combined type pile forming method of loose Backfilled Stone Layer interlocking pile
AR113621A1 (en) COMPACTION METHOD OF FOUNDATIONS FORMED BY SOIL MINERAL SOILS
CN105274984A (en) Double-casing-pipe full-circle-swinging erect column pile construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication