CN107977792A - A kind of high-caliber power engineering project management system - Google Patents

A kind of high-caliber power engineering project management system Download PDF

Info

Publication number
CN107977792A
CN107977792A CN201711305899.8A CN201711305899A CN107977792A CN 107977792 A CN107977792 A CN 107977792A CN 201711305899 A CN201711305899 A CN 201711305899A CN 107977792 A CN107977792 A CN 107977792A
Authority
CN
China
Prior art keywords
evaluation
index
power engineering
project
engineering project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711305899.8A
Other languages
Chinese (zh)
Inventor
何旭连
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711305899.8A priority Critical patent/CN107977792A/en
Publication of CN107977792A publication Critical patent/CN107977792A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of high-caliber power engineering project management system, including project input subsystem, project storage subsystem, project performance evaluation subsystem, project screening subsystem and project issue subsystem, the project input subsystem is used for engineering staff's input electric power engineering project information, the project storage subsystem is used for the power engineering project information for storing input, the project performance evaluation subsystem is used to evaluate the performance of the power engineering project of storage, obtain evaluation result, the project screening subsystem filters out the good power engineering project of performance according to evaluation result, the project issue subsystem is used for the power engineering project filtered out to society's issue.Beneficial effects of the present invention are:The performance appraisal and issue of power engineering project are realized, improves power engineering project management level.

Description

A kind of high-caliber power engineering project management system
Technical field
The present invention relates to technical field of electric power, and in particular to a kind of high-caliber power engineering project management system.
Background technology
In recent years, governments at all levels of China generally increase the dynamics of investment to power engineering project, and power engineering project exists More and more important effect is played in Chinese society, economic development.Just increase sharply in power engineering project investment, effectively draw While dynamic economic growth, also occurs the problem of some can not be ignored successively, as portfolio performance is undesirable, low-level repetition is built If the problems such as seriously, ignoring environmental pollution monitoring.In order to make limited power engineering project investment play bigger benefit, it is necessary to create The performance evaluation theory and management system of new power engineering project, improve power engineering project performance evaluation mechanism and management body System.
The content of the invention
A kind of in view of the above-mentioned problems, the present invention is intended to provide high-caliber power engineering project management system.
The purpose of the present invention is realized using following technical scheme:
Provide a kind of high-caliber power engineering project management system, including project input subsystem, project storage System, project performance evaluation subsystem, project screening subsystem and project issue subsystem, the project input subsystem are used for Engineering staff's input electric power engineering project information, the project storage subsystem are used for the power engineering project letter for storing input Breath, the project performance evaluation subsystem are used to evaluate the performance of the power engineering project of storage, obtain evaluation result, The project screening subsystem filters out the good power engineering project of performance according to evaluation result, and the project issue subsystem is used In the power engineering project filtered out to society's issue.
Beneficial effects of the present invention are:The performance appraisal and issue of power engineering project are realized, improves power engineering Project management level.
Brief description of the drawings
Using attached drawing, the invention will be further described, but the embodiment in attached drawing does not form any limit to the present invention System, for those of ordinary skill in the art, without creative efforts, can also obtain according to the following drawings Other attached drawings.
Fig. 1 is the structure diagram of the present invention;
Reference numeral:
Project input subsystem 1, project storage subsystem 2, project performance evaluation subsystem 3, project screening subsystem 4, Project issues subsystem 5.
Embodiment
The invention will be further described with the following Examples.
Referring to Fig. 1, a kind of high-caliber power engineering project management system of the present embodiment, including project input subsystem 1st, project storage subsystem 2, project performance evaluation subsystem 3, project screening subsystem 4 and project issue subsystem 5, the item Mesh input subsystem 1 is used for engineering staff's input electric power engineering project information, and the project storage subsystem 2, which is used to store, to be inputted Power engineering project information, the project performance evaluation subsystem 3 is used to carry out the performance of the power engineering project of storage Evaluation, obtains evaluation result, and the project screening subsystem 4 filters out the good power engineering project of performance according to evaluation result, The project issue subsystem 5 is used for the power engineering project filtered out to society's issue.
The present embodiment realizes the performance appraisal and issue of power engineering project, improves power engineering project management water It is flat.
Preferably, the project performance evaluation subsystem 3 includes index determining module, index classification module, index processing Module, evaluation module and inspection module, the index determining module are used for the evaluation index for determining power engineering project performance, institute Index classification module is stated to be used to evaluation index being divided into qualitative evaluation index and quantitative assessing index, the index processing module For handling sorted evaluation index, handling result is obtained, the evaluation module is used for according to handling result to electricity Power engineering project performance is evaluated, and the inspection module is used to test to evaluation effect.
This preferred embodiment realizes the accurate evaluation of power engineering project performance and the inspection to evaluation effect.
Preferably, the index determining module is used for the evaluation index for determining power engineering project performance, is specially:A, really Accepted opinion valency index set is EH:EH={ EH1, EH2..., EHn, wherein, EHi(i=1,2 ..., n) represents that i-th of evaluation refers to Mark, n represent the number of evaluation index;B, agriculture products Comment gathers are combined into GP, GP={ GP1, GP2..., GPr, wherein, GPk(k =1,2 ..., r) represent the comment that evaluation index may be determined, r represents the species of comment, and k is bigger, represents to comment index Language is better;
It is true that the index processing module includes the first quantitative target processing submodule, the second comment submodule and the 3rd weight Stator modules, the first quantitative target processing submodule are used to handle quantitative target, the second comment submodule For determining that evaluation index is judged as comment GPkThe probability of (k=1,2 ..., r), the 3rd weight determination sub-module are used for Determine the weights of evaluation index.
The processing to evaluation index by index processing modules implement of this preferred embodiment, is following needs engineering project The evaluation of performance is laid a good foundation.
The first quantitative target processing submodule is used to handle quantitative target:Desired value equipped with quantitative target Vector is BZ:BZ=[x1, x2..., xm], xj(j=1,2 ..., m) represents the desired value of j-th of quantitative assessing index, and m is represented The number of quantitative assessing index, is in the following ways handled quantitative assessing index:
In formula, YWjFor j-th of quantitative assessing index desired value handled after value, I1Represent profit evaluation model index Set, desired value is bigger to represent that evaluation object is better, I2Represent cost type index set, desired value is smaller to represent that evaluation object is got over It is good;
The second comment submodule is used to determine that evaluation index is judged as comment GPkThe probability of (k=1,2 ..., r): For qualitative evaluation index, comment GP is judged as by the direct agriculture products of expertkThe probability of (k=1,2 ..., r), for fixed Evaluation index is measured, comment GP is judged as according to the desired value agriculture products after processing by expertk(k=1,2 ..., r's) is general Rate;The result of qualitative evaluation index and quantitative assessing index is integrated, evaluation index is obtained and is judged as comment GPkIt is general Rate matrix CF;CF=[CFik]n×r, CFikRepresent evaluation index EHiIt is judged as comment GPkProbability;
The 3rd weight determination sub-module is used for the weights for determining evaluation index:Determine evaluation index EHiWeight FVi, Weight vectors FV is determined according to each evaluation criterion weight:FV=[FV1, FV2..., FVn];
The evaluation module is used to evaluate power engineering project performance according to handling result:According to probability matrix and Weight vectors determine evaluation vector p:P=FV × CF=[p1, p2..., pr], pk(k=1,2 ..., r) represents power engineering project Performance is judged as comment GPkProbability, choose pkEvaluation result of the comment of maximum as power engineering project performance;
This preferred embodiment quantitative assessing index processing submodule handles quantitative assessing index, eliminates and quantitatively comments Between valency index due to dimension is different and it is relatively difficult to bring, the second comment submodule and the 3rd weight determination sub-module will be qualitative Evaluation index and quantitative assessing index are uniformly processed, it is determined that evaluation index probability matrix and weight vectors, for follow-up electricity Power engineering project performance appraisal is laid a good foundation;Evaluation module realizes power engineering project standard by being chosen to comment Really evaluation.
Preferably, the inspection module includes the first validity check submodule, the second validity check submodule and comprehensive effect Fruit examines submodule, and the first validity check submodule is used for the first test value for obtaining evaluation effect, second effect Submodule is examined to be used for the second test value for obtaining evaluation effect, the resultant effect examines submodule to be used to examine according to first Value and the second test value test evaluation effect;
The first validity check submodule is used for the first test value for obtaining evaluation effect:
In formula, LG1Represent the first test value, N represents the number for the power engineering project being evaluated, PAiRepresent i-th The evaluation time of a power engineering project;
The second validity check submodule is used for the second test value for obtaining evaluation effect:
In formula, LG2Represent the second test value, KW represents to be familiar with the personnel amount of power engineering project, KW1Expression pair The personnel amount of evaluation result satisfaction;
The resultant effect examines submodule to be used to examine evaluation effect according to the first test value and the second test value Test:The comprehensive test value of Calculation Estimation effect:
In formula, LG represents comprehensive test value;Comprehensive test value is bigger, represents that evaluation effect is better.
This preferred embodiment tests evaluation effect by inspection module, ensure that evaluation level, when evaluation is horizontal During reduction, easy to pinpoint the problems in time, specifically, the first test value reflects evaluation efficiency, the second test value reflects evaluation Accuracy, comprehensive test value are examined by the first test value and second and are worth to, and can realize and the effective of evaluation effect is examined, So as to ensure that the item-level of power engineering project.
Power engineering project is managed using the present invention high-caliber power engineering project management system, chooses 5 Power engineering project is tested, and is respectively power engineering project 1, power engineering project 2, power engineering project 3, power engineering Project 4, power engineering project 5, count the efficiency of management and management cost, are compared compared with management system, and generation has Beneficial effect is as shown in the table:
The efficiency of management improves Management cost reduces
Power engineering project 1 29% 27%
Power engineering project 2 27% 26%
Power engineering project 3 26% 26%
Power engineering project 4 25% 24%
Power engineering project 5 24% 22%
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than the present invention is protected The limitation of scope is protected, although being explained with reference to preferred embodiment to the present invention, those of ordinary skill in the art should Work as understanding, can be to technical scheme technical scheme is modified or replaced equivalently, without departing from the reality of technical solution of the present invention Matter and scope.

Claims (8)

1. a kind of high-caliber power engineering project management system, it is characterised in that stored including project input subsystem, project Subsystem, project performance evaluation subsystem, project screening subsystem and project issue subsystem, the project input subsystem are used In engineering staff's input electric power engineering project information, the project storage subsystem is used for the power engineering project letter for storing input Breath, the project performance evaluation subsystem are used to evaluate the performance of the power engineering project of storage, obtain evaluation result, The project screening subsystem filters out the good power engineering project of performance according to evaluation result, and the project issue subsystem is used In the power engineering project filtered out to society's issue.
2. high-caliber power engineering project management system according to claim 1, it is characterised in that the project performance Evaluation subsystem includes index determining module, index classification module, index processing module, evaluation module and inspection module, described Index determining module is used for the evaluation index for determining power engineering project performance, and the index classification module is used for evaluation index Qualitative evaluation index and quantitative assessing index are divided into, the index processing module is used for sorted evaluation index Reason, obtains handling result, and the evaluation module is used to evaluate power engineering project performance according to handling result, the inspection Module is tested to be used to test to evaluation effect.
3. high-caliber power engineering project management system according to claim 2, it is characterised in that the index determines Module is used for the evaluation index for determining power engineering project performance, is specially:A, determine that evaluation indice is combined into EH:EH= {EH1,EH2,…,EHn, wherein, EHi(i=1,2 ..., n) represents i-th of evaluation index, and n represents the number of evaluation index;b、 Agriculture products Comment gathers are combined into GP, GP={ GP1,GP2,…,GPr, wherein, GPk(k=1,2 ..., r) represent that evaluation index can The comment that can be determined, r represent the species of comment, and k is bigger, represents better to the comment of index;The index processing module bag Include the first quantitative target processing submodule, the second comment submodule and the 3rd weight determination sub-module, first quantitative target Processing submodule is used to handle quantitative target, and the second comment submodule is used to determine that evaluation index is judged as commenting Language GPkThe probability of (k=1,2 ..., r), the 3rd weight determination sub-module are used for the weights for determining evaluation index.
4. high-caliber power engineering project management system according to claim 3, it is characterised in that described first is quantitative Index processing submodule is used to handle quantitative target:Desired value vector equipped with quantitative target is BZ:BZ=[x1, x2,…,xm], xj(j=1,2 ..., m) represents the desired value of j-th of quantitative assessing index, and m represents the number of quantitative assessing index Mesh, is in the following ways handled quantitative assessing index:
In formula, YWjFor j-th of quantitative assessing index desired value handled after value, I1Represent profit evaluation model index set Close, desired value is bigger to represent that evaluation object is better, I2Represent cost type index set, desired value is smaller to represent that evaluation object is got over It is good.
5. high-caliber power engineering project management system according to claim 4, it is characterised in that second comment Submodule is used to determine that evaluation index is judged as comment GPkThe probability of (k=1,2 ..., r):For qualitative evaluation index, by The direct agriculture products of expert are judged as comment GPkThe probability of (k=1,2 ..., r), for quantitative assessing index, by expert's root Comment GP is judged as according to the desired value agriculture products after processingkThe probability of (k=1,2 ..., r);By qualitative evaluation index and determine The result of amount evaluation index is integrated, and is obtained evaluation index and is judged as comment GPkProbability matrix CF;CF=[CFik]n×r, CFikRepresent evaluation index EHiIt is judged as comment GPkProbability;
The 3rd weight determination sub-module is used for the weights for determining evaluation index:Determine evaluation index EHiWeight FVi, according to Each evaluation criterion weight determines weight vectors FV:FV=[FV1,FV2,…,FVn]。
6. high-caliber power engineering project management system according to claim 5, it is characterised in that the evaluation module For being evaluated according to handling result power engineering project performance:Evaluation vector is determined according to probability matrix and weight vectors p:P=FV × CF=[p1,p2,…pr], pk(k=1,2 ..., r) represent that power engineering project performance is judged as comment GPk's Probability, chooses pkEvaluation result of the comment of maximum as power engineering project performance.
7. high-caliber power engineering project management system according to claim 6, it is characterised in that the inspection module Submodule, the first effect inspection are examined including the first validity check submodule, the second validity check submodule and resultant effect The first test value that submodule is used to obtain evaluation effect is tested, the second validity check submodule is used to obtain evaluation effect Second test value, the resultant effect examine submodule to be used to carry out evaluation effect according to the first test value and the second test value Examine;
The first validity check submodule is used for the first test value for obtaining evaluation effect:
In formula, LG1Represent the first test value, N represents the number for the power engineering project being evaluated, PAiRepresent i-th of electricity The evaluation time of power engineering project;
The second validity check submodule is used for the second test value for obtaining evaluation effect:
In formula, LG2Represent the second test value, KW represents to be familiar with the personnel amount of power engineering project, KW1Represent to evaluation As a result satisfied personnel amount.
8. high-caliber power engineering project management system according to claim 7, it is characterised in that the resultant effect Submodule is examined to be used to test to evaluation effect according to the first test value and the second test value:The synthesis of Calculation Estimation effect Test value:
In formula, LG represents comprehensive test value;Comprehensive test value is bigger, represents that evaluation effect is better.
CN201711305899.8A 2017-12-11 2017-12-11 A kind of high-caliber power engineering project management system Withdrawn CN107977792A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711305899.8A CN107977792A (en) 2017-12-11 2017-12-11 A kind of high-caliber power engineering project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711305899.8A CN107977792A (en) 2017-12-11 2017-12-11 A kind of high-caliber power engineering project management system

Publications (1)

Publication Number Publication Date
CN107977792A true CN107977792A (en) 2018-05-01

Family

ID=62009845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711305899.8A Withdrawn CN107977792A (en) 2017-12-11 2017-12-11 A kind of high-caliber power engineering project management system

Country Status (1)

Country Link
CN (1) CN107977792A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108629518A (en) * 2018-05-08 2018-10-09 广西柳州市三集科技有限公司 A kind of engineering management promotion service system Internet-based

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108629518A (en) * 2018-05-08 2018-10-09 广西柳州市三集科技有限公司 A kind of engineering management promotion service system Internet-based

Similar Documents

Publication Publication Date Title
Song et al. Improving the evaluation of cross efficiencies: A method based on Shannon entropy weight
Olson Comparison of weights in TOPSIS models
CN106131158A (en) Resource scheduling device based on cloud tenant's credit rating under a kind of cloud data center environment
CN102509240A (en) Grid investment benefit evaluation method based on multiple indexes and multiple levels
CN106845777A (en) Case workload evaluation method, judge's performance evaluation techniques, modeling method, computing device and computer-readable recording medium
CN106530139A (en) Method for calculating the index parameter of grid investment analysis model
CN107545038A (en) A kind of file classification method and equipment
CN110472806A (en) Financial letter comments System and method for
CN106548413A (en) A kind of power system energy storage fitness-for-service assessment method and system
CN103902798B (en) Data preprocessing method
CN116307841A (en) Construction method of college evaluation system integrating multiple indexes
CN103150476B (en) A kind of system efficiency evaluation method based on data station field
CN107122919A (en) A kind of distribution efficiency estimation method and system based on intelligence operation
CN107977792A (en) A kind of high-caliber power engineering project management system
CN105956755A (en) Method and system for establishing quantitative relationship of general power line loss rate influencing factors
CN109784666A (en) The detection method and device of equipment quality
CN107945079A (en) A kind of poverty alleviation object selection method and device
CN107220475A (en) A kind of bearing features data analysing method based on linear discriminant analysis
CN109636244A (en) Enterprise's Rating Model construction method, enterprise's methods of marking and device
CN116167659B (en) Carbon market carbon emission data quality evaluation method
CN107909296A (en) One kind plans accurate smart city planning system
CN107767089A (en) A kind of flood fighting engineering project Performance Evaluation System
CN107679753A (en) A kind of electricity market principle market power evaluation method based on weighted Mahalanobis distance method
CN110750572A (en) Adaptive method and device for heuristic evaluation of scientific and technological achievements
CN109544337A (en) A kind of equity estimation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180501