CN108590747A - Wall type allwork hydraulic column gib afterwards filling method - Google Patents
Wall type allwork hydraulic column gib afterwards filling method Download PDFInfo
- Publication number
- CN108590747A CN108590747A CN201810335503.2A CN201810335503A CN108590747A CN 108590747 A CN108590747 A CN 108590747A CN 201810335503 A CN201810335503 A CN 201810335503A CN 108590747 A CN108590747 A CN 108590747A
- Authority
- CN
- China
- Prior art keywords
- stope
- row
- ventilation
- tunnel
- back production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/22—Methods of underground mining; Layouts therefor for ores, e.g. mining placers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/02—Supporting means, e.g. shuttering, for filling-up materials
- E21F15/04—Stowing mats; Goaf wire netting; Partition walls
Abstract
The invention discloses wall type allwork hydraulic column gib afterwards filling methods,The method can be economical,Safety,Efficient exploitation ore body,It ensure that the life safety of exploitation person well,Driving people's row ventilation The Taoist Priest Mountain first,Enter the channel of stope as personnel equipment,And as stope ventilation channel,Again drop shaft is tunneled from the tunnels Chuan Mai specified location,Cutting tunnel is tunneled again,Scraper chamber is tunneled with the propulsion of stope,Interval width 6m,Stope overdraught mouth is completed with back production to explosion when top,Ore body is whole from a side to other side strip-type,Drawing back,Along nugget along inclination back production in band,First to cut tunnel as the scope of freedom,Back production goes out certain space,With hydraulic prop supporting,Reserve working space,The horizontal blasthole of pusher leg drill Drilling is used later,The effective length that drills 2.2m,Per 3~5 row of separate explosion,The distance of 0.3m~0.5m is kept close to the tier pitch-row top plate of top plate.
Description
Technical field
The present invention relates to a kind of mining methods technical field, specifically wall type allwork hydraulic column gib is afterwards filled
Fill out method.
Background technology
Shuiyindong gold mine is located at the forts approximately EW Hui Jia anticline eastern section, is Xingren~Anlong gold of Yangtze paraplatform Margin of Southwest
Output region in " Carlin Trend " gold deposit on mine belt, Shuiyindong gold mine 1100m or more can adopt using ore amount 69.63 ×
104t, 6.72 × 10-6 of average grade, amount of metal 4679kg, 1100m~1000m can adopt using ore amount 445.56 ×
104t, 4.5 × 10-6 of average grade, amount of metal 20050kg, mineral deposit is based on magma bound type, is supplemented by breaking type compound in area
Blind deposit, in category-low temperature hot liquid " Carlin Trend " gold mine, ore body in stratiform, like stratiform, occurrence is consistent with the attitude of rocks, inclination angle
5 °~10 °, thickness is thin for tool, grade is rich, walk tool undulation upwards, incline eastwards not, the spy that spatially multiple ore bodies are overlapped up and down
Point, mining area are the part in the anticline geohydrologic unit of the forts Hui Jia, under natural endowment in area in water-bearing layer underground water supply
Including two aspects:First, vertrep, second is that the lateral runoff from upstream aqueous layer is fed, exposure stratum is essentially in area
Night youth organizes marl, the mud stone of first segment, and landform is based on hilly and mountainous land, and it is bad to ooze condition under Atmospheric precipitation, but on mining area,
Downstream water-bearing layer distribution area is big, therefore, the recharge laterally from upstream be area in the important Source Of Supply of underground water, water-bearing layer by
After supply, underground water outside horizontal runoff discharge area, becomes the supply source in downstream water-bearing layer, only superficial part underground water is in area from West to East
Interior cheuch is discharged earth's surface in the form of Junichiro Koizumi, and mature fault in area, the development in tectonic joint crack, rock stratum crack in layer destroys
The integrality of rock stratum becomes the channel of underground water water-filling, and exploitation, which causes water producing fractures also, can become the channel of underground water water-filling, water
The literary medium complexity of geological conditions, rock stratum is bedded rock in mining area, and based on clastic rock and Impure Carbonate Rocks, engineering
Matter type is sedimentogenic lamellar type, and according to the lithology of rock stratum, mechanics index of physics, ground can be divided into loose rock in area
Group, hard rock group and soft rockmass group three classes engineering geology rock group, ore body are in anticlinal nucleus, and the attitude of rocks is more gentle, in order to
Adapt to local geological conditions, it is necessary to propose that a kind of wall type allwork hydraulic column gib afterwards filling method carrys out quarry
Body.
Invention content
The purpose of the present invention is to provide wall type allwork hydraulic column gib afterwards filling methods, to solve the above-mentioned back of the body
The problem of being proposed in scape technology.
To achieve the above object, the present invention provides the following technical solutions:
Wall type allwork hydraulic column gib afterwards filling method, including people's row ventilating duct, slusher runner, scraper cave mouth,
Along the pulse haul road, massif, ore, obturation, filling well, filling counterfort, hydraulic column, blasthole, ore body, drop shaft, Chuan Mai, top plate and
The middle section side of stope, the massif is equipped with obturation, and the middle section other side of massif is ore body, the ore body and mountain
It is stope between body, is fixed with more hydraulic columns in stope, obturation is fixed with filling counterfort, mine close to the side of hydraulic column
Internal portion is further opened with multiple blastholes, and the front position of the blasthole is ore, and ore body front position is equipped with slusher runner, the electricity
Through being connected with equipped with drop shaft, the front end of drop shaft is transported along the pulse through haul road along the pulse is connected with for rake side of the road far from hydraulic column
Defeated road is equipped with close to the side of ore body and wears arteries and veins, and haul road opens up someone's row ventilating duct close to the upper end position for wearing arteries and veins along the pulse, described
Through multiple scraper cave mouths are connected on ore body, the back-end location of the massif offers multiple fillings for the front end of slusher runner
Well fills well through the interior location for having hollowed out ore body.
As a further solution of the present invention:The ore body can be divided into two types by thickness, and one kind is low-angle dip lean ore
Body, one kind are thick mine in low-angle dip.
As a further solution of the present invention:The hydraulic column is DW28 type monomer external poureds, and hydraulic column is from working face branch
Protect three rows, array pitch 3-2.5m, 1.5-1.0 meters of spacing.
As a further solution of the present invention:The stope is by level haulage tunnel inlet air, through people's row vent (-escape) raise and people
Row connecting taxiway enters stope work surface, and waste air is discharged into upper stage casing tailgate by stope other end people's row vent (-escape) raise and enters ventilation
Well drains into earth's surface, and stope carries out secondary ventilation using JK58-2NO.4 type portable blowers.
As a further solution of the present invention:One is built by laying bricks or stones per 15m~25m in filling counterfort across pitch direction.
As a further solution of the present invention:The horizontal blasthole of pusher leg drill Drilling, drilling are used in the ore body back production
Effective length 2.2m keeps the distance of 0.3m~0.5m close to the tier pitch-row top plate of top plate per 3~5 row of separate explosion.
As further scheme of the invention:2# rock emulsion explosives, nonel tube are used when the shot hole blasting
Detonator elementary errors sequence is detonated, minimum burden 1m, pitch-row 1m~1.2m, hole depth 2.2m, per 5 row of separate explosion, with photoface exploision or
Uncoincided charge Controlled blasting technique ensures shield top layer.
Compared with prior art, the beneficial effects of the invention are as follows:Reasonable design of the present invention uses wall type allwork hydraulic pressure
Column gib afterwards filling method can economic, safe and efficient exploitation ore body, ensure that the life peace of exploitation person well
Entirely, people's row ventilation The Taoist Priest Mountain is tunneled first, the channel of stope is entered as personnel equipment, and as stope ventilation channel, then from
The tunnels Chuan Mai specified location tunnels drop shaft, then tunnels cutting tunnel, and scraper chamber is dug with the propulsion of stope
Into, interval width 6m, stope overdraught mouth is completed with back production to explosion when top, and ore body is whole from a side to other side item
Belt, drawing back, band is interior along the suitable inclination back production of nugget, and first to cut tunnel as the scope of freedom, back production goes out certain space, uses
Hydraulic prop supporting reserves working space, uses the horizontal blasthole of pusher leg drill Drilling later, and drill effective length 2.2m,
Per 3~5 row of separate explosion, after the distance of tier pitch-row top plate holding 0.3m~0.5m of top plate, stope mining, edge
Filling counterfort is built by laying bricks or stones along nugget plagioclase, carry out tailing-filled after direction is moved towards per back production 15m~25m.
Description of the drawings
Fig. 1 is vertical view of the wall type allwork hydraulic column gib afterwards filling method in orebody mining.
Fig. 2 is front view of the wall type allwork hydraulic column gib afterwards filling method in orebody mining.
Fig. 3 is partial side view of the wall type allwork hydraulic column gib afterwards filling method in orebody mining.
In figure:People's row ventilating duct 1, slusher runner 2, scraper cave mouth 3, along the pulse haul road 4, massif 5, ore 6, obturation 7, fill
Well filling 8, hydraulic column 10, blasthole 11, ore body 12, drop shaft 13, wears arteries and veins 14, top plate 15, stope 16 at filling counterfort 9.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig.1~3, in the embodiment of the present invention, wall type allwork hydraulic column gib afterwards filling method, including
People's row ventilating duct 1, slusher runner 2, scraper cave mouth 3, along the pulse haul road 4, massif 5, ore 6, obturation 7, filling well 8, filling gear
Wall 9, blasthole 11, ore body 12, drop shaft 13, wears arteries and veins 14, top plate 15 and stope 16, the middle section one of the massif 5 at hydraulic column 10
Side is equipped with obturation 7, and the middle section other side of massif 5 is ore body 12, and the ore body 12 can be divided into two types by thickness, and one
Class is slight slope and thin ore body, and one kind is gently inclined medium thick orebody, is stope 16 between ore body 12 and massif 5, is fixed in stope 16
It is DW28 type monomer external poureds to have more hydraulic columns 10, the hydraulic column 10, and hydraulic column 10 is from three row of face timbering, array pitch 3-
2.5m, 1.5-1.0 meters of spacing, the obturation 7 are fixed with filling counterfort 9, the filling gear close to the side of hydraulic column 10
9 across pitch direction of wall builds one by laying bricks or stones per 15m~25m, and multiple blastholes 11, the front end of the blasthole 11 are further opened with inside ore body 12
Position is equipped with ore 6, and 12 front position of ore body is equipped with slusher runner 2, and side of the slusher runner 2 far from hydraulic column 10 is through connection
Have and be equipped with drop shaft 13, the front end of drop shaft 13 is through haul road 4 along the pulse are connected with, and haul road 4 is set close to the side of ore body 12 along the pulse
Arteries and veins 14 is worn, haul road 4 opens up someone's row ventilating duct 1 close to the upper end position for wearing arteries and veins 14 along the pulse, and the front end of the slusher runner 2 exists
Through multiple scraper cave mouths 3 are connected on ore body 12, the back-end location of the massif 5 offers multiple filling wells 8, fills well 8
Through the interior location for having hollowed out ore body 12.
The stope 16 enters stope operation by level haulage tunnel inlet air, through people's row vent (-escape) raise and people's row connecting taxiway
Face, waste air, which by stope other end people's row vent (-escape) raise is discharged into upper stage casing tailgate and enters ventilation shaft, drains into earth's surface, and stope uses
JK58-2NO.4 type portable blowers carry out secondary ventilation.
The horizontal blasthole of pusher leg drill Drilling is used in 12 back production of the ore body, and drill effective length 2.2m, per separate explosion 3
~5 rows keep the distance of 0.3m~0.5m close to the tier pitch-row top plate of top plate.
2# rock emulsion explosives, non-electric shock conducting tube detonator elementary errors sequence is used to detonate when 11 explosion of blasthole, minimum is supported
Anti- line 1m, pitch-row 1m~1.2m, hole depth 2.2m are protected per 5 row of separate explosion with photoface exploision or Uncoincided charge Controlled blasting technique
Card shield top layer.
The present invention operation principle be:Driving people's row ventilation The Taoist Priest Mountain first, the channel of stope is entered as personnel equipment,
And as stope ventilation channel, then from the tunnels Chuan Mai specified location tunnel drop shaft, then tunnel cutting tunnel, scraper chamber with
The propulsion of stope is tunneled, interval width 6m, and stope overdraught mouth is completed with back production to explosion when top, mine
Body is whole from a side to other side strip-type, drawing back, and band is interior along the suitable inclination back production of nugget, is first certainly to cut tunnel
By face, back production goes out certain space, with hydraulic prop supporting, reserves working space, uses pusher leg drill Drilling horizontal later
Blasthole, drill effective length 2.2m, and per 3~5 row of separate explosion, the tier pitch-row top plate close to top plate keeps 0.3m~0.5m's
Distance, after stope mining, across pitch direction per back production 15m~25m after along nugget plagioclase build filling counterfort by laying bricks or stones, carry out tailings
Filling.
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art,
It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc.
With replacing, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this
Within the protection domain of invention.
Claims (1)
1. wall type allwork hydraulic column gib afterwards filling method, method are as follows:
(1) stope structure parameter determines:
Stope nugget across pitch arranges, nugget length 50m, miding level height 40m, and 4m studdings, top-bottom pillar 3m are stayed between nugget.
(2) cutting journey is adopted:
Adopt cutting journey include the ventilation of people's row go up a hill, scraper chamber, drop shaft, cutting tunnel etc., tunnel the ventilation of people's row first and go up a hill, make
Enter the channel of stope for personnel equipment, and as stope ventilation channel, then drop shaft is tunneled from the tunnels Chuan Mai specified location, then
Driving cutting tunnel, scraper chamber tunneled with the propulsion of stope, interval width 6m, stope overdraught mouth with
It back production to complete to explosion when top, the ventilation of people's row goes up a hill, cuts tunnel, scraper chamber is all made of photoface exploision and shot anchor net branch
Shield, rock drilling use YT-28 types and YSP-45 type rock drills, working face to divulge information with JK58-2NO.4 type portable blower assistant reinforcements.
(3) mineral building back production:
Nugget is whole from a side to other side strip-type, drawing back, and band is interior along the suitable inclination back production of nugget.First to cut lane
Road is the scope of freedom, and back production goes out certain space, with hydraulic prop supporting, reserves working space, uses pusher leg drill to bore later
Dig horizontal blasthole, drill effective length 2.2m, per 3~5 row of separate explosion, close to the tier pitch-row top plate of top plate keep 0.3m~
The distance of 0.5m, explosion use 2# rock emulsion explosives, non-electric shock conducting tube detonator elementary errors sequence to detonate, minimum burden 1m, hole
Away from 1m~1.2m, hole depth 2.2m, per five row of separate explosion, ensure shield top with Controlled blasting techniques such as photoface exploision, Uncoincided charges
Layer after each stope falls mine, first uses 30kW scrapers that ore is transported to cutting tunnel from inclined cut by scraper tunnel
In, then tunnel is cut using 30kW scrapers edge and is harrowed to drop shaft entrucking.
(4) roof control and supporting:
Reserved protection fore-set, foundation support nugget top plate;In order to recycle ore to greatest extent, pillar dimension is reduced, auxiliary is light-duty
Hydraulic prop equipment (such as DW28 types monomer external poured hydraulic prop) roof supporting, specific support form is with arrangement according to live feelings
Condition determines;Local crushing stress concentrated area, anchor net shield are pushed up, array pitch between hydraulic prop:According to ore and rock condition and combine other mines
Mountain use experience fixes tentatively hydraulic prop from three row of face timbering, array pitch 3-2.5m, spacing 1.5-1.0m.
(5) stope ventilation:
Each stope enters stope work surface, waste air by level haulage tunnel inlet air through people's row vent (-escape) raise and people's row connecting taxiway
Upper stage casing tailgate is discharged by stope other end people's row vent (-escape) raise enters ventilation shaft and drain into earth's surface, stope uses JK58-
2NO.4 type portable blowers carry out secondary ventilation.
(6) it fills:
After stope mining, filling counterfort is built by laying bricks or stones along nugget plagioclase after the every back production 15m~25m in across pitch direction, carry out tailings
Filling.
(7) back production recycles:
Stoping operation cycle includes rock drilling, explosion, ventilation, ore removal, removes column, pillar, daily class Three's operation, daily yield 50t/
D~70t/d is filled after across pitch back production certain distance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810335503.2A CN108590747B (en) | 2018-04-16 | 2018-04-16 | Wall type full-face extraction hydraulic column temporary support subsequent filling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810335503.2A CN108590747B (en) | 2018-04-16 | 2018-04-16 | Wall type full-face extraction hydraulic column temporary support subsequent filling method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108590747A true CN108590747A (en) | 2018-09-28 |
CN108590747B CN108590747B (en) | 2020-04-10 |
Family
ID=63622695
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810335503.2A Active CN108590747B (en) | 2018-04-16 | 2018-04-16 | Wall type full-face extraction hydraulic column temporary support subsequent filling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108590747B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109505650A (en) * | 2018-11-20 | 2019-03-22 | 贵州大学 | A kind of filling-up hydraulically barricade of easy cleaning |
CN109763452A (en) * | 2019-01-17 | 2019-05-17 | 广西新港湾工程有限公司 | A kind of broken reef construction method of underwater hydraulic column |
CN110145307A (en) * | 2019-06-13 | 2019-08-20 | 山东科技大学 | Wide lane and flexible chamber wall prevention and treatment tight roof stay lane bump method |
CN112160753A (en) * | 2020-09-28 | 2021-01-01 | 牌洪坤 | Roadway tunneling mining method taking gold-steel sand line cutting as premise |
CN113137233A (en) * | 2021-05-07 | 2021-07-20 | 文山麻栗坡紫金钨业集团有限公司 | High-grade top protecting layer and ore pillar residual ore recovery method |
CN114151086A (en) * | 2021-11-29 | 2022-03-08 | 紫金(厦门)工程设计有限公司 | Construction method for large-scale mining of bottom structure of thick and large broken ore body |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1383920A (en) * | 1971-12-31 | 1974-02-12 | Coal Industry Patents Ltd | Apparatus for conveying broken rock material |
CN104141495A (en) * | 2014-07-25 | 2014-11-12 | 长沙有色冶金设计研究院有限公司 | Filling mining method for gently inclined medium-thickness phosphate ore body |
CN105626071A (en) * | 2015-12-30 | 2016-06-01 | 北京矿冶研究总院 | Mining method for gently inclined thin ore body |
CN106121643A (en) * | 2016-08-31 | 2016-11-16 | 湖北三鑫金铜股份有限公司 | The reserved retaining wall ore deposit two step nesting combination method of mining by the way of filling |
-
2018
- 2018-04-16 CN CN201810335503.2A patent/CN108590747B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1383920A (en) * | 1971-12-31 | 1974-02-12 | Coal Industry Patents Ltd | Apparatus for conveying broken rock material |
CN104141495A (en) * | 2014-07-25 | 2014-11-12 | 长沙有色冶金设计研究院有限公司 | Filling mining method for gently inclined medium-thickness phosphate ore body |
CN105626071A (en) * | 2015-12-30 | 2016-06-01 | 北京矿冶研究总院 | Mining method for gently inclined thin ore body |
CN106121643A (en) * | 2016-08-31 | 2016-11-16 | 湖北三鑫金铜股份有限公司 | The reserved retaining wall ore deposit two step nesting combination method of mining by the way of filling |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109505650A (en) * | 2018-11-20 | 2019-03-22 | 贵州大学 | A kind of filling-up hydraulically barricade of easy cleaning |
CN109505650B (en) * | 2018-11-20 | 2020-06-16 | 贵州大学 | Hydraulic filling retaining wall convenient to clean |
CN109763452A (en) * | 2019-01-17 | 2019-05-17 | 广西新港湾工程有限公司 | A kind of broken reef construction method of underwater hydraulic column |
CN110145307A (en) * | 2019-06-13 | 2019-08-20 | 山东科技大学 | Wide lane and flexible chamber wall prevention and treatment tight roof stay lane bump method |
CN110145307B (en) * | 2019-06-13 | 2020-12-18 | 山东科技大学 | Method for preventing and treating hard roof roadway-retained rock burst by wide roadway and flexible chamber wall |
CN112160753A (en) * | 2020-09-28 | 2021-01-01 | 牌洪坤 | Roadway tunneling mining method taking gold-steel sand line cutting as premise |
CN113137233A (en) * | 2021-05-07 | 2021-07-20 | 文山麻栗坡紫金钨业集团有限公司 | High-grade top protecting layer and ore pillar residual ore recovery method |
CN113137233B (en) * | 2021-05-07 | 2023-03-17 | 文山麻栗坡紫金钨业集团有限公司 | High-grade top protecting layer and pillar residual ore recovery method |
CN114151086A (en) * | 2021-11-29 | 2022-03-08 | 紫金(厦门)工程设计有限公司 | Construction method for large-scale mining of bottom structure of thick and large broken ore body |
Also Published As
Publication number | Publication date |
---|---|
CN108590747B (en) | 2020-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108590747A (en) | Wall type allwork hydraulic column gib afterwards filling method | |
CN105587318B (en) | A kind of method of mining by the way of filling of the parallel middle thickness orebody group continuous stoping of low-angle dip | |
CN106761912B (en) | It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods | |
CN101105129B (en) | Mining environment reconstructed continuous mining afterwards filling mining method | |
CN108643911B (en) | It is a kind of inclination or Steeply dipping narrow deposits boom-type roadheader fall mine success mining method | |
CN100535387C (en) | Improved sublevel caving method without bottom column | |
CN106761756B (en) | A kind of stope structure for Upward slicing all-tailing cemented filling method | |
CN108625856A (en) | A kind of mining methods in the two neighboring one ore removal lane of stope of underground mine | |
CN107975373B (en) | A kind of lower continuous digging hard-rock mine method of mechanization of liquid-gas phase transition induction | |
CN102182461A (en) | Efficient mining method for thick metal ore body in slanting | |
CN103527200A (en) | Sill-pillar-free sublevel rhombus room subsequent filling mining method | |
CN111894584B (en) | Cemented filling mining method for fully-pseudo-arranged reserved roadway of slowly-inclined thin ore body | |
MX2012009756A (en) | Underground mining. | |
CN112964144B (en) | Soft rock railway tunnel blasting construction method in stress environment | |
CN111058847B (en) | Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body | |
CN109653748A (en) | A kind of thin mining methods with very thin ore body | |
CN106761745B (en) | The outer sublevel open stope method of arteries and veins | |
CN105649635A (en) | Method for tunneling coal bed repeated mining roadway in goaf | |
CN108049870B (en) | The induction caving mining methods of high-dipping middle thickness orebody of the upper disk containing unstable rock stratum | |
CN109958438A (en) | A kind of quick-fried power fortune mine barnyard mining methods of high sublevel | |
CN108625855A (en) | Safe and efficient mining methods under a kind of obturation | |
CN106285731B (en) | A kind of small courtyard radiant type of high Large chamber and the mixed construction method of step | |
CN107939402A (en) | The mining methods of firm inclined thick ore body more than a kind of back production ore-rock is medium | |
CN105370280B (en) | A kind of double-deck thin jade ore deposit nondestructive blasting mining methods of underground low-angle dip | |
CN105298493B (en) | Underground low-angle dip lamelliform jade ore deposit nondestructive blasting mining methods |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |