CN108561160A - 拱盖法大断面隧道二衬钢筋加固装置及加固方法 - Google Patents
拱盖法大断面隧道二衬钢筋加固装置及加固方法 Download PDFInfo
- Publication number
- CN108561160A CN108561160A CN201810509326.5A CN201810509326A CN108561160A CN 108561160 A CN108561160 A CN 108561160A CN 201810509326 A CN201810509326 A CN 201810509326A CN 108561160 A CN108561160 A CN 108561160A
- Authority
- CN
- China
- Prior art keywords
- skeleton
- reinforcing
- steel muscle
- lined steel
- large cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
Abstract
本发明公开了一种拱盖法大断面隧道二衬钢筋加固装置及加固方法,属于隧道施工技术领域。一种拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固装置,包括若干个沿拱部的纵向依次间隔布置的加固骨架,所述加固骨架为由工字钢加工成的弧形状,所述加固骨架的底部两端设置有折向弧形内侧的折边,所述加固骨架的两端的折边支撑在拱脚梁上,所述加固骨架之间通过连接钢筋焊接连接为一个整体。本发明可以对二衬钢筋进行有效支撑,并可以作为二衬钢筋的吊点,可以有效防止二衬钢筋下垂和防止施工完的二衬钢筋发生倾覆,可大大提高施工质量和提高施工安全性。
Description
技术领域
本发明涉及一种拱盖法施工的大断面隧道/暗挖地铁车站的二衬钢筋加固装置,及采用上述的加固装置的加固方法,属于隧道施工技术领域。
背景技术
采用拱盖法施工大断面隧道/暗挖地铁车站时,在拱部二衬钢筋安装时,由于拱部弧度扁平、跨度大,钢筋自重大,极易造成拱部钢筋下垂。而由于隧道初支已施工完成,钢筋安装按照设计尺寸施工,无法进行外放,在钢筋下垂后,无法控制钢筋的保护层,且二衬钢筋安装时无支撑点或吊点(拱盖法施工时因防水层的原因不能在拱部设置钢筋吊点),施工时由于外界扰动极容易造成施工完钢筋的发生倾覆,无法保证钢筋安装作业人员的安全。
发明内容
针对现有技术中存在的上述缺陷,本发明提供了一种可有效防止二衬钢筋下垂、倾覆、能够提高施工质量及施工安全性的拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固装置。
本发明是通过如下技术方案来实现的:一种拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固装置,其特征是:包括若干个沿拱部的纵向依次间隔布置的加固骨架,所述加固骨架为由工字钢加工成的弧形状,所述加固骨架的底部两端设置有折向弧形内侧的折边,所述加固骨架的两端的折边支撑在拱脚梁上,所述加固骨架之间通过连接钢筋焊接连接为一个整体。
本发明中的加固骨架可以对二衬钢筋进行有效支撑,防止二衬钢筋下垂,并且加固骨架还可以作为二衬钢筋的吊点,能够有效防止施工完的二衬钢筋发生倾覆。
进一步的,所述加固骨架为可拆卸连接结构,其是由多个骨架单元相连接组成,相邻的骨架单元之间通过设置在连接端的连接板采用螺栓连接在一起。加固骨架采用骨架单元可拆卸连接而成,既可以降低加工难度,同时可拆卸的结构可在现场进行组装,无须大型施工机械进场,便于在现场安装,可降低施工难度。
进一步的,优选所述骨架单元的长度为3m。
进一步的,为保证加固装置的整体强度,所述连接钢筋为Φ22钢筋。
本发明还提供了一种拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固方法,其采用的技术方案是:采用上述的加固装置进行施工,具体施工步骤是:
(1)采用结构计算软件进行模拟受力情况,计算分析出加固骨架所采用的工字钢的型号及加固骨架的布置间距;
(2)加工加固骨架;
(3)绑扎二衬钢筋的外层钢筋;
(4)根据步骤(1)中计算的加固骨架的布置间距,在二衬外层钢筋的内侧安装加固骨架,加固骨架的底部两端的折边分别支撑在拱部两侧的拱脚梁上,然后在加固骨架之间焊接连接钢筋,使加固骨架之间形成加固整体;
(5)在加固骨架内侧继续绑扎二衬剩余钢筋,并利用加固骨架作为二衬剩余钢筋的吊点,然后立模浇筑混凝土,加固骨架与二衬固结为一体。
本发明的有益效果是:本发明中加固骨架两端支撑在拱脚梁上,支撑稳定,与连接钢筋一起可形成稳定的整体;本发明中的加固骨架可以对二衬钢筋进行有效支撑,防止二衬钢筋下垂,并且加固骨架还可以作为二衬钢筋的吊点,能够有效防止施工完的二衬钢筋发生倾覆。采用本发明方法进行拱盖法大断面隧道/暗挖地铁车站施工,能够解决现有技术中拱部钢筋下垂导致无法控制钢筋保护层厚度及因钢筋安装时无支撑点或吊点极易造成钢筋倾覆的技术难题,其能大大提高施工质量,能够有效保证钢筋安装作业人员的安全。
附图说明
图1是本发明具体实施方式中的横断面示意图;
图2是本发明具体实施方式中的纵断面示意图;
图3是本发明具体实施方式中的骨架单元的主视示意图;
图4是本发明具体实施方式中的骨架单元的侧视示意图;
图中,1、加固骨架,11、折边,2、连接钢筋,3、拱脚梁,4、二衬,5、连接板,6、螺栓孔。
具体实施方式
下面通过非限定性的实施例并结合附图对本发明作进一步的说明:
如附图所示,一种拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固装置,其包括若干个沿拱部的纵向依次间隔布置的加固骨架1,所述加固骨架1为由工字钢加工成的弧形状,所述加固骨架1的底部两端设置有折向弧形内侧的折边11,所述加固骨架1的两端的折边11支撑在拱脚梁3上,所述加固骨架1之间通过连接钢筋2焊接连接为一个整体。
为便于加工及安装,所述加固骨架1为可拆卸连接结构,其是由多节弧状的骨架单元相连接组成,优选每节长度为3m,每节骨架单元的连接端焊接有连接板5,连接板5上设置有螺栓孔6,相邻的两节骨架单元之间通过连接板5采用螺栓连接在一起。
为保证加固装置的强度,所述连接钢筋2采用Φ22钢筋。
采用上述的加固装置进行拱盖法大断面隧道/暗挖地铁车站二衬钢筋施工时,具体施工步骤是:
(1)采用迈达斯等结构计算软件进行模拟受力情况,计算分析出加固骨架1所采用的工字钢的型号及加固骨架1的布置间距;
(2)加工加固骨架1;
(3)绑扎二衬钢筋的外层钢筋;
(4)根据步骤1中计算的加固骨架1的布置间距,在二衬外层钢筋的内侧安装加固骨架1,加固骨架1的底部两端的折边11分别支撑在拱部两侧的拱脚梁3上,然后在加固骨架1之间焊接连接钢筋2,使加固骨架1之间形成加固整体;
(5)在加固骨架1内侧继续绑扎二衬剩余钢筋,并利用加固骨架1作为二衬剩余钢筋的吊点,然后立模浇筑混凝土,加固骨架1与二衬固结为一体。
本发明中,加固骨架1两端支撑在拱脚梁上,支撑稳定,与连接钢筋一起可形成稳定的整体;加固骨架1在二衬外层钢筋的内侧,其在钢筋绑扎过程中可以对二衬外层钢筋形成支撑,当绑扎二衬剩余钢筋时,加固骨架可以作为二衬内侧钢筋的吊点,二衬内侧钢筋可通过吊筋等悬吊在加固骨架上。通过加固装置可有效防止二衬钢筋下垂,能够有效控制钢筋保护层厚度,提高施工质量,同时加固装置整体稳定,能够有效防止施工完的二衬钢筋在有外界扰动时发生倾覆,可有效提高施工安全性。
本发明可广泛应用在拱盖法施工的大断面隧道和暗挖地铁车站施工中,可大大提高施工质量,提高施工的安全性。
本实施例中的其他部分均为现有技术,在此不再赘述。
Claims (5)
1.一种拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固装置,其特征是:包括若干个沿拱部的纵向依次间隔布置的加固骨架(1),所述加固骨架(1)为由工字钢加工成的弧形状,所述加固骨架(1)的底部两端设置有折向弧形内侧的折边(11),所述加固骨架(1)的两端的折边(11)支撑在拱脚梁(3)上,所述加固骨架(1)之间通过连接钢筋(2)焊接连接为一个整体。
2.根据权利要求1所述的拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固装置,其特征是:所述加固骨架(1)为可拆卸连接结构,其是由多个骨架单元相连接组成,相邻的骨架单元之间通过设置在连接端的连接板(5)采用螺栓连接在一起。
3.根据权利要求2所述的拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固装置,其特征是:所述骨架单元的长度为3m。
4.根据权利要求1或2或3所述的拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固装置,其特征是:所述连接钢筋(2)为Φ22钢筋。
5.一种拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固方法,其特征是:采用如权利要求1-4任一所述的加固装置进行施工,具体施工步骤是:
(1)采用结构计算软件进行模拟受力情况,计算分析出加固骨架(1)所采用的工字钢的型号及加固骨架(1)的布置间距;
(2)加工加固骨架(1);
(3)绑扎二衬钢筋的外层钢筋;
(4)根据步骤(1)中计算的加固骨架(1)的布置间距,在二衬外层钢筋的内侧安装加固骨架(1),加固骨架(1)的底部两端的折边(11)分别支撑在拱部两侧的拱脚梁(3)上,然后在加固骨架(1)之间焊接连接钢筋(2),使加固骨架(1)之间形成加固整体;
(5)在加固骨架(1)内侧继续绑扎二衬剩余钢筋,并利用加固骨架作为二衬剩余钢筋的吊点,然后立模浇筑混凝土,加固骨架(1)与二衬固结为一体。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810509326.5A CN108561160A (zh) | 2018-05-24 | 2018-05-24 | 拱盖法大断面隧道二衬钢筋加固装置及加固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810509326.5A CN108561160A (zh) | 2018-05-24 | 2018-05-24 | 拱盖法大断面隧道二衬钢筋加固装置及加固方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108561160A true CN108561160A (zh) | 2018-09-21 |
Family
ID=63539739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810509326.5A Pending CN108561160A (zh) | 2018-05-24 | 2018-05-24 | 拱盖法大断面隧道二衬钢筋加固装置及加固方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108561160A (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102797481A (zh) * | 2012-08-13 | 2012-11-28 | 中铁一局集团有限公司 | 基于骨架梁的大跨度隧道拱部二次衬砌钢筋绑扎施工方法 |
CN202900288U (zh) * | 2012-10-31 | 2013-04-24 | 中建八局第三建设有限公司 | 一种隧道小半径段衬砌浇筑的型钢骨架组合结构 |
CN104061004A (zh) * | 2014-07-10 | 2014-09-24 | 招商局重庆交通科研设计院有限公司 | 隧道二次衬砌钢筋结构 |
CN204920990U (zh) * | 2015-09-01 | 2015-12-30 | 中铁十七局集团第三工程有限公司 | 一种隧道二衬钢筋定位卡具 |
CN105909280A (zh) * | 2016-06-13 | 2016-08-31 | 中铁五局集团有限公司 | 一种用于超大断面隧道拱墙衬砌钢筋定位加固的安装结构 |
JP2017089104A (ja) * | 2015-11-02 | 2017-05-25 | 株式会社奥村組 | トンネル覆工体の構築構造及び構築方法 |
CN206503605U (zh) * | 2017-02-20 | 2017-09-19 | 长安大学 | 隧道二次衬砌拱架单元及其所构成的拱架结构 |
CN108005689A (zh) * | 2018-01-17 | 2018-05-08 | 招商局重庆交通科研设计院有限公司 | 一种隧道衬砌病害的波纹钢板加固系统及施工方法 |
CN208294540U (zh) * | 2018-05-24 | 2018-12-28 | 中铁十局集团第一工程有限公司 | 拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固装置 |
-
2018
- 2018-05-24 CN CN201810509326.5A patent/CN108561160A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102797481A (zh) * | 2012-08-13 | 2012-11-28 | 中铁一局集团有限公司 | 基于骨架梁的大跨度隧道拱部二次衬砌钢筋绑扎施工方法 |
CN202900288U (zh) * | 2012-10-31 | 2013-04-24 | 中建八局第三建设有限公司 | 一种隧道小半径段衬砌浇筑的型钢骨架组合结构 |
CN104061004A (zh) * | 2014-07-10 | 2014-09-24 | 招商局重庆交通科研设计院有限公司 | 隧道二次衬砌钢筋结构 |
CN204920990U (zh) * | 2015-09-01 | 2015-12-30 | 中铁十七局集团第三工程有限公司 | 一种隧道二衬钢筋定位卡具 |
JP2017089104A (ja) * | 2015-11-02 | 2017-05-25 | 株式会社奥村組 | トンネル覆工体の構築構造及び構築方法 |
CN105909280A (zh) * | 2016-06-13 | 2016-08-31 | 中铁五局集团有限公司 | 一种用于超大断面隧道拱墙衬砌钢筋定位加固的安装结构 |
CN206503605U (zh) * | 2017-02-20 | 2017-09-19 | 长安大学 | 隧道二次衬砌拱架单元及其所构成的拱架结构 |
CN108005689A (zh) * | 2018-01-17 | 2018-05-08 | 招商局重庆交通科研设计院有限公司 | 一种隧道衬砌病害的波纹钢板加固系统及施工方法 |
CN208294540U (zh) * | 2018-05-24 | 2018-12-28 | 中铁十局集团第一工程有限公司 | 拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固装置 |
Non-Patent Citations (2)
Title |
---|
曲晓辉;: "大跨度隧道骨架梁施工工艺", 绿色环保建材, no. 02, pages 130 * |
李金会;杨德;汪仲琦;沈兴东;李念国;: "超大断面隧道二次衬砌施工技术", 施工技术, no. 2, pages 268 - 273 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110847156A (zh) | 一种适用于风井地下连续墙的钢筋笼及使用方法 | |
CN105350454B (zh) | 一种用于钢桁拱桥梁的钢拱肋外包混凝土施工方法 | |
CN102493360A (zh) | 钢筋混凝土拱桥施工方法 | |
CN108360380A (zh) | 一种桥梁墩柱施工作业平台及其施工方法 | |
CN102797481A (zh) | 基于骨架梁的大跨度隧道拱部二次衬砌钢筋绑扎施工方法 | |
CN107524284A (zh) | 一种定型化外挂架防护体系及安装方法 | |
CN105822329B (zh) | 一种支护架、支护结构及支护结构的施工方法 | |
CN208884362U (zh) | 一种连续梁施工托架 | |
CN205636474U (zh) | 一种装配式牛腿结构 | |
WO2020098394A1 (zh) | 沿空巷道约束混凝土支柱施工装备及机械化施工方法 | |
CN208294540U (zh) | 拱盖法大断面隧道/暗挖地铁车站二衬钢筋加固装置 | |
CN105781131B (zh) | 装配式建筑墙板安装支撑体系及其构建方法 | |
CN108222062A (zh) | 一种地下综合管廊钢筋骨架临时固定架及经纬绑扎方法 | |
CN105088971B (zh) | 一种波形钢腹板pc箱梁斜拉桥中跨合龙施工方法 | |
CN206784915U (zh) | 一种新型钢结构悬挂式楼面组合模板 | |
CN105926925A (zh) | 一种悬挂式脚手架的工字钢悬挑梁及施工方法 | |
CN108561160A (zh) | 拱盖法大断面隧道二衬钢筋加固装置及加固方法 | |
CN102733599A (zh) | 适用于型钢混凝土梁的扣件式钢管脚手架模板支架 | |
CN107882065B (zh) | 一种轨行区上方混凝土梁施工用操作平台及其搭设方法 | |
CN103061444B (zh) | 自承式异形外包钢-混凝土组合梁 | |
CN207332305U (zh) | 一种塔柱施工内爬架 | |
CN105484509A (zh) | 一种工具式安全平网及其实施方法 | |
CN205840052U (zh) | 一种装配式钢框架内填钢筋混凝土墙及其连接结构 | |
CN108930406A (zh) | 基于整体拼装大模板狭窄空间墙体施工方法 | |
CN205135656U (zh) | 组合式多用途二衬台车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |