CN108609454B - A kind of segmented setting out method of elevator installation - Google Patents
A kind of segmented setting out method of elevator installation Download PDFInfo
- Publication number
- CN108609454B CN108609454B CN201810450066.9A CN201810450066A CN108609454B CN 108609454 B CN108609454 B CN 108609454B CN 201810450066 A CN201810450066 A CN 201810450066A CN 108609454 B CN108609454 B CN 108609454B
- Authority
- CN
- China
- Prior art keywords
- template
- stage
- transect
- layer doorway
- line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/002—Mining-hoist operation installing or exchanging guide rails
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The invention discloses a kind of segmented setting out method of elevator installation, the lower half portion hoistway of the elevator is completed, insulating course is set in hoistway, first stage loading frame is arranged on the insulating course of hoistway, the pit of hoistway is arranged in lower sample rack, using interim template as second stage layer doorway template, and layer doorway line-transect is hung at interim template both ends, by layer doorway line-transect determine second stage layer doorway template front and back and left-right position after install second stage layer doorway template, dismantle interim template, and the installation site of second stage upper rail template is determined according to second stage layer doorway template, setting-out process is completed with this repetitive operation.The present invention installs elevator using the setting out method of segmented, elevator installation work can be made to begin to carry out when hoistway does not build completion, it is matched with civil engineering, hence it is evident that shorten the installation integral cycle of elevator, complete civil construction within the normal duration to ensure.
Description
Technical field
The present invention relates to the segmented setting out method that elevator mounting engineering technical field more particularly to a kind of elevator are installed.
Specifically, when hoistway does not build completion, elevator installation work is divided into two sections or more and is installed.
Background technique
With the high speed development of China's economic, urban development is also getting faster, and Re-search on Urbanization process also can further add
Fastly.When urban population constantly expands, and economy continues to develop, soil will be especially nervous, and therefore, domestic skyscraper will be a large amount of
It emerges in large numbers, emerging in large numbers for skyscraper means that elevator will enter Rapid development stage.In order to facilitate the discrepancy of citizen, skyscraper will
Express elevator is installed with meet demand.
Due to the quickening that work section gathers, the speed of civil engineering construction is also getting faster, and the installation progress of elevator also will constantly add
Fastly.But since the civil construction part of project construction is there is more uncertain factor, when the case where construction speed lags
There is generation, cause the construction period in project later period at full stretch, very big influence especially is produced on our elevator installation progresses.
Once civil engineering working-day claims, the transfer of elevator shaft is just postponed, and client is at this time in order to promote project process, and civil engineering is damaged before making up
The time is lost, may require that elevator company installs Fire lift in the shortest possible time, often so as to as rapid vertical transport and communications
Tool, while in order to across construction elevator and close outer eaves hole offer condition outside premature removal.And the elevator that client provides at this time
Installation period is seriously less than normal installation period;It such as installs by the normal duration, can not substantially complete.
The traditional mounting means of elevator is the installation of whole segmentation, and setting out method: elevator shaft is just opened after the completion of all building
Begin to carry out setting-out, loading setting is arranged in computer room or well headroom, lower sample in pit.In order to meet customer requirement, accelerate installation
The method of the integral cycle of elevator, segmented installation elevator is just come into being, and in civil engineering construction, elevator section construction can be protected
Card elevator is constructed after civil engineering reach a certain height.
Summary of the invention
In order to solve the problems, such as that the traditional mounting means integral cycle of elevator is long, the present invention provides a kind of point of elevator installation
Segmentation setting out method, with it is simple, low in cost, convenient for disassembly and assembly, highly-safe, be easy implement, it is adaptable, convenient effectively
The features such as.
The purpose of the present invention will be achieved through the following technical solutions: a kind of segmented setting out method of elevator installation, described
The lower half portion hoistway of elevator is completed, and insulating course is arranged in hoistway, and the insulating course of hoistway is arranged in first stage loading frame
On, the both ends positioned at the first stage layer doorway template of first stage upper sample rack are hung with first stage layer doorway line-transect, lower sample
The pit of hoistway is arranged in frame, using interim template as second stage layer doorway template, and in interim template both ends hanging the
Two-stage layer doorway line-transect, the front and back and left and right position of second stage layer doorway template are determined by second stage layer doorway line-transect
Installation second stage layer doorway template is postponed, dismantles interim template, and second stage is determined according to second stage layer doorway template
The installation site of upper rail template completes setting-out process with this repetitive operation.
Preferably, the segmented setting out method of described a kind of elevator installation, before the template of second stage layer doorway
Afterwards position by the distance between measurement two groups of second stage layer doorway line-transects and first stage layer doorway line-transect it is whether equal come
It determines, when the distance between two groups of second stage layer doorway line-transects and first stage layer doorway line-transect is equal, interim sample at this time
The front and back relative position of plate is second stage layer doorway template front-rear direction position.
Preferably, the segmented setting out method of described a kind of elevator installation, second stage layer doorway line-transect and the
The distance between one phase layer doorway line-transect is primary every 8~12 meters of measurements, ensures interim template and first stage layer door with this
Mouth template is parallel.
Preferably, a kind of segmented setting out method of elevator installation, second stage layer doorway line-transect are in
Vertical state, by the way that a right-angle side of square to be overlapped with interim template, another right-angle side of square is close to second stage
Layer doorway line-transect, when another right-angle side of square is overlapped with second stage layer doorway line-transect at the line-transect of second stage layer doorway
In vertical state, otherwise, constantly adjusts second stage layer doorway line-transect and make second stage layer doorway line-transect in a vertical state.
Preferably, the segmented setting out method of a kind of elevator installation, a left side for second stage layer doorway template
Right position is determined by moving left and right interim template, after moving left and right interim template, second stage layer doorway line-transect and
One phase layer doorway line-transect coincides together, and interim template position is the installation position of second stage layer doorway template at this time
It sets.
Preferably, the segmented setting out method of a kind of elevator installation, the distance that the interim template moves left and right
Equal to the distance between second stage layer doorway line-transect and first stage layer doorway line-transect, second stage layer doorway sample is verified repeatedly
Interim template is moved left and right after the distance between line and first stage layer doorway line-transect, when second stage layer doorway line-transect and first
When phase layer doorway line-transect coincides together, interim template position is the installation site of second stage layer doorway template.
Preferably, the segmented setting out method of a kind of elevator installation, the installation of second stage layer doorway template
After determination, by way of evening up line, it is ensured that second stage upper rail template is parallel with second stage layer doorway template to be installed.
Preferably, the segmented setting out method of a kind of elevator installation, the installation of second stage layer doorway template
Afterwards, by the mounting distance between measurement second stage upper rail template and second stage layer doorway template, second stage is determined
The left-right position of upper rail template.
Preferably, the segmented setting out method of a kind of elevator installation, the installation of second stage layer doorway template
Afterwards, whether equal by detecting the distance of center to the second stage upper rail template left and right ends of second stage layer doorway template
To determine the front-rear position of second stage upper rail template.
Preferably, the segmented setting out method of a kind of elevator installation, the first stage, upper sample rack was far from institute
The side for stating first stage layer doorway template is equipped with template on the secondary rail of first stage, and sample rack is far from described in second stage
The side of second stage layer doorway template is equipped with template on the secondary rail of second stage, the second stage upper rail template installation
After the completion, template is hung with secondary rail line-transect on template and the secondary rail of second stage on secondary rail in the first stage, when second
When the secondary rail line-transect of template is overlapped with the secondary rail line-transect of template on the secondary rail of first stage on the secondary rail in stage, second stage is confirmed
Upper template installation is errorless.
Compared with prior art, the invention has the following advantages: the present invention is installed using the setting out method of segmented
Elevator can make elevator installation work begin to carry out when hoistway does not build completion, match with civil engineering, hence it is evident that shorten electricity
The installation integral cycle of ladder, completes civil construction within the normal duration to ensure.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
One embodiment of invention without any creative labor, may be used also for those of ordinary skill in the art
To obtain other drawings based on these drawings.
Fig. 1 is a kind of structural schematic diagram of the segmented setting out method of elevator installation;
Fig. 2 is a kind of side view of the segmented setting out method of elevator installation;
Fig. 3 is a kind of top view of the segmented setting out method of elevator installation;
Fig. 4 is second stage upper rail template installation diagram in a kind of segmented setting out method of elevator installation;
Fig. 5 is that sample rack is installed figure in a kind of second stage of the segmented setting out method of elevator installation.
In figure: 1. interim template;2. sample rack in second stage;3. second stage layer doorway line-transect;4. first stage loading
Frame;5. first stage layer doorway line-transect;6. second stage layer doorway template;7. second stage upper rail template;8. lower sample rack.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
As shown in Fig. 1 to Fig. 5, a kind of segmented setting out method of elevator installation, the lower half portion hoistway of the elevator is
It completes, insulating course is set in hoistway, on the first stage 4. sample rack is arranged on the insulating course of hoistway, is located at first stage loading
5. the both ends of the first stage layer doorway template of frame 4. are hung with first stage layer doorway line-transect, 8. hoistway is arranged in lower sample rack
1. 6. pit is used as second stage layer doorway template using interim template, and 1. second stage layer is hung at both ends in interim template
3., by second stage layer doorway line-transect 3. doorway line-transect determines second stage layer doorway template front and back 6. and left-right position
Afterwards 6. 1. installation second stage layer doorway template, dismantles interim template, and 6. determines second according to second stage layer doorway template
The installation site of stage upper rail template 7. completes setting-out process with this repetitive operation.
The front-rear position of second stage layer doorway template 6. by measurement two groups of second stage layer doorway line-transects 3. with
First stage layer doorway line-transect the distance between 5. whether it is equal determine, when two groups of second stage layer doorway line-transects are 3. with first
Phase layer doorway line-transect the distance between 5. equal (A1=A1 ') when, the front and back relative position of interim template 1. is at this time
Two-stage layer doorway template 6. front-rear direction position.Second stage layer doorway line-transect 3. with first stage layer doorway line-transect 5.
The distance between measure primary (A1=A1 '=A2=A2 ') every 8~12 meters, with this ensure interim template 1. with the first stage
Layer doorway template is parallel.
Second stage layer doorway line-transect is 3. in a vertical state, by by a right-angle side of square and interim template
1. be overlapped, another right-angle side of square close to second stage layer doorway line-transect 3., when another right-angle side of square and second
Second stage layer doorway line-transect is 3. in a vertical state when phase layer doorway line-transect is overlapped 3., otherwise, constantly adjusts second stage
3. layer doorway line-transect makes second stage layer doorway line-transect 3. in a vertical state.
The left-right position of second stage layer doorway template 6. is determined by moving left and right interim template 1., when left and right
After moving interim template 1., 3. 5. second stage layer doorway line-transect coincides together with first stage layer doorway line-transect, faces at this time
When template 1. position is the installation site of second stage layer doorway template 6..The interim template 1. move left and right away from
From be equal to second stage layer doorway line-transect 3. with first stage layer doorway line-transect the distance between 5., verify second stage layer repeatedly
Doorway line-transect 3. with first stage layer doorway line-transect the distance between 5. after move left and right interim template 1., when second stage layer door
When mouth line-transect coincides together with first stage layer doorway line-transect 3. 5., 1. position is second stage layer door to interim template
The installation site of mouth template 6..
6. second stage layer doorway template installs determination after, by way of evening up line, it is ensured that in second stage
Guide rail template 7. with second stage layer doorway template is 6. parallel installs.6. second stage layer doorway template is installed after, pass through
Measure second stage upper rail template 7. with second stage layer doorway template 6. between mounting distance, determine and led in second stage
The left-right position of rail template 7..6. second stage layer doorway template is installed after, by detecting second stage layer doorway template
6. the distances of center to second stage upper rail template 7. left and right ends whether equal determine second stage upper rail template
7. front-rear position.4. the first stage upper sample rack is equipped with the first stage in the side far from first stage layer doorway template
Secondary rail on template, 2. sample rack is being equipped with second stage far from the side of second stage layer doorway template 6. in second stage
Template on secondary rail, 7. the second stage upper rail template is installed after, template and second on secondary rail in the first stage
Template is hung with secondary rail line-transect on the secondary rail in stage, when the secondary rail line-transect of template on the secondary rail of second stage and first stage
When the secondary rail line-transect of template is overlapped on secondary rail (B=B '), confirm that template installation is errorless in second stage.
The above is merely preferred embodiments of the present invention, be not intended to limit the invention, it is all in spirit herein and
Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of segmented setting out method of elevator installation, the lower half portion hoistway of the elevator are completed, it is characterised in that:
Insulating course is set in hoistway, and first stage loading frame is arranged on the insulating course of hoistway, positioned at the first of first stage upper sample rack
The both ends of phase layer doorway template are hung with first stage layer doorway line-transect, and the pit of hoistway is arranged in lower sample rack, using interim
Template hangs second stage layer doorway line-transect as second stage layer doorway template, and at interim template both ends, passes through second-order
Section layer doorway line-transect determine second stage layer doorway template front and back and left-right position after second stage layer doorway template is installed,
Interim template is dismantled, and determines the installation site of second stage upper rail template according to second stage layer doorway template, it is heavy with this
Setting-out process is completed in multiple operation.
2. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage
The front-rear position of layer doorway template passes through between two groups of second stage layer doorway line-transects of measurement and first stage layer doorway line-transect
Whether distance is equal to determine, when two groups of second stage layer doorway line-transects are equal with the distance between first stage layer doorway line-transect
When, the front and back relative position of interim template is second stage layer doorway template front-rear direction position at this time.
3. a kind of segmented setting out method of elevator installation according to claim 2, it is characterised in that: the second stage
The distance between layer doorway line-transect and first stage layer doorway line-transect are primary every 8~12 meters of measurements, ensure interim template with this
It is parallel with first stage layer doorway template.
4. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage
Layer doorway line-transect is in a vertical state, by the way that a right-angle side of square is overlapped with interim template, another right angle of square
While close to second stage layer doorway line-transect, the second-order when another right-angle side of square is overlapped with second stage layer doorway line-transect
Section layer doorway line-transect is in a vertical state, otherwise, constantly adjusts second stage layer doorway line-transect and makes second stage layer doorway sample
Line is in a vertical state.
5. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage
The left-right position of layer doorway template is determined by moving left and right interim template, after moving left and right interim template, second stage
Layer doorway line-transect coincides together with first stage layer doorway line-transect, and interim template position is second stage layer door at this time
The installation site of mouth template.
6. a kind of segmented setting out method of elevator installation according to claim 5, it is characterised in that: the interim template
The distance moved left and right is equal to the distance between second stage layer doorway line-transect and first stage layer doorway line-transect, verifies the repeatedly
Interim template is moved left and right after the distance between two-stage layer doorway line-transect and first stage layer doorway line-transect, when second stage layer
When doorway line-transect and first stage layer doorway line-transect coincide together, interim template position is second stage layer doorway sample
The installation site of plate.
7. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage
After layer doorway template installation determines, by way of evening up line, it is ensured that second stage upper rail template and second stage layer door
Mouth template is installed in parallel.
8. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage
After layer doorway template installation, pass through the locating distance between measurement second stage upper rail template and second stage layer doorway template
From determining the left-right position of second stage upper rail template.
9. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage
After layer doorway template installation, by the center to second stage upper rail template left and right ends for detecting second stage layer doorway template
The whether equal front-rear position to determine second stage upper rail template of distance.
10. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: first rank
Sample rack template, second stage on the secondary rail that the side far from first stage layer doorway template is equipped with the first stage in section
Upper sample rack template, second-order on the secondary rail that the side far from second stage layer doorway template is equipped with second stage
After section upper rail template is installed, template is hung on template and the secondary rail of second stage on secondary rail in the first stage
Secondary rail line-transect, when the secondary rail line-transect of template is overlapped on the secondary rail line-transect and the secondary rail of first stage of template on the secondary rail of second stage
When, confirm that template installation is errorless in second stage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810450066.9A CN108609454B (en) | 2018-05-11 | 2018-05-11 | A kind of segmented setting out method of elevator installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810450066.9A CN108609454B (en) | 2018-05-11 | 2018-05-11 | A kind of segmented setting out method of elevator installation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108609454A CN108609454A (en) | 2018-10-02 |
CN108609454B true CN108609454B (en) | 2019-09-27 |
Family
ID=63662877
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810450066.9A Active CN108609454B (en) | 2018-05-11 | 2018-05-11 | A kind of segmented setting out method of elevator installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108609454B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339399B (en) * | 2018-11-23 | 2023-08-25 | 宝钢钢构有限公司 | Sectional construction method of steel structure in elevator hoistway |
CN110642131A (en) * | 2019-09-28 | 2020-01-03 | 中建三局集团有限公司 | Scaffold-free sectional installation construction method for super high-rise fire elevator |
CN111472547B (en) * | 2020-04-01 | 2021-11-19 | 日立电梯(中国)有限公司 | Lofting method for scaffold-free elevator |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000073485A (en) * | 1998-09-02 | 2000-03-07 | Misawa Homes Co Ltd | Mounting structure for elevator for building |
JP2002188212A (en) * | 2000-12-19 | 2002-07-05 | Toa:Kk | Prefabricating device for elevator-mounted building |
CN104340813A (en) * | 2014-10-30 | 2015-02-11 | 中国建筑股份有限公司 | Construction method of elevator mounting |
CN105366494A (en) * | 2015-11-11 | 2016-03-02 | 四川汇辰精密机械有限公司 | Elevator mounting process |
-
2018
- 2018-05-11 CN CN201810450066.9A patent/CN108609454B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000073485A (en) * | 1998-09-02 | 2000-03-07 | Misawa Homes Co Ltd | Mounting structure for elevator for building |
JP2002188212A (en) * | 2000-12-19 | 2002-07-05 | Toa:Kk | Prefabricating device for elevator-mounted building |
CN104340813A (en) * | 2014-10-30 | 2015-02-11 | 中国建筑股份有限公司 | Construction method of elevator mounting |
CN105366494A (en) * | 2015-11-11 | 2016-03-02 | 四川汇辰精密机械有限公司 | Elevator mounting process |
Also Published As
Publication number | Publication date |
---|---|
CN108609454A (en) | 2018-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108609454B (en) | A kind of segmented setting out method of elevator installation | |
CN103046933B (en) | Shield station-crossing tunneling and station parallel construction method | |
CN107399656A (en) | Outdoor installation elevator and its construction method | |
CN104631819A (en) | Template system of arc-shaped facade arch-shaped concrete door beam and erection method of template system | |
CN108999281A (en) | A kind of novel precast concrete bean column node and its construction method | |
CN109440987A (en) | A kind of construction method of the element type curtain wall of super high-rise building | |
CN206408951U (en) | A kind of architectural industrialization project conversion layer position level ladder muscle | |
CN104060838B (en) | A kind of vestibule divides into groups aerial group to Method for Installation | |
CN207110029U (en) | A kind of assembled house | |
CN204370314U (en) | A kind of lower hanging steel bridge erects suspension rod | |
CN205662189U (en) | Mounting structure of elevator guide rail and elevator | |
CN204960324U (en) | Suspension type floor formwork support device | |
CN103775091A (en) | Partition detecting method and device for flyover crossing tunnel construction | |
CN107190989A (en) | Shaped steel partition plate external wall construction method | |
CN208250928U (en) | A kind of steel and wood composite template | |
CN206468003U (en) | A kind of Xin Jiamo guard bar structures | |
CN202914109U (en) | Integral type lining system of light-section cable tunnel | |
CN206458067U (en) | Operation platform in high-rise building elevator | |
CN208601460U (en) | A kind of Liftable type electric hammer operating platform | |
CN107313355B (en) | A kind of steel trestle construction method waterborne | |
CN208844782U (en) | A kind of fast-assembling walling system and hangar system | |
CN204384738U (en) | Poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment | |
CN205918142U (en) | Aligning device is assembled to shear force wall | |
CN105537470A (en) | Hydraulic pier shaft rebar machining formwork and pier shaft rebar construction technology | |
CN205530326U (en) | Tower crane landing leg anchor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |