CN108629518A - A kind of engineering management promotion service system Internet-based - Google Patents

A kind of engineering management promotion service system Internet-based Download PDF

Info

Publication number
CN108629518A
CN108629518A CN201810431644.4A CN201810431644A CN108629518A CN 108629518 A CN108629518 A CN 108629518A CN 201810431644 A CN201810431644 A CN 201810431644A CN 108629518 A CN108629518 A CN 108629518A
Authority
CN
China
Prior art keywords
party
expert
request
service
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810431644.4A
Other languages
Chinese (zh)
Inventor
冯冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Liuzhou Three Sets Technology Co Ltd
Original Assignee
Guangxi Liuzhou Three Sets Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Liuzhou Three Sets Technology Co Ltd filed Critical Guangxi Liuzhou Three Sets Technology Co Ltd
Priority to CN201810431644.4A priority Critical patent/CN108629518A/en
Publication of CN108629518A publication Critical patent/CN108629518A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of engineering management Internet-based to promote service system, including line module, the identity information of typing and identification user;For supply and demand to connection module, the supplying party becomes the expert of processing item after system is verified, and system forms expert group according to project data come the several experts that organizational capacity is adapted to;Prioritization scheme module, the expert group are further linked up with party in request, comb and clear enterprise and project there are the problem of, and problem is sorted according to urgency, in conjunction with the short-term goal that enterprise, project are formulated, incentive measure is formulated, final managerial promotion scheme is formed;Transaction modules, the staff of system and party in request hold consultation and sign a contract according to preliminary quotation;After-sale service module, after the completion of project construction, party in request combines the service scenario of expert group, provides evaluation, and the evaluation of system side according to demand settles accounts service charge to the member of expert group.Have the effect of promoting engineering company's managerial ability.

Description

A kind of engineering management promotion service system Internet-based
Technical field
The present invention relates to Internet Engineering service technology fields, more specifically, it relates to a kind of work Internet-based Thread management promotes service system.
Background technology
Currently, the immediate cause that the safety accident of construction industry occurs is the establishment of scheme or executes out of joint.I State is in extensive Development of China's Urbanization, and engineering project class is more, and the duration is tight, task weight.
Due to the potential tight demand that engineering company reforms supply side, and self-condition and ability are limited in the presence of not Certainty, there is an urgent need to experienced experts to give evaluation determination, promote managerial ability, reduce risk.There is speciality in the market Expert is distributed in different units, and creativeness is not fully exerted, competent redundancy.Therefore it is deposited in construction industry In engineering company's not professional guidance, managerial ability is difficult the problem of promotion.
Invention content
In view of the deficiencies of the prior art, the present invention intends to provide a kind of engineering management Internet-based to carry Service system is risen, has the effect of promoting engineering company's managerial ability.
To realize the above-mentioned technical purpose, the present invention provides following technical solutions:A kind of engineering management Internet-based Service system is promoted, including
Line module, the identity information of typing and identification user, the user is divided into party in request and supplying party, to the need The side of asking and supplying party carry out Classification Management and guiding, assign the permission needed for the user;
Supply and demand issue project in system and provide data to connection module, the party in request, and the supplying party tests by system Become the expert of processing item after card, the project data that system just provides according to demand specifies expert to become expert group Group leader, the group leader and system form expert group according to project data come the several experts that organizational capacity is adapted to;
Prioritization scheme module, the expert group form preliminary managerial promotion scheme by brainstorming, the expert group with Party in request is further linked up for the problem that preliminary managerial promotion scheme, combs and clear enterprise and project exist, and by problem It sorts according to urgency, in conjunction with the short-term goal that enterprise, project are formulated, formulates incentive measure, form final managerial promotion side Case;
Transaction modules, the expert group obtain preliminary quotation according to the workload and expected effects of final managerial promotion scheme And system is submitted to, the staff of system and party in request hold consultation and sign a contract according to preliminary quotation, determine final report Valence, party in request pay fund to system;
After-sale service module, the expert group according to final managerial promotion scheme to party in request related personnel carry out explanation and Training, the expert group assist party in request to work out embodiment and corresponding rules and regulations and incentive measure, and the expert group is fixed Phase tracks final managerial promotion scheme progress of implementation and supervises and urges, sustained improvement, and after the completion of project construction, party in request combines special The service scenario of family's group, provides evaluation, and the evaluation of system side according to demand settles accounts service charge to the member of expert group.
By using above-mentioned technical proposal, after project is submitted to system by party in request, the specified group leader of system will take over Project after preliminary the case where understanding party in request, sets up expert group, and preliminary management is formed by brainstorming with system cooperating Lifting scheme forms final managerial promotion scheme further according to enterprise and the particular problem of project.In project and enterprise operation, Using the methods of problem guiding and goal orientation hommization examination, the owner that employee is oneself manual labour, advances and retreats together with enterprise is transferred Father-in-law's spirit, promotes enterprise or project sustained improvement, gradually quickly go on benign development track, achieve and improve business administration energy The effect of power.
Preferably, the party in request, after system issues project and offer data, the group leader of the expert group audits and needs The data for the side of asking proposes that targetedly pipe is filled according to own situation by problem of management questionnaire, the party in request to party in request Reason problem questionnaire.
By using above-mentioned technical proposal, after the data verification that group leader provides party in request, and assist party in request that will lack Data polishing, when expert group being avoided to discuss, just find data missing, then go with party in request exchange, waste time.Therefore early period By veteran expert group group leader by data polishing, the data for improving early period improves efficiency, shortens scheme and submits the period.
Preferably, in the project implementation process, the group leader of the expert group is responsible for arranging the responsibility of expert service party in request And the time.
By using above-mentioned technical proposal, by the rich experiences of group leader, the work of reasonable arrangement brainstrust ensures demand Fang Yizhi can relate to expert at any time, in time fall issue handling, and ensure that problem is found in time.
Preferably, in the transaction modules, the staff of the party in request and system contract contract when, need to handle Fund trustship ensures formality to ensure that service charge consigns to system in time, and system gives final managerial promotion scheme to party in request Afterwards, the party in request needed to complete to pay the bill within five days, if party in request's arrearage, system will be transferred automatically after five days Trustship fund serves as service charge.
By using above-mentioned technical proposal, the service charge paid needed for party in request has ensured there is no escaping and is The equity of system and supplying party, gives expert's confidence being earnest about one's work.
Preferably, be provided with the prestige extension set system for expert in the line module, project because expert after sale Service and scheme explanation are unsatisfactory for requiring, and project is caused not carry out normally, deduct 10 o'clock prestige minute of the expert, described special There is second of the above situation in family;
After project, the expert harasses party in request after being reported, per once reporting, that is, deducts the expert's 10 o'clock prestige minute;
The expert directly subcontracts after system undertaking project or gives other people account and uses, and system has the right not to distribute Service charge, while finding to deduct 30 o'clock prestige minute of the expert, second of direct title for the first time;
Expert guide demand side off-line transaction, one is verified, detains 30 o'clock prestige minute for the first time, second directly Title;
The expert submits false personal information, and one is verified, detains 30 o'clock prestige minute for the first time, directly seals for the second time Number;
If the prestige of the expert point is less than 60 points, the qualification of project will be participated in by system limitation a couple of days.
By using above-mentioned technical proposal, perfect party in request exchanges with system, improves supervision of the system to expert, It avoids the malicious operation of expert from damaging the equity of party in request, while also enhancing the authenticity of information in system.For expert's Most of malicious act will not disposably title handle, to the chance that expert corrects one's mistakes, also avoid the direct loss of expert, Protect the equity of supplying party.
Preferably, the supplying party is provided with the level mechanism for expert, the expert is divided into 1-10 grades, every grade of institute It states integral needed for expert to be constantly incremented by, the service charge that the expert obtains every time is scaled integral in proportion.
By using above-mentioned technical proposal, expert's classification is handled, the expert of different level is distinguished, party in request is facilitated Intuitively understand the level of expert, can also embody the effort of expert.The grade of expert promotes the evaluation for being only from client simultaneously, carries The high public trust of expert level.
Preferably, further including information module, the information module has included information plate and bad information plate, good information Plate is used to include the project of not accident, and bad information plate is for including the project that accident occurs;
The information module includes the information master of the information regularly updated and publication information, and the information is main to be needed to oneself The information of publication is understood, and the information master is served as by the staff and user of system, and user needs after audit As information master, the information master equally uses social estate system, can be obtained after the main publication information of information and promote own tier Empirical value.
By using above-mentioned technical proposal, user can recognize the topical news of construction industry by information module, and know It is worth the place of study in road excellent case, while also can know that unsuccessfully the place needed to pay attention in case, industry can be propagated Knowledge improves the social value of system, can also enhance viscosity of the system to user.Expert can also exchange gains in depth of comprehension in information, mutually Mutually learn, promotes the promotion of industry profession degree.
Preferably, further include marketing module, the specific page displaying being provided in the marketing module in system is outstanding The special service plate of project, the special service plate are provided with from the work for selecting outstanding project and packaging in project is completed Make personnel.
By using above-mentioned technical proposal, demand can rapidly be recognized by the outstanding project of special service plate and be The effect united to itself project, and degree of belief of the user to system is improved, enhancing client's viscosity.
The free service plate of free answer, institute are provided the user with preferably, the marketing module further includes not timing It states free service plate and is provided with the service inventory selected for party in request, the service inventory, which includes artistry and personalization, to be needed It asks, the planning of environmental suitability, function reasonability, be applicable in convenience planning, waterproof and dampproof material, lightning protection earthing equipment, finishing material Material and engineering, supply and drain water system, forceful electric power light current layout and household appliance;
The party in request chooses itself required service in service inventory and submits customer service, is serviced and is arranged by system automatically generated Simultaneously statistical fractals take table, and by service charge trustship to system, the customer service contact expert of system comes process demand side for the party in request House ornamentation scheme is seeked advice from, and submits to party in request;
The party in request is satisfied with after receiving advice programme and without query, the service charge of house ornamentation consulting is paid after three days, if institute It states party in request not operate, system will automatically transfer in the trustship fund of party in request, and the expert needs in scheme implementation process Fulfil the obligation of after-sale service.
By using above-mentioned technical proposal, party in request also can directly select the clothes needed for oneself in free service plate Business, square house scale and the grade of service, directly convert service charge clear, demand can directly determine house ornamentation according to demand Service charge.After the expert for being responsible for house ornamentation is connected to the house ornamentation project of system distribution, prioritization scheme is just directly provided, after party in request receives Just it comes into effect, after the completion of project, service charge is distributed to expert by system square feedback according to demand.Improve house ornamentation project Working efficiency, and price is disclosed, improves clear thinking degree of the party in request in selection.It can also be carried by free service plate High user volume improves the popularity of system.
Preferably, being provided with broker's mechanism in the marketing module, the user in system can part-time be broker, The responsibility of broker is 5 percent clothes of the project recommended for the new project of system recommendation and expert, each broker's extraction Business expense, each broker extract the centesimal service charge of the expert recommended, recommend broker's extraction pair of above-mentioned broker 0. 5 percent service charge answered.
By using above-mentioned technical proposal, user recommends new user as broker, can also obtain certain commission, improves User goes to recommend the interest of new user, increases the user sources of system.
In conclusion the present invention achieves following effect:
1. realizing that party in request exchanges with the accessible of supplying party by system, the limitation of region and information is eliminated, It helps enterprise and project to solve the problems, such as its managerial ability, reduces cost, increase benefit, promote its economy and social value;
2. by line module, prestige extension set system and level mechanism, the constraint to expert in system is realized, having ensured needs The equity for the side of asking;
3. ensureing that the constraint to party in request is realized in formality by fund trustship, system and the equity of supplying party have been ensured.
Description of the drawings
Fig. 1 is the flow diagram for runing process in the present embodiment for representation system.
In figure, 1, line module;11, party in request;12, supplying party;13, expert;14, prestige extension set system;15, grade machine System;2, supply and demand are to connection module;21, preliminary managerial promotion scheme;22, expert group;23, group leader;3, prioritization scheme module;31, most Whole managerial promotion scheme;4, transaction modules;5, after-sale service module;6, information module;61, information master;7, marketing module;71、 Special service plate;72, free service plate;73, broker's mechanism.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as in this hair It is all protected by Patent Law in bright right.
Embodiment:A kind of engineering management promotion service system Internet-based, as shown in Figure 1, including:
Line module 1, the identity information of typing and identification user, user is divided into party in request 11 and supplying party 12, to demand Side 11 and supplying party 12 carry out Classification Management and guiding, assign the permission needed for user;
Supply and demand issue project in system and provide data to connection module 2, party in request 11, and supplying party 12 is after system is verified As the expert 13 of processing item, system according to demand side 11 provide project datas come specify an expert 13 become expert group 22 group leader 23, group leader 23 and system form expert group 22 according to project data come the several experts 13 that organizational capacity is adapted to;
Prioritization scheme module 3, the process brainstorming of expert group 22 form preliminary managerial promotion scheme 21, expert group 22 and need The side of asking 11 is further linked up for the problem that preliminary managerial promotion scheme 21, and combing and clear enterprise and project exist, and will ask Topic sorts according to urgency, in conjunction with the short-term goal that enterprise, project are formulated, formulates incentive measure, forms final managerial promotion Scheme 31;
Transaction modules 4, expert group 22 obtain preliminary report according to the workload and expected effects of final managerial promotion scheme 31 Valence simultaneously submits to system, and the staff of system and party in request 11 hold consultation and sign a contract according to preliminary quotation, determines most Quotation, party in request 11 pay fund to system eventually;
11 related personnel of party in request says according to final managerial promotion scheme 31 in after-sale service module 5, expert group 22 Solution and training, expert group 22 assist party in request 11 to work out embodiment and corresponding rules and regulations and incentive measure, expert group 22 It periodically tracks final 31 progress of implementation of managerial promotion scheme and supervises and urges, sustained improvement, after the completion of project construction, party in request 11 In conjunction with the service scenario of expert group 22, evaluation is provided, just 11 evaluation settles accounts service charge to expert group to system according to demand 22 member.
In project and enterprise operation, using the methods of problem guiding and goal orientation hommization examination, transferring employee is The sense of being the master that oneself is done manual work, advances and retreats together with enterprise promotes enterprise or project sustained improvement, gradually quickly go on benign hair Open up track.
After system issues project and offer data, the group leader 23 of expert group 22 audits the money of party in request 11 for party in request 11 Material proposes that targetedly problem of management tune is filled according to own situation by problem of management questionnaire, party in request 11 to party in request 11 Interrogate volume.After the data verification that group leader 23 provides party in request 11, and data polishing of the party in request 11 by missing is assisted, avoided specially When family's group 22 discusses, data missing is just found, then go to exchange with party in request 11, waste time.
In the project implementation process, the group leader 23 of expert group 22 be responsible for arranging the responsibility of 13 demand for services side 11 of expert and when Between.By the rich experiences of group leader 23, reasonable arrangement expert 13 work, ensure that party in request 11 can relate to always specially at any time Family 13, in time falls issue handling, and ensure that problem is found in time.
In transaction modules 4, the staff of party in request 11 and system contract contract when, need to handle fund trustship and ensure hand Continue to ensure that service charge consigns to system in time, after system gives final managerial promotion scheme 31 to party in request 11, party in request 11 It needs to complete to pay the bill within five days, if 11 arrearage of party in request, system will transfer trustship fund automatically and serve as clothes after five days Business expense.The service charge paid needed for party in request 11 has ensured the equity of system and supplying party 12, has given there is no escaping The confidence that expert 13 is earnest about one's work.
As shown in Figure 1, being provided with the prestige extension set system 14 for expert 13 in line module 1, project is because of expert's 13 After-sale service and scheme explanation are unsatisfactory for requiring, and cause project not carry out normally, deduct 10 o'clock prestige minute of expert 13, expert 13 there is second of the above situation;
After project, expert 13 harasses party in request after being reported, per once reporting, that is, deducts the ten of expert 13 Point prestige minute;
Expert 13 directly subcontracts after system undertaking project or gives other people account and uses, and system has the right not to distribute clothes Business expense, while finding to deduct 30 o'clock prestige minute of the expert 13, second of direct title for the first time;
Expert's 13 guide demand sides off-line transaction, one is verified, detains 30 o'clock prestige minute for the first time, directly seals for the second time Number;
Expert 13 submits false personal information, and one is verified, detains 30 o'clock prestige minute, second of direct title for the first time;
If the prestige of expert 13 point is less than 60 points, the qualification of project will be participated in by system limitation a couple of days.
Perfect party in request 11 exchanges with system, improves supervision of the system to expert 13, avoids the malice of expert 13 The equity of operation damage party in request 11, while also enhancing the authenticity of information in system.For most of malice of expert 13 Behavior will not disposably title handle, to the chance that expert 13 corrects one's mistakes, also avoid the direct loss of expert 13, protect confession To the equity of side 12.
As shown in Figure 1, supplying party 12 is provided with the level mechanism 15 for expert 13, it is 1-10 grades, every grade that expert 13, which divides, Integral needed for expert 13 is constantly incremented by, and the service charge that each expert 13 obtains is scaled integral in proportion.At 13 classification of expert Reason, the expert 13 of different level is distinguished, party in request 11 is facilitated intuitively to understand the level of expert 13, can also embody expert 13 effort.The grade of expert 13 promotes the evaluation for being only from client simultaneously, improves the horizontal public trust of expert 13.
As shown in Figure 1, further including information module 6, information module 6 includes good information plate and bad information plate, good information Plate is used to include the project of not accident, and bad information plate is for including the project that accident occurs;
Information module 6 includes the information master 61 of the information regularly updated and publication information, and information master 61 needs to send out oneself The information of cloth is understood, and information master 61 is served as by the staff and user of system, and user needs to become after audit Information master 61, information master 61 can obtain the empirical value for promoting own tier after equally using social estate system, information master 61 to issue information.
User can recognize the topical news of construction industry by information module 6, and know worth study in excellent case Place, while also can know that unsuccessfully in case it should be noted that place, domain knowledge can be propagated, improve the social valence of system Value, can also enhance viscosity of the system to user.Expert 13 can also exchange gains in depth of comprehension in information, learn from each other, and promote industry profession The promotion of degree.
As shown in Figure 1, further including marketing module 7, the specific page being provided in marketing module 7 in system shows outstanding item Purpose special service plate 71, special service plate 71 are provided with from the work for selecting outstanding project and packaging in project is completed Personnel.Party in request 11 can recognize effect of the system to itself project rapidly by the outstanding project of special service plate 71, and Improve degree of belief of the user to system, enhancing client's viscosity.
The free service plate 72 of free answer is provided the user with as shown in Figure 1, marketing module 7 further includes not timing, is exempted from Expense service plate 72 is provided with the service inventory selected for party in request 11, and service inventory includes artistry and individual demand, ring Border adaptability, is applicable in convenience planning, waterproof and dampproof material, lightning protection earthing equipment, finishing material and work at the planning of function reasonability Journey, supply and drain water system, forceful electric power light current layout and household appliance;
Party in request 11 chooses itself required service in service inventory and submits customer service, by system automatically generated service list And statistical fractals take, by service charge trustship to system, the customer service contact expert 13 of system comes process demand side 11 for party in request 11 House ornamentation scheme is seeked advice from, and submits to party in request 11;
Party in request 11 is satisfied with after receiving advice programme and without query, the service charge of house ornamentation consulting is paid after three days, if demand Side 11 does not operate, and system will automatically transfer in the trustship fund of party in request 11, and expert 13 needs to carry out in scheme implementation process The obligation of row after-sale service.
The working efficiency of house ornamentation project is improved, and price is disclosed, improves clear thinking of the party in request 11 in selection Degree.User volume can be also improved by free service plate 72, improves the popularity of system.
As shown in Figure 1, being provided with broker's mechanism 73 in marketing module 7, the user in system can part-time be broker, The responsibility of broker is 5 the percent of the project recommended for the new project of system recommendation and expert 13, each broker's extraction Service charge, each broker extract the centesimal service charge of the expert 13 recommended, the broker of above-mentioned broker are recommended to take out Take 0. 5 corresponding percent service charge.User recommends new user as broker, can also obtain certain commission, improves User goes to recommend the interest of new user, increases the user sources of system.

Claims (10)

1. a kind of engineering management Internet-based promotes service system, including:
Line module (1), the identity information of typing and identification user, the user are divided into party in request (11) and supplying party (12), Classification Management and guiding are carried out to the party in request (11) and supplying party (12), assign the permission needed for the user;
Supply and demand issue project in system and provide data to connection module (2), the party in request (11), and the supplying party (12) is passed through System verification after become processing item expert (13), system according to demand side (11) provide project data come specify one specially Family (13) becomes the group leader (23) of expert group (22), what the group leader (23) and system were adapted to according to project data come organizational capacity Several expert (13) composition expert groups (22);
Prioritization scheme module (3), the expert group (22) forms preliminary managerial promotion scheme (21) by brainstorming, described special Family's group (22) is further linked up with party in request (11) for preliminary managerial promotion scheme (21), combs and clear enterprise and project are deposited The problem of, and problem is sorted according to urgency, in conjunction with the short-term goal that enterprise, project are formulated, formulates incentive measure, shape At final managerial promotion scheme (31);
Transaction modules (4), the expert group (22) obtain according to the workload and expected effects of final managerial promotion scheme (31) Preliminary quotation simultaneously submits to system, and the staff of system and party in request (11) hold consultation according to preliminary quotation and sign conjunction Together, determine that final quotation, party in request (11) pay fund to system;
After-sale service module (5), the expert group (22) is according to final managerial promotion scheme (31) to party in request (11) relevant people Member is explained and is trained, and the expert group (22) assists party in request (11) to work out embodiment and corresponding rules and regulations and swash Measure is encouraged, the expert group (22) periodically tracks final managerial promotion scheme (31) progress of implementation and supervises and urges, sustained improvement, After the completion of project construction, party in request (11) combines the service scenario of expert group (22), provides evaluation, system is according to demand square (11) Evaluation service charge is settled accounts to the member of expert group (22).
2. a kind of engineering management Internet-based according to claim 1 promotes service system, it is characterised in that:It is described After system issues project and offer data, the group leader (23) of the expert group (22) audits party in request (11) for party in request (11) Data proposes that targetedly problem of management questionnaire, the party in request (11) are filled according to own situation to party in request (11) Problem of management questionnaire.
3. a kind of engineering management Internet-based according to claim 1 promotes service system, it is characterised in that:Project In implementation process, the group leader (23) of the expert group (22) be responsible for arranging the responsibility of expert (13) demand for services side (11) and when Between.
4. a kind of engineering management Internet-based according to claim 1 promotes service system, it is characterised in that:It is described In transaction modules (4), the staff of the party in request (11) and system contract contract when, need to handle fund trustship and ensure hand Continue to ensure that service charge consigns to system in time, it is described after system gives final managerial promotion scheme (31) to party in request (11) Party in request (11) needed to complete to pay the bill within five days, if the party in request (11) arrearage, system will be drawn automatically after five days It dials trustship fund and serves as service charge.
5. a kind of engineering management Internet-based according to claim 1 promotes service system, it is characterised in that:It is described The prestige extension set system (14) for expert (13) is provided in line module (1), project because the after-sale service of expert (13) and Scheme explanation is unsatisfactory for requiring, and causes project not carry out normally, deducts 10 o'clock prestige minute of the expert (13), the expert (13) there is second of the above situation;
After project, the expert (13) harasses party in request after being reported, per once reporting, that is, deducts the expert (13) 10 o'clock prestige minute;
The expert (13) directly subcontracts after system undertaking project or gives other people account and uses, and system has the right not to distribute Service charge, while finding to deduct 30 o'clock prestige minute of the expert (13), second of direct title for the first time;
Expert (13) guide demand side's off-line transaction, one is verified, detains 30 o'clock prestige minute for the first time, second directly Title;
The expert (13) submits false personal information, and one is verified, detains 30 o'clock prestige minute for the first time, directly seals for the second time Number;
If the prestige of the expert (13) point is less than 60 points, the qualification of project will be participated in by system limitation a couple of days.
6. a kind of engineering management Internet-based according to claim 1 promotes service system, it is characterised in that:It is described Supplying party (12) is provided with the level mechanism (15) for expert (13), and the expert (13) is divided into 1-10 grades, and every grade described special Integral needed for family (13) is constantly incremented by, and the service charge that the expert (13) obtains every time is scaled integral in proportion.
7. a kind of engineering management Internet-based according to claim 1 promotes service system, it is characterised in that:Also wrap Information module (6) is included, information module (6) has included information plate and bad information plate, and good information plate is for including no thing Therefore project, bad information plate is for including the project that accident occurs;
Information module (6) includes the information master (61) of the information regularly updated and publication information, and information master (61) needs to oneself The information of publication is understood, and information master (61) is served as by the staff and user of system, and user needs after audit As information master (61), information master (61) can obtain promotion itself etc. after equally using social estate system, information master (61) to issue information The empirical value of grade.
8. a kind of engineering management Internet-based according to claim 1 promotes service system, it is characterised in that:Also wrap It includes marketing module (7), the special service plate that the specific page in system shows outstanding project is provided in the marketing module (7) Block (71), the special service plate (71) are provided with from the staff for selecting outstanding project and packaging in project is completed.
9. a kind of engineering management Internet-based according to claim 8 promotes service system, it is characterised in that:It is described Marketing module (7) further includes the free service plate (72) that not timing provides the user with free answer, the free service plate (72) it is provided with the service inventory selected for party in request (11), the service inventory includes artistry and individual demand, environment Adaptability, is applicable in convenience planning, waterproof and dampproof material, lightning protection earthing equipment, finishing material and work at the planning of function reasonability Journey, supply and drain water system, forceful electric power light current layout and household appliance;
The party in request (11) chooses itself required service in service inventory and submits customer service, is serviced and is arranged by system automatically generated Simultaneously statistical fractals take table, and for the party in request (11) by service charge trustship to system, the customer service of system contacts expert (13) to handle The house ornamentation scheme of party in request (11) is seeked advice from, and submits to party in request (11);
The party in request (11) is satisfied with after receiving advice programme and without query, the service charge of house ornamentation consulting is paid after three days, if institute It states party in request (11) not operate, system will automatically transfer in the trustship fund of party in request (11), and the expert (13) is in scheme Need to fulfil the obligation of after-sale service in implementation process.
10. a kind of engineering management Internet-based according to claim 9 promotes service system, it is characterised in that:Institute It states in marketing module (7) and is provided with broker's mechanism (73), the user in system can part-time be broker, the responsibility of broker It is 5 percent service charge of the project recommended for the new project of system recommendation and expert (13), each broker's extraction, often A broker extracts the centesimal service charge of the expert (13) recommended, recommends the broker of above-mentioned broker to extract corresponding 0. 5 percent service charge.
CN201810431644.4A 2018-05-08 2018-05-08 A kind of engineering management promotion service system Internet-based Pending CN108629518A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810431644.4A CN108629518A (en) 2018-05-08 2018-05-08 A kind of engineering management promotion service system Internet-based

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810431644.4A CN108629518A (en) 2018-05-08 2018-05-08 A kind of engineering management promotion service system Internet-based

Publications (1)

Publication Number Publication Date
CN108629518A true CN108629518A (en) 2018-10-09

Family

ID=63695813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810431644.4A Pending CN108629518A (en) 2018-05-08 2018-05-08 A kind of engineering management promotion service system Internet-based

Country Status (1)

Country Link
CN (1) CN108629518A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110675124A (en) * 2019-09-23 2020-01-10 江西毕姆工程技术有限公司 Engineering management promotes service system based on internet

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101609540A (en) * 2009-07-27 2009-12-23 周佺喜 A kind of information comprehensive exchange platform based on browser
CN103226758A (en) * 2013-05-08 2013-07-31 灏域联华科技(北京)有限公司 Project development management method
CN103942654A (en) * 2014-04-30 2014-07-23 国家电网公司 Electric power engineering quality supervision and management platform
CN103941675A (en) * 2014-03-27 2014-07-23 北京卓越经纬测控技术有限公司 Safety monitoring management system based on wireless network
CN105205745A (en) * 2015-09-29 2015-12-30 中关村四方现代服务产业技术创新战略联盟 Scientific and technological achievement converting system
CN105956777A (en) * 2016-05-03 2016-09-21 深圳科眸网络科技有限公司 Scientific and technological innovation product cooperative exploitation management method and device based on Internet
CN106779512A (en) * 2017-03-30 2017-05-31 董雄勇 A kind of Internet Engineering Task mass-rent transaction platform
CN106886862A (en) * 2017-04-15 2017-06-23 湖南新邦软件股份有限公司 One kind bid and purchase management system and method
CN107464096A (en) * 2017-08-02 2017-12-12 合肥哲诚项目管理有限公司 A kind of systems, devices and methods of project management
CN107977792A (en) * 2017-12-11 2018-05-01 何旭连 A kind of high-caliber power engineering project management system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101609540A (en) * 2009-07-27 2009-12-23 周佺喜 A kind of information comprehensive exchange platform based on browser
CN103226758A (en) * 2013-05-08 2013-07-31 灏域联华科技(北京)有限公司 Project development management method
CN103941675A (en) * 2014-03-27 2014-07-23 北京卓越经纬测控技术有限公司 Safety monitoring management system based on wireless network
CN103942654A (en) * 2014-04-30 2014-07-23 国家电网公司 Electric power engineering quality supervision and management platform
CN105205745A (en) * 2015-09-29 2015-12-30 中关村四方现代服务产业技术创新战略联盟 Scientific and technological achievement converting system
CN105956777A (en) * 2016-05-03 2016-09-21 深圳科眸网络科技有限公司 Scientific and technological innovation product cooperative exploitation management method and device based on Internet
CN106779512A (en) * 2017-03-30 2017-05-31 董雄勇 A kind of Internet Engineering Task mass-rent transaction platform
CN106886862A (en) * 2017-04-15 2017-06-23 湖南新邦软件股份有限公司 One kind bid and purchase management system and method
CN107464096A (en) * 2017-08-02 2017-12-12 合肥哲诚项目管理有限公司 A kind of systems, devices and methods of project management
CN107977792A (en) * 2017-12-11 2018-05-01 何旭连 A kind of high-caliber power engineering project management system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110675124A (en) * 2019-09-23 2020-01-10 江西毕姆工程技术有限公司 Engineering management promotes service system based on internet

Similar Documents

Publication Publication Date Title
Tewari et al. An assessment of South African prepaid electricity experiment, lessons learned, and their policy implications for developing countries
CN102930485A (en) Five-star hotel management system
CN108573372A (en) A kind of Engineering Service system Internet-based
Shahzad et al. Evaluating human resource management capacity for effective implementation of advanced metering infrastructure by electricity distribution companies in Pakistan
CN107038654A (en) Electric company's power marketing management information system based on cloud computing
CN108681874A (en) A kind of engineering proposal service system Internet-based
CN107862564A (en) A kind of whole people's foundation electric business platform
Kiesling Implications of smart grid innovation for organizational models in electricity distribution
Street et al. Assessing the sustainability of bank service channels: the case of the co-operative bank
Senso et al. Challenges of mobile-phone money transfer services’ market penetration and expansion in Singida District, Tanzania’
Riyadh et al. Barriers to e-finance adoption in small and medium Sized enterprises (SMEs) in Bangladesh
Batidzirai et al. Willingness to pay for improved electricity supply reliability in Zambia
Peterson et al. The future of the electric grid and its regulation: Some considerations
CN108629518A (en) A kind of engineering management promotion service system Internet-based
Jennings et al. Workforce planning and technology installation optimisation for utilities
Orina Influence of adoption of technology on performance of Kenya Power and Lighting Company; a case of Kenya Power Embu Office.
KR102518503B1 (en) Providng Method of a Waste or Used Resource Trading Platform
CN107767149A (en) The processing system of favor information
KR20200049553A (en) Method for providing financial product for investment
Dubash et al. Of rocks and hard places: a critical overview of recent global experience with electricity restructuring
Kambule et al. Formulating best practice recommendations for prepaid electricity meter deployment in Soweto, South Africa–Capitalising on the developed‐world's experiences
Papavasiliou Modelling cross-border interactions of EU balancing markets: A focus on scarcity pricing
Tuffour et al. The role of pre-paid meters in energy efficiency promotion: merits and demerits in Accra, Ghana
Burgess et al. Electricity is not a Right
CN109493013A (en) Electronic note processing method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181009

RJ01 Rejection of invention patent application after publication