CN107464096A - A kind of systems, devices and methods of project management - Google Patents
A kind of systems, devices and methods of project management Download PDFInfo
- Publication number
- CN107464096A CN107464096A CN201710649852.7A CN201710649852A CN107464096A CN 107464096 A CN107464096 A CN 107464096A CN 201710649852 A CN201710649852 A CN 201710649852A CN 107464096 A CN107464096 A CN 107464096A
- Authority
- CN
- China
- Prior art keywords
- unit
- scoring
- project
- expert
- project management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of system of project management, including:Database Unit, project control unit, display unit and automatic scoring unit, project is scored by automatic scoring unit, project control unit includes technocracy unit, project management unit, scoring administrative unit, examination & verification administrative unit and searching and managing unit, scoring administrative unit is scored destination item by the corresponding expert of technocracy unit selection, and contrasted with automatic scoring unit, the invention also discloses the device using said system and the application method of said system.The system can select expert's art to carry out product point to project with domain expert similar in project by technocracy unit, so that the evaluation result of project is more accurate, and the system can be by being contrasted between Auto-Evaluation System and expert analysis mode, judge the error of expert analysis mode, substantially increase the feasibility of the project implementation.
Description
Technical field
The present invention relates to project management field, specifically a kind of systems, devices and methods of project management.
Background technology
Project management is at present an emerging subject in China, and mainly project under construction is managed, avoids project
Occur potential dangerous and cause evitable loss occurrence, project management at present China application than wide, also by
The welcome of people, improve construction quality and avoid risk.
But existing project management system is in use, typically project implementation is scored by expert
Evaluation, in practical operation, art and the project of expert are not close to, and cause the evaluation result of project not accurate enough, separately
Outside, existing project management system can only be scored project by expert, real when the appraisal result of expert is not accurate enough
There is potential danger in the project of applying, be unfavorable for protecting the personal safety of people.
The content of the invention
It is an object of the invention to provide a kind of systems, devices and methods of project management, to solve above-mentioned background skill
The problem of being proposed in art.
To achieve the above object, the present invention provides following technical scheme:
A kind of system of project management, including:
Database Unit, standard and automatic scoring system are used for storing expert info, scoring criterion and corresponding scoring
The relative program and standard that system uses;The expert info includes special edition essential information and corresponding art;It is described from
The relative program and standard that dynamic points-scoring system uses also include relevant parameter required during automatic scoring.
Project control unit, it includes technocracy unit, project management unit, scoring administrative unit, examination & verification management list
Member and searching and managing unit, wherein:
Display unit, it is used for the relevant information and art that show expert in the technocracy unit;Project
The relevant information of administrative unit;The auditing result of appraisal result and examination & verification administrative unit in the administrative unit that scores;
Power supply unit, it is used for system power supply, connects municipal circuit socket;
Automatic scoring unit, in addition to the relative program that uses of storage system and Auto-Evaluation System and standard, it is used for
The destination item in project management unit is scored automatically in itself using system according to the program of correlation and standard, and according to
Display unit shows appraisal result;
Comparative analysis unit, it is used to the result of scoring administrative unit and automatic scoring unit be analyzed, looked into
See the error of relevant scoring.
As the further scheme of the present invention:Technocracy unit, including Procedure for selection, it is used for according to Database Unit
In expert info and art project is evaluated from corresponding expert;
Project management unit, it is used for multiple project storages in systems, for choosing destination item therein, to project
It is managed evaluation;
Score administrative unit, and it is used for according to the expert chosen in technocracy unit, to the mesh in project management unit
Mark project scores destination item according to certain points-scoring system and criterion;
Administrative unit is audited, its appraisal result being used in scoring administrative unit, is audited, checked according to standard
Whether destination item meets national corresponding policy of the law and rules and regulations;
Searching and managing unit, it is used for client and the auditing result in examination & verification administrative unit is inquired about, is convenient for people to
Understand the associated schedule of destination item.
A kind of device of project management, include the system of above-mentioned project management.
A kind of method of project management, the system of above-mentioned project management, is concretely comprised the following steps:
S1, build Database Unit;
S2, using technocracy unit the expert of Database Unit memory storage is screened, chosen and project fields phase
Near or identical expert;
S3, project management unit are used to choose destination item;
Corresponding scoring model is chosen in S4, scoring administrative unit, if expert analysis mode, if choosing is, using in step S
The expert of selection scores the destination item in step S;
The scoring of S5, examination & verification administrative unit to expert is audited, and checks whether destination item meets the corresponding method of country
Restrain policy and regulation system;
S6, auditing result and associated schedule for inquiring about destination item according to searching and managing unit;
In S7, step S whether expert analysis mode, if selection is no, the destination item in step S is entered using automatic scoring unit
Row scoring;
S8, contrasted by the appraisal result in step S and the appraisal result in step S, if error is larger, error
Small, then direct output result, error is big, then destination item is scored again using expert again by scoring administrative unit.
Compared with prior art, the beneficial effects of the invention are as follows:
The system can select expert's art with domain expert similar in project to project by technocracy unit
Carry out product point so that the evaluation result of project is more accurate, and the system can by Auto-Evaluation System and expert analysis mode it
Between contrasted, judge the error of expert analysis mode, substantially increase the feasibility of the project implementation.
Brief description of the drawings
Fig. 1 is the system principle diagram of project management.
Fig. 2 is the method flow diagram of project management.
In figure, 1- Database Unit;2- data updating units;3- project control units;4- display units;5- power supplies are single
Member;6- automatic scoring units;7- comparative analysis units;31- technocracy units;32- project management units;33- scoring management
Unit;34- audits administrative unit;35- searching and managing units.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
Referring to Fig. 1, in the embodiment of the present invention, a kind of system of project management, including:
Database Unit 1, standard and automatic scoring system are used for storing expert info, scoring criterion and corresponding scoring
The relative program and standard that system uses;The expert info includes special edition essential information and corresponding art;It is described from
The relative program and standard that dynamic points-scoring system uses also include relevant parameter required during automatic scoring.
Project control unit 3, it includes technocracy unit 31, project management unit 32, scoring administrative unit 33, examination & verification
Administrative unit 34 and searching and managing unit 35, wherein:
Technocracy unit 31, including Procedure for selection, its expert info being used in Database Unit 1 and affiliated
Project is evaluated from corresponding expert in field;
Project management unit 32, it is used for multiple project storages in systems, for choosing destination item therein, to item
Mesh is managed evaluation;
Score administrative unit 33, and it is used for according to the expert chosen in technocracy unit 31, to project management unit 32
In destination item destination item is scored according to certain points-scoring system and criterion;
Administrative unit 34 is audited, its appraisal result being used in scoring administrative unit 33, is audited according to standard,
Check whether destination item meets national corresponding policy of the law and rules and regulations;
Searching and managing unit 35, it is used for client and the auditing result in examination & verification administrative unit 34 is inquired about, convenient
People understand the associated schedule of destination item;
Display unit 4, it is used for the relevant information and art that show expert in the technocracy unit 31;
The relevant information of mesh administrative unit 32;The auditing result of appraisal result and examination & verification administrative unit 34 in the administrative unit 33 that scores;
Power supply unit 5, it is used for system power supply, connects municipal circuit socket;
Automatic scoring unit 6, in addition to the relative program that uses of storage system and Auto-Evaluation System and standard, it is used for
The destination item in project management unit 32 is scored automatically in itself using system according to the program of correlation and standard, and root
Appraisal result is shown according to display unit 4;
Comparative analysis unit 7, it is used to carry out to score the result of scoring administrative unit 33 and automatic scoring unit 6
Analysis, check the error of relevant scoring.
In the present invention, the system of the project management also includes data updating unit 2, and it is used for user data update
Stored into the Database Unit 1;
Present invention also offers a kind of device of project management, include the system of above-mentioned project management.The device
Can be mobile phone, PC, tablet personal computer.
Referring to Fig. 2, a kind of method of project management, includes the system of above-mentioned project management, concretely comprises the following steps:
S1, build Database Unit 1;
S2, using technocracy unit 31 expert of the memory storage of Database Unit 1 is screened, chosen and project fields
Close or identical expert;
S3, project management unit 32 are used to choose destination item;
Corresponding scoring model is chosen in S4, scoring administrative unit 33, if expert analysis mode, if it is to utilize step to choose
The expert chosen in S2 scores the destination item in step S3;
The scoring of S5, examination & verification administrative unit 34 to expert is audited, and it is national corresponding to check whether destination item meets
Policy of the law and rules and regulations;
S6, auditing result and associated schedule for inquiring about destination item according to searching and managing unit 35;
In S7, step S4 whether expert analysis mode, if selection is no, using automatic scoring unit 6 to the target item in step S3
Mesh is scored;
S8, contrasted by the appraisal result in step S4 and the appraisal result in step S7, if error is larger, by mistake
Difference is small, then direct output result, and error is big, then destination item is commented again using expert again by scoring administrative unit 33
Point.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling
Change is included in the present invention.Any reference in claim should not be considered as to the involved claim of limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped
Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity
Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (4)
- A kind of 1. system of project management, it is characterised in that including:Database Unit, made for storing expert info, scoring criterion and scoring accordingly using standard and Auto-Evaluation System Relative program and standard;The expert info includes special edition essential information and corresponding art;It is described to comment automatically The relative program and standard that subsystem uses also include relevant parameter required during automatic scoring;Project control unit, it include technocracy unit, project management unit, scoring administrative unit, examination & verification administrative unit and Searching and managing unit, wherein:Display unit, it is used for the relevant information and art that show expert in the technocracy unit;Project management The relevant information of unit;The auditing result of appraisal result and examination & verification administrative unit in the administrative unit that scores;Power supply unit, it is used for system power supply, connects municipal circuit socket;Automatic scoring unit, in addition to the relative program that uses of storage system and Auto-Evaluation System and standard, it is used for basis Related program and standard is scored the destination item in project management unit automatically in itself using system, and according to display Unit shows appraisal result;Comparative analysis unit, it is used to the result of scoring administrative unit and automatic scoring unit be analyzed, and checks phase Close the error of scoring.
- A kind of 2. system of project management according to claim 1, it is characterised in thatTechnocracy unit, including Procedure for selection, its expert info being used in Database Unit and art choosing Project is evaluated with corresponding expert;Project management unit, it is used for multiple project storages in systems, for choosing destination item therein, project is carried out Administrative evaluation;Score administrative unit, and it is used for according to the expert chosen in technocracy unit, to the target item in project management unit Mesh scores destination item according to certain points-scoring system and criterion;Administrative unit is audited, its appraisal result being used in scoring administrative unit, is audited according to standard, checks target Whether project meets national corresponding policy of the law and rules and regulations;Searching and managing unit, it is used for client and the auditing result in examination & verification administrative unit is inquired about, is convenient for people to understand The associated schedule of destination item.
- 3. a kind of device of project management, it is characterised in that including the project management as described in one of claim 1-2 System.
- A kind of 4. method of project management, it is characterised in that including the project management as described in one of claim 1-2 System, concretely comprise the following steps:S1, build Database Unit;S2, using technocracy unit the expert of Database Unit memory storage is screened, choose it is close with project fields or Identical expert;S3, project management unit are used to choose destination item;Corresponding scoring model is chosen in S4, scoring administrative unit, if expert analysis mode, if choosing is, using being chosen in step S Expert the destination item in step S is scored;The scoring of S5, examination & verification administrative unit to expert is audited, and checks whether destination item meets national corresponding law political affairs Plan and rules and regulations;S6, auditing result and associated schedule for inquiring about destination item according to searching and managing unit;In S7, step S whether expert analysis mode, if selection is no, the destination item in step S is commented using automatic scoring unit Point;S8, being contrasted by the appraisal result in step S and the appraisal result in step S, if error is larger, and error is small, Then direct output result, error is big, then destination item is scored again using expert again by scoring administrative unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710649852.7A CN107464096A (en) | 2017-08-02 | 2017-08-02 | A kind of systems, devices and methods of project management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710649852.7A CN107464096A (en) | 2017-08-02 | 2017-08-02 | A kind of systems, devices and methods of project management |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107464096A true CN107464096A (en) | 2017-12-12 |
Family
ID=60547329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710649852.7A Pending CN107464096A (en) | 2017-08-02 | 2017-08-02 | A kind of systems, devices and methods of project management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107464096A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108629518A (en) * | 2018-05-08 | 2018-10-09 | 广西柳州市三集科技有限公司 | A kind of engineering management promotion service system Internet-based |
CN111754058A (en) * | 2019-03-29 | 2020-10-09 | 上海忆尧信息技术有限公司 | Project management system based on project audit |
CN111798203A (en) * | 2020-06-19 | 2020-10-20 | 中建一局集团建设发展有限公司 | Block chain-based engineering construction achievement evaluation method and system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105956817A (en) * | 2016-07-22 | 2016-09-21 | 深圳市赛普爱德科技股份有限公司 | Bidding management method for purchase supplier |
CN106815663A (en) * | 2015-11-28 | 2017-06-09 | 刘瑛 | A kind of brand names management system and management value appraisal procedure |
CN106886937A (en) * | 2017-02-14 | 2017-06-23 | 克拉玛依融信智有信息技术有限责任公司 | A kind of bidding management system |
CN106886862A (en) * | 2017-04-15 | 2017-06-23 | 湖南新邦软件股份有限公司 | One kind bid and purchase management system and method |
-
2017
- 2017-08-02 CN CN201710649852.7A patent/CN107464096A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106815663A (en) * | 2015-11-28 | 2017-06-09 | 刘瑛 | A kind of brand names management system and management value appraisal procedure |
CN105956817A (en) * | 2016-07-22 | 2016-09-21 | 深圳市赛普爱德科技股份有限公司 | Bidding management method for purchase supplier |
CN106886937A (en) * | 2017-02-14 | 2017-06-23 | 克拉玛依融信智有信息技术有限责任公司 | A kind of bidding management system |
CN106886862A (en) * | 2017-04-15 | 2017-06-23 | 湖南新邦软件股份有限公司 | One kind bid and purchase management system and method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108629518A (en) * | 2018-05-08 | 2018-10-09 | 广西柳州市三集科技有限公司 | A kind of engineering management promotion service system Internet-based |
CN111754058A (en) * | 2019-03-29 | 2020-10-09 | 上海忆尧信息技术有限公司 | Project management system based on project audit |
CN111798203A (en) * | 2020-06-19 | 2020-10-20 | 中建一局集团建设发展有限公司 | Block chain-based engineering construction achievement evaluation method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Turner et al. | The challenge of reforming big bureaucracy in Indonesia | |
Welle Donker et al. | How to assess the success of the open data ecosystem? | |
Funk et al. | Securing the climate benefits of stable forests | |
US9038014B2 (en) | Intelligently recommending schemas based on user input | |
CN103383263B (en) | Interactive dynamic cloud navigation system | |
CN107464096A (en) | A kind of systems, devices and methods of project management | |
CN104361139A (en) | Data importing device and method | |
CN107844425A (en) | A kind of database statement inspection method and device | |
Mallinson et al. | Policy and political learning: The development of medical marijuana policies in the states | |
US20100250313A1 (en) | Systems and methods for enforcing fiduciary compliance | |
CN101354776A (en) | Method and system for generating emergency scheme based on GIS platform | |
Domingues et al. | New organisational issues and macroergonomics: integrating management systems | |
CN105677620A (en) | Generation method and device for project management documents | |
CN106022625A (en) | Pig farm information management system and method | |
CN106202507A (en) | Electric power first-aid rehearsal analogue system and method | |
CN110110072A (en) | A kind of method, system, terminal and storage medium generating interactive electronic handbook | |
CN101482942A (en) | Real-time network investigation and statistics system and its implementing method | |
CN105138636B (en) | Graph construction method and device for entity relationship | |
Gong | Understanding institutional shareholder activism: A comparative study of the UK and China | |
CN103442016B (en) | The method and system of white list are pushed based on website fingerprint | |
CN110516909B (en) | Urban and rural resource management system based on big data analysis | |
Halbwirth et al. | Information, knowledge and the organization of the Olympic Games | |
Cappelli¹ et al. | Managing transparency guided by a maturity model | |
Gibson et al. | Learning from error: Leading a culture of safety | |
Dominguez et al. | Panel Discussion Cognitive Engineering: Will They Know Our Name When We Are 40? |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171212 |
|
RJ01 | Rejection of invention patent application after publication |