CN204384738U - Poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment - Google Patents

Poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment Download PDF

Info

Publication number
CN204384738U
CN204384738U CN201420843846.7U CN201420843846U CN204384738U CN 204384738 U CN204384738 U CN 204384738U CN 201420843846 U CN201420843846 U CN 201420843846U CN 204384738 U CN204384738 U CN 204384738U
Authority
CN
China
Prior art keywords
cement concrete
basement
wall
groove
crosshead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420843846.7U
Other languages
Chinese (zh)
Inventor
温江
杨元伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongcheng National Construction Co., Ltd.
Original Assignee
ZHONGYU YUANFA INTERNATIONAL CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGYU YUANFA INTERNATIONAL CONSTRUCTION GROUP Co Ltd filed Critical ZHONGYU YUANFA INTERNATIONAL CONSTRUCTION GROUP Co Ltd
Priority to CN201420843846.7U priority Critical patent/CN204384738U/en
Application granted granted Critical
Publication of CN204384738U publication Critical patent/CN204384738U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a kind of poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment, particularly a kind of poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment being applied to the realm of building construction.The utility model provides a kind of structure simple, easy to operate, and handling efficiency is high, the poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment that handling accuracy is high.Comprise outer crosshead and winch, also comprise operation layer, described operation layer is by two or more and be positioned at conplane crossbearer and form, described operation layer is vertical with stand, also comprise service platform, the installation site will installing cement concrete draw-in groove due to outer crosshead distance is very near, and therefore the distance of handling is short, contributes to the speed improving handling installation.The diagonal brace arranged, can increase the Rigidity and strength of crosshead, improves the integrally-built stability of crosshead.The weight concrete arranged can make winch keep balance when lifting cement concrete draw-in groove, to avoid and topples.

Description

Poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment
Technical field
The utility model relates to a kind of poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment, particularly a kind of poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment being applied to the realm of building construction.
Background technology
Along with the modernization of urban construction, large-scale executive information systems thing gets more and more, the application of post-cast strip is also increasingly extensive, post-cast strip is for preventing monolithic reinforced concrete structure due to temperature, shrinking uneven issuable harmful cracks in building operation, according to design or job specifications requirement, stay in concrete structure relevant position and establish temporary construction to stitch.Before poured band of outer wall of basement is closed, not only there is potential safety hazard, post-cast strip closed front foreign material, rainwater and construction water easily enters in subterranean room simultaneously, affect post-cast strip pouring quality and normal construction, the long-term exposure of post-pouring belt of outer wall also gives external wall waterproof, indoor backfilling working brings drawback, agent structure can not be given, build the site requirements of finishing and equipment installation needs by laying bricks or stones, especially narrow field is on-the-spot, contradiction is more outstanding, and therefore post-cast strip closure construction becomes the important step in construction.Brick retaining wall is adopted to close outer wall of basement in prior art, the method working procedure is many, duration is longer, and structural instability under the effect of backfill earth lateral pressure, in order to overcome aforesaid drawbacks, adopt precast concrete draw-in groove to close post-cast strip, substitute the isolation of in the past conventional brick retaining wall as back fill and post-cast strip, effectively keep out backfill earth lateral pressure.But adopt preceding method cement concrete draw-in groove handling to be installed to tram executing man-hour requirement, higher requirement is had to the efficiency of handling and the accuracy of handling, but also do not have a kind of structure simple in prior art, easy to operate, can fast by the handling of poured band of outer wall of basement cement concrete draw-in groove to installation site, auxiliary installation, and handling efficiency is high, the poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment that handling accuracy is high.
Utility model content
It is simple that technical problem to be solved in the utility model is to provide a kind of structure, easy to operate, can fast by the handling of poured band of outer wall of basement cement concrete draw-in groove to installation site, auxiliary installation, and handling efficiency is high, the poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment that handling accuracy is high.
For solving the problems of the technologies described above, the poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment that the utility model adopts, comprise outer crosshead and winch, described outer crosshead is made up of three each and every one above stands, also comprise operation layer, described operation layer is by two or more and be positioned at conplane crossbearer and form, described operation layer is vertical with stand, and operation layer is fixedly connected with stand, also comprise service platform, described service platform is fixed on operation layer, and described winch is installed on the operational platform.
Further, described crosshead is also provided with diagonal brace.
Further, the afterbody of described winch is also provided with weight concrete.
The beneficial effects of the utility model are: utilize the outer crosshead at poured band of outer wall of basement place as support, outside crosshead utilizes crossbearer constructor layer, then build service platform on operation layer, lifting appliance are rolled up machine fixed installation on the operational platform.The installation site that outer crosshead distance due to poured band of outer wall of basement place will install cement concrete draw-in groove is very near, and therefore the distance of handling is short, contributes to the speed improving handling installation.The diagonal brace that crosshead is arranged, can increase the Rigidity and strength of crosshead, improves the integrally-built stability of crosshead and safety.The afterbody of winch is also provided with weight concrete can make winch keep balance when lifting cement concrete draw-in groove, to avoid and topples.
Accompanying drawing explanation
Fig. 1 is master map of the present utility model;
Fig. 2 is birds-eye view of the present utility model;
Fig. 3 is right elevation of the present utility model;
Parts, position and numbering in figure: stand 1, operation layer 2, service platform 3, winch 4, diagonal brace 5, weight concrete 6, post-cast strip cement concrete draw-in groove 7.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, for solving the problems of the technologies described above, the poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment that the utility model adopts, comprise outer crosshead and winch 4, described outer crosshead is made up of three each and every one above stands 1, also comprise operation layer 2, described operation layer 2 is by two or more and be positioned at conplane crossbearer and form, described operation layer 2 is vertical with stand 1, and operation layer 2 is fixedly connected with stand 1, also comprise service platform 3, described service platform 3 is fixed on operation layer 2, and described winch 4 is arranged on service platform 3.With the outer crosshead at poured band of outer wall of basement place as support, outside crosshead utilizes crossbearer constructor layer 2, then build service platform 3 on operation layer 2, machine of being rolled up by lifting appliance is fixedly mounted on service platform 3.The installation site that outer crosshead distance due to poured band of outer wall of basement place will install cement concrete draw-in groove 7 is very near, and the distance segment of therefore handling contributes to the speed improving handling installation.
Described crosshead is also provided with diagonal brace 5.The diagonal brace 5 that crosshead is arranged, can increase the Rigidity and strength of crosshead, improves the integrally-built stability of crosshead and safety.
The afterbody of described winch 4 is also provided with weight concrete 6.The afterbody of winch 4 is also provided with weight concrete 6 can make winch 4 keep balance when lifting cement concrete draw-in groove 7, to avoid and topples.
The structure of the cement concrete draw-in groove 7 of the utility model handling is the side plate comprising base plate He be arranged on base plate both sides, base plate and side plate surround a groove 1, cement concrete draw-in groove 7 is adopted to close post-cast strip, substitute the isolation of in the past conventional brick retaining wall as back fill and post-cast strip, can effectively keep out backfill earth lateral pressure.Splicing groove and splicing projection is provided with in the upper end of base plate; Be provided with splicing groove in the upper end of side plate and splice protruding, be provided with in the lower end of base plate and splice groove and splicing projection, be provided with splicing groove in the lower end of side plate protruding with splicing.The splicing utilizing cement concrete draw-in groove 7 to arrange is protruding and splice groove, makes to splice between two pieces of draw-in grooves tighter, forms the template outside poured band of outer wall of basement, substitute secondary formwork.Groove 1 is provided with pre-buried ring.Utilize hoist tool by cement concrete draw-in groove 7 handling extremely place to be installed, when handling, the hook of hoist tool is hung on pre-buried ring.Be connected pre-buried with reinforcing bar outside post-cast strip in installation process.The structure that when pre-buried ring is also fixed as installation while facilitating handling, cement concrete draw-in groove 7 is connected with post-cast strip.Pre-buried ring is two.Pre-buried ring is set to two can facilitate handling, makes handling process more steady, with post-cast strip outside bar connecting time, also make connection more firm.
The hoisting process of poured band of outer wall of basement cement concrete draw-in groove 7 construction hoisting equipment of the present utility model is adopted to be:
Concrete handling is installed and can be installed aftermentioned method and carry out: reinforce the existing outrigger in poured band of outer wall of basement place, above the service platform 3 winch 4 being fixedly mounted on the superiors.Winch 4 install service platform 3 from basement roof at about 1.5m.The position of winch 4 needs just to poured band of outer wall of basement, just there will not be serious skew during installation.Precast concrete draw-in groove 7 is lifted and is transported to post-pouring belt of outer wall top board place by workmen, and two suspension hooks are hung on the pre-buried ring of precast concrete draw-in groove 7, slowly starts winch 4 and precast concrete draw-in groove 7 handling is got up until steadily.By slow for prefabricated cement concrete draw-in groove 7 down let-down under the help of workmen, when will arrive installation site, carry out coordinating until be in place with the operating personal at post empiricism position.Fitting operation personnel are receiving after under precast concrete draw-in groove 7 handling, and man-machine cooperation is emitted on lastblock precast concrete draw-in groove 7 and namely installs according to post-pouring belt of outer wall both sides mark at first piece of precast concrete draw-in groove 7.After precast concrete draw-in groove 7 is in place by operating personal, be connected by ring pre-buried on precast concrete draw-in groove 7 with galvanized wire with reinforcing bar outside poured band of outer wall of basement, colligation is firm, ensures that it is firm.If there is skew wild effect when installing, then need man-machine cooperation to re-start installation fixing, guarantee that whole piece precast concrete draw-in groove 7 is steadily straight after closing post-cast strip.

Claims (3)

1. poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment, it is characterized in that: comprise outer crosshead and winch (4), described outer crosshead is made up of three each and every one above stands (1), also comprise operation layer (2), described operation layer (2) is by two or more and be positioned at conplane crossbearer and form, described operation layer (2) is vertical with stand (1), and operation layer (2) is fixedly connected with stand (1), also comprise service platform (3), described service platform (3) is fixed on operation layer (2), described winch (4) is arranged on service platform (3).
2. poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment as claimed in claim 1, is characterized in that: described crosshead is also provided with diagonal brace (5).
3. poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment as claimed in claim 1, is characterized in that: the afterbody of described winch (4) is also provided with weight concrete (6).
CN201420843846.7U 2014-12-26 2014-12-26 Poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment Expired - Fee Related CN204384738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420843846.7U CN204384738U (en) 2014-12-26 2014-12-26 Poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420843846.7U CN204384738U (en) 2014-12-26 2014-12-26 Poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment

Publications (1)

Publication Number Publication Date
CN204384738U true CN204384738U (en) 2015-06-10

Family

ID=53357475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420843846.7U Expired - Fee Related CN204384738U (en) 2014-12-26 2014-12-26 Poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment

Country Status (1)

Country Link
CN (1) CN204384738U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108858817A (en) * 2017-07-21 2018-11-23 东营联润信息科技有限公司 A kind of enclosure wall cutting translating device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108858817A (en) * 2017-07-21 2018-11-23 东营联润信息科技有限公司 A kind of enclosure wall cutting translating device
CN108908752A (en) * 2017-07-21 2018-11-30 东营联润信息科技有限公司 A kind of enclosure wall cutting translating device
CN108858817B (en) * 2017-07-21 2020-03-06 北京天润建设有限公司 Fence cutting translation device

Similar Documents

Publication Publication Date Title
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN106638940B (en) A kind of assembled high residential building concrete prefabricated element construction
CN103711323B (en) Utilize the anti-ceiling board construction method of portable tubular truss stage+module roofing
CN205077845U (en) Hydraulic intelligent climbing operation scaffold for core barrel well of building
CN105604334A (en) Rapid-construction method used for overall installation of large-span steel truss
CN103758348B (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN104790676A (en) Rapid leveling and alignment device and method for installation of prefabricated wallboards
CN104631512A (en) Post-cast strip beam and slab construction method adopting formwork hanging method
CN104405062A (en) Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN104264865A (en) Assembly type firewall
CN103195256A (en) Hanging column type steel structure jig frame construction method
CN204609154U (en) The hollow stair system of a kind of prefabricated assembling type reinforced concrete
CN102561690A (en) Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN105908965A (en) Assembly type concrete wall board, assembly type building and assembly method
CN105133754A (en) Prefabricated concrete shear wallboard counterbore guide type mounting device and method
CN103061508A (en) Triangular slip form device and construction method for the same triangular slip form
CN113482312A (en) Guide type double-layer structure elevator shaft operating platform and construction method based on platform
CN102733608B (en) Construction method for spray head layer of granulation tower
CN210685444U (en) Quick leveling, mounting and supporting device for prefabricated external wall panel
CN114059782A (en) Construction method of prefabricated slab
CN102337782A (en) Lift system for constructing truss platform on top of tall and large space and construction method for lift system
CN113338508A (en) PC component installation construction method for fabricated building
CN104775606A (en) Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof
CN204384738U (en) Poured band of outer wall of basement cement concrete draw-in groove construction hoisting equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171212

Address after: 610081 Chengdu City, Chengdu, Sichuan, Jinniu District new village riverside Street 3 layer

Patentee after: Zhongcheng National Construction Co., Ltd.

Address before: 610027, 19, 1, 1, 2 ginkgo Road, Sichuan, Chengdu, Jinniu District

Patentee before: ZHONGYU YUANFA INTERNATIONAL CONSTRUCTION GROUP CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150610

Termination date: 20171226