CN108547434A - The quick mopping device of metope - Google Patents

The quick mopping device of metope Download PDF

Info

Publication number
CN108547434A
CN108547434A CN201810234884.5A CN201810234884A CN108547434A CN 108547434 A CN108547434 A CN 108547434A CN 201810234884 A CN201810234884 A CN 201810234884A CN 108547434 A CN108547434 A CN 108547434A
Authority
CN
China
Prior art keywords
sprocket wheel
fixedly mounted
gear
helical gear
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810234884.5A
Other languages
Chinese (zh)
Other versions
CN108547434B (en
Inventor
林敏�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Minjiang University
Original Assignee
Minjiang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Minjiang University filed Critical Minjiang University
Priority to CN201810234884.5A priority Critical patent/CN108547434B/en
Publication of CN108547434A publication Critical patent/CN108547434A/en
Application granted granted Critical
Publication of CN108547434B publication Critical patent/CN108547434B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cleaning Implements For Floors, Carpets, Furniture, Walls, And The Like (AREA)
  • Spray Control Apparatus (AREA)

Abstract

The quick mopping device of metope, including pedestal, cavity is opened up in pedestal, the horizontal first gear of cavity top end inner wall activity installation, the both sides of first gear are respectively equipped with horizontal second gear, the rotary shaft top of second gear is flexibly connected with the top inner wall of cavity, first gear engages cooperation with second gear, the first horizontal sprocket wheel is fixedly mounted in the rotary shaft bottom end of first gear, horizontal support plate is fixedly mounted in the rear portion bottom end of pedestal, motor is fixedly mounted in the middle part of support plate top surface, the second horizontal sprocket wheel is fixedly mounted in the rotary shaft top of motor.Rotation axis passes through the second through-hole, rotation axis is mutually perpendicular to fixed link, strip plate is set to be rotated, and it can also be moved horizontally, and then can make roller be in vertical state or roller be in horizontality and upward when carry out mopping operation, and roller be in horizontality and downward when, glue painting and operate, make to be again filled with paint on roller, then carries out mopping operation.

Description

The quick mopping device of metope
Technical field
The invention belongs to metope mopping device field, specifically a kind of quick mopping device of metope.
Background technology
Currently, in carrying out mopping operation to metope, usually artificial mopping operation, the side operated using artificial mopping Formula, labor intensity is big, and paint can also adhere on clothes, it is difficult to clean, and paint can also cause damages to painting personnel, influence to paint The health of personnel, to more inconvenient in use.
Invention content
The present invention provides a kind of quick mopping device of metope, to solve defect in the prior art.
The present invention is achieved by the following technical programs:
The quick mopping device of metope, including pedestal open up cavity, the first horizontal tooth of cavity top end inner wall activity installation in pedestal Wheel, the both sides of first gear are respectively equipped with horizontal second gear, the rotary shaft top of second gear and the top inner wall of cavity Flexible connection, first gear engage cooperation with second gear, and the first horizontal chain is fixedly mounted in the rotary shaft bottom end of first gear Horizontal support plate is fixedly mounted in the rear portion bottom end of wheel, pedestal, and motor, the rotary shaft of motor is fixedly mounted in the middle part of support plate top surface The second horizontal sprocket wheel is fixedly mounted in top, is flexibly connected by the first chain between the first sprocket wheel and the second sprocket wheel, the first chain Item can pass through pedestal, and the rotary shaft bottom end of each second gear is fixedly mounted the first horizontal helical gear, in cavity rear and front end Two shafts are installed by bearing activity respectively between wall, two shafts are located at the both sides of cavity, and every shaft middle part is solid Dingan County fills vertical third sprocket wheel, and the second vertical helical gear is fixedly mounted in every shaft, and the second helical gear is located at third chain The bottom part down both sides at the rear of wheel, pedestal are respectively equipped with one group of roller group, and every group of roller group is by two idler wheels, first company Spindle, two wheel carriers form, and two idler wheels in every group of roller group are fixedly mounted in the first connecting shaft, in every group of roller group Two idler wheels are located at the rear and front end of the first connecting shaft, the first connecting shaft in every group of roller group be located at two wheel carriers it Between, the rear and front end of the first connecting shaft is flexibly connected with the bottom end of wheel carrier respectively, and the top of wheel carrier and the bottom surface of pedestal are fixed and connected It connects, the 4th vertical sprocket wheel is fixedly mounted in the middle part of every first connecting shaft, is located at the third sprocket wheel and the 4th of pedestal the same side Sprocket wheel is flexibly connected by second chain, and the second chain can pass through pedestal, the rotary shaft top of the second sprocket wheel to be fixedly mounted Scissors mechanism is hingedly installed in the top surface of vertical multistage retractable rod, pedestal, and horizontal connection is hingedly installed on the top of scissors mechanism Plate, the top surface both sides of connecting plate are fixedly mounted starting stave respectively, and the top surface rear end of connecting plate is fixedly mounted the second riser, and second Riser is mutually perpendicular to starting stave, and starting stave is fixedly connected with the second riser, part in the opposite face of two pieces of starting staves Vertical disk is not fixedly mounted in the 5th vertical sprocket wheel of activity installation, the rotary shaft opposite end of two the 5th sprocket wheels respectively, the Five sprocket wheels are located at the front end of starting stave, and the 6th sprocket wheel, the 6th sprocket wheel position are installed in activity to the opposite face of two pieces of starting staves respectively Third helical gear is fixedly mounted respectively in the opposite end at the rear of the 5th sprocket wheel, two the 6th sprocket wheel rotary shafts, is located at same It is flexibly connected by third chain between the 5th sprocket wheel and the 6th sprocket wheel on starting stave, passes through two water between two disks Flat guide rod is fixedly connected, and two guide rods are symmetrical with the center of circle of disk, is coordinated on every guide rod and is equipped with guide sleeve, It is fixedly connected by strip plate between two guide sleeves, fixed installation is horizontal respectively first stretches for upper and lower ends before long strip block Contracting bar is flexibly connected by vertical roller between two first telescopic rod front ends, strip plate middle part fixed installation below two Block fixed block is flexibly connected by horizontal rotation axis between two pieces of fixed blocks, both sides activity peace respectively before the second riser The 7th sprocket wheel is filled, is flexibly connected by the 4th chain between two the 7th sprocket wheels, cross is opened up before each 7th sprocket wheel The 8th sprocket wheel is installed in the forward, central part activity of type slot, the second riser, and the 8th sprocket wheel rotary shaft is located at the 7th sprocket wheel rotary shaft In same level, the 8th sprocket wheel can engage cooperation with the 4th chain, and level is fixedly mounted in the rotary shaft front end of the 8th sprocket wheel Horizontal horizon bar is fixedly mounted in second telescopic rod, the second telescopic rod front end, and peace is fixed in the rotary shaft front end of each 7th sprocket wheel The second horizontal connecting shaft is filled, the front both sides of horizon bar open up first through hole respectively, and every second connecting shaft, which can pass through, to be corresponded to A first through hole, the back both sides of horizon bar the 4th helical gear of activity installation respectively, the second connecting shaft can pass through the 4th tiltedly Cross inserted block is fixedly mounted in gear, each 4th helical gear rear end, and cross inserted block can be inserted into cross slot, often A 4th helical gear can be engaged with a corresponding third helical gear to be coordinated, and horizontal fixed link is fixedly connected on the 4th chain The side of one end, the fixed link other end opens up the second through-hole, and rotation axis can pass through the second through-hole, rotation axis mutually to hang down with fixed link Directly, the rotation shaft rear end of the 8th sprocket wheel can pass through the second riser, the rotation shaft rear end of the 8th sprocket wheel that the 5th helical gear is fixedly mounted, 5th helical gear is located at the rear of the second riser, and multistage retractable rod top is fixedly mounted the 6th helical gear, and the 6th helical gear can be with The engagement cooperation of 5th helical gear, connection plate top surface are fixedly mounted open-topped dress and paint case.
The quick mopping device of metope as described above, the rear end of the connecting plate and the rear end of pedestal are respectively fixed to pacify Link block is filled, ball bearing is fixedly mounted in the rear end of every piece of link block, and multistage retractable rod can pass through ball bearing.
The quick mopping device of metope as described above, passes through fixed link between described two first telescopic rods and fixes and connect It connects.
Push rod is fixedly mounted in the side of the quick mopping device of metope as described above, the pedestal.
It is an advantage of the invention that:Pedestal is moved into front of a face interior wall, cavity top end inner wall activity installation first Gear, second gear, first gear engage cooperation with second gear, and the first sprocket wheel is fixedly mounted in first gear rotary shaft bottom end, Support plate is fixedly mounted in base rear portion bottom end, and support plate top surface installs motor, and the second chain is fixedly mounted in the rotary shaft top of motor Wheel, is flexibly connected between the first sprocket wheel and the second sprocket wheel by the first chain, and motor work makes the second sprocket wheel rotate, and then drives First sprocket wheel rotates, and synchronous drive first gear, second gear rotate, and the first helical teeth is installed in second gear rotary shaft bottom end Wheel, chamber body activity install two shafts, third sprocket wheel, the second helical gear, the first helical gear and second are installed in every shaft Helical gear engagement cooperation, energy band turn shaft rotation is dynamic, and the 4th sprocket wheel on third sprocket wheel and the first connecting shaft is connected by the second chain It connects, and then the first connecting shaft can be driven to rotate, and roller is driven to rotate, to make pedestal be moved, the rotation of the second sprocket wheel Vertical multistage retractable rod is fixedly mounted in axis top, and the 6th helical gear is fixedly mounted in multistage retractable rod top, and base top surface is hinged Scissors mechanism is installed, connecting plate is hingedly installed on scissors mechanism top, connection plate top surface installation starting stave, the second riser, and first Riser is mutually perpendicular to the second riser, and the 8th sprocket wheel, the rotation shaft rear end of the 8th sprocket wheel are installed in the second riser forward, central part activity The 5th helical gear is fixedly mounted, the 5th helical gear engages cooperation with the 6th helical gear, and the second sprocket wheel rotational energy drives multi-stage expansion Bar carries out rotation, and by the 5th helical gear with the 6th it is helical gear engage cooperation, the 8th sprocket wheel of synchronous drive rotates, and second erects The 7th sprocket wheel of activity installation, two the 7th sprocket wheels are connected by the 4th chain respectively for both sides before plate, the 8th sprocket wheel and the 4th chain Item engagement cooperation, and then the 8th sprocket wheel rotational energy drives two the 7th sprocket wheels, the rotation of the 4th chain, is fixedly connected on the 4th chain The other end side of one end of fixed link, fixed link opens up first through hole, and the opposite face of two pieces of starting staves respectively pacify by activity The 5th sprocket wheel is filled, the rotary shaft opposite end of two the 5th sprocket wheels is respectively fixedly mounted disk, passes through two between two disks Guide rod is fixedly connected, and cooperation is equipped with guide sleeve on every guide rod, and is fixedly connected by strip plate between two guide sleeves, Two pieces of fixed blocks to be installed behind strip plate, are flexibly connected by rotation axis between two pieces of fixed blocks, rotation axis passes through first through hole, Rotation axis is mutually perpendicular to fixed link, and then the 4th chain can drive fixed link to move, and strip plate is driven to be moved along guide rod, Lower two first telescopic rods are installed before strip plate, are connected by roller between two first telescopic rod front ends, and then strip The reciprocating movement of plate can drive the reciprocating movement of roller, mopping operation be carried out to metope, while movement along metope to pedestal Roller carries out mopping operation to metope;After paint on roller is reduced, the second telescopic rod of the 8th sprocket wheel rotary shaft front end is shunk, the Horizon bar is fixedly mounted in two telescopic rod front ends, and horizon bar front both sides open up first through hole, each 7th sprocket wheel rotary shaft respectively Second connecting shaft of front end can pass through first through hole, and the 4th helical gear is installed in activity respectively for horizon bar back both sides, and second connects Spindle can pass through the 4th helical gear, the 4th helical gear rear end to install cross inserted block, and the front end of each 7th sprocket wheel opens up cross Type slot, the second telescopic rod, which is shunk, drives the 4th helical gear to be moved to the 7th sprocket wheel direction, and cross inserted block is made to be inserted into cross In type slot, the 7th sprocket wheel rotational energy drives the rotation of the 4th helical gear, and the 4th helical gear engages cooperation with third helical gear at this time, Third helical gear is installed in the rotary shaft of the 6th sprocket wheel, is connected by third chain between the 6th sprocket wheel and the 5th sprocket wheel, into And the 4th helical gear rotational energy drives the 5th sprocket wheel to rotate and drive disc rotary, makes roller downward, and the first telescopic rod Stretching, extension makes roller stretch in dress paint case and carries out gluing paint again, and then inverted repeat above-mentioned steps, make roller be again at vertically State then proceedes to carry out mopping operation to metope.The present invention can drive movement and the roller of pedestal by motor It is mobile, and then in mopping operation without human intervention, labor intensity is reduced, also avoid paint from adhering on clothes, while Harm of the paint to personnel during painting is reduced, and reduces power plant, saves energy consumption, and drum turning court When to roof, can also mopping operation be carried out to roof, ascend a height and paint by other ancillary equipments without personnel, reduce Danger improves safety.Height adjusting can be carried out to connecting plate by scissors mechanism, and then can carry out powder to entire metope Brush.Rotation axis passes through the second through-hole, rotation axis to be mutually perpendicular to fixed link, so that strip plate is rotated, and can also carry out water Translation is dynamic, so can make roller be in vertical state or roller be in horizontality and upward when progress mopping operation, and Roller be in horizontality and downward when, carry out viscous paint operation, make to be again filled with paint on roller, then progress mopping behaviour Make.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair Some bright embodiments for those of ordinary skill in the art without having to pay creative labor, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is the structural schematic diagram of the present invention;Fig. 2 is the left view of Fig. 1;Fig. 3 is the direction view of the A of Fig. 1;Fig. 4 is Fig. 1 B direction view;Fig. 5 is the direction view of the C of Fig. 1;Fig. 6 is the direction view of the D of Fig. 1.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art The every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
The quick mopping device of metope opens up cavity 2 as shown, including pedestal 1 in pedestal 1,2 top inner wall of cavity is lived The horizontal first gear 3 of dynamic installation, the both sides of first gear 3 are respectively equipped with horizontal second gear 4, the rotation of second gear 4 Axis top is flexibly connected with the top inner wall of cavity 2, and first gear 3 engages cooperation, the rotation of first gear 3 with second gear 4 The first horizontal sprocket wheel 5 is fixedly mounted in axis bottom end, and horizontal support plate 6 is fixedly mounted in the rear portion bottom end of pedestal 1, and support plate 6 is pushed up Motor 7 is fixedly mounted in Middle face, and the second horizontal sprocket wheel 8, the first sprocket wheel 5 and second is fixedly mounted in the rotary shaft top of motor 7 It is flexibly connected by the first chain 9 between sprocket wheel 8, the first chain 9 can pass through pedestal 1,3 rotary shaft bottom end of first gear install the One sprocket wheel 5 is connected by the first chain 9 between second sprocket wheel 8 on 7 rotary shaft top of the first sprocket wheel 5 and motor, and first gear 3 engage cooperation with second gear 4, and 8 rotational energy of the second sprocket wheel drives the rotation of the first sprocket wheel 5, and first gear 3 is driven to rotate, and 3 rotational energy of first gear drive second gear 4 rotate each second gear 4 rotary shaft bottom end fixed installation it is horizontal first tiltedly Gear 10, installs two shafts 11 between 2 rear and front end inner wall of cavity by bearing activity respectively, and two shafts 11 are located at The both sides of cavity 2, every 11 middle part of shaft are fixedly mounted vertical third sprocket wheel 12, are fixedly mounted vertically in every shaft 11 Second helical gear 13, the second helical gear 13 are located at the rear of third sprocket wheel 12, and the bottom part down both sides of pedestal 1 are respectively equipped with one group Roller group 15, every group of roller group 15 are made of two idler wheels, 151, first connecting shafts, 152, two wheel carriers 153, every group of idler wheel Two idler wheels 151 in group 15 are fixedly mounted in the first connecting shaft 152, two idler wheels 151 difference in every group of roller group 15 The first connecting shaft 152 in the rear and front end of the first connecting shaft 152, every group of roller group 15 is located between two wheel carriers 153, The rear and front end of first connecting shaft 152 is flexibly connected with the bottom end of wheel carrier 153 respectively, the bottom surface on the top and pedestal 1 of wheel carrier 153 It is fixedly connected, the 4th vertical sprocket wheel 16 is fixedly mounted in the middle part of every first connecting shaft 152, is located at the of 1 the same side of pedestal Three sprocket wheels 13 are flexibly connected with the 4th sprocket wheel 16 by one article of second chain 17, and the second chain 17 can pass through pedestal 1, second gear The first helical gear 10 is installed in 4 rotary shaft bottom ends, and the first helical gear 10 engages cooperation with the second helical gear 13 in shaft 11, every Third sprocket wheel 12 is installed in shaft 11, and the 4th sprocket wheel 16 on third sprocket wheel 12 and the first connecting shaft 152 passes through the second chain 17 connections, second gear 4 drive the rotation of the first helical gear 10, and then drive the rotation of the second helical gear 13, and make the first connecting shaft 152 rotations, the first connecting shaft 152 are connect with idler wheel 151, and idler wheel 151 is made to rotate, and pedestal 1 is driven to carry out mobile second sprocket wheel 8 Rotary shaft top vertical multistage retractable rod 18 is fixedly mounted, scissors mechanism 19, scissors mechanism are hingedly installed in the top surface of pedestal 1 Horizontal connecting plate 20 is hingedly installed on 19 top, the lifting of connecting plate 20 can be controlled by scissors mechanism 19, to connecting plate 20 height is adjusted, and multistage retractable rod 18 can carry out the top surface both sides of contractile motion connecting plate 20 with the lifting of connecting plate 20 Starting stave 21 is fixedly mounted respectively, the second riser 22, the second riser 22 and first is fixedly mounted in the top surface rear end of connecting plate 20 Riser 21 is mutually perpendicular to, and starting stave 21 is fixedly connected with the second riser 22, in the middle part of the opposite face of two pieces of starting staves 21 respectively The 5th vertical sprocket wheel 23 of activity installation, vertical disk is fixedly mounted in the rotary shaft opposite end of two the 5th sprocket wheels 23 respectively 24, the 5th sprocket wheel 23 is located at the front end of starting stave 21, and the 6th sprocket wheel is installed in activity to the opposite face of two pieces of starting staves 21 respectively 25, the 6th sprocket wheel 25 is located at the rear of the 5th sprocket wheel 23, and the opposite end of two 25 rotary shafts of the 6th sprocket wheel is fixedly mounted respectively Three helical gears 40 are located between the 5th sprocket wheel 23 and the 6th sprocket wheel 25 on same starting stave 21 and are lived by third chain 26 It is dynamic to connect, it is connected by third chain 26 between the 5th sprocket wheel 23 and the 6th sprocket wheel 25 on same starting stave 21, two Disk 24 is installed in the rotary shaft opposite end of 5th sprocket wheel 23 respectively, and 25 rotational energy of the 6th sprocket wheel drives the rotation of the 5th sprocket wheel 23, into And disk 24 is made to carry out rotation, it is fixedly connected by two horizontal guide rods 27 between two disks 24, two guide rods 27 It is symmetrical with the center of circle of disk 24, coordinate on every guide rod 27 and be equipped with guide sleeve 28, passes through length between two guide sleeves 28 Batten 29 is fixedly connected, and upper and lower ends are fixedly mounted the first horizontal telescopic rod 30 respectively before long strip block 29, two first It is flexibly connected by vertical roller 31 between 30 front end of telescopic rod, cooperation is equipped with guide sleeve 28, guiding on every guide rod 27 Bar 27 passes through guide sleeve 28, is connected by strip plate 29 between two guide sleeves 28,29 front upper and lower ends of strip plate are pacified respectively The first telescopic rod 30 is filled, is connected by roller 31 between two 30 front ends of the first telescopic rod, strip plate can be made by guide sleeve 28 29 move back and forth along guide rod 27, and then roller 31 is driven to move back and forth, and two pieces of middle part fixed installation is solid behind strip plate 29 Determine block 32, is flexibly connected by horizontal rotation axis 33 between two pieces of fixed blocks 32, both sides are lived respectively before the second riser 22 It is dynamic that 7th sprocket wheel 34 is installed, it is flexibly connected by the 4th chain 35 between two the 7th sprocket wheels 34, before each 7th sprocket wheel 34 Face opens up cross slot 36, and the 8th sprocket wheel 37,37 rotary shaft of the 8th sprocket wheel are installed in the forward, central part activity of the second riser 22 It is located in same level with 34 rotary shaft of the 7th sprocket wheel, the 8th sprocket wheel 37 can engage cooperation, the 8th sprocket wheel with the 4th chain 35 The second horizontal telescopic rod 38 is fixedly mounted in 37 rotary shaft front end, and horizontal horizon bar is fixedly mounted in 38 front end of the second telescopic rod 52, the second horizontal connecting shaft 39, the front both sides point of horizon bar 52 are fixedly mounted in the rotary shaft front end of each 7th sprocket wheel 34 First through hole 44 is not opened up, and every second connecting shaft 39 can pass through a corresponding first through hole 44, the back two of horizon bar 52 The 4th helical gear 41 of activity installation, the second connecting shaft 39 can pass through the 4th helical gear 41 respectively for side, each 4th helical gear 41 Cross inserted block 42 is fixedly mounted in rear end, and cross inserted block 42 can be inserted into cross slot 36, each 4th helical gear 41 It can engage and coordinate with a corresponding third helical gear 40, when the second telescopic rod 52 is in extended configuration, the 4th helical gear 41 In the front end of the second connecting shaft 39, cross inserted block 42 is far from cross slot 36, and the 4th helical gear 41 is far from the 4th helical gear 40, so that roller 31 is in vertical state and carries out mopping operation;Second telescopic rod 52 is shunk, and the 4th helical gear 41 is pushed to move back Dynamic, cross inserted block 42 is inserted into cross slot 36, makes the 7th sprocket wheel 34 that the 4th helical gear 41 be driven to be rotated, simultaneously 4th helical gear 41 engages cooperation with third helical gear 40, and drives the rotation of the 6th sprocket wheel 25, and then disk 24 is made to rotate, roller 31 gradually turn down to horizontality, while the first telescopic rod 30 stretches, and so that roller 31 is entered in dress paint case 48 and carry out gluing paint then It is turned down again to vertical state and carries out mopping operation, one end of horizontal fixed link 43 is fixedly connected on the 4th chain 35, Gu The side of 43 other end of fixed pole opens up the second through-hole 45, and rotation axis 33 can pass through the second through-hole 45, rotation axis 33 and fixed link 43 It is mutually perpendicular to, one end of fixed link 43 is connect with the 4th chain 35, and 43 other end side of fixed link opens up the second through-hole 45, and turns Moving axis 33 passes through the second through-hole 45, and then strip plate 29 can be made turn down up and down, while strip plate 29 simultaneously can also be pushed to carry out Left and right moves back and forth, and the rotation shaft rear end of the 8th sprocket wheel 37 can pass through the second riser 22, the rotation shaft rear end of the 8th sprocket wheel 37 solid Dingan County fills the 5th helical gear 46, and the 5th helical gear is located at the rear of the second riser 22, and 18 top of multistage retractable rod is fixedly mounted the Six helical gears 47, the 6th helical gear 47 can engage cooperation with the 5th helical gear 46, and the 6th helical gear 47 is nibbled with the 5th helical gear 46 Cooperation is closed, multistage retractable rod 18 is connect with the 6th helical gear 47, the second sprocket wheel 8 respectively, and then can drive first by motor 7 Sprocket wheel 5, the 8th sprocket wheel 37 synchronize rotation, and power plant is few, save energy consumption.Top is fixedly mounted in 20 top surface of connecting plate The dress paint case 48 of opening.Pedestal 1 is moved into front of a face interior wall, 2 top inner wall activity installation first gear 3 of cavity, Second gear 4, first gear 3 engage cooperation with second gear 4, and the first sprocket wheel 5 is fixedly mounted in 3 rotary shaft bottom end of first gear, 1 rear portion bottom end of pedestal is fixedly mounted support plate 6, and motor 7 is installed in 6 top surface of support plate, and the rotary shaft top of motor 7 is fixedly mounted the Two sprocket wheels 8 are flexibly connected between first sprocket wheel 5 and the second sprocket wheel 8 by the first chain 9, and the work of motor 7 makes the second sprocket wheel 8 revolve Turn, and then drive the rotation of the first sprocket wheel 5, and synchronous drive first gear 3, second gear 4 rotate, 4 rotary shaft bottom of second gear It holds and the first helical gear 10 is installed, it is movable in cavity 2 that two shafts 11 are installed, third sprocket wheel 12, second is installed in every shaft 11 Helical gear 13, the first helical gear 10 engage cooperation with the second helical gear 13, and energy band turn axis 11 rotates, third sprocket wheel 12 and first The 4th sprocket wheel 16 in connecting shaft 152 is connected by the second chain 17, and then the first connecting shaft 152 can be driven to rotate, and band Dynamic roller 151 rotates, and to make pedestal 1 be moved, vertical multistage retractable rod is fixedly mounted in 8 rotary shaft top of the second sprocket wheel 18, the 6th helical gear 47 is fixedly mounted in 18 top of multistage retractable rod, and scissors mechanism 19, scissors mechanism are hingedly installed in 1 top surface of pedestal Connecting plate 20 is hingedly installed on 19 tops, and starting stave 21, the second riser 22, starting stave 21 and second are installed in 20 top surface of connecting plate Riser 22 is mutually perpendicular to, and the 8th sprocket wheel 37 is installed in the 22 forward, central part activity of the second riser, and the rotation shaft rear end of the 8th sprocket wheel 37 is solid Dingan County fills the 5th helical gear 46, and the 5th helical gear 46 engages cooperation with the 6th helical gear 47, and 8 rotational energy of the second sprocket wheel drives multistage Telescopic rod 18 carries out rotation, and passes through the cooperation of engaging of the 5th helical gear 46 and the 6th helical gear 47, the 8th sprocket wheel of synchronous drive 37 rotations, the 7th sprocket wheel 34 of activity installation, two the 7th sprocket wheels 34 pass through the 4th chain 35 to 22 front both sides of the second riser respectively Connection, the 8th sprocket wheel 37 engage cooperation with the 4th chain 35, and then 37 rotational energy of the 8th sprocket wheel drive, two the 7th sprocket wheels 37, the Four chains 35 rotate, and one end of fixed link 43 are fixedly connected on the 4th chain 35, the other end side of fixed link 43 opens up first Through-hole 44, respectively the 5th sprocket wheel 23, the rotary shaft of two the 5th sprocket wheels 23 are installed in activity to the opposite face of two pieces of starting staves 21 Disk 24 is respectively fixedly mounted in opposite end, is fixedly connected by two guide rods 27 between two disks 24, every guide rod Cooperation is equipped with guide sleeve 28 on 27, and is fixedly connected by strip plate 29 between two guide sleeves 28, is installed behind strip plate 29 Two pieces of fixed blocks 32 are flexibly connected by rotation axis 33 between two pieces of fixed blocks 32, and rotation axis 33 passes through first through hole 44, rotation Axis 33 is mutually perpendicular to fixed link 43, and then the 4th chain 35 can drive fixed link 43 to move, and drives strip plate 29 along guiding Bar 27 moves, and lower two first telescopic rods 30 are installed in 29 front of strip plate, pass through rolling between two first telescopic rod, 30 front ends Cylinder 31 connects, and then the reciprocating movement of strip plate 29 can drive the reciprocating movement of roller 31, and mopping operation is carried out to metope, to Roller 31 carries out mopping operation to metope while pedestal 1 is moved along metope;After paint on roller 31 is reduced, the rotation of the 8th sprocket wheel 37 Second telescopic rod 38 of shaft front end is shunk, and horizon bar 52,52 front both sides of horizon bar are fixedly mounted in 38 front end of the second telescopic rod First through hole 44 is opened up respectively, the second connecting shaft 39 of 34 rotary shaft front end of each 7th sprocket wheel can pass through first through hole 44, and 52 back both sides of horizon bar the 4th helical gear 41 of activity installation respectively, the second connecting shaft 39 can across the 4th helical gear 41, the 4th Cross inserted block 42 is installed in 41 rear end of helical gear, and the front end of each 7th sprocket wheel 34 opens up cross slot 36, the second telescopic rod 38 shrink the 4th helical gear 41 of drive moves to 34 direction of the 7th sprocket wheel, and cross inserted block 42 is made to be inserted into cross slot 36 Interior, 34 rotational energy of the 7th sprocket wheel drives the rotation of the 4th helical gear 41, and the 4th helical gear 41 is engaged with third helical gear 40 at this time matches It closes, third helical gear 40 is installed in the rotary shaft of the 6th sprocket wheel 25, passes through third between the 6th sprocket wheel 25 and the 5th sprocket wheel 23 Chain 26 connects, and then 41 rotational energy of the 4th helical gear drives the 5th sprocket wheel 23 to rotate and disk 24 is driven to rotate, and makes roller 31 Downward, and the first telescopic rod 30 stretches, and so that roller 31 is stretched in dress paint case 48 and carries out gluing paint again, then inverted repeat Above-mentioned steps make roller 31 be again at vertical state, then proceed to carry out mopping operation to metope.The present invention passes through an electricity Machine 7 can drive the movement of the movement and roller 31 of pedestal 1, and then in mopping operation without human intervention, reduce labour Intensity also avoids paint from adhering on clothes, while also reducing harm of the paint to personnel during painting, and reduces power Device, save energy consumption, and roller 31 overturning towards roof when, also can to roof carry out mopping operation, without people Member ascends a height by other ancillary equipments to be painted, and dangerous, raising safety is reduced.It can be to connecting plate by scissors mechanism 19 20 carry out height adjusting, and then can paint entire metope.Rotation axis 33 passes through the second through-hole 45, rotation axis 33 and fixation Bar 43 is mutually perpendicular to, and strip plate 29 is enable to be rotated, and can also be moved horizontally, and then roller 31 can be made to be in vertical shape State or roller 31 be in horizontality and upward when carry out mopping operation, and roller 31 is in horizontality and downward When, viscous paint operation is carried out, makes to be again filled with paint on roller 31, then carries out mopping operation.
Specifically, the rear end of the connecting plate 20 described in the present embodiment is respectively fixedly mounted with the rear end of pedestal 1 and connect Ball bearing 50 is fixedly mounted in the rear end of block 49, every piece of link block 49, and multistage retractable rod 18 can pass through ball bearing 50.Multistage retractable rod It is connected by link block 49, ball bearing 50 between 18 and connecting plate 20, pedestal 1, multistage retractable rod 18 can be made to keep vertical shape State prevents multistage retractable rod 18 from tilting, keeps structure more stable, using effect is more preferable.
Specifically, being fixedly connected by fixed link 51 between two first telescopic rods 30 described in the present embodiment.Two It is fixedly connected by fixed link 51 between one telescopic rod 30, when two first telescopic rods 30 being made to be in horizontality, stress is more Uniformly, structure is more stable.
Further, push rod 14 is fixedly mounted in the side of the pedestal 1 described in the present embodiment.The side of pedestal 1 is fixedly mounted Push rod 14, it is more convenient in use convenient for manually pushing pedestal 1 to be moved.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, it will be understood by those of ordinary skill in the art that:It still may be used With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features; And these modifications or replacements, various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (4)

1. the quick mopping device of metope, it is characterised in that:Including pedestal(1), pedestal(1)Inside open up cavity(2), cavity(2)Top The first gear for holding inner wall activity installation horizontal(3), first gear(3)Both sides be respectively equipped with horizontal second gear(4), the Two gears(4)Rotary shaft top and cavity(2)The flexible connection of top inner wall, first gear(3)With second gear(4)Engagement Cooperation, first gear(3)Rotary shaft bottom end the first horizontal sprocket wheel is fixedly mounted(5), pedestal(1)Rear portion bottom end fix peace Fill horizontal support plate(6), support plate(6)Motor is fixedly mounted in the middle part of top surface(7), motor(7)Rotary shaft top fix peace Fill the second horizontal sprocket wheel(8), the first sprocket wheel(5)With the second sprocket wheel(8)Between pass through the first chain(9)Flexible connection, first Chain(9)Pedestal can be passed through(1), each second gear(4)Rotary shaft bottom end the first horizontal helical gear is fixedly mounted(10), Cavity(2)Two shafts are installed by bearing activity respectively between the inner wall of rear and front end(11), two shafts(11)It is located at Cavity(2)Both sides, every shaft(11)Vertical third sprocket wheel is fixedly mounted in middle part(12), every shaft(11)Upper fixed peace The second vertical helical gear of dress(13), the second helical gear(13)Positioned at third sprocket wheel(12)Rear, pedestal(1)Bottom part down Both sides are respectively equipped with one group of roller group(15), every group of roller group(15)By two idler wheels(151), first connecting shaft(152)、 Two wheel carriers(153)Composition, every group of roller group(15)In two idler wheels(151)It is fixedly mounted on the first connecting shaft(152)On, Every group of roller group(15)In two idler wheels(151)It is located at the first connecting shaft(152)Rear and front end, every group of roller group (15)In the first connecting shaft(152)Positioned at two wheel carriers(153)Between, the first connecting shaft(152)Rear and front end respectively with Wheel carrier(153)Bottom end flexible connection, wheel carrier(153)Top and pedestal(1)Bottom surface be fixedly connected, every first connecting shaft (152)Middle part the 4th vertical sprocket wheel is fixedly mounted(16), it is located at pedestal(1)The third sprocket wheel of the same side(13)With the 4th chain Wheel(16)Pass through second chain(17)Flexible connection, the second chain(17)Pedestal can be passed through(1), the second sprocket wheel(8)Rotation Vertical multistage retractable rod is fixedly mounted in shaft top(18), pedestal(1)Top surface scissors mechanism is hingedly installed(19), scissor machine Structure(19)Top horizontal connecting plate is hingedly installed(20), connecting plate(20)Top surface both sides starting stave is fixedly mounted respectively (21), connecting plate(20)Top surface rear end be fixedly mounted the second riser(22), the second riser(22)With starting stave(21)Mutually Vertically, starting stave(21)With the second riser(22)It is fixedly connected, two pieces of starting staves(21)Opposite face in the middle part of respectively activity The 5th vertical sprocket wheel of installation(23), two the 5th sprocket wheels(23)Rotary shaft opposite end vertical disk is fixedly mounted respectively (24), the 5th sprocket wheel(23)Positioned at starting stave(21)Front end, two pieces of starting staves(21)Opposite face respectively activity installation 6th sprocket wheel(25), the 6th sprocket wheel(25)Positioned at the 5th sprocket wheel(23)Rear, two the 6th sprocket wheels(25)Rotary shaft it is opposite Third helical gear is fixedly mounted in end respectively(40), it is located at same starting stave(21)On the 5th sprocket wheel(23)With the 6th sprocket wheel (25)Between pass through third chain(26)Flexible connection, two disks(24)Between pass through two horizontal guide rods(27)It is fixed Connection, two guide rods(27)With disk(24)The center of circle it is symmetrical, every guide rod(27)Upper cooperation is equipped with guide sleeve (28), two guide sleeves(28)Between pass through strip plate(29)It is fixedly connected, long strip block(29)Before upper and lower ends it is solid respectively The first horizontal telescopic rod of Dingan County's dress(30), two first telescopic rods(30)Pass through vertical roller between front end(31)Activity is even It connects, strip plate(29)Behind middle part be fixedly mounted two pieces of fixed blocks(32), two pieces of fixed blocks(32)Between pass through horizontal turn Moving axis(33)Flexible connection, the second riser(22)Before both sides respectively activity installation the 7th sprocket wheel(34), two the 7th sprocket wheels (34)Between pass through the 4th chain(35)Flexible connection, each 7th sprocket wheel(34)Before open up cross slot(36), Second riser(22)Forward, central part activity install the 8th sprocket wheel(37), the 8th sprocket wheel(37)Rotary shaft and the 7th sprocket wheel(34)Rotation Shaft is located in same level, the 8th sprocket wheel(37)It can be with the 4th chain(35)Engagement cooperation, the 8th sprocket wheel(37)Rotation The second horizontal telescopic rod is fixedly mounted in axis front end(38), the second telescopic rod(38)Horizontal horizon bar is fixedly mounted in front end (52), each 7th sprocket wheel(34)Rotary shaft front end the second horizontal connecting shaft is fixedly mounted(39), horizon bar(52)Before Side both sides open up first through hole respectively(44), every second connecting shaft(39)A corresponding first through hole can be passed through(44), water Flat bar(52)Back both sides respectively activity installation the 4th helical gear(41), the second connecting shaft(39)The 4th helical gear can be passed through (41), each 4th helical gear(41)Rear end cross inserted block is fixedly mounted(42), cross inserted block(42)Ten can be inserted into Font slot(36)It is interior, each 4th helical gear(41)It can be with a corresponding third helical gear(40)Engagement cooperation, the 4th chain Item(35)On be fixedly connected with horizontal fixed link(43)One end, fixed link(43)The side of the other end opens up the second through-hole (45), rotation axis(33)The second through-hole can be passed through(45), rotation axis(33)With fixed link(43)It is mutually perpendicular to, the 8th sprocket wheel(37) Rotation shaft rear end can pass through the second riser(22), the 8th sprocket wheel(37)Rotation shaft rear end be fixedly mounted the 5th helical gear (46), the 5th helical gear is located at the second riser(22)Rear, multistage retractable rod(18)The 6th helical gear is fixedly mounted in top (47), the 6th helical gear(47)It can be with the 5th helical gear(46)Engagement cooperation, connecting plate(20)Open top is fixedly mounted in top surface Dress paint case(48).
2. the quick mopping device of metope according to claim 1, it is characterised in that:The connecting plate(20)Rear end with Pedestal(1)Rear end link block is respectively fixedly mounted(49), every piece of link block(49)Rear end be fixedly mounted ball bearing(50), Multistage retractable rod(18)Ball bearing can be passed through(50).
3. the quick mopping device of metope according to claim 1, it is characterised in that:Two first telescopic rods(30) Between pass through fixed link(51)It is fixedly connected.
4. the quick mopping device of metope according to claim 1, it is characterised in that:The pedestal(1)Side fix Push rod is installed(14).
CN201810234884.5A 2018-03-21 2018-03-21 Quick wall painting device Expired - Fee Related CN108547434B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810234884.5A CN108547434B (en) 2018-03-21 2018-03-21 Quick wall painting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810234884.5A CN108547434B (en) 2018-03-21 2018-03-21 Quick wall painting device

Publications (2)

Publication Number Publication Date
CN108547434A true CN108547434A (en) 2018-09-18
CN108547434B CN108547434B (en) 2020-04-03

Family

ID=63516920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810234884.5A Expired - Fee Related CN108547434B (en) 2018-03-21 2018-03-21 Quick wall painting device

Country Status (1)

Country Link
CN (1) CN108547434B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138382A (en) * 2018-09-28 2019-01-04 龙伟 A kind of architectural engineering interior decoration lime brush coating device
CN110306763A (en) * 2019-07-15 2019-10-08 诸暨欧亿自动化设备有限公司 A kind of architectural coating paste materials application device
CN113759190A (en) * 2021-07-27 2021-12-07 国网电力科学研究院有限公司 Wireless receiving module adjusting device that charges

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB247256A (en) * 1925-08-26 1926-02-18 Charles Downs Apparatus for plastering ceilings, walls and the like
US5578327A (en) * 1993-08-16 1996-11-26 Tan; Tah H. Plastering machine
CN104120863A (en) * 2014-07-25 2014-10-29 武汉理工大学 Multifunctional environment-friendly and coating-saving wall painting machine
CN105926908A (en) * 2016-06-23 2016-09-07 福建工程学院 Novel automatic-feeding intelligent cement paint whitewashing machine
CN206458047U (en) * 2016-12-31 2017-09-01 山东省建筑科学研究院 A kind of automatic roller coating device
CN206607818U (en) * 2017-03-24 2017-11-03 王佳丽 A kind of Multifunction wall processing unit
CN107355063A (en) * 2017-08-30 2017-11-17 浙江工业大学 A kind of wall painting machine
CN207092488U (en) * 2017-08-12 2018-03-13 深圳中壹建设工程有限公司 A kind of automatic plastering machine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB247256A (en) * 1925-08-26 1926-02-18 Charles Downs Apparatus for plastering ceilings, walls and the like
US5578327A (en) * 1993-08-16 1996-11-26 Tan; Tah H. Plastering machine
CN104120863A (en) * 2014-07-25 2014-10-29 武汉理工大学 Multifunctional environment-friendly and coating-saving wall painting machine
CN105926908A (en) * 2016-06-23 2016-09-07 福建工程学院 Novel automatic-feeding intelligent cement paint whitewashing machine
CN206458047U (en) * 2016-12-31 2017-09-01 山东省建筑科学研究院 A kind of automatic roller coating device
CN206607818U (en) * 2017-03-24 2017-11-03 王佳丽 A kind of Multifunction wall processing unit
CN207092488U (en) * 2017-08-12 2018-03-13 深圳中壹建设工程有限公司 A kind of automatic plastering machine
CN107355063A (en) * 2017-08-30 2017-11-17 浙江工业大学 A kind of wall painting machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138382A (en) * 2018-09-28 2019-01-04 龙伟 A kind of architectural engineering interior decoration lime brush coating device
CN109138382B (en) * 2018-09-28 2020-08-04 瑞安市佰德装饰工程有限公司 Lime slurry brushing device for interior decoration of building engineering
CN110306763A (en) * 2019-07-15 2019-10-08 诸暨欧亿自动化设备有限公司 A kind of architectural coating paste materials application device
CN113759190A (en) * 2021-07-27 2021-12-07 国网电力科学研究院有限公司 Wireless receiving module adjusting device that charges

Also Published As

Publication number Publication date
CN108547434B (en) 2020-04-03

Similar Documents

Publication Publication Date Title
CN108547434A (en) The quick mopping device of metope
CN108967143A (en) A kind of summer gardens are with from traveling swing type sprinkler
CN107138313B (en) A kind of leather shoes manufacture station-service high efficiency spray-painting plant
CN106963246B (en) A kind of automatic roast device
CN111624025A (en) Soil sampling device with adjustable environmental monitoring is used
CN107553676B (en) Surface archaizing furniture processing unit (plant)
CN108086681A (en) A kind of building template surface cleaning equipment
CN108146813A (en) A kind of cosmetic packaging box
CN115318506A (en) Household plate paint spraying device
CN107600480B (en) Garment production processes transmission device
CN108996266A (en) A kind of constructing tunnel transport structure
CN208491498U (en) Edible mushroom multiple layer up-down bidirectional swinging Tui Kuang mechanism
CN114308478A (en) Lime coating brushing device based on forestry planting pest control
CN206140512U (en) Material device is held in hand to truss machinery
CN108162675A (en) A kind of field sketching multifunction drawing board
CN104481199A (en) Vehicle-mounted tent lifting device
CN106334979B (en) House decoration putty grinding device
CN110273279B (en) Electric clothes hanger
CN210244938U (en) Mobilizable culture art exchanges exhibition frame
CN108480255A (en) A kind of interior decoration cleaning robot
CN108458300A (en) A kind of pendent lamp with automatically cleaning effect
CN108405386A (en) A kind of desk lamp processing equipment
CN209931434U (en) Cleaning device before organic vegetable packaging of greenhouse
CN209244037U (en) High-rise curtain wall cleaning plant
CN106272980B (en) A kind of mosaic tiles scratch removal device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200403

CF01 Termination of patent right due to non-payment of annual fee