CN108609454B - A kind of segmented setting out method of elevator installation - Google Patents

A kind of segmented setting out method of elevator installation Download PDF

Info

Publication number
CN108609454B
CN108609454B CN201810450066.9A CN201810450066A CN108609454B CN 108609454 B CN108609454 B CN 108609454B CN 201810450066 A CN201810450066 A CN 201810450066A CN 108609454 B CN108609454 B CN 108609454B
Authority
CN
China
Prior art keywords
template
stage
transect
layer doorway
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810450066.9A
Other languages
Chinese (zh)
Other versions
CN108609454A (en
Inventor
吴子坚
黄照明
黄伟栊
萧粤柏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Elevator China Co Ltd
Original Assignee
Hitachi Elevator China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Elevator China Co Ltd filed Critical Hitachi Elevator China Co Ltd
Priority to CN201810450066.9A priority Critical patent/CN108609454B/en
Publication of CN108609454A publication Critical patent/CN108609454A/en
Application granted granted Critical
Publication of CN108609454B publication Critical patent/CN108609454B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/002Mining-hoist operation installing or exchanging guide rails

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a kind of segmented setting out method of elevator installation, the lower half portion hoistway of the elevator is completed, insulating course is set in hoistway, first stage loading frame is arranged on the insulating course of hoistway, the pit of hoistway is arranged in lower sample rack, using interim template as second stage layer doorway template, and layer doorway line-transect is hung at interim template both ends, by layer doorway line-transect determine second stage layer doorway template front and back and left-right position after install second stage layer doorway template, dismantle interim template, and the installation site of second stage upper rail template is determined according to second stage layer doorway template, setting-out process is completed with this repetitive operation.The present invention installs elevator using the setting out method of segmented, elevator installation work can be made to begin to carry out when hoistway does not build completion, it is matched with civil engineering, hence it is evident that shorten the installation integral cycle of elevator, complete civil construction within the normal duration to ensure.

Description

A kind of segmented setting out method of elevator installation
Technical field
The present invention relates to the segmented setting out method that elevator mounting engineering technical field more particularly to a kind of elevator are installed. Specifically, when hoistway does not build completion, elevator installation work is divided into two sections or more and is installed.
Background technique
With the high speed development of China's economic, urban development is also getting faster, and Re-search on Urbanization process also can further add Fastly.When urban population constantly expands, and economy continues to develop, soil will be especially nervous, and therefore, domestic skyscraper will be a large amount of It emerges in large numbers, emerging in large numbers for skyscraper means that elevator will enter Rapid development stage.In order to facilitate the discrepancy of citizen, skyscraper will Express elevator is installed with meet demand.
Due to the quickening that work section gathers, the speed of civil engineering construction is also getting faster, and the installation progress of elevator also will constantly add Fastly.But since the civil construction part of project construction is there is more uncertain factor, when the case where construction speed lags There is generation, cause the construction period in project later period at full stretch, very big influence especially is produced on our elevator installation progresses. Once civil engineering working-day claims, the transfer of elevator shaft is just postponed, and client is at this time in order to promote project process, and civil engineering is damaged before making up The time is lost, may require that elevator company installs Fire lift in the shortest possible time, often so as to as rapid vertical transport and communications Tool, while in order to across construction elevator and close outer eaves hole offer condition outside premature removal.And the elevator that client provides at this time Installation period is seriously less than normal installation period;It such as installs by the normal duration, can not substantially complete.
The traditional mounting means of elevator is the installation of whole segmentation, and setting out method: elevator shaft is just opened after the completion of all building Begin to carry out setting-out, loading setting is arranged in computer room or well headroom, lower sample in pit.In order to meet customer requirement, accelerate installation The method of the integral cycle of elevator, segmented installation elevator is just come into being, and in civil engineering construction, elevator section construction can be protected Card elevator is constructed after civil engineering reach a certain height.
Summary of the invention
In order to solve the problems, such as that the traditional mounting means integral cycle of elevator is long, the present invention provides a kind of point of elevator installation Segmentation setting out method, with it is simple, low in cost, convenient for disassembly and assembly, highly-safe, be easy implement, it is adaptable, convenient effectively The features such as.
The purpose of the present invention will be achieved through the following technical solutions: a kind of segmented setting out method of elevator installation, described The lower half portion hoistway of elevator is completed, and insulating course is arranged in hoistway, and the insulating course of hoistway is arranged in first stage loading frame On, the both ends positioned at the first stage layer doorway template of first stage upper sample rack are hung with first stage layer doorway line-transect, lower sample The pit of hoistway is arranged in frame, using interim template as second stage layer doorway template, and in interim template both ends hanging the Two-stage layer doorway line-transect, the front and back and left and right position of second stage layer doorway template are determined by second stage layer doorway line-transect Installation second stage layer doorway template is postponed, dismantles interim template, and second stage is determined according to second stage layer doorway template The installation site of upper rail template completes setting-out process with this repetitive operation.
Preferably, the segmented setting out method of described a kind of elevator installation, before the template of second stage layer doorway Afterwards position by the distance between measurement two groups of second stage layer doorway line-transects and first stage layer doorway line-transect it is whether equal come It determines, when the distance between two groups of second stage layer doorway line-transects and first stage layer doorway line-transect is equal, interim sample at this time The front and back relative position of plate is second stage layer doorway template front-rear direction position.
Preferably, the segmented setting out method of described a kind of elevator installation, second stage layer doorway line-transect and the The distance between one phase layer doorway line-transect is primary every 8~12 meters of measurements, ensures interim template and first stage layer door with this Mouth template is parallel.
Preferably, a kind of segmented setting out method of elevator installation, second stage layer doorway line-transect are in Vertical state, by the way that a right-angle side of square to be overlapped with interim template, another right-angle side of square is close to second stage Layer doorway line-transect, when another right-angle side of square is overlapped with second stage layer doorway line-transect at the line-transect of second stage layer doorway In vertical state, otherwise, constantly adjusts second stage layer doorway line-transect and make second stage layer doorway line-transect in a vertical state.
Preferably, the segmented setting out method of a kind of elevator installation, a left side for second stage layer doorway template Right position is determined by moving left and right interim template, after moving left and right interim template, second stage layer doorway line-transect and One phase layer doorway line-transect coincides together, and interim template position is the installation position of second stage layer doorway template at this time It sets.
Preferably, the segmented setting out method of a kind of elevator installation, the distance that the interim template moves left and right Equal to the distance between second stage layer doorway line-transect and first stage layer doorway line-transect, second stage layer doorway sample is verified repeatedly Interim template is moved left and right after the distance between line and first stage layer doorway line-transect, when second stage layer doorway line-transect and first When phase layer doorway line-transect coincides together, interim template position is the installation site of second stage layer doorway template.
Preferably, the segmented setting out method of a kind of elevator installation, the installation of second stage layer doorway template After determination, by way of evening up line, it is ensured that second stage upper rail template is parallel with second stage layer doorway template to be installed.
Preferably, the segmented setting out method of a kind of elevator installation, the installation of second stage layer doorway template Afterwards, by the mounting distance between measurement second stage upper rail template and second stage layer doorway template, second stage is determined The left-right position of upper rail template.
Preferably, the segmented setting out method of a kind of elevator installation, the installation of second stage layer doorway template Afterwards, whether equal by detecting the distance of center to the second stage upper rail template left and right ends of second stage layer doorway template To determine the front-rear position of second stage upper rail template.
Preferably, the segmented setting out method of a kind of elevator installation, the first stage, upper sample rack was far from institute The side for stating first stage layer doorway template is equipped with template on the secondary rail of first stage, and sample rack is far from described in second stage The side of second stage layer doorway template is equipped with template on the secondary rail of second stage, the second stage upper rail template installation After the completion, template is hung with secondary rail line-transect on template and the secondary rail of second stage on secondary rail in the first stage, when second When the secondary rail line-transect of template is overlapped with the secondary rail line-transect of template on the secondary rail of first stage on the secondary rail in stage, second stage is confirmed Upper template installation is errorless.
Compared with prior art, the invention has the following advantages: the present invention is installed using the setting out method of segmented Elevator can make elevator installation work begin to carry out when hoistway does not build completion, match with civil engineering, hence it is evident that shorten electricity The installation integral cycle of ladder, completes civil construction within the normal duration to ensure.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this One embodiment of invention without any creative labor, may be used also for those of ordinary skill in the art To obtain other drawings based on these drawings.
Fig. 1 is a kind of structural schematic diagram of the segmented setting out method of elevator installation;
Fig. 2 is a kind of side view of the segmented setting out method of elevator installation;
Fig. 3 is a kind of top view of the segmented setting out method of elevator installation;
Fig. 4 is second stage upper rail template installation diagram in a kind of segmented setting out method of elevator installation;
Fig. 5 is that sample rack is installed figure in a kind of second stage of the segmented setting out method of elevator installation.
In figure: 1. interim template;2. sample rack in second stage;3. second stage layer doorway line-transect;4. first stage loading Frame;5. first stage layer doorway line-transect;6. second stage layer doorway template;7. second stage upper rail template;8. lower sample rack.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
As shown in Fig. 1 to Fig. 5, a kind of segmented setting out method of elevator installation, the lower half portion hoistway of the elevator is It completes, insulating course is set in hoistway, on the first stage 4. sample rack is arranged on the insulating course of hoistway, is located at first stage loading 5. the both ends of the first stage layer doorway template of frame 4. are hung with first stage layer doorway line-transect, 8. hoistway is arranged in lower sample rack 1. 6. pit is used as second stage layer doorway template using interim template, and 1. second stage layer is hung at both ends in interim template 3., by second stage layer doorway line-transect 3. doorway line-transect determines second stage layer doorway template front and back 6. and left-right position Afterwards 6. 1. installation second stage layer doorway template, dismantles interim template, and 6. determines second according to second stage layer doorway template The installation site of stage upper rail template 7. completes setting-out process with this repetitive operation.
The front-rear position of second stage layer doorway template 6. by measurement two groups of second stage layer doorway line-transects 3. with First stage layer doorway line-transect the distance between 5. whether it is equal determine, when two groups of second stage layer doorway line-transects are 3. with first Phase layer doorway line-transect the distance between 5. equal (A1=A1 ') when, the front and back relative position of interim template 1. is at this time Two-stage layer doorway template 6. front-rear direction position.Second stage layer doorway line-transect 3. with first stage layer doorway line-transect 5. The distance between measure primary (A1=A1 '=A2=A2 ') every 8~12 meters, with this ensure interim template 1. with the first stage Layer doorway template is parallel.
Second stage layer doorway line-transect is 3. in a vertical state, by by a right-angle side of square and interim template 1. be overlapped, another right-angle side of square close to second stage layer doorway line-transect 3., when another right-angle side of square and second Second stage layer doorway line-transect is 3. in a vertical state when phase layer doorway line-transect is overlapped 3., otherwise, constantly adjusts second stage 3. layer doorway line-transect makes second stage layer doorway line-transect 3. in a vertical state.
The left-right position of second stage layer doorway template 6. is determined by moving left and right interim template 1., when left and right After moving interim template 1., 3. 5. second stage layer doorway line-transect coincides together with first stage layer doorway line-transect, faces at this time When template 1. position is the installation site of second stage layer doorway template 6..The interim template 1. move left and right away from From be equal to second stage layer doorway line-transect 3. with first stage layer doorway line-transect the distance between 5., verify second stage layer repeatedly Doorway line-transect 3. with first stage layer doorway line-transect the distance between 5. after move left and right interim template 1., when second stage layer door When mouth line-transect coincides together with first stage layer doorway line-transect 3. 5., 1. position is second stage layer door to interim template The installation site of mouth template 6..
6. second stage layer doorway template installs determination after, by way of evening up line, it is ensured that in second stage Guide rail template 7. with second stage layer doorway template is 6. parallel installs.6. second stage layer doorway template is installed after, pass through Measure second stage upper rail template 7. with second stage layer doorway template 6. between mounting distance, determine and led in second stage The left-right position of rail template 7..6. second stage layer doorway template is installed after, by detecting second stage layer doorway template 6. the distances of center to second stage upper rail template 7. left and right ends whether equal determine second stage upper rail template 7. front-rear position.4. the first stage upper sample rack is equipped with the first stage in the side far from first stage layer doorway template Secondary rail on template, 2. sample rack is being equipped with second stage far from the side of second stage layer doorway template 6. in second stage Template on secondary rail, 7. the second stage upper rail template is installed after, template and second on secondary rail in the first stage Template is hung with secondary rail line-transect on the secondary rail in stage, when the secondary rail line-transect of template on the secondary rail of second stage and first stage When the secondary rail line-transect of template is overlapped on secondary rail (B=B '), confirm that template installation is errorless in second stage.
The above is merely preferred embodiments of the present invention, be not intended to limit the invention, it is all in spirit herein and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of segmented setting out method of elevator installation, the lower half portion hoistway of the elevator are completed, it is characterised in that: Insulating course is set in hoistway, and first stage loading frame is arranged on the insulating course of hoistway, positioned at the first of first stage upper sample rack The both ends of phase layer doorway template are hung with first stage layer doorway line-transect, and the pit of hoistway is arranged in lower sample rack, using interim Template hangs second stage layer doorway line-transect as second stage layer doorway template, and at interim template both ends, passes through second-order Section layer doorway line-transect determine second stage layer doorway template front and back and left-right position after second stage layer doorway template is installed, Interim template is dismantled, and determines the installation site of second stage upper rail template according to second stage layer doorway template, it is heavy with this Setting-out process is completed in multiple operation.
2. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage The front-rear position of layer doorway template passes through between two groups of second stage layer doorway line-transects of measurement and first stage layer doorway line-transect Whether distance is equal to determine, when two groups of second stage layer doorway line-transects are equal with the distance between first stage layer doorway line-transect When, the front and back relative position of interim template is second stage layer doorway template front-rear direction position at this time.
3. a kind of segmented setting out method of elevator installation according to claim 2, it is characterised in that: the second stage The distance between layer doorway line-transect and first stage layer doorway line-transect are primary every 8~12 meters of measurements, ensure interim template with this It is parallel with first stage layer doorway template.
4. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage Layer doorway line-transect is in a vertical state, by the way that a right-angle side of square is overlapped with interim template, another right angle of square While close to second stage layer doorway line-transect, the second-order when another right-angle side of square is overlapped with second stage layer doorway line-transect Section layer doorway line-transect is in a vertical state, otherwise, constantly adjusts second stage layer doorway line-transect and makes second stage layer doorway sample Line is in a vertical state.
5. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage The left-right position of layer doorway template is determined by moving left and right interim template, after moving left and right interim template, second stage Layer doorway line-transect coincides together with first stage layer doorway line-transect, and interim template position is second stage layer door at this time The installation site of mouth template.
6. a kind of segmented setting out method of elevator installation according to claim 5, it is characterised in that: the interim template The distance moved left and right is equal to the distance between second stage layer doorway line-transect and first stage layer doorway line-transect, verifies the repeatedly Interim template is moved left and right after the distance between two-stage layer doorway line-transect and first stage layer doorway line-transect, when second stage layer When doorway line-transect and first stage layer doorway line-transect coincide together, interim template position is second stage layer doorway sample The installation site of plate.
7. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage After layer doorway template installation determines, by way of evening up line, it is ensured that second stage upper rail template and second stage layer door Mouth template is installed in parallel.
8. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage After layer doorway template installation, pass through the locating distance between measurement second stage upper rail template and second stage layer doorway template From determining the left-right position of second stage upper rail template.
9. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: the second stage After layer doorway template installation, by the center to second stage upper rail template left and right ends for detecting second stage layer doorway template The whether equal front-rear position to determine second stage upper rail template of distance.
10. a kind of segmented setting out method of elevator installation according to claim 1, it is characterised in that: first rank Sample rack template, second stage on the secondary rail that the side far from first stage layer doorway template is equipped with the first stage in section Upper sample rack template, second-order on the secondary rail that the side far from second stage layer doorway template is equipped with second stage After section upper rail template is installed, template is hung on template and the secondary rail of second stage on secondary rail in the first stage Secondary rail line-transect, when the secondary rail line-transect of template is overlapped on the secondary rail line-transect and the secondary rail of first stage of template on the secondary rail of second stage When, confirm that template installation is errorless in second stage.
CN201810450066.9A 2018-05-11 2018-05-11 A kind of segmented setting out method of elevator installation Active CN108609454B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810450066.9A CN108609454B (en) 2018-05-11 2018-05-11 A kind of segmented setting out method of elevator installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810450066.9A CN108609454B (en) 2018-05-11 2018-05-11 A kind of segmented setting out method of elevator installation

Publications (2)

Publication Number Publication Date
CN108609454A CN108609454A (en) 2018-10-02
CN108609454B true CN108609454B (en) 2019-09-27

Family

ID=63662877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810450066.9A Active CN108609454B (en) 2018-05-11 2018-05-11 A kind of segmented setting out method of elevator installation

Country Status (1)

Country Link
CN (1) CN108609454B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339399B (en) * 2018-11-23 2023-08-25 宝钢钢构有限公司 Sectional construction method of steel structure in elevator hoistway
CN110642131A (en) * 2019-09-28 2020-01-03 中建三局集团有限公司 Scaffold-free sectional installation construction method for super high-rise fire elevator
CN111472547B (en) * 2020-04-01 2021-11-19 日立电梯(中国)有限公司 Lofting method for scaffold-free elevator

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000073485A (en) * 1998-09-02 2000-03-07 Misawa Homes Co Ltd Mounting structure for elevator for building
JP2002188212A (en) * 2000-12-19 2002-07-05 Toa:Kk Prefabricating device for elevator-mounted building
CN104340813A (en) * 2014-10-30 2015-02-11 中国建筑股份有限公司 Construction method of elevator mounting
CN105366494A (en) * 2015-11-11 2016-03-02 四川汇辰精密机械有限公司 Elevator mounting process

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000073485A (en) * 1998-09-02 2000-03-07 Misawa Homes Co Ltd Mounting structure for elevator for building
JP2002188212A (en) * 2000-12-19 2002-07-05 Toa:Kk Prefabricating device for elevator-mounted building
CN104340813A (en) * 2014-10-30 2015-02-11 中国建筑股份有限公司 Construction method of elevator mounting
CN105366494A (en) * 2015-11-11 2016-03-02 四川汇辰精密机械有限公司 Elevator mounting process

Also Published As

Publication number Publication date
CN108609454A (en) 2018-10-02

Similar Documents

Publication Publication Date Title
CN108609454B (en) A kind of segmented setting out method of elevator installation
CN103046933B (en) Shield station-crossing tunneling and station parallel construction method
CN107399656A (en) Outdoor installation elevator and its construction method
CN104631819A (en) Template system of arc-shaped facade arch-shaped concrete door beam and erection method of template system
CN108999281A (en) A kind of novel precast concrete bean column node and its construction method
CN109440987A (en) A kind of construction method of the element type curtain wall of super high-rise building
CN206408951U (en) A kind of architectural industrialization project conversion layer position level ladder muscle
CN104060838B (en) A kind of vestibule divides into groups aerial group to Method for Installation
CN207110029U (en) A kind of assembled house
CN204370314U (en) A kind of lower hanging steel bridge erects suspension rod
CN205662189U (en) Mounting structure of elevator guide rail and elevator
CN204960324U (en) Suspension type floor formwork support device
CN103775091A (en) Partition detecting method and device for flyover crossing tunnel construction
CN107190989A (en) Shaped steel partition plate external wall construction method
CN208250928U (en) A kind of steel and wood composite template
CN206468003U (en) A kind of Xin Jiamo guard bar structures
CN202914109U (en) Integral type lining system of light-section cable tunnel
CN206458067U (en) Operation platform in high-rise building elevator
CN208601460U (en) A kind of Liftable type electric hammer operating platform
CN107313355B (en) A kind of steel trestle construction method waterborne
CN208844782U (en) A kind of fast-assembling walling system and hangar system
CN204384738U (en) Poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment
CN205918142U (en) Aligning device is assembled to shear force wall
CN105537470A (en) Hydraulic pier shaft rebar machining formwork and pier shaft rebar construction technology
CN205530326U (en) Tower crane landing leg anchor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant