CN108589740A - The water mill of artificial digging pile bores construction method - Google Patents

The water mill of artificial digging pile bores construction method Download PDF

Info

Publication number
CN108589740A
CN108589740A CN201810263684.2A CN201810263684A CN108589740A CN 108589740 A CN108589740 A CN 108589740A CN 201810263684 A CN201810263684 A CN 201810263684A CN 108589740 A CN108589740 A CN 108589740A
Authority
CN
China
Prior art keywords
pile foundation
drilling
water mill
depth
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810263684.2A
Other languages
Chinese (zh)
Inventor
梁强
彭平
陆均
王伟
倪燕华
夏星豪
韩孔玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Provincial Transportation Engineering Group Co Ltd
Original Assignee
Jiangsu Provincial Transportation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Provincial Transportation Engineering Group Co Ltd filed Critical Jiangsu Provincial Transportation Engineering Group Co Ltd
Priority to CN201810263684.2A priority Critical patent/CN108589740A/en
Publication of CN108589740A publication Critical patent/CN108589740A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling

Abstract

The invention belongs to bridge construction technical fields, are related to a kind of water mill brill construction method of the artificial digging pile for bridge pile foundation engineering.This approach includes the following steps:1)After determining pile foundation borehole position and diameter, it is carried out continuously bore operation along the circumferential edges of pile foundation hole with water mill brill, the depth each to drill is determined by drilling pipe length, and each drilling is tangent successively or intersects, and core is transported after drilling;2)Using the broken removal pile foundation hole central part of pneumatic pick, broken rock slag is transported, the borehole operation of one section of depth is completed;3)Step 1 is repeated several times)To step 2), the borehole operation of next section of depth is completed, until reaching the projected depth of pile foundation hole.The method boring procedure operation of the present invention flexibly, easy maintenance, construction safety, pollution it is small, while shaking and noise is small, in the region of unsuitable explosion, construction has prodigious advantage.

Description

The water mill of artificial digging pile bores construction method
Technical field
The invention belongs to bridge construction technical field, it is related to a kind of artificial digging pile for bridge pile foundation engineering Water mill bores construction method.
Background technology
At present in Bridges in Mountainous Areas pile foundation construction, manually digging hole enters behind rock stratum the side for generally using emulsion explosion Formula, but there are larger security risks for this method, and when close to resident house, the shock wave that explosion generates is easy to cause house Harm, it is unfavorable to the personal safety of resident, and it is serious to disturb residents.It is not easy to control for the aperture in hole simultaneously in explosion, it causes Aperture is excessive, the serious phenomenon of the super side of concrete.
Invention content
That the technical problem to be solved by the invention is to provide a kind of working securities is good, vibrations and noise are small, dust pollution Small, the construction high artificial digging pile of accurate size water mill bores construction method.
The water mill of the artificial digging pile of the present invention bores construction method:
Hoisting bracket is set on the aperture ground of pile foundation hole and lifting appliance is installed;
1)After determining pile foundation borehole position and diameter, it is carried out continuously bore operation along the circumferential edges of pile foundation hole 1 with water mill brill, often The depth of a drilling is determined that each drilling is tangent successively or intersects, and core is transported after drilling by drilling pipe length;
2)Using the broken removal pile foundation hole central part of pneumatic pick, broken rock slag is transported, the borehole for completing one section of depth is made Industry;
3)Step 1 is repeated several times)To step 2), the borehole operation of next section of depth is completed, until the design for reaching pile foundation hole is deep Degree.
Further, in above-mentioned steps, derrick 2 is set in the well head of pile foundation hole, and lifting appliance 3 is installed, passes through lifting Equipment handling drilling pipe, core and rock slag.
The drilling pipe length is 50-70cm, a diameter of 15-18cm.Preferred drilling pipe length is 60cm, a diameter of 16cm.
The present invention method boring procedure operation flexibly, easy maintenance, construction safety, pollution it is small, while shake and noise It is small, there is prodigious advantage in the region construction of unsuitable explosion.
Description of the drawings
Fig. 1 is the Construction State schematic diagram of the method for the present invention;
Fig. 2 is pile foundation hole bottom hole distribution schematic diagram.
Specific implementation mode
The method of the present invention is described further with reference to embodiment.
Embodiment:
The work progress of the embodiment of the present invention(Referring to Fig. 1):
1)After determining pile foundation borehole position and diameter, derrick is set in the well head of pile foundation hole, and lifting appliance is installed, is bored with water mill Circumferential edges along pile foundation hole are carried out continuously bore operation, and according to the specification of drilling pipe, the depth each to drill is 60cm, a diameter of 16cm, each drilling is tangent successively or intersects(Such as Fig. 2), fortune goes out core by lifting appliance after drilling;
2)Using the broken removal pile foundation hole central part of pneumatic pick, broken rock slag is transported by lifting appliance, completes one section The borehole operation of depth;
3)Step 1 is repeated several times)To step 2), the borehole operation of next section of depth is completed, until the design for reaching pile foundation hole is deep Degree.
Above-mentioned work progress is not necessarily to bursting work, will not cause to damage to neighbouring building construction, ensure that construction safety, Also reduce the influence to environment.

Claims (4)

1. a kind of water mill of artificial digging pile bores construction method, it is characterized in that:
1)After determining pile foundation borehole position and diameter, it is carried out continuously bore operation along the circumferential edges of pile foundation hole with water mill brill, often The depth of a drilling is determined that each drilling is tangent successively or intersects, and core is transported after drilling by drilling pipe length;
2)Using the broken removal pile foundation hole central part of pneumatic pick, broken rock slag is transported, the borehole for completing one section of depth is made Industry;
3)Step 1 is repeated several times)To step 2), the borehole operation of next section of depth is completed, until the design for reaching pile foundation hole is deep Degree.
2. the water mill of artificial digging pile according to claim 1 bores construction method, it is characterized in that:It is set in the well head of pile foundation hole Derrick is set, and lifting appliance is installed, passes through lifting appliance handling drilling pipe, core and rock slag.
3. the water mill of artificial digging pile according to claim 1 bores construction method, it is characterized in that:The drilling pipe length is 50-70cm, a diameter of 15-18cm.
4. the water mill of artificial digging pile according to claim 3 bores construction method, it is characterized in that:The drilling pipe length is 60cm, a diameter of 16cm.
CN201810263684.2A 2018-03-28 2018-03-28 The water mill of artificial digging pile bores construction method Pending CN108589740A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810263684.2A CN108589740A (en) 2018-03-28 2018-03-28 The water mill of artificial digging pile bores construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810263684.2A CN108589740A (en) 2018-03-28 2018-03-28 The water mill of artificial digging pile bores construction method

Publications (1)

Publication Number Publication Date
CN108589740A true CN108589740A (en) 2018-09-28

Family

ID=63624793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810263684.2A Pending CN108589740A (en) 2018-03-28 2018-03-28 The water mill of artificial digging pile bores construction method

Country Status (1)

Country Link
CN (1) CN108589740A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513038A (en) * 2019-08-27 2019-11-29 中铁六局集团有限公司 It closes on Business Line rock geology pile foundation water mill and bores construction
CN113482013A (en) * 2021-07-12 2021-10-08 中国水电建设集团十五工程局有限公司 Manual hole digging construction method for cast-in-place pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071683A (en) * 2011-02-15 2011-05-25 中交第四公路工程局有限公司 Water drill dug pile construction method
JP2017020327A (en) * 2015-05-28 2017-01-26 隆夫 中野 Cast-in-place pile method
CN106381868A (en) * 2016-09-06 2017-02-08 中交第航务工程局有限公司 Water abrasive drilling construction method for manual hole digging pile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071683A (en) * 2011-02-15 2011-05-25 中交第四公路工程局有限公司 Water drill dug pile construction method
JP2017020327A (en) * 2015-05-28 2017-01-26 隆夫 中野 Cast-in-place pile method
CN106381868A (en) * 2016-09-06 2017-02-08 中交第航务工程局有限公司 Water abrasive drilling construction method for manual hole digging pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513038A (en) * 2019-08-27 2019-11-29 中铁六局集团有限公司 It closes on Business Line rock geology pile foundation water mill and bores construction
CN113482013A (en) * 2021-07-12 2021-10-08 中国水电建设集团十五工程局有限公司 Manual hole digging construction method for cast-in-place pile

Similar Documents

Publication Publication Date Title
CN109026039A (en) Subway tunnel shield tunnels boulder deep hole blasting and pre-processes construction method
CN104005415B (en) The efficient forming construction method thereof of diaphram wall in light weathered granite
CN103835648B (en) One improves rock stratum performance mine shaft rising boring technique by surface grout injection
CN106014421B (en) A kind of limited rock tunnel excavation method of concussion of blasting
CN106194193A (en) The auxiliary excavation method of a kind of group hole, big cross section vertical shaft non-explosion large aperture
CN103046931A (en) Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode
CN106545007A (en) The method of pile in stratum of the bottom for hard rock stratum
CN108589740A (en) The water mill of artificial digging pile bores construction method
CN102912791A (en) Construction method of bored pile
CN103277037A (en) Pipe pile leading-hole construction method under boulder cluster geological condition
CN102661688A (en) Pile foundation control blasting excavation method of integral-plate rocky area
CN107091094A (en) Short inclined shaft pilot shaft excavation method in one kind
CN113882801A (en) Rotary drilling pile foundation construction method for soil and hard rock combined stratum
CN105887814A (en) Rotary excavating rock-embedded pedestal pile construction method
CN102409978B (en) Rotary drilling hole forming method by using multi-stage alloy pilot roller bit in complex stratum cast-in-place pile construction
CN103835647A (en) Method for drilling floating pebble bed
CN114278227B (en) Construction method of lower pile casing of cast-in-place pile
CN116181224A (en) Construction method of multi-layer oversized karst cave rock-socketed pile foundation in complex karst area
CN210507418U (en) Construction structure close to existing line bridge pile foundation
CN105401572A (en) Construction technique for environment-friendly cast-in-situ bored pile provided with wall protecting tube
CN110130321A (en) The processing method of rock in a kind of manual digging pile construction
CN108411919A (en) Pile bottom sediment cleaning method for rotary drilling mechanical hole-forming pile
CN212154699U (en) Prevent balanced atmospheric pressure system of rock burst
CN108729461A (en) For the constructing structure and construction method on aerial leakage stratum in deep hole impervious wall construction
CN204344048U (en) Foreign matter fisher in hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination