CN108590747A - Wall type allwork hydraulic column gib afterwards filling method - Google Patents

Wall type allwork hydraulic column gib afterwards filling method Download PDF

Info

Publication number
CN108590747A
CN108590747A CN201810335503.2A CN201810335503A CN108590747A CN 108590747 A CN108590747 A CN 108590747A CN 201810335503 A CN201810335503 A CN 201810335503A CN 108590747 A CN108590747 A CN 108590747A
Authority
CN
China
Prior art keywords
stope
row
ventilation
tunnel
back production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810335503.2A
Other languages
Chinese (zh)
Other versions
CN108590747B (en
Inventor
陈焰苗
唐匡仁
罗来和
范家斌
关功华
程祝祥
张那
朱天红
张希正
唐鹏善
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Zijin Mining Co Ltd
Original Assignee
Guizhou Zijin Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Zijin Mining Co Ltd filed Critical Guizhou Zijin Mining Co Ltd
Priority to CN201810335503.2A priority Critical patent/CN108590747B/en
Publication of CN108590747A publication Critical patent/CN108590747A/en
Application granted granted Critical
Publication of CN108590747B publication Critical patent/CN108590747B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials
    • E21F15/04Stowing mats; Goaf wire netting; Partition walls

Abstract

The invention discloses wall type allwork hydraulic column gib afterwards filling methods,The method can be economical,Safety,Efficient exploitation ore body,It ensure that the life safety of exploitation person well,Driving people's row ventilation The Taoist Priest Mountain first,Enter the channel of stope as personnel equipment,And as stope ventilation channel,Again drop shaft is tunneled from the tunnels Chuan Mai specified location,Cutting tunnel is tunneled again,Scraper chamber is tunneled with the propulsion of stope,Interval width 6m,Stope overdraught mouth is completed with back production to explosion when top,Ore body is whole from a side to other side strip-type,Drawing back,Along nugget along inclination back production in band,First to cut tunnel as the scope of freedom,Back production goes out certain space,With hydraulic prop supporting,Reserve working space,The horizontal blasthole of pusher leg drill Drilling is used later,The effective length that drills 2.2m,Per 3~5 row of separate explosion,The distance of 0.3m~0.5m is kept close to the tier pitch-row top plate of top plate.

Description

Wall type allwork hydraulic column gib afterwards filling method
Technical field
The present invention relates to a kind of mining methods technical field, specifically wall type allwork hydraulic column gib is afterwards filled Fill out method.
Background technology
Shuiyindong gold mine is located at the forts approximately EW Hui Jia anticline eastern section, is Xingren~Anlong gold of Yangtze paraplatform Margin of Southwest Output region in " Carlin Trend " gold deposit on mine belt, Shuiyindong gold mine 1100m or more can adopt using ore amount 69.63 × 104t, 6.72 × 10-6 of average grade, amount of metal 4679kg, 1100m~1000m can adopt using ore amount 445.56 × 104t, 4.5 × 10-6 of average grade, amount of metal 20050kg, mineral deposit is based on magma bound type, is supplemented by breaking type compound in area Blind deposit, in category-low temperature hot liquid " Carlin Trend " gold mine, ore body in stratiform, like stratiform, occurrence is consistent with the attitude of rocks, inclination angle 5 °~10 °, thickness is thin for tool, grade is rich, walk tool undulation upwards, incline eastwards not, the spy that spatially multiple ore bodies are overlapped up and down Point, mining area are the part in the anticline geohydrologic unit of the forts Hui Jia, under natural endowment in area in water-bearing layer underground water supply Including two aspects:First, vertrep, second is that the lateral runoff from upstream aqueous layer is fed, exposure stratum is essentially in area Night youth organizes marl, the mud stone of first segment, and landform is based on hilly and mountainous land, and it is bad to ooze condition under Atmospheric precipitation, but on mining area, Downstream water-bearing layer distribution area is big, therefore, the recharge laterally from upstream be area in the important Source Of Supply of underground water, water-bearing layer by After supply, underground water outside horizontal runoff discharge area, becomes the supply source in downstream water-bearing layer, only superficial part underground water is in area from West to East Interior cheuch is discharged earth's surface in the form of Junichiro Koizumi, and mature fault in area, the development in tectonic joint crack, rock stratum crack in layer destroys The integrality of rock stratum becomes the channel of underground water water-filling, and exploitation, which causes water producing fractures also, can become the channel of underground water water-filling, water The literary medium complexity of geological conditions, rock stratum is bedded rock in mining area, and based on clastic rock and Impure Carbonate Rocks, engineering Matter type is sedimentogenic lamellar type, and according to the lithology of rock stratum, mechanics index of physics, ground can be divided into loose rock in area Group, hard rock group and soft rockmass group three classes engineering geology rock group, ore body are in anticlinal nucleus, and the attitude of rocks is more gentle, in order to Adapt to local geological conditions, it is necessary to propose that a kind of wall type allwork hydraulic column gib afterwards filling method carrys out quarry Body.
Invention content
The purpose of the present invention is to provide wall type allwork hydraulic column gib afterwards filling methods, to solve the above-mentioned back of the body The problem of being proposed in scape technology.
To achieve the above object, the present invention provides the following technical solutions:
Wall type allwork hydraulic column gib afterwards filling method, including people's row ventilating duct, slusher runner, scraper cave mouth, Along the pulse haul road, massif, ore, obturation, filling well, filling counterfort, hydraulic column, blasthole, ore body, drop shaft, Chuan Mai, top plate and The middle section side of stope, the massif is equipped with obturation, and the middle section other side of massif is ore body, the ore body and mountain It is stope between body, is fixed with more hydraulic columns in stope, obturation is fixed with filling counterfort, mine close to the side of hydraulic column Internal portion is further opened with multiple blastholes, and the front position of the blasthole is ore, and ore body front position is equipped with slusher runner, the electricity Through being connected with equipped with drop shaft, the front end of drop shaft is transported along the pulse through haul road along the pulse is connected with for rake side of the road far from hydraulic column Defeated road is equipped with close to the side of ore body and wears arteries and veins, and haul road opens up someone's row ventilating duct close to the upper end position for wearing arteries and veins along the pulse, described Through multiple scraper cave mouths are connected on ore body, the back-end location of the massif offers multiple fillings for the front end of slusher runner Well fills well through the interior location for having hollowed out ore body.
As a further solution of the present invention:The ore body can be divided into two types by thickness, and one kind is low-angle dip lean ore Body, one kind are thick mine in low-angle dip.
As a further solution of the present invention:The hydraulic column is DW28 type monomer external poureds, and hydraulic column is from working face branch Protect three rows, array pitch 3-2.5m, 1.5-1.0 meters of spacing.
As a further solution of the present invention:The stope is by level haulage tunnel inlet air, through people's row vent (-escape) raise and people Row connecting taxiway enters stope work surface, and waste air is discharged into upper stage casing tailgate by stope other end people's row vent (-escape) raise and enters ventilation Well drains into earth's surface, and stope carries out secondary ventilation using JK58-2NO.4 type portable blowers.
As a further solution of the present invention:One is built by laying bricks or stones per 15m~25m in filling counterfort across pitch direction.
As a further solution of the present invention:The horizontal blasthole of pusher leg drill Drilling, drilling are used in the ore body back production Effective length 2.2m keeps the distance of 0.3m~0.5m close to the tier pitch-row top plate of top plate per 3~5 row of separate explosion.
As further scheme of the invention:2# rock emulsion explosives, nonel tube are used when the shot hole blasting Detonator elementary errors sequence is detonated, minimum burden 1m, pitch-row 1m~1.2m, hole depth 2.2m, per 5 row of separate explosion, with photoface exploision or Uncoincided charge Controlled blasting technique ensures shield top layer.
Compared with prior art, the beneficial effects of the invention are as follows:Reasonable design of the present invention uses wall type allwork hydraulic pressure Column gib afterwards filling method can economic, safe and efficient exploitation ore body, ensure that the life peace of exploitation person well Entirely, people's row ventilation The Taoist Priest Mountain is tunneled first, the channel of stope is entered as personnel equipment, and as stope ventilation channel, then from The tunnels Chuan Mai specified location tunnels drop shaft, then tunnels cutting tunnel, and scraper chamber is dug with the propulsion of stope Into, interval width 6m, stope overdraught mouth is completed with back production to explosion when top, and ore body is whole from a side to other side item Belt, drawing back, band is interior along the suitable inclination back production of nugget, and first to cut tunnel as the scope of freedom, back production goes out certain space, uses Hydraulic prop supporting reserves working space, uses the horizontal blasthole of pusher leg drill Drilling later, and drill effective length 2.2m, Per 3~5 row of separate explosion, after the distance of tier pitch-row top plate holding 0.3m~0.5m of top plate, stope mining, edge Filling counterfort is built by laying bricks or stones along nugget plagioclase, carry out tailing-filled after direction is moved towards per back production 15m~25m.
Description of the drawings
Fig. 1 is vertical view of the wall type allwork hydraulic column gib afterwards filling method in orebody mining.
Fig. 2 is front view of the wall type allwork hydraulic column gib afterwards filling method in orebody mining.
Fig. 3 is partial side view of the wall type allwork hydraulic column gib afterwards filling method in orebody mining.
In figure:People's row ventilating duct 1, slusher runner 2, scraper cave mouth 3, along the pulse haul road 4, massif 5, ore 6, obturation 7, fill Well filling 8, hydraulic column 10, blasthole 11, ore body 12, drop shaft 13, wears arteries and veins 14, top plate 15, stope 16 at filling counterfort 9.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig.1~3, in the embodiment of the present invention, wall type allwork hydraulic column gib afterwards filling method, including People's row ventilating duct 1, slusher runner 2, scraper cave mouth 3, along the pulse haul road 4, massif 5, ore 6, obturation 7, filling well 8, filling gear Wall 9, blasthole 11, ore body 12, drop shaft 13, wears arteries and veins 14, top plate 15 and stope 16, the middle section one of the massif 5 at hydraulic column 10 Side is equipped with obturation 7, and the middle section other side of massif 5 is ore body 12, and the ore body 12 can be divided into two types by thickness, and one Class is slight slope and thin ore body, and one kind is gently inclined medium thick orebody, is stope 16 between ore body 12 and massif 5, is fixed in stope 16 It is DW28 type monomer external poureds to have more hydraulic columns 10, the hydraulic column 10, and hydraulic column 10 is from three row of face timbering, array pitch 3- 2.5m, 1.5-1.0 meters of spacing, the obturation 7 are fixed with filling counterfort 9, the filling gear close to the side of hydraulic column 10 9 across pitch direction of wall builds one by laying bricks or stones per 15m~25m, and multiple blastholes 11, the front end of the blasthole 11 are further opened with inside ore body 12 Position is equipped with ore 6, and 12 front position of ore body is equipped with slusher runner 2, and side of the slusher runner 2 far from hydraulic column 10 is through connection Have and be equipped with drop shaft 13, the front end of drop shaft 13 is through haul road 4 along the pulse are connected with, and haul road 4 is set close to the side of ore body 12 along the pulse Arteries and veins 14 is worn, haul road 4 opens up someone's row ventilating duct 1 close to the upper end position for wearing arteries and veins 14 along the pulse, and the front end of the slusher runner 2 exists Through multiple scraper cave mouths 3 are connected on ore body 12, the back-end location of the massif 5 offers multiple filling wells 8, fills well 8 Through the interior location for having hollowed out ore body 12.
The stope 16 enters stope operation by level haulage tunnel inlet air, through people's row vent (-escape) raise and people's row connecting taxiway Face, waste air, which by stope other end people's row vent (-escape) raise is discharged into upper stage casing tailgate and enters ventilation shaft, drains into earth's surface, and stope uses JK58-2NO.4 type portable blowers carry out secondary ventilation.
The horizontal blasthole of pusher leg drill Drilling is used in 12 back production of the ore body, and drill effective length 2.2m, per separate explosion 3 ~5 rows keep the distance of 0.3m~0.5m close to the tier pitch-row top plate of top plate.
2# rock emulsion explosives, non-electric shock conducting tube detonator elementary errors sequence is used to detonate when 11 explosion of blasthole, minimum is supported Anti- line 1m, pitch-row 1m~1.2m, hole depth 2.2m are protected per 5 row of separate explosion with photoface exploision or Uncoincided charge Controlled blasting technique Card shield top layer.
The present invention operation principle be:Driving people's row ventilation The Taoist Priest Mountain first, the channel of stope is entered as personnel equipment, And as stope ventilation channel, then from the tunnels Chuan Mai specified location tunnel drop shaft, then tunnel cutting tunnel, scraper chamber with The propulsion of stope is tunneled, interval width 6m, and stope overdraught mouth is completed with back production to explosion when top, mine Body is whole from a side to other side strip-type, drawing back, and band is interior along the suitable inclination back production of nugget, is first certainly to cut tunnel By face, back production goes out certain space, with hydraulic prop supporting, reserves working space, uses pusher leg drill Drilling horizontal later Blasthole, drill effective length 2.2m, and per 3~5 row of separate explosion, the tier pitch-row top plate close to top plate keeps 0.3m~0.5m's Distance, after stope mining, across pitch direction per back production 15m~25m after along nugget plagioclase build filling counterfort by laying bricks or stones, carry out tailings Filling.
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc. With replacing, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this Within the protection domain of invention.

Claims (1)

1. wall type allwork hydraulic column gib afterwards filling method, method are as follows:
(1) stope structure parameter determines:
Stope nugget across pitch arranges, nugget length 50m, miding level height 40m, and 4m studdings, top-bottom pillar 3m are stayed between nugget.
(2) cutting journey is adopted:
Adopt cutting journey include the ventilation of people's row go up a hill, scraper chamber, drop shaft, cutting tunnel etc., tunnel the ventilation of people's row first and go up a hill, make Enter the channel of stope for personnel equipment, and as stope ventilation channel, then drop shaft is tunneled from the tunnels Chuan Mai specified location, then Driving cutting tunnel, scraper chamber tunneled with the propulsion of stope, interval width 6m, stope overdraught mouth with It back production to complete to explosion when top, the ventilation of people's row goes up a hill, cuts tunnel, scraper chamber is all made of photoface exploision and shot anchor net branch Shield, rock drilling use YT-28 types and YSP-45 type rock drills, working face to divulge information with JK58-2NO.4 type portable blower assistant reinforcements.
(3) mineral building back production:
Nugget is whole from a side to other side strip-type, drawing back, and band is interior along the suitable inclination back production of nugget.First to cut lane Road is the scope of freedom, and back production goes out certain space, with hydraulic prop supporting, reserves working space, uses pusher leg drill to bore later Dig horizontal blasthole, drill effective length 2.2m, per 3~5 row of separate explosion, close to the tier pitch-row top plate of top plate keep 0.3m~ The distance of 0.5m, explosion use 2# rock emulsion explosives, non-electric shock conducting tube detonator elementary errors sequence to detonate, minimum burden 1m, hole Away from 1m~1.2m, hole depth 2.2m, per five row of separate explosion, ensure shield top with Controlled blasting techniques such as photoface exploision, Uncoincided charges Layer after each stope falls mine, first uses 30kW scrapers that ore is transported to cutting tunnel from inclined cut by scraper tunnel In, then tunnel is cut using 30kW scrapers edge and is harrowed to drop shaft entrucking.
(4) roof control and supporting:
Reserved protection fore-set, foundation support nugget top plate;In order to recycle ore to greatest extent, pillar dimension is reduced, auxiliary is light-duty Hydraulic prop equipment (such as DW28 types monomer external poured hydraulic prop) roof supporting, specific support form is with arrangement according to live feelings Condition determines;Local crushing stress concentrated area, anchor net shield are pushed up, array pitch between hydraulic prop:According to ore and rock condition and combine other mines Mountain use experience fixes tentatively hydraulic prop from three row of face timbering, array pitch 3-2.5m, spacing 1.5-1.0m.
(5) stope ventilation:
Each stope enters stope work surface, waste air by level haulage tunnel inlet air through people's row vent (-escape) raise and people's row connecting taxiway Upper stage casing tailgate is discharged by stope other end people's row vent (-escape) raise enters ventilation shaft and drain into earth's surface, stope uses JK58- 2NO.4 type portable blowers carry out secondary ventilation.
(6) it fills:
After stope mining, filling counterfort is built by laying bricks or stones along nugget plagioclase after the every back production 15m~25m in across pitch direction, carry out tailings Filling.
(7) back production recycles:
Stoping operation cycle includes rock drilling, explosion, ventilation, ore removal, removes column, pillar, daily class Three's operation, daily yield 50t/ D~70t/d is filled after across pitch back production certain distance.
CN201810335503.2A 2018-04-16 2018-04-16 Wall type full-face extraction hydraulic column temporary support subsequent filling method Active CN108590747B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810335503.2A CN108590747B (en) 2018-04-16 2018-04-16 Wall type full-face extraction hydraulic column temporary support subsequent filling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810335503.2A CN108590747B (en) 2018-04-16 2018-04-16 Wall type full-face extraction hydraulic column temporary support subsequent filling method

Publications (2)

Publication Number Publication Date
CN108590747A true CN108590747A (en) 2018-09-28
CN108590747B CN108590747B (en) 2020-04-10

Family

ID=63622695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810335503.2A Active CN108590747B (en) 2018-04-16 2018-04-16 Wall type full-face extraction hydraulic column temporary support subsequent filling method

Country Status (1)

Country Link
CN (1) CN108590747B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505650A (en) * 2018-11-20 2019-03-22 贵州大学 A kind of filling-up hydraulically barricade of easy cleaning
CN109763452A (en) * 2019-01-17 2019-05-17 广西新港湾工程有限公司 A kind of broken reef construction method of underwater hydraulic column
CN110145307A (en) * 2019-06-13 2019-08-20 山东科技大学 Wide lane and flexible chamber wall prevention and treatment tight roof stay lane bump method
CN112160753A (en) * 2020-09-28 2021-01-01 牌洪坤 Roadway tunneling mining method taking gold-steel sand line cutting as premise
CN113137233A (en) * 2021-05-07 2021-07-20 文山麻栗坡紫金钨业集团有限公司 High-grade top protecting layer and ore pillar residual ore recovery method
CN114151086A (en) * 2021-11-29 2022-03-08 紫金(厦门)工程设计有限公司 Construction method for large-scale mining of bottom structure of thick and large broken ore body

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1383920A (en) * 1971-12-31 1974-02-12 Coal Industry Patents Ltd Apparatus for conveying broken rock material
CN104141495A (en) * 2014-07-25 2014-11-12 长沙有色冶金设计研究院有限公司 Filling mining method for gently inclined medium-thickness phosphate ore body
CN105626071A (en) * 2015-12-30 2016-06-01 北京矿冶研究总院 Mining method for gently inclined thin ore body
CN106121643A (en) * 2016-08-31 2016-11-16 湖北三鑫金铜股份有限公司 The reserved retaining wall ore deposit two step nesting combination method of mining by the way of filling

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1383920A (en) * 1971-12-31 1974-02-12 Coal Industry Patents Ltd Apparatus for conveying broken rock material
CN104141495A (en) * 2014-07-25 2014-11-12 长沙有色冶金设计研究院有限公司 Filling mining method for gently inclined medium-thickness phosphate ore body
CN105626071A (en) * 2015-12-30 2016-06-01 北京矿冶研究总院 Mining method for gently inclined thin ore body
CN106121643A (en) * 2016-08-31 2016-11-16 湖北三鑫金铜股份有限公司 The reserved retaining wall ore deposit two step nesting combination method of mining by the way of filling

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505650A (en) * 2018-11-20 2019-03-22 贵州大学 A kind of filling-up hydraulically barricade of easy cleaning
CN109505650B (en) * 2018-11-20 2020-06-16 贵州大学 Hydraulic filling retaining wall convenient to clean
CN109763452A (en) * 2019-01-17 2019-05-17 广西新港湾工程有限公司 A kind of broken reef construction method of underwater hydraulic column
CN110145307A (en) * 2019-06-13 2019-08-20 山东科技大学 Wide lane and flexible chamber wall prevention and treatment tight roof stay lane bump method
CN110145307B (en) * 2019-06-13 2020-12-18 山东科技大学 Method for preventing and treating hard roof roadway-retained rock burst by wide roadway and flexible chamber wall
CN112160753A (en) * 2020-09-28 2021-01-01 牌洪坤 Roadway tunneling mining method taking gold-steel sand line cutting as premise
CN113137233A (en) * 2021-05-07 2021-07-20 文山麻栗坡紫金钨业集团有限公司 High-grade top protecting layer and ore pillar residual ore recovery method
CN113137233B (en) * 2021-05-07 2023-03-17 文山麻栗坡紫金钨业集团有限公司 High-grade top protecting layer and pillar residual ore recovery method
CN114151086A (en) * 2021-11-29 2022-03-08 紫金(厦门)工程设计有限公司 Construction method for large-scale mining of bottom structure of thick and large broken ore body

Also Published As

Publication number Publication date
CN108590747B (en) 2020-04-10

Similar Documents

Publication Publication Date Title
CN108590747A (en) Wall type allwork hydraulic column gib afterwards filling method
CN105587318B (en) A kind of method of mining by the way of filling of the parallel middle thickness orebody group continuous stoping of low-angle dip
CN106761912B (en) It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods
CN101105129B (en) Mining environment reconstructed continuous mining afterwards filling mining method
CN108643911B (en) It is a kind of inclination or Steeply dipping narrow deposits boom-type roadheader fall mine success mining method
CN100535387C (en) Improved sublevel caving method without bottom column
CN106761756B (en) A kind of stope structure for Upward slicing all-tailing cemented filling method
CN108625856A (en) A kind of mining methods in the two neighboring one ore removal lane of stope of underground mine
CN107975373B (en) A kind of lower continuous digging hard-rock mine method of mechanization of liquid-gas phase transition induction
CN102182461A (en) Efficient mining method for thick metal ore body in slanting
CN103527200A (en) Sill-pillar-free sublevel rhombus room subsequent filling mining method
CN111894584B (en) Cemented filling mining method for fully-pseudo-arranged reserved roadway of slowly-inclined thin ore body
MX2012009756A (en) Underground mining.
CN112964144B (en) Soft rock railway tunnel blasting construction method in stress environment
CN111058847B (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
CN109653748A (en) A kind of thin mining methods with very thin ore body
CN106761745B (en) The outer sublevel open stope method of arteries and veins
CN105649635A (en) Method for tunneling coal bed repeated mining roadway in goaf
CN108049870B (en) The induction caving mining methods of high-dipping middle thickness orebody of the upper disk containing unstable rock stratum
CN109958438A (en) A kind of quick-fried power fortune mine barnyard mining methods of high sublevel
CN108625855A (en) Safe and efficient mining methods under a kind of obturation
CN106285731B (en) A kind of small courtyard radiant type of high Large chamber and the mixed construction method of step
CN107939402A (en) The mining methods of firm inclined thick ore body more than a kind of back production ore-rock is medium
CN105370280B (en) A kind of double-deck thin jade ore deposit nondestructive blasting mining methods of underground low-angle dip
CN105298493B (en) Underground low-angle dip lamelliform jade ore deposit nondestructive blasting mining methods

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant